Atch 2-Proposal Price Breakout Sheet.xlsx

XLSX spreadsheet 75 KB Posted

Attached to
Family Camp RV Parking Expansion
Solicitation number
FA480325B001
Issued by

About this file

The file is a Proposal Price Breakout Sheet for a base year contract related to repair and maintenance of base pavements. The document provides a detailed line-item breakdown of construction and site work tasks, including site preparation, earthwork, clearing and grubbing, erosion control, storm water management, asphalt paving, concrete work, and landscaping. Specific line items cover activities such as mobilization, utility services, excavation, tree removal, road construction, erosion control, manhole installation, asphalt placement, crack sealing, concrete curb and gutter work, and sodding.

The associated federal contract opportunity is for the Shaw Air Force Base Family Camp RV Parking Expansion, a non-appropriated fund project valued between $250,000 and $500,000. The project requires adding 14 recreational vehicle parking spaces, including asphalt drive, electrical systems, concrete RV pads, water, and sewer infrastructure. The solicitation (FA480325B001) is issued by the Department of the Air Force Air Combat Command, with proposal submissions due on Monday, 07 April 2025, at 2:00 PM EST, and offer packages to be opened on Wednesday, 09 April 2025, at 10:00 AM EST.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year (CLIN 0001)

Exihibit AExhibit A
Contract:
REPAIR BASE PAVEMENTSPage 1 of 5 (See Tabs)
Base Year (CLIN 0001)
DescriptionU/IEstimated QuantityUnit PriceLine Total
SITE WORK/GENERAL TASK
AAMobilization per Delivery Order,EA$3,572.02$0.00
ABBack fill (Unwashed Sand)TON$18.75$0.00
ACBack fill (Flowable Fill)CY$112.53$0.00
ADBack fill (Pea Gravel)TON$15.49$0.00
AE4 inch sewer line serviceLF$41.67$0.00
AF4 inch electrical conduitLF$17.86$0.00
AGWater line service up to two inchLF$41.67$0.00
AHHaulingCY$5.95$0.00
AIKey Stone Retaining Wall with Back Fill and footingsLF$38.10$0.00
AJUtility Boring, Horizontal, 6 in dia.LF$148.83$0.00
AKUtility Boring, Horizontal, 24 in dia.LF$351.25$0.00
ALCross tie timber walls/max 48"HSF$14.28$0.00
AMTop Soil 4 inches thick and spreadSY$3.29$0.00
EARTH WORK
ANSand Clay FillCY$14.28$0.00
AOSurface PreparationSY$1.36$0.00
APSubgrade Preparation +or-3"SY$5.67$0.00
AQUnclassified Excavation including haul off siteCY$18.68$0.00
CLEARING AND GRUBBING
ARClearing and grubbing/all roots and stumps1-500 ACRESACRE$5,953.38$0.00
ASRemove Trees 6 " to 12 "EA$297.67$0.00
ATRemove Trees 12 " to 18 "EA$475.97$0.00
AURemove Trees 18 " to 28 "EA$595.33$0.00
EROSION CONTRTOL
