Atch_15_TOPR.docx
DOCX document 29 KB Posted
- Attached to
- Multipla Award Construction Contract (MACC) at JBLE Langley-Ft Eustis, VA Federal contract opportunity
- Solicitation number
- FA4800-16-R-0004
About this file
Attachment 15 TOPR Revision 2
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.: FA4800-16-R-0004
ATTACHMENT 15
Amendment 02
TASK ORDER PROPOSAL REQUEST (TOPR)
Joint Base Langley-Eustis Multiple Award Construction Contract (MACC)
Issued By: 633d Contracting Squadron/LGCB 13 March 2017 14 Burrell St., Bldg 67 Langley AFB, VA 23665
Point of Contact: Delores Powell, (727) 764-7228, delores.powell@us.af.mil
PROJECT NUMBER: MUHJ 17-4005
PROJECT TITLE: Repair Restroom Fixtures/Interiors, Doors, FAMCAMP, Facility 50060, JBLE-Langley, VA
STATEMENT OF WORK: Furnish all plant, labor, equipment, materials, tools and other items required to complete this project in accordance with the Statement of Work (SOW), attached documents, General Provisions, Wage Determination VA170170VA170022, Modification 2, dated 27 January 2017 and all other the terms and conditions of the basic contract. This Design/Bid/Build project is to Repair Restroom Fixtures/Interiors/Doors, FAMCAMP, in Facility 50060.
SITE VISIT/PRE-PROPOSAL MEETING: The site visit is scheduled for 27 March 2016 at 10:00 a.m.
Conference Room 633d Contracting Squadron 14 Burrell Street, Facility 67 Langley AFB, VA, 23665-2088Bethel Park 123 Saunder Road Hampton, VA
Questions following the site visit are due to the Contracting Office not later than 3 April 2017.
SUBMISSION OF 35% DESIGN PROPOSALS: A 35% design propsoal will be due to the Contracting Officer on 13 April 2017. The contractor shall use the provided drawings, and the information included in the SOW.
DESIGN PERFORMANCE PERIOD: The Government is proposing the following timetable fo rthe Design/Construction requirement:
Design: N/A calendar days. The performance time to take the design to the 100% level following issuance of the Design Notice to Proceed (NTP).
Construction: 365 calendar days following the issuance of the Construction Notice to Proceed.
SUBMISSION OF PRICE PROPOSALS: Price proposals for this project are due to the Contracting Office on 2013 April 2017.
PERFORMANCE PERIOD: 365 Days from NTP
CONSTRUCTION The Construction period for this project shall be Ninety (90) calendar days following issuance of the Notice to Proceed.
MAGNITUDE OF CONSTRUCTION PROJECT: Estimated between $250,000 and $500,000.
PROPOSAL ACCEPTANCE PERIOD: Government acceptance will occur on or before 30 September 2017.
PROPOSAL PREPARATION INSTRUCTIONS: Reference contract Section H, paragraph 3.2. Also reference contract, attachment 1, General Provisions paragraphs 4 for design and cost estimate requirement.
BASIS OF AWARD: In accordance with Section H, paragraph 3.1, award will be made to the Best Value. Only one task order will be awarded for this project.
TERMS AND CONDITIONS SPECIFIC TO THIS PROJECT:
NOTICE TO PROCEED: Other than submittal of payment and performance bonds, the Contractor shall not proceed with performance of this project until the Contractor receives a Notice to Proceed from the Contracting Officer. Notice to Proceed will be issued within thirty (30) days of award and work will begin within ten (10) calendar days after issuance of the Notice to Proceed.
PERFORMANCE AND PAYMENT BONDS: Payment and Performance Bonds will be required for this project. Bonds are due no later than 10 calendar days after award.
WAGE RATES – The attached Davis Bacon wage decision applicable to this procurement is General Decision Number VA170170, Modification 2, dated 27 January 2017 – Building.
LIQUIDATED DAMAGES: In accordance with FAR Clause 52.211-12, the contractor shall pay liquidated damages to the Government at the minimum amount of $446.86 for the first and last day and $171.50 for all other days in between for each calendar day of delay until the work is completed or accepted.
INVOICES: Invoices may be submitted for progress payments based on a percentage of work completed. Invoices will be submitted electronically using Wide Area Flow (WAWF) procedures.
COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK:
The Contractor shall be required to commence work under this contract within 10 calendar days after the date the Contractor receives the Construction Notice to Proceed, prosecute the work diligently, and complete the entire work ready for use within the stated days after issuance of the Notice to Proceed.
ATTACHMENTS PROVIDED ON CD:
1. Statement of Work, MUHJ 17-4005
2. General Decision Number VA170022
3. Floorplan Schedule
4. Picture of Fac 50060
5. Drawing, 17 pages
6. Cover sheet Template5. Drawings 17 pages
OFFEROR PLEASE
COMPLETE THE FOLLOWING:
COMPANY NAME: ___________________________________ DATE: ________________
OFFEROR'S SIGNATURE: ____________________________________________________
TITLE OF PERSON AUTHORIZED TO SIGN: _________________________________
BID SCHEDULE
MUHJ 17-4005, REPAIR RESTROOM FIXTURES/ INTERIORS/DOORS,
FAMCAMP, FACILITY 50060
JBLE-Langley, VA
BID ITEM NO.
DESCRIPTION
LUMP SUM
Design – Furnish all drawings, specificatio, plant, labor, equipment, materials, and tools and perform all operation necessare for a 35% designcomp
Renovate interior of both male and female restrooms of the RV Park at Langely AFB FAM Camp. Renovation of the restroom interiors is to include new finishes, sinks, toilets, showers, lighting, stalls partition, accessories, handicap grab bars, mirror, flooring, ceiling, exhaust and heating systems, and other items as identified in the Statement of Work.
Total