This is a pricing template spreadsheet for base pavement repair work, containing detailed line item pricing for various construction and repair tasks. The spreadsheet breaks down costs across multiple categories including site work, earthwork, clearing/grubbing, erosion control, storm water management, asphalt paving, grassing, and concrete paving work. Individual line items include unit prices for tasks such as mobilization ($3,572.02 per delivery order), various types of backfill materials, utility work, paving operations, and concrete installations.

The file is related to a NAFI solicitation (FA480325B001) for expanding Shaw Air Force Base Family Camp RV parking, which requires adding 14 RV spaces with asphalt drives, electrical systems, concrete pads, water, and sewer connections. The construction magnitude is between $250,000-$500,000, with offers due April 7, 2025 at 2:00 PM EST and bid opening scheduled for April 9, 2025 at 10:00 AM EST. A site visit was conducted on February 7, 2025.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year (CLIN 0001)

Exihibit AExhibit A
Contract:
REPAIR BASE PAVEMENTSPage 1 of 5 (See Tabs)
Base Year (CLIN 0001)
DescriptionU/IEstimated QuantityUnit PriceLine Total
SITE WORK/GENERAL TASK
AAMobilization per Delivery Order,EA$3,572.02$0.00
ABBack fill (Unwashed Sand)TON$18.75$0.00
ACBack fill (Flowable Fill)CY$112.53$0.00
ADBack fill (Pea Gravel)TON$15.49$0.00
AE4 inch sewer line serviceLF$41.67$0.00
AF4 inch electrical conduitLF$17.86$0.00
AGWater line service up to two inchLF$41.67$0.00
AHHaulingCY$5.95$0.00
AIKey Stone Retaining Wall with Back Fill and footingsLF$38.10$0.00
AJUtility Boring, Horizontal, 6 in dia.LF$148.83$0.00
AKUtility Boring, Horizontal, 24 in dia.LF$351.25$0.00
ALCross tie timber walls/max 48"HSF$14.28$0.00
AMTop Soil 4 inches thick and spreadSY$3.29$0.00
EARTH WORK
ANSand Clay FillCY$14.28$0.00
AOSurface PreparationSY$1.36$0.00
APSubgrade Preparation +or-3"SY$5.67$0.00
AQUnclassified Excavation including haul off siteCY$18.68$0.00
CLEARING AND GRUBBING
ARClearing and grubbing/all roots and stumps1-500 ACRESACRE$5,953.38$0.00
ASRemove Trees 6 " to 12 "EA$297.67$0.00
ATRemove Trees 12 " to 18 "EA$475.97$0.00
AURemove Trees 18 " to 28 "EA$595.33$0.00
EROSION CONTRTOL
AVErosion Control Temporary Seeding /Acre 1-500ACRE$1,666.94$0.00
AWSilt Fence Erosion Control Temporary Seeding 1 to 2500LF$4.16$0.00
AXAnchored Straw BaleEA$10.12$0.00
STORM WATER
AYHeadwalls 8 inch Thick x 15 Long x 5' H RPCCCY$351.25$0.00
AZ4' Dia. Manhole 6 ' Deep precast concrete w/frame & coverEA$2,262.29$0.00
BA18 Inch RCP Class IIILF$47.63$0.00
BB24 Inch RCP Class IIILF$50.01$0.00
BC36 Inch RCP Class IIILF$57.16$0.00
BDReset Valve BoxEA$59.53$0.00
BE4" Plastic Under drain with SockLF$11.31$0.00
BFConvert Inlets w/frame and grateEA$952.55$0.00
BGFlorida Catch BasinEA$2,381.36$0.00
ASPHALT PAVING
BHAsphalt EmulsionSY$2.16$0.00
BIPetrotac FabricSF$5.95$0.00
BJHand Asphalt PlacementTON$333.39$0.00
BKSlurry SealSY$5.41$0.00
BLPot Hole Repair (per/SY)SY$105.97$0.00
BMCrack SealLF$2.49$0.00
BN6 inch SABC # 1 Base CourseTON$34.85$0.00
BO3 inch AC Binder CourseTON$267.63$0.00
BPAC Surface Course Per InchTON$153.11$0.00
BQSurface SterilizationSY$1.19$0.00
BRAsphalt Pavement Removal Per Inch thickness (asphalt) 1 to 25,000.00SY$2.48$0.00
BSreflective yellow/with layoutSF$1.57$0.00
BTreflective white/with layoutSF$1.57$0.00
BUPrime CoatSY$0.91$0.00
BVHaul Spread Asphalt MillingsTON$11.90$0.00
BWDemo Curb & GutterLF$10.71$0.00
BXHooded Catch basin 2x3x4EA$2,143.21$0.00
BYSlurry seal EmulsionSY$5.41$0.00
BZRem /Reinstall wheel stopsEA$47.63$0.00
CANew Wheel StopsEA$95.25$0.00
CBSawcutting asphalt to 4" 1 to 1000LF$4.97$0.00
CCReservedN/A$0.00
CDDemo Wheel StopsEA$23.82$0.00
$0.00
GRASSING$0.00
CEBermuda Sod 419SY$6.55$0.00