AVErosion Control Temporary Seeding /Acre 1-500ACRE$1,666.94$0.00
AWSilt Fence Erosion Control Temporary Seeding 1 to 2500LF$4.16$0.00
AXAnchored Straw BaleEA$10.12$0.00
STORM WATER
AYHeadwalls 8 inch Thick x 15 Long x 5' H RPCCCY$351.25$0.00
AZ4' Dia. Manhole 6 ' Deep precast concrete w/frame & coverEA$2,262.29$0.00
BA18 Inch RCP Class IIILF$47.63$0.00
BB24 Inch RCP Class IIILF$50.01$0.00
BC36 Inch RCP Class IIILF$57.16$0.00
BDReset Valve BoxEA$59.53$0.00
BE4" Plastic Under drain with SockLF$11.31$0.00
BFConvert Inlets w/frame and grateEA$952.55$0.00
BGFlorida Catch BasinEA$2,381.36$0.00
ASPHALT PAVING
BHAsphalt EmulsionSY$2.16$0.00
BIPetrotac FabricSF$5.95$0.00
BJHand Asphalt PlacementTON$333.39$0.00
BKSlurry SealSY$5.41$0.00
BLPot Hole Repair (per/SY)SY$105.97$0.00
BMCrack SealLF$2.49$0.00
BN6 inch SABC # 1 Base CourseTON$34.85$0.00
BO3 inch AC Binder CourseTON$267.63$0.00
BPAC Surface Course Per InchTON$153.11$0.00
BQSurface SterilizationSY$1.19$0.00
BRAsphalt Pavement Removal Per Inch thickness (asphalt) 1 to 25,000.00SY$2.48$0.00
BSreflective yellow/with layoutSF$1.57$0.00
BTreflective white/with layoutSF$1.57$0.00
BUPrime CoatSY$0.91$0.00
BVHaul Spread Asphalt MillingsTON$11.90$0.00
BWDemo Curb & GutterLF$10.71$0.00
BXHooded Catch basin 2x3x4EA$2,143.21$0.00
BYSlurry seal EmulsionSY$5.41$0.00
BZRem /Reinstall wheel stopsEA$47.63$0.00
CANew Wheel StopsEA$95.25$0.00
CBSawcutting asphalt to 4" 1 to 1000LF$4.97$0.00
CCReservedN/A$0.00
CDDemo Wheel StopsEA$23.82$0.00
$0.00
GRASSING$0.00
CEBermuda Sod 419SY$6.55$0.00
CFHydro seed large area's 80,000 to 350,000SY$0.56$0.00
CGCentipede SodSY$6.55$0.00
CHHydroseed and Finish Grade 1 to 80,000SY$0.64$0.00
CONCRETE PAVING
CINew 24 Inch Concrete Curb and GutterLF$21.78$0.00
CJReplace 24 inch Concrete Curb and GutterLF$36.72$0.00
CKRemove and Replace Sidewalk 4" thick (0-200 SF)SF$17.86$0.00
CLRemove and Replace Sidewalk 4" thick (over 200 SF)SF$8.93$0.00
CMNew Sidewalk 4 Inches (0-200 SF)SF$8.34$0.00
CNNew Side Walk 4 Inches Thick (over 200 SF)SF$7.14$0.00
COInstall 650 flex PCC pavement 14" thick>5000<10000SY$85.14$0.00
CPInstall 650 flex PCC pavement 14" thick>1000<5000SY$93.18$0.00
CQInstall 650 flex PCC pavement 14" thick>1<1000SY$121.22$0.00
CRPartial depth spall repairs-epoxy bonded PCCSF$149.39$0.00
CSFull depth (up to T=14") spall repairSF$160.74$0.00
CTProvide/install 1" dia smooth dowels-24"L,drill&epoxyEA$16.19$0.00
CUProvide/install 1-1/2" dia smooth dowels-24"L,drill&epoxyEA$21.16$0.00
CVProvide/install #3 rebars, 0.376LBS/LFPND$1.19$0.00
CWProvide/install #4 rebars, 0.668LBS/LFPND$2.38$0.00
CXProvide/install #5 rebars, 1.043LBS/LFPND$2.38$0.00
CYProvide/install #5 deformed tie bars-2.5' L (new pavement)EA$8.64$0.00
