Attachment 4 AF66 VKAG 10-1042E.pdf
PDF 87 KB Posted
- Attached to
- Repair Lighting for Ammo Area Federal contract opportunity
- Solicitation number
- FA4809-11-R-0002
About this file
Attachment 4 AF Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and answers 8 Feb 11.docx | DOCX document | |
| Questions and answers 4 Feb 11.docx | DOCX document | |
| Questions and Answers 1 Feb 11.docx | DOCX document | |
| Revised Drawing Sheet E-1.pdf | ||
| Amendment 0001.doc | DOC document | |
| Site Visit.pdf | ||
| 11-R-0002.doc | DOC document | |
| Cover Sheet and Instructions.doc | DOC document | |
| Attachment 1 SPECIFICATIONS VKAG 10-1042E .doc | DOC document | |
| Attachment 7 Facility Inspection Assessment Letter.pdf | ||
| Attachment 3 DOR.doc | DOC document | |
| Attachment 6 Construction Cost Estimate Breakdown.pdf | ||
| Attachment 2 Wage Determination.docx | DOCX document | |
| Attachment 5 Sheet 2 of 2 KAG 10-1042E E-1.pdf | ||
| Attachment 5 Sheet 1 of 2 VKAG 10-1042E G-1.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL CODES: A: 30 DAYS AFTER NTP B: DURING CONSTRUCTION
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
VKAG101042E Repair Lighting For Ammo Area
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C
M P
LI
A
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
LE
S
C O
LO
R
S E
LE
C
T
IO
N
M A
N U
F A
C T
U R
E R
'S
IN
S
T R
U C
T
IO
N S
M A
N U
F A
C T
U R
E
'S
W A
R R
A N
T Y
C A
T A
LO
G
D A
T A
O P
E R
A T
G
T R
U C
T
IO
N S
M A
IN
T
E N
A N
C E
D A
T A
S U
B M
IT
T
A L
C O
D E
R E
Q U
IR
E
D
U
B M
IS
S
IO
N
D A
T E
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
N
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
S U
B M
IT
T
A L
N U
M B
E
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
APPROVED DISAPPROVED
TRAINING CERTIFICATES
1 SPEC SECTION 01560 3 A
PARA 3
SOLID WASTE REPORT
2 SPEC SECTION 01560 2 B
PARA 8.B
HAZ. MATERIAL USAGE FORM
3 SPEC SECTION 01560 3 B
PARA 9
PRE-REMOVAL PLAN
4 SPEC SECTION 02051 3 A
PARA 4.1
AIR MONITORING REPORTS
5 SPEC SECTION 02051 3 B
PARA 4.2
TRAINING CERTIFICATES
6 SPEC SECTION 02051 3 A
PARA 4.3
RETURN MANIFEST
7 SPEC SECTION 02051 3 B
PARA 4.4
INDUCTION LUMINAIRES
8 SPEC SECTION 16530 3 A
PARA 1.3.A
INDUCTION LUMINAIRES
9 SPEC SECTION 16530 3 A
PARA 1.3.B
INDUCTION LUMINAIRES
10 SPEC SECTION 16530 3 A
PARA 1.3.C
INDUCTION LUMINAIRES
11 SPEC SECTION 16530 3 A
PARA 1.4.A
INDUCTION LUMINAIRES
12 SPEC SECTION 16530 3 A
PARA 1.5.A
SCHEDULE OF MATERIAL SUBMITTALS
DATE
CONTRACTOR
NOTIFIED
File details come from the government source that posted it. Updated .