CFHydro seed large area's 80,000 to 350,000SY$0.56$0.00
CGCentipede SodSY$6.55$0.00
CHHydroseed and Finish Grade 1 to 80,000SY$0.64$0.00
CONCRETE PAVING
CINew 24 Inch Concrete Curb and GutterLF$21.78$0.00
CJReplace 24 inch Concrete Curb and GutterLF$36.72$0.00
CKRemove and Replace Sidewalk 4" thick (0-200 SF)SF$17.86$0.00
CLRemove and Replace Sidewalk 4" thick (over 200 SF)SF$8.93$0.00
CMNew Sidewalk 4 Inches (0-200 SF)SF$8.34$0.00
CNNew Side Walk 4 Inches Thick (over 200 SF)SF$7.14$0.00
COInstall 650 flex PCC pavement 14" thick>5000<10000SY$85.14$0.00
CPInstall 650 flex PCC pavement 14" thick>1000<5000SY$93.18$0.00
CQInstall 650 flex PCC pavement 14" thick>1<1000SY$121.22$0.00
CRPartial depth spall repairs-epoxy bonded PCCSF$149.39$0.00
CSFull depth (up to T=14") spall repairSF$160.74$0.00
CTProvide/install 1" dia smooth dowels-24"L,drill&epoxyEA$16.19$0.00
CUProvide/install 1-1/2" dia smooth dowels-24"L,drill&epoxyEA$21.16$0.00
CVProvide/install #3 rebars, 0.376LBS/LFPND$1.19$0.00
CWProvide/install #4 rebars, 0.668LBS/LFPND$2.38$0.00
CXProvide/install #5 rebars, 1.043LBS/LFPND$2.38$0.00
CYProvide/install #5 deformed tie bars-2.5' L (new pavement)EA$8.64$0.00
CZProvide/install 3/4" dia smooth dowels-24"L (new pavement)EA$8.64$0.00
DAProvide/install 1" dia smooth dowels-24"L (new pavement)EA$8.64$0.00
DBProvide/install 1-1/2" dia smooth dowels-24"L (new pavement)EA$16.68$0.00
DCProvide/install expansion joint 3/4" corkSF$10.71$0.00
DDProvide/install expansion joint 1-1/2" corkSF$20.86$0.00
DEProvide & install aircraft tie-downEA$595.33$0.00
DFWeld wire mesh W2.5 x W2.5SF$1.92$0.00
DGConcrete joint resealing incl backer mat'l replacementLF$6.49$0.00
DHCrack routing/sealing (PCC) using crack sawLF$11.02$0.00
DICrack routing/sealing (PCC) using crack saw (up to 2"W)LF$15.49$0.00
DJSaw cut reservoir then provide & install joint sealant & backer mat'lLF$6.49$0.00
DKJoint seal neopherene compression sealLF$6.49$0.00
DLSawcutting concrete to 4" 1 to 1000LF$4.75$0.00
DMSawcutting concrete full depth / LF inchLF$1.48$0.00
DNConcrete Driveways 4" thick 1 to 100 SQ-YD, fiber mesh reinforced with 6 inch thickened edge see detail in Section 03300SY$71.43$0.00
DOExpansion Board 4" wide (fiber) 1/2 thickLF$4.75$0.00
DPExpansion Board 14" wide (Cork) 1/2 thickLF$10.71$0.00
DQJoint sealer 1/2" wide with backer rod 1 to 100000 LF(Silicone) to include green saw and widen jointLF$10.71$0.00
DRJoint sealer 1/2" wide with backer rod 10000 to 50000 LF(Silicone) to include green saw and widen jointLF$6.37$0.00
DSRemove Concrete Pavement 1" to 6 thick with disposalSY$17.86$0.00
DTRemove Concrete Pavement 6" to 14" thick with disposalSY$17.43$0.00
DUInstall 650 Flex concrete PCC per inch thickness per Square Yard to include white pigmented curing compoundSY$9.02$0.00
PAVEMENT MARKINGS
DVPaint Removal Air Field 0to 50,000 SFSF$2.26$0.00
DWPaint Removal Air Field 50,000to 100,000 SFSF$2.11$0.00
DXPaint Removal Air Field 100,000 to InfinitySF$1.72$0.00
DYRubber Removal Airfield 0 to 400,000SF$0.15$0.00
DZreflective yellow/with layout >10000 <50000SF$1.60$0.00
EAReflective white/with layout <10000SF$1.60$0.00
EBreflective white/with layout >10000 <500000SF$1.44$0.00
ECBlack Non Reflective >5000 <100000SF$1.23$0.00
EDYellow Non Reflective >10000<75,000SF$1.44$0.00
EERed Non Reflective <5000SF$1.42$0.00
EFRed Non Reflective >5000 <75000SF$1.23$0.00
Chain Link Fence& Gates
EG4 foot Chain link fenceLF$16.00$0.00
EH7 foot Chain link fence with 3 strands barbed wireLF$45.25$0.00
EIDouble Gate's with 25x4foot clear openingEA$650.00$0.00
EJDouble Gate's with 25x7 foot clear opening with 3 strands barbed wireEA$2,053.91$0.00
EKPersonal Gate 4 x 4 foot high clear openingEA$250.00$0.00
ELPersonal Gate 4 x 7 foot high clear opening with 3 strands barbed wire.EA$458.40$0.00

$0.00

Option Year 1 (CLIN 1001)