CZProvide/install 3/4" dia smooth dowels-24"L (new pavement)EA$8.64$0.00
DAProvide/install 1" dia smooth dowels-24"L (new pavement)EA$8.64$0.00
DBProvide/install 1-1/2" dia smooth dowels-24"L (new pavement)EA$16.68$0.00
DCProvide/install expansion joint 3/4" corkSF$10.71$0.00
DDProvide/install expansion joint 1-1/2" corkSF$20.86$0.00
DEProvide & install aircraft tie-downEA$595.33$0.00
DFWeld wire mesh W2.5 x W2.5SF$1.92$0.00
DGConcrete joint resealing incl backer mat'l replacementLF$6.49$0.00
DHCrack routing/sealing (PCC) using crack sawLF$11.02$0.00
DICrack routing/sealing (PCC) using crack saw (up to 2"W)LF$15.49$0.00
DJSaw cut reservoir then provide & install joint sealant & backer mat'lLF$6.49$0.00
DKJoint seal neopherene compression sealLF$6.49$0.00
DLSawcutting concrete to 4" 1 to 1000LF$4.75$0.00
DMSawcutting concrete full depth / LF inchLF$1.48$0.00
DNConcrete Driveways 4" thick 1 to 100 SQ-YD, fiber mesh reinforced with 6 inch thickened edge see detail in Section 03300SY$71.43$0.00
DOExpansion Board 4" wide (fiber) 1/2 thickLF$4.75$0.00
DPExpansion Board 14" wide (Cork) 1/2 thickLF$10.71$0.00
DQJoint sealer 1/2" wide with backer rod 1 to 100000 LF(Silicone) to include green saw and widen jointLF$10.71$0.00
DRJoint sealer 1/2" wide with backer rod 10000 to 50000 LF(Silicone) to include green saw and widen jointLF$6.37$0.00
DSRemove Concrete Pavement 1" to 6 thick with disposalSY$17.86$0.00
DTRemove Concrete Pavement 6" to 14" thick with disposalSY$17.43$0.00
DUInstall 650 Flex concrete PCC per inch thickness per Square Yard to include white pigmented curing compoundSY$9.02$0.00
PAVEMENT MARKINGS
DVPaint Removal Air Field 0to 50,000 SFSF$2.26$0.00
DWPaint Removal Air Field 50,000to 100,000 SFSF$2.11$0.00
DXPaint Removal Air Field 100,000 to InfinitySF$1.72$0.00
DYRubber Removal Airfield 0 to 400,000SF$0.15$0.00
DZreflective yellow/with layout >10000 <50000SF$1.60$0.00
EAReflective white/with layout <10000SF$1.60$0.00
EBreflective white/with layout >10000 <500000SF$1.44$0.00
ECBlack Non Reflective >5000 <100000SF$1.23$0.00
EDYellow Non Reflective >10000<75,000SF$1.44$0.00
EERed Non Reflective <5000SF$1.42$0.00
EFRed Non Reflective >5000 <75000SF$1.23$0.00
Chain Link Fence& Gates
EG4 foot Chain link fenceLF$16.00$0.00
EH7 foot Chain link fence with 3 strands barbed wireLF$45.25$0.00
EIDouble Gate's with 25x4foot clear openingEA$650.00$0.00
EJDouble Gate's with 25x7 foot clear opening with 3 strands barbed wireEA$2,053.91$0.00
EKPersonal Gate 4 x 4 foot high clear openingEA$250.00$0.00
ELPersonal Gate 4 x 7 foot high clear opening with 3 strands barbed wire.EA$458.40$0.00

$0.00

Option Year 1 (CLIN 1001)

Exihibit AExhibit A
Contract:
REPAIR BASE PAVEMENTSPage 2 of 5 (See Tabs)
Option Year 1 (CLIN 1001)
DescriptionU/IEstimated QuantityUnit PriceLine Total
SITE WORK/GENERAL TASK
AAMobilization per Delivery Order,EA$3,643.46$0.00
ABBack fill (Unwashed Sand)TON$19.13$0.00
ACBack fill (Flowable Fill)CY$114.78$0.00
ADBack fill (Pea Gravel)TON$15.80$0.00
AE4 inch sewer line serviceLF$42.50$0.00
AF4 inch electrical conduitLF$18.22$0.00
AGWater line service up to two inchLF$42.50$0.00
AHHaulingCY$6.07$0.00
AIKey Stone Retaining Wall with Back Fill and footingsLF$38.87$0.00
AJUtility Boring, Horizontal, 6 in dia.LF$151.81$0.00
AKUtility Boring, Horizontal, 24 in dia.LF$358.28$0.00
ALCross tie timber walls/max 48"HSF$14.56$0.00
AMTop Soil 4 inches thick and spreadSY$3.35$0.00
EARTH WORK
ANSand Clay FillCY$14.56$0.00
AOSurface PreparationSY$1.40$0.00
APSubgrade Preparation +or-3"SY$5.78$0.00
AQUnclassified Excavation including haul off siteCY$19.24$0.00
CLEARING AND GRUBBING
ARClearing and grubbing/all roots and stumps1-500 ACRESACRE$6,072.44$0.00
ASRemove Trees 6 " to 12 "EA$303.62$0.00
ATRemove Trees 12 " to 18 "EA$485.49$0.00
AURemove Trees 18 " to 28 "EA$607.24$0.00
EROSION CONTRTOL
AVErosion Control Temporary Seeding /Acre 1-500ACRE$1,700.28$0.00
AWSilt Fence Erosion Control Temporary Seeding 1 to 2500LF$4.24$0.00
AXAnchored Straw BaleEA$10.32$0.00
STORM WATER
AYHeadwalls 8 inch Thick x 15 Long x 5' H RPCCCY$358.28$0.00
AZ4' Dia. Manhole 6 ' Deep precast concrete w/frame & coverEA$2,307.54$0.00
BA18 Inch RCP Class IIILF$48.58$0.00
BB24 Inch RCP Class IIILF$51.01$0.00
BC36 Inch RCP Class IIILF$58.30$0.00
BDReset Valve BoxEA$60.72$0.00
BE4" Plastic Under drain with SockLF$11.53$0.00
BFConvert Inlets w/frame and grateEA$971.60$0.00
BGFlorida Catch BasinEA$2,428.98$0.00
ASPHALT PAVING
BHAsphalt EmulsionSY$2.20$0.00
BIPetrotac FabricSF$6.07$0.00
BJHand Asphalt PlacementTON$340.06$0.00
BKSlurry SealSY$5.52$0.00
BLPot Hole Repair (per/SY)SY$108.09$0.00
BMCrack SealLF$2.54$0.00
BN6 inch SABC # 1 Base CourseTON$35.89$0.00
BO3 inch AC Binder CourseTON$272.98$0.00
BPAC Surface Course Per InchTON$157.70$0.00
BQSurface SterilizationSY$1.21$0.00
BRAsphalt Pavement Removal Per Inch thickness (asphalt) 1 to 25,000.00SY$2.56$0.00
BSreflective yellow/with layoutSF$1.60$0.00
BTreflective white/with layoutSF$1.60$0.00
BUPrime CoatSY$0.93$0.00
BVHaul Spread Asphalt MillingsTON$12.14$0.00
BWDemo Curb & GutterLF$10.93$0.00
BXHooded Catch basin 2x3x4EA$2,186.07$0.00
BYSlurry seal EmulsionSY$5.52$0.00
BZRem /Reinstall wheel stopsEA$48.58$0.00
CANew Wheel StopsEA$97.15$0.00
CBSawcutting asphalt to 4" 1 to 1000LF$5.12$0.00
CCReservedN/A$0.00$0.00
CDDemo Wheel StopsEA$24.29$0.00
$0.00
GRASSING$0.00
CEBermuda Sod 419SY$6.68$0.00
CFHydro seed large area's 80,000 to 350,000SY$0.57$0.00
CGCentipede SodSY$6.68$0.00
CHHydroseed and Finish Grade 1 to 80,000SY$0.65$0.00
CONCRETE PAVING
CINew 24 Inch Concrete Curb and GutterLF$22.43$0.00
CJReplace 24 inch Concrete Curb and GutterLF$37.82$0.00
CKRemove and Replace Sidewalk 4" thick (0-200 SF)SF$18.40$0.00
CLRemove and Replace Sidewalk 4" thick (over 200 SF)SF$9.11$0.00
CMNew Sidewalk 4 Inches (0-200 SF)SF$8.50$0.00
CNNew Side Walk 4 Inches Thick (over 200 SF)SF$7.28$0.00