Exihibit AExhibit A
Contract:
REPAIR BASE PAVEMENTSPage 2 of 5 (See Tabs)
Option Year 1 (CLIN 1001)
DescriptionU/IEstimated QuantityUnit PriceLine Total
SITE WORK/GENERAL TASK
AAMobilization per Delivery Order,EA$3,643.46$0.00
ABBack fill (Unwashed Sand)TON$19.13$0.00
ACBack fill (Flowable Fill)CY$114.78$0.00
ADBack fill (Pea Gravel)TON$15.80$0.00
AE4 inch sewer line serviceLF$42.50$0.00
AF4 inch electrical conduitLF$18.22$0.00
AGWater line service up to two inchLF$42.50$0.00
AHHaulingCY$6.07$0.00
AIKey Stone Retaining Wall with Back Fill and footingsLF$38.87$0.00
AJUtility Boring, Horizontal, 6 in dia.LF$151.81$0.00
AKUtility Boring, Horizontal, 24 in dia.LF$358.28$0.00
ALCross tie timber walls/max 48"HSF$14.56$0.00
AMTop Soil 4 inches thick and spreadSY$3.35$0.00
EARTH WORK
ANSand Clay FillCY$14.56$0.00
AOSurface PreparationSY$1.40$0.00
APSubgrade Preparation +or-3"SY$5.78$0.00
AQUnclassified Excavation including haul off siteCY$19.24$0.00
CLEARING AND GRUBBING
ARClearing and grubbing/all roots and stumps1-500 ACRESACRE$6,072.44$0.00
ASRemove Trees 6 " to 12 "EA$303.62$0.00
ATRemove Trees 12 " to 18 "EA$485.49$0.00
AURemove Trees 18 " to 28 "EA$607.24$0.00
EROSION CONTRTOL
AVErosion Control Temporary Seeding /Acre 1-500ACRE$1,700.28$0.00
AWSilt Fence Erosion Control Temporary Seeding 1 to 2500LF$4.24$0.00
AXAnchored Straw BaleEA$10.32$0.00
STORM WATER
AYHeadwalls 8 inch Thick x 15 Long x 5' H RPCCCY$358.28$0.00
AZ4' Dia. Manhole 6 ' Deep precast concrete w/frame & coverEA$2,307.54$0.00
BA18 Inch RCP Class IIILF$48.58$0.00
BB24 Inch RCP Class IIILF$51.01$0.00
BC36 Inch RCP Class IIILF$58.30$0.00
BDReset Valve BoxEA$60.72$0.00
BE4" Plastic Under drain with SockLF$11.53$0.00
BFConvert Inlets w/frame and grateEA$971.60$0.00
BGFlorida Catch BasinEA$2,428.98$0.00
ASPHALT PAVING
BHAsphalt EmulsionSY$2.20$0.00
BIPetrotac FabricSF$6.07$0.00
BJHand Asphalt PlacementTON$340.06$0.00
BKSlurry SealSY$5.52$0.00
BLPot Hole Repair (per/SY)SY$108.09$0.00
BMCrack SealLF$2.54$0.00
BN6 inch SABC # 1 Base CourseTON$35.89$0.00
BO3 inch AC Binder CourseTON$272.98$0.00
BPAC Surface Course Per InchTON$157.70$0.00
BQSurface SterilizationSY$1.21$0.00
BRAsphalt Pavement Removal Per Inch thickness (asphalt) 1 to 25,000.00SY$2.56$0.00
BSreflective yellow/with layoutSF$1.60$0.00
BTreflective white/with layoutSF$1.60$0.00
BUPrime CoatSY$0.93$0.00
BVHaul Spread Asphalt MillingsTON$12.14$0.00
BWDemo Curb & GutterLF$10.93$0.00
BXHooded Catch basin 2x3x4EA$2,186.07$0.00
BYSlurry seal EmulsionSY$5.52$0.00
BZRem /Reinstall wheel stopsEA$48.58$0.00
CANew Wheel StopsEA$97.15$0.00
CBSawcutting asphalt to 4" 1 to 1000LF$5.12$0.00
CCReservedN/A$0.00$0.00
CDDemo Wheel StopsEA$24.29$0.00
$0.00
GRASSING$0.00
CEBermuda Sod 419SY$6.68$0.00
CFHydro seed large area's 80,000 to 350,000SY$0.57$0.00
CGCentipede SodSY$6.68$0.00
CHHydroseed and Finish Grade 1 to 80,000SY$0.65$0.00
CONCRETE PAVING
CINew 24 Inch Concrete Curb and GutterLF$22.43$0.00
CJReplace 24 inch Concrete Curb and GutterLF$37.82$0.00
CKRemove and Replace Sidewalk 4" thick (0-200 SF)SF$18.40$0.00
CLRemove and Replace Sidewalk 4" thick (over 200 SF)SF$9.11$0.00
CMNew Sidewalk 4 Inches (0-200 SF)SF$8.50$0.00
CNNew Side Walk 4 Inches Thick (over 200 SF)SF$7.28$0.00
COInstall 650 flex PCC pavement 14" thick>5000<10000SY$86.84$0.00
CPInstall 650 flex PCC pavement 14" thick>1000<5000SY$95.04$0.00
CQInstall 650 flex PCC pavement 14" thick>1<1000SY$123.64$0.00
CRPartial depth spall repairs-epoxy bonded PCCSF$153.87$0.00
CSFull depth (up to T=14") spall repairSF$163.96$0.00
CTProvide/install 1" dia smooth dowels-24"L,drill&epoxyEA$16.68$0.00
CUProvide/install 1-1/2" dia smooth dowels-24"L,drill&epoxyEA$21.79$0.00
CVProvide/install #3 rebars, 0.376LBS/LFPND$1.21$0.00
CWProvide/install #4 rebars, 0.668LBS/LFPND$2.42$0.00
CXProvide/install #5 rebars, 1.043LBS/LFPND$2.42$0.00
CYProvide/install #5 deformed tie bars-2.5' L (new pavement)EA$8.81$0.00
CZProvide/install 3/4" dia smooth dowels-24"L (new pavement)EA$8.81$0.00
DAProvide/install 1" dia smooth dowels-24"L (new pavement)EA$8.81$0.00
DBProvide/install 1-1/2" dia smooth dowels-24"L (new pavement)EA$17.01$0.00
DCProvide/install expansion joint 3/4" corkSF$10.93$0.00
DDProvide/install expansion joint 1-1/2" corkSF$21.49$0.00
DEProvide & install aircraft tie-downEA$607.24$0.00
DFWeld wire mesh W2.5 x W2.5SF$1.98$0.00
DGConcrete joint resealing incl backer mat'l replacementLF$6.62$0.00
DHCrack routing/sealing (PCC) using crack sawLF$11.24$0.00
DICrack routing/sealing (PCC) using crack saw (up to 2"W)LF$15.80$0.00
DJSaw cut reservoir then provide & install joint sealant & backer mat'lLF$6.62$0.00
DKJoint seal neopherene compression sealLF$6.62$0.00
DLSawcutting concrete to 4" 1 to 1000LF$4.85$0.00
DMSawcutting concrete full depth / LF inchLF$1.53$0.00
DNConcrete Driveways 4" thick 1 to 100 SQ-YD, fiber mesh reinforced with 6 inch thickened edge see detail in Section 03300SY$72.86$0.00
DOExpansion Board 4" wide (fiber) 1/2 thickLF$4.85$0.00
DPExpansion Board 14" wide (Cork) 1/2 thickLF$10.93$0.00
DQJoint sealer 1/2" wide with backer rod 1 to 100000 LF(Silicone) to include green saw and widen jointLF$10.93$0.00
DRJoint sealer 1/2" wide with backer rod 10000 to 50000 LF(Silicone) to include green saw and widen jointLF$6.50$0.00
DSRemove Concrete Pavement 1" to 6 thick with disposalSY$18.22$0.00
DTRemove Concrete Pavement 6" to 14" thick with disposalSY$17.96$0.00
DUInstall 650 Flex concrete PCC per inch thickness per Square Yard to include white pigmented curing compoundSY$9.29$0.00
PAVEMENT MARKINGS
DVPaint Removal Air Field 0to 50,000 SFSF$2.31$0.00
DWPaint Removal Air Field 50,000to 100,000 SFSF$2.15$0.00
DXPaint Removal Air Field 100,000 to InfinitySF$1.75$0.00
DYRubber Removal Airfield 0 to 400,000SF$0.15$0.00
DZreflective yellow/with layout >10000 <50000SF$1.63$0.00
EAReflective white/with layout <10000SF$1.63$0.00
EBreflective white/with layout >10000 <500000SF$1.47$0.00
ECBlack Non Reflective >5000 <100000SF$1.25$0.00
EDYellow Non Reflective >10000<75,000SF$1.47$0.00
EERed Non Reflective <5000SF$1.45$0.00
EFRed Non Reflective >5000 <75000SF$1.25$0.00
Chain Link Fence& Gates
EG4 foot Chain link fenceLF$16.32$0.00
EH7 foot Chain link fence with 3 strands barbed wireLF$46.16$0.00
EIDouble Gate's with 25x4foot clear openingEA$663.00$0.00
EJDouble Gate's with 25x7 foot clear opening with 3 strands barbed wireEA$2,094.99$0.00
EKPersonal Gate 4 x 4 foot high clear openingEA$255.00$0.00
ELPersonal Gate 4 x 7 foot high clear opening with 3 strands barbed wire.EA$467.57$0.00