COInstall 650 flex PCC pavement 14" thick>5000<10000SY$86.84$0.00
CPInstall 650 flex PCC pavement 14" thick>1000<5000SY$95.04$0.00
CQInstall 650 flex PCC pavement 14" thick>1<1000SY$123.64$0.00
CRPartial depth spall repairs-epoxy bonded PCCSF$153.87$0.00
CSFull depth (up to T=14") spall repairSF$163.96$0.00
CTProvide/install 1" dia smooth dowels-24"L,drill&epoxyEA$16.68$0.00
CUProvide/install 1-1/2" dia smooth dowels-24"L,drill&epoxyEA$21.79$0.00
CVProvide/install #3 rebars, 0.376LBS/LFPND$1.21$0.00
CWProvide/install #4 rebars, 0.668LBS/LFPND$2.42$0.00
CXProvide/install #5 rebars, 1.043LBS/LFPND$2.42$0.00
CYProvide/install #5 deformed tie bars-2.5' L (new pavement)EA$8.81$0.00
CZProvide/install 3/4" dia smooth dowels-24"L (new pavement)EA$8.81$0.00
DAProvide/install 1" dia smooth dowels-24"L (new pavement)EA$8.81$0.00
DBProvide/install 1-1/2" dia smooth dowels-24"L (new pavement)EA$17.01$0.00
DCProvide/install expansion joint 3/4" corkSF$10.93$0.00
DDProvide/install expansion joint 1-1/2" corkSF$21.49$0.00
DEProvide & install aircraft tie-downEA$607.24$0.00
DFWeld wire mesh W2.5 x W2.5SF$1.98$0.00
DGConcrete joint resealing incl backer mat'l replacementLF$6.62$0.00
DHCrack routing/sealing (PCC) using crack sawLF$11.24$0.00
DICrack routing/sealing (PCC) using crack saw (up to 2"W)LF$15.80$0.00
DJSaw cut reservoir then provide & install joint sealant & backer mat'lLF$6.62$0.00
DKJoint seal neopherene compression sealLF$6.62$0.00
DLSawcutting concrete to 4" 1 to 1000LF$4.85$0.00
DMSawcutting concrete full depth / LF inchLF$1.53$0.00
DNConcrete Driveways 4" thick 1 to 100 SQ-YD, fiber mesh reinforced with 6 inch thickened edge see detail in Section 03300SY$72.86$0.00
DOExpansion Board 4" wide (fiber) 1/2 thickLF$4.85$0.00
DPExpansion Board 14" wide (Cork) 1/2 thickLF$10.93$0.00
DQJoint sealer 1/2" wide with backer rod 1 to 100000 LF(Silicone) to include green saw and widen jointLF$10.93$0.00
DRJoint sealer 1/2" wide with backer rod 10000 to 50000 LF(Silicone) to include green saw and widen jointLF$6.50$0.00
DSRemove Concrete Pavement 1" to 6 thick with disposalSY$18.22$0.00
DTRemove Concrete Pavement 6" to 14" thick with disposalSY$17.96$0.00
DUInstall 650 Flex concrete PCC per inch thickness per Square Yard to include white pigmented curing compoundSY$9.29$0.00
PAVEMENT MARKINGS
DVPaint Removal Air Field 0to 50,000 SFSF$2.31$0.00
DWPaint Removal Air Field 50,000to 100,000 SFSF$2.15$0.00
DXPaint Removal Air Field 100,000 to InfinitySF$1.75$0.00
DYRubber Removal Airfield 0 to 400,000SF$0.15$0.00
DZreflective yellow/with layout >10000 <50000SF$1.63$0.00
EAReflective white/with layout <10000SF$1.63$0.00
EBreflective white/with layout >10000 <500000SF$1.47$0.00
ECBlack Non Reflective >5000 <100000SF$1.25$0.00
EDYellow Non Reflective >10000<75,000SF$1.47$0.00
EERed Non Reflective <5000SF$1.45$0.00
EFRed Non Reflective >5000 <75000SF$1.25$0.00
Chain Link Fence& Gates
EG4 foot Chain link fenceLF$16.32$0.00
EH7 foot Chain link fence with 3 strands barbed wireLF$46.16$0.00
EIDouble Gate's with 25x4foot clear openingEA$663.00$0.00
EJDouble Gate's with 25x7 foot clear opening with 3 strands barbed wireEA$2,094.99$0.00
EKPersonal Gate 4 x 4 foot high clear openingEA$255.00$0.00
ELPersonal Gate 4 x 7 foot high clear opening with 3 strands barbed wire.EA$467.57$0.00