$0.00

Option Year 2 (CLIN 2001)

Exihibit AExhibit A
Contract:
REPAIR BASE PAVEMENTSPage 3 of 5 (See Tabs)
Option Year 2 (CLIN 2001)
DescriptionU/IEstimated QuantityUnit PriceLine Total
SITE WORK/GENERAL TASK
AAMobilization per Delivery Order,EA$3,716.33$0.00
ABBack fill (Unwashed Sand)TON$19.51$0.00
ACBack fill (Flowable Fill)CY$117.08$0.00
ADBack fill (Pea Gravel)TON$16.11$0.00
AE4 inch sewer line serviceLF$43.35$0.00
AF4 inch electrical conduitLF$18.59$0.00
AGWater line service up to two inchLF$43.35$0.00
AHHaulingCY$6.19$0.00
AIKey Stone Retaining Wall with Back Fill and footingsLF$39.64$0.00
AJUtility Boring, Horizontal, 6 in dia.LF$154.84$0.00
AKUtility Boring, Horizontal, 24 in dia.LF$365.44$0.00
ALCross tie timber walls/max 48"HSF$14.85$0.00
AMTop Soil 4 inches thick and spreadSY$3.42$0.00
EARTH WORK
ANSand Clay FillCY$14.85$0.00
AOSurface PreparationSY$1.44$0.00
APSubgrade Preparation +or-3"SY$5.89$0.00
AQUnclassified Excavation including haul off siteCY$19.81$0.00
CLEARING AND GRUBBING
ARClearing and grubbing/all roots and stumps1-500 ACRESACRE$6,193.89$0.00
ASRemove Trees 6 " to 12 "EA$309.70$0.00
ATRemove Trees 12 " to 18 "EA$495.20$0.00
AURemove Trees 18 " to 28 "EA$619.38$0.00
EROSION CONTRTOL
AVErosion Control Temporary Seeding /Acre 1-500ACRE$1,734.28$0.00
AWSilt Fence Erosion Control Temporary Seeding 1 to 2500LF$4.33$0.00
AXAnchored Straw BaleEA$10.53$0.00
STORM WATER
AYHeadwalls 8 inch Thick x 15 Long x 5' H RPCCCY$365.44$0.00
AZ4' Dia. Manhole 6 ' Deep precast concrete w/frame & coverEA$2,353.69$0.00
BA18 Inch RCP Class IIILF$49.55$0.00
BB24 Inch RCP Class IIILF$52.03$0.00
BC36 Inch RCP Class IIILF$59.47$0.00
BDReset Valve BoxEA$61.94$0.00
BE4" Plastic Under drain with SockLF$11.76$0.00
BFConvert Inlets w/frame and grateEA$991.03$0.00
BGFlorida Catch BasinEA$2,477.56$0.00
ASPHALT PAVING
BHAsphalt EmulsionSY$2.24$0.00
BIPetrotac FabricSF$6.19$0.00
BJHand Asphalt PlacementTON$346.86$0.00
BKSlurry SealSY$5.63$0.00
BLPot Hole Repair (per/SY)SY$110.26$0.00
BMCrack SealLF$2.59$0.00
BN6 inch SABC # 1 Base CourseTON$36.97$0.00
BO3 inch AC Binder CourseTON$278.44$0.00
BPAC Surface Course Per InchTON$162.44$0.00
BQSurface SterilizationSY$1.24$0.00
BRAsphalt Pavement Removal Per Inch thickness (asphalt) 1 to 25,000.00SY$2.64$0.00
BSreflective yellow/with layoutSF$1.63$0.00
BTreflective white/with layoutSF$1.63$0.00
BUPrime CoatSY$0.95$0.00
BVHaul Spread Asphalt MillingsTON$12.38$0.00
BWDemo Curb & GutterLF$11.15$0.00
BXHooded Catch basin 2x3x4EA$2,229.79$0.00
BYSlurry seal EmulsionSY$5.63$0.00
BZRem /Reinstall wheel stopsEA$49.55$0.00
CANew Wheel StopsEA$99.10$0.00
CBSawcutting asphalt to 4" 1 to 1000LF$5.27$0.00
CCReservedN/A$0.00$0.00
CDDemo Wheel StopsEA$24.78$0.00
$0.00
GRASSING$0.00
CEBermuda Sod 419SY$6.81$0.00
CFHydro seed large area's 80,000 to 350,000SY$0.58$0.00
CGCentipede SodSY$6.81$0.00
CHHydroseed and Finish Grade 1 to 80,000SY$0.66$0.00
CONCRETE PAVING
CINew 24 Inch Concrete Curb and GutterLF$23.11$0.00
CJReplace 24 inch Concrete Curb and GutterLF$38.96$0.00
CKRemove and Replace Sidewalk 4" thick (0-200 SF)SF$18.95$0.00
CLRemove and Replace Sidewalk 4" thick (over 200 SF)SF$9.29$0.00
CMNew Sidewalk 4 Inches (0-200 SF)SF$8.67$0.00
CNNew Side Walk 4 Inches Thick (over 200 SF)SF$7.43$0.00
COInstall 650 flex PCC pavement 14" thick>5000<10000SY$88.58$0.00
CPInstall 650 flex PCC pavement 14" thick>1000<5000SY$96.95$0.00
CQInstall 650 flex PCC pavement 14" thick>1<1000SY$126.12$0.00
CRPartial depth spall repairs-epoxy bonded PCCSF$158.48$0.00
CSFull depth (up to T=14") spall repairSF$167.24$0.00
CTProvide/install 1" dia smooth dowels-24"L,drill&epoxyEA$17.18$0.00
CUProvide/install 1-1/2" dia smooth dowels-24"L,drill&epoxyEA$22.45$0.00
CVProvide/install #3 rebars, 0.376LBS/LFPND$1.24$0.00
CWProvide/install #4 rebars, 0.668LBS/LFPND$2.47$0.00
CXProvide/install #5 rebars, 1.043LBS/LFPND$2.47$0.00
CYProvide/install #5 deformed tie bars-2.5' L (new pavement)EA$8.98$0.00
CZProvide/install 3/4" dia smooth dowels-24"L (new pavement)EA$8.98$0.00
DAProvide/install 1" dia smooth dowels-24"L (new pavement)EA$8.98$0.00
DBProvide/install 1-1/2" dia smooth dowels-24"L (new pavement)EA$17.35$0.00
DCProvide/install expansion joint 3/4" corkSF$11.15$0.00
DDProvide/install expansion joint 1-1/2" corkSF$22.13$0.00
DEProvide & install aircraft tie-downEA$619.38$0.00
DFWeld wire mesh W2.5 x W2.5SF$2.04$0.00
DGConcrete joint resealing incl backer mat'l replacementLF$6.75$0.00
DHCrack routing/sealing (PCC) using crack sawLF$11.47$0.00
DICrack routing/sealing (PCC) using crack saw (up to 2"W)LF$16.11$0.00
DJSaw cut reservoir then provide & install joint sealant & backer mat'lLF$6.75$0.00
DKJoint seal neopherene compression sealLF$6.75$0.00
DLSawcutting concrete to 4" 1 to 1000LF$4.94$0.00
DMSawcutting concrete full depth / LF inchLF$1.57$0.00
DNConcrete Driveways 4" thick 1 to 100 SQ-YD, fiber mesh reinforced with 6 inch thickened edge see detail in Section 03300SY$74.32$0.00
DOExpansion Board 4" wide (fiber) 1/2 thickLF$4.94$0.00
DPExpansion Board 14" wide (Cork) 1/2 thickLF$11.15$0.00
DQJoint sealer 1/2" wide with backer rod 1 to 100000 LF(Silicone) to include green saw and widen jointLF$11.15$0.00
DRJoint sealer 1/2" wide with backer rod 10000 to 50000 LF(Silicone) to include green saw and widen jointLF$6.63$0.00
DSRemove Concrete Pavement 1" to 6 thick with disposalSY$18.59$0.00
DTRemove Concrete Pavement 6" to 14" thick with disposalSY$18.50$0.00
DUInstall 650 Flex concrete PCC per inch thickness per Square Yard to include white pigmented curing compoundSY$9.57$0.00
PAVEMENT MARKINGS
DVPaint Removal Air Field 0to 50,000 SFSF$2.35$0.00
DWPaint Removal Air Field 50,000to 100,000 SFSF$2.20$0.00
DXPaint Removal Air Field 100,000 to InfinitySF$1.79$0.00
DYRubber Removal Airfield 0 to 400,000SF$0.16$0.00
DZreflective yellow/with layout >10000 <50000SF$1.66$0.00
EAReflective white/with layout <10000SF$1.66$0.00
EBreflective white/with layout >10000 <500000SF$1.50$0.00
ECBlack Non Reflective >5000 <100000SF$1.28$0.00
EDYellow Non Reflective >10000<75,000SF$1.50$0.00
EERed Non Reflective <5000SF$1.48$0.00
EFRed Non Reflective >5000 <75000SF$1.28$0.00
Chain Link Fence& Gates
EG4 foot Chain link fenceLF$16.65$0.00
EH7 foot Chain link fence with 3 strands barbed wireLF$47.08$0.00
EIDouble Gate's with 25x4foot clear openingEA$676.26$0.00
EJDouble Gate's with 25x7 foot clear opening with 3 strands barbed wireEA$2,136.89$0.00
EKPersonal Gate 4 x 4 foot high clear openingEA$260.10$0.00
ELPersonal Gate 4 x 7 foot high clear opening with 3 strands barbed wire.EA$476.92$0.00