$0.00

Option Year 2 (CLIN 2001)

Exihibit AExhibit A
Contract:
REPAIR BASE PAVEMENTSPage 3 of 5 (See Tabs)
Option Year 2 (CLIN 2001)
DescriptionU/IEstimated QuantityUnit PriceLine Total
SITE WORK/GENERAL TASK
AAMobilization per Delivery Order,EA$3,716.33$0.00
ABBack fill (Unwashed Sand)TON$19.51$0.00
ACBack fill (Flowable Fill)CY$117.08$0.00
ADBack fill (Pea Gravel)TON$16.11$0.00
AE4 inch sewer line serviceLF$43.35$0.00
AF4 inch electrical conduitLF$18.59$0.00
AGWater line service up to two inchLF$43.35$0.00
AHHaulingCY$6.19$0.00
AIKey Stone Retaining Wall with Back Fill and footingsLF$39.64$0.00
AJUtility Boring, Horizontal, 6 in dia.LF$154.84$0.00
AKUtility Boring, Horizontal, 24 in dia.LF$365.44$0.00
ALCross tie timber walls/max 48"HSF$14.85$0.00
AMTop Soil 4 inches thick and spreadSY$3.42$0.00
EARTH WORK
ANSand Clay FillCY$14.85$0.00
AOSurface PreparationSY$1.44$0.00
APSubgrade Preparation +or-3"SY$5.89$0.00
AQUnclassified Excavation including haul off siteCY$19.81$0.00
CLEARING AND GRUBBING
ARClearing and grubbing/all roots and stumps1-500 ACRESACRE$6,193.89$0.00
ASRemove Trees 6 " to 12 "EA$309.70$0.00
ATRemove Trees 12 " to 18 "EA$495.20$0.00
AURemove Trees 18 " to 28 "EA$619.38$0.00
EROSION CONTRTOL
AVErosion Control Temporary Seeding /Acre 1-500ACRE$1,734.28$0.00
AWSilt Fence Erosion Control Temporary Seeding 1 to 2500LF$4.33$0.00
AXAnchored Straw BaleEA$10.53$0.00
STORM WATER
AYHeadwalls 8 inch Thick x 15 Long x 5' H RPCCCY$365.44$0.00
AZ4' Dia. Manhole 6 ' Deep precast concrete w/frame & coverEA$2,353.69$0.00
BA18 Inch RCP Class IIILF$49.55$0.00
BB24 Inch RCP Class IIILF$52.03$0.00
BC36 Inch RCP Class IIILF$59.47$0.00
BDReset Valve BoxEA$61.94$0.00
BE4" Plastic Under drain with SockLF$11.76$0.00
BFConvert Inlets w/frame and grateEA$991.03$0.00
BGFlorida Catch BasinEA$2,477.56$0.00
ASPHALT PAVING
BHAsphalt EmulsionSY$2.24$0.00
BIPetrotac FabricSF$6.19$0.00
BJHand Asphalt PlacementTON$346.86$0.00
BKSlurry SealSY$5.63$0.00
BLPot Hole Repair (per/SY)SY$110.26$0.00
BMCrack SealLF$2.59$0.00
BN6 inch SABC # 1 Base CourseTON$36.97$0.00
BO3 inch AC Binder CourseTON$278.44$0.00
BPAC Surface Course Per InchTON$162.44$0.00
BQSurface SterilizationSY$1.24$0.00
BRAsphalt Pavement Removal Per Inch thickness (asphalt) 1 to 25,000.00SY$2.64$0.00
BSreflective yellow/with layoutSF$1.63$0.00
BTreflective white/with layoutSF$1.63$0.00
BUPrime CoatSY$0.95$0.00
BVHaul Spread Asphalt MillingsTON$12.38$0.00
BWDemo Curb & GutterLF$11.15$0.00
BXHooded Catch basin 2x3x4EA$2,229.79$0.00
BYSlurry seal EmulsionSY$5.63$0.00
BZRem /Reinstall wheel stopsEA$49.55$0.00
CANew Wheel StopsEA$99.10$0.00
CBSawcutting asphalt to 4" 1 to 1000LF$5.27$0.00
CCReservedN/A$0.00$0.00
CDDemo Wheel StopsEA$24.78$0.00
$0.00
GRASSING$0.00
CEBermuda Sod 419SY$6.81$0.00
CFHydro seed large area's 80,000 to 350,000SY$0.58$0.00
CGCentipede SodSY$6.81$0.00
CHHydroseed and Finish Grade 1 to 80,000SY$0.66$0.00
CONCRETE PAVING
CINew 24 Inch Concrete Curb and GutterLF$23.11$0.00
CJReplace 24 inch Concrete Curb and GutterLF$38.96$0.00
CKRemove and Replace Sidewalk 4" thick (0-200 SF)SF$18.95$0.00
CLRemove and Replace Sidewalk 4" thick (over 200 SF)SF$9.29$0.00
CMNew Sidewalk 4 Inches (0-200 SF)SF$8.67$0.00
CNNew Side Walk 4 Inches Thick (over 200 SF)SF$7.43$0.00
COInstall 650 flex PCC pavement 14" thick>5000<10000SY$88.58$0.00
CPInstall 650 flex PCC pavement 14" thick>1000<5000SY$96.95$0.00
CQInstall 650 flex PCC pavement 14" thick>1<1000SY$126.12$0.00
CRPartial depth spall repairs-epoxy bonded PCCSF$158.48$0.00