$0.00

2024 IGE Price Sheet

Exihibit BExhibit B
Contract: VLSB 24-0019 FAMCAMP
REPAIR / REPLACE BASE INFRASTRUCTUREPage 1 of 2 (See Tabs)
1
2DescriptionU/IEstimated QuantityUnit PriceLine Total
3SITE WORK/GENERAL TASK
4Mobilization per Delivery Order,EA1$4,125.00$4,125.00Market Research
5Back fill (Unwashed Sand)TON$20.30$0.00Market Research
6Back fill (Flowable Fill)CY$121.81$0.00Market Research
7Back fill (Pea Gravel)TON$16.76$0.00Market Research
84 inch sewer line serviceLF0$45.10$0.00Market Research
94 inch electrical conduitLF0$40.10$0.00Market Research
10
11HaulingCY$6.44$0.00Market Research
12Key Stone Retaining Wall with Back Fill and footingsLF$41.24$0.00Market Research
13Utility Boring, Horizontal, 6 in dia.LF0$235.00$0.00
14Utility Boring, Horizontal, 24 in dia.LF$380.21$0.00Market Research
15Cross tie timber walls/max 48"HSF$15.45$0.00Market Research
16Market Research
Project ManagerDay60$115.00$6,900.00Past Projects
17SuperintendentDay115$100.00$11,500.00Past Projects
18EARTH WORK
19Sand Clay FillCY$15.45$0.00
20Surface PreparationSY0$1.53$0.00Market Research
21Subgrade Preparation +or-3"SY0$6.13$0.00Market Research
22Excavation including haul off site (Includes Loading)CY500$24.50$12,250.00Market Research
23Topsoil dressingSY1000$4.75$4,750.00Market Research
24CLEARING AND GRUBBING
25Clearing and grubbing/all roots and stumpsACRE1.6$3,978.00$6,364.803111110100150 RS Means
26Remove Trees 6 " to 12 "EA0$322.21$0.00Estimated
27Remove Trees 12 " to 18 "EA0$515.21$0.00Estimated
28Remove Trees 18 " to 28 "EA0$644.41$0.00Estimated
29Tree removalEA35.0$325.00$11,375.00311110107160 RS Means
30EROSION CONTRTOL
31Erosion Control Temporary SeedingACRE1.0$926.00$926.00329219130020 RS Means
32Silt Fence Erosion Control Temporary Seeding 1 to 2500LF1000$3.91$3,910.00312524161000 RSMeans
33Anchored Straw BaleEA$10.95$0.00
34
35STORM WATER
36Headwalls 8 inch Thick x 15 Long x 5' H RPCCCY$380.21$0.00
374' Dia. Manhole 6 ' Deep precast concrete w/frame & coverEA$2,448.78$0.00
3818 Inch RCP Class IIILF$51.56$0.00
3924 Inch RCP Class IIILF$54.13$0.00
4036 Inch RCP Class IIILF$61.87$0.00
41Reset Valve BoxEA$64.44$0.00
424" Plastic Under drain with SockLF$12.24$0.00
43Convert Inlets w/frame and grateEA$1,031.07$0.00
44Florida Catch BasinEA$2,577.66$0.00
45
46ASPHALT PAVING
47Asphalt EmulsionSY$2.33$0.00
48Petrotac FabricSF$6.44$0.00
49Hand Asphalt PlacementTON$360.87$0.00
50Slurry SealSY$5.86$0.00
51Pot Hole Repair (per/SY)SY$114.71$0.00
52Crack SealLF$2.69$0.00
53Aspahlt paving and markings (includes grading)SY1840$21.88$40,259.20G20202301400 RSMeansMobilization4125
543 inch AC Binder CourseTON$289.69$0.00Market Research
55AC Surface Course Per InchTON0$185.32$0.00Market Research
56Surface SterilizationSY0$1.29$0.00Market Research
57Asphalt Pavement Removal Per Inch thickness (asphalt) 1 to 25,000.00SY$2.80$0.00Market Research
58reflective yellow/with layoutSF$1.70$0.00Market Research
59reflective white/with layoutSF0$3.00$0.00Market Research
60Prime CoatSY0$0.99$0.00Market Research
61Haul Spread Asphalt MillingsTON$12.88$0.00
62Demo Curb & GutterLF$11.60$0.00
63Hooded Catch basin 2x3x4EA$2,319.88$0.00
64Slurry seal EmulsionSY$5.86$0.00
65Rem /Reinstall wheel stopsEA$51.56$0.00
66New Wheel StopsEA$103.10$0.00
67Sawcutting asphalt to 4" 1 to 1000LF$5.59$0.00
68ReservedN/A$0.00$0.00
69Demo Wheel StopsEA$25.78$0.00
70Civil$131,667.25
71GRASSINGElectrical$129,793.75
72Bermuda Sod 419SY$7.08$0.00
73Hydro seed large area's 80,000 to 350,000SY$0.61$0.00
74Centipede SodSF1800$1.15$2,070.00Market ResearchWater$25,544.00
75Hydroseed and Finish Grade 1 to 80,000SF1800$0.10$180.00Market ResearchSewer$23,386.00
76WiFi Poles46,800
77CONCRETE PAVINGSupervision$18,400.00
78New 24 Inch Concrete Curb and GutterLF$24.51$0.00
79Replace 24 inch Concrete Curb and GutterLF$41.33$0.00
80Remove and Replace Sidewalk 4" thick (0-200 SF)SF$20.11$0.00
81Remove and Replace Sidewalk 4" thick (over 200 SF)SF$9.67$0.00
82New Sidewalk 4 Inches (0-200 SF)SF$9.03$0.00
83New Side Walk 4 Inches Thick (over 200 SF)SF$7.73$0.00
84Install 650 flex PCC pavement 14" thick>5000<10000SY$92.16$0.00
85Install 650 flex PCC pavement 14" thick>1000<5000SY$100.86$0.00
86Install 650 flex PCC pavement 14" thick>1<1000SY$131.21$0.00
87Partial depth spall repairs-epoxy bonded PCCSF$168.13$0.00
88Full depth (up to T=14") spall repairSF$173.99$0.00
89Provide/install 1" dia smooth dowels-24"L,drill&epoxyEA$18.22$0.00
90Provide/install 1-1/2" dia smooth dowels-24"L,drill&epoxyEA$23.82$0.00
91Provide/install #3 rebars, 0.376LBS/LFPND$1.29$0.00
92Provide/install #4 rebars, 0.668LBS/LFPND$2.57$0.00
93Provide/install #5 rebars, 1.043LBS/LFPND$2.57$0.00
94Provide/install #5 deformed tie bars-2.5' L (new pavement)EA$9.35$0.00
95Provide/install 3/4" dia smooth dowels-24"L (new pavement)EA$9.35$0.00
96Provide/install 1" dia smooth dowels-24"L (new pavement)EA$9.35$0.00
97Provide/install 1-1/2" dia smooth dowels-24"L (new pavement)EA$18.05$0.00
98Provide/install expansion joint 3/4" corkSF$11.60$0.00
99Provide/install expansion joint 1-1/2" corkSF$23.48$0.00
100Provide & install aircraft tie-downEA$644.41$0.00
101Weld wire mesh W2.5 x W2.5SF$2.16$0.00
102Concrete joint resealing incl backer mat'l replacementLF$7.02$0.00
103Crack routing/sealing (PCC) using crack sawLF$11.93$0.00
104Crack routing/sealing (PCC) using crack saw (up to 2"W)LF$16.76$0.00
105Saw cut reservoir then provide & install joint sealant & backer mat'lLF$7.02$0.00
106Joint seal neopherene compression sealLF$7.02$0.00
107Sawcutting concrete to 4" 1 to 1000LF$5.14$0.00
108Sawcutting concrete full depth / LF inchLF$1.67$0.00
1093000 PSI Conc padSY825$44.13$36,407.25G20202401500 RSMeansTotal379716
110Expansion Board 4" wide (fiber) 1/2 thickLF$5.14$0.00
111Expansion Board 14" wide (Cork) 1/2 thickLF$11.60$0.00
112Joint sealer 1/2" wide with backer rod 1 to 100000 LF(Silicone) to include green saw and widen jointLF$11.60$0.00
113Joint sealer 1/2" wide with backer rod 10000 to 50000 LF(Silicone) to include green saw and widen jointLF$6.89$0.00
114Remove Concrete Pavement 1" to 6 thick with disposalSY$19.34$0.00
115Remove Concrete Pavement 6" to 14" thick with disposalSY$19.62$0.00
116Install 650 Flex concrete PCC per inch thickness per Square Yard to include white pigmented curing compoundSY$10.15$0.00
117
118PAVEMENT MARKINGS
119Paint Removal Air Field 0to 50,000 SFSF$2.45$0.00
120Paint Removal Air Field 50,000to 100,000 SFSF$2.28$0.00
121Paint Removal Air Field 100,000 to InfinitySF$1.86$0.00
122Rubber Removal Airfield 0 to 400,000SF$0.16$0.00
123reflective yellow/with layout >10000 <50000SF$1.73$0.00
124Reflective white/with layout <10000SF$1.73$0.00
125reflective white/with layout >10000 <500000SF$1.56$0.00
126Black Non Reflective >5000 <100000SF$1.33$0.00
127Yellow Non Reflective >10000<75,000SF$1.56$0.00
128Red Non Reflective <5000SF$1.54$0.00
129Red Non Reflective >5000 <75000SF$1.33$0.00
130
131ADD-ONS
132Electrical
133400 Amp Panel includes installationEA1$8500.00$8,500.00R/S Means
134400 AMP Panel Concrete and RackEA1$1200.00$1,200.00Market Research
1351" inch electrical conduit includes installationLF515$25.00$12,875.00Market Research
1361.25" inch electrical conduitLF720$29.00$20,880.00Market Research
1372" inch electrical conduitLF415$34.00$14,110.00Market Research
138#3/0 Wire and installLF2240$6.25$14,000.00Market Research
1396" Sewer Line ServiceLF0$55.25$0.00Past Work
140Market Research
1414" electrical conduit installedLF400$40.10$16,040.00Market Research
142#4 Wire and installLF560$7.25$4,060.00Market Research
143(3) #10 wire and installLF515$5.25$2,703.75Market Research
144RV Site Power Outlet Panel @ RV SiteEA14$450.00$6,300.00Market Research
145(3) #2 wire and installLF720$19.00$13,680.00Market Research
146(3) #1/0 wire and installLF145$21.00$3,045.00Market Research
147Site Lighting with base and hookupEA2$6200.00$12,400.00G40202100400 RS Means
Water and Sewer
1486" Sewer Connection (To Trunk Line)EA2$2600.00$5,200.00Market Research
149Market Research
150Market Research
151Sewer Service Connection (CO) @ RV SiteEA14$45.00$630.00Market Research
1526" Sewer Line ServiceLF550$31.92$17,556.00RS Means G30201121750
153Yard Hydrant (Water Bib) @ RV SiteEA14$125.00$1,750.00Market Research
154Water line serviceLF700$31.92$22,344.00G30101241900 RS Means
155Install BollardEA2$425.00$850.00Market Research
156Water valvesEA2$725.00$1,450.00Market Research
157WiFi Poles (installed)EA12$3900.00$46,800.00Market Research
158Site Signs (includes traffic control and site signage)EA17$725.00$12,325.00Market Research
$379,716.00
Supervision$0.00
Direct Cost:$4,500.00
Total Line Item Cost:$384,216.00
Overhead:10%$38,421.60
Subtotal:$422,637.60
Profit:10%$42,263.76
Subtotal:$464,901.36
Bond:2.0%$9,298.03
Total Contract Price:$474,199.39

Sheet2

Exihibit AExhibit A
Contract: VLSB 24-0019 FAMCAMP
REPAIR / REPLACE BASE INFRASTRUCTUREPage 2 of 2 (See Tabs)

Mobilization

Civil

Electrical

Water

Sewer

WiFi Poles

Supervision

Total

Direct Cost:
Total Line Item Cost:$ - 0
Overhead:$ - 0
Subtotal:$ - 0
Profit:$ - 0
Subtotal:$ - 0
Bond:$ - 0
Total Contract Price:$ - 0