CSFull depth (up to T=14") spall repairSF$167.24$0.00
CTProvide/install 1" dia smooth dowels-24"L,drill&epoxyEA$17.18$0.00
CUProvide/install 1-1/2" dia smooth dowels-24"L,drill&epoxyEA$22.45$0.00
CVProvide/install #3 rebars, 0.376LBS/LFPND$1.24$0.00
CWProvide/install #4 rebars, 0.668LBS/LFPND$2.47$0.00
CXProvide/install #5 rebars, 1.043LBS/LFPND$2.47$0.00
CYProvide/install #5 deformed tie bars-2.5' L (new pavement)EA$8.98$0.00
CZProvide/install 3/4" dia smooth dowels-24"L (new pavement)EA$8.98$0.00
DAProvide/install 1" dia smooth dowels-24"L (new pavement)EA$8.98$0.00
DBProvide/install 1-1/2" dia smooth dowels-24"L (new pavement)EA$17.35$0.00
DCProvide/install expansion joint 3/4" corkSF$11.15$0.00
DDProvide/install expansion joint 1-1/2" corkSF$22.13$0.00
DEProvide & install aircraft tie-downEA$619.38$0.00
DFWeld wire mesh W2.5 x W2.5SF$2.04$0.00
DGConcrete joint resealing incl backer mat'l replacementLF$6.75$0.00
DHCrack routing/sealing (PCC) using crack sawLF$11.47$0.00
DICrack routing/sealing (PCC) using crack saw (up to 2"W)LF$16.11$0.00
DJSaw cut reservoir then provide & install joint sealant & backer mat'lLF$6.75$0.00
DKJoint seal neopherene compression sealLF$6.75$0.00
DLSawcutting concrete to 4" 1 to 1000LF$4.94$0.00
DMSawcutting concrete full depth / LF inchLF$1.57$0.00
DNConcrete Driveways 4" thick 1 to 100 SQ-YD, fiber mesh reinforced with 6 inch thickened edge see detail in Section 03300SY$74.32$0.00
DOExpansion Board 4" wide (fiber) 1/2 thickLF$4.94$0.00
DPExpansion Board 14" wide (Cork) 1/2 thickLF$11.15$0.00
DQJoint sealer 1/2" wide with backer rod 1 to 100000 LF(Silicone) to include green saw and widen jointLF$11.15$0.00
DRJoint sealer 1/2" wide with backer rod 10000 to 50000 LF(Silicone) to include green saw and widen jointLF$6.63$0.00
DSRemove Concrete Pavement 1" to 6 thick with disposalSY$18.59$0.00
DTRemove Concrete Pavement 6" to 14" thick with disposalSY$18.50$0.00
DUInstall 650 Flex concrete PCC per inch thickness per Square Yard to include white pigmented curing compoundSY$9.57$0.00
PAVEMENT MARKINGS
DVPaint Removal Air Field 0to 50,000 SFSF$2.35$0.00
DWPaint Removal Air Field 50,000to 100,000 SFSF$2.20$0.00
DXPaint Removal Air Field 100,000 to InfinitySF$1.79$0.00
DYRubber Removal Airfield 0 to 400,000SF$0.16$0.00
DZreflective yellow/with layout >10000 <50000SF$1.66$0.00
EAReflective white/with layout <10000SF$1.66$0.00
EBreflective white/with layout >10000 <500000SF$1.50$0.00
ECBlack Non Reflective >5000 <100000SF$1.28$0.00
EDYellow Non Reflective >10000<75,000SF$1.50$0.00
EERed Non Reflective <5000SF$1.48$0.00
EFRed Non Reflective >5000 <75000SF$1.28$0.00
Chain Link Fence& Gates
EG4 foot Chain link fenceLF$16.65$0.00
EH7 foot Chain link fence with 3 strands barbed wireLF$47.08$0.00
EIDouble Gate's with 25x4foot clear openingEA$676.26$0.00
EJDouble Gate's with 25x7 foot clear opening with 3 strands barbed wireEA$2,136.89$0.00
EKPersonal Gate 4 x 4 foot high clear openingEA$260.10$0.00
ELPersonal Gate 4 x 7 foot high clear opening with 3 strands barbed wire.EA$476.92$0.00

$0.00

Sheet2

Exihibit AExhibit A
Contract: VLSB 24-0019 FAMCAMP
REPAIR / REPLACE BASE INFRASTRUCTUREPage 2 of 2 (See Tabs)

Mobilization

Civil

Electrical

Water

Sewer

WiFi Poles

Supervision

Total

Direct Cost:
Total Line Item Cost:$ - 0
Overhead:$ - 0
Subtotal:$ - 0
Profit:$ - 0
Subtotal:$ - 0
Bond:$ - 0
Total Contract Price:$ - 0

File details come from the government source that posted it. Updated .