Atch_04_-_LAFB_01_06_00_Regulatory_Requirements.docx
DOCX document 26 KB Posted
- Attached to
- Multipla Award Construction Contract (MACC) at JBLE Langley-Ft Eustis, VA Federal contract opportunity
- Solicitation number
- FA4800-16-R-0004
About this file
Attachment 04- LAFB 01 06 00 Regulatory Requirement
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.:FA4800-16-R-0004
ATTACHMENT 04
SECTION 01 06 00
REGULATORY REQUIREMENTS
PART 1 - GENERAL
| 1.1 | SECTION INCLUDES: |
| a. | Regulatory Codes. |
| b. | Air Force Regulations. |
| c. | Permits. |
| 1.2 | REGULATORY CODES: The latest editions of Federal, State, Industry, and local codes which govern this work include, but may not be limited to: |
| a. | Federal: |
1. Part 1926 - Chapter of Title 29, Code of Federal Regulations.
2. Part 192 - Chapter of Title 49, Code of Federal Regulations.
3. Corps of Engineers Safety and Health Requirement Manual, EM385-1-1.
4. National Historic Preservation Act of 1966 as amended and 1980 as amended.
5. Executive Order 13101 – “Greening the Government through Waste Prevention, Recycling, and Federal Acquisition
6. Resource Conservation and Recovery Act Section 6002
7. FAR Clause 52.223-4 Recovered Materials Certification
8. FAR Clause 52.223-9 Certification of Percentage of Recovered Material Content for EPA Designated Items Used in Performance of the Contract
9. FAR Clause 52.223-10 Waste Reduction Program
| b. | State: Virginia State Enforcement. |
| 1.3 | AIR FORCE REGULATIONS: The latest editions of the following Air Force Regulations shall apply to this work: |
| a. | MIL Handbook 1190, Facility Planning and Design Guide. |
| b. | Air Force Safety and Health Standard: AFR127-12, Air Force Occupational Safety and Health Program, and applicable standards. |
| 1.4 | PERMITS: |
| a. | The Contractor shall apply for and obtain the following permits, in addition to any other required permits, as applicable: |
| 1. | Disposal of Hazardous Materials. |
| b. | The Contractor shall be responsible for payment of any fees associated with acquiring the required permits and should reflect those costs in his/her bid proposal. |
PART 2 - PRODUCTS: NOT USED.
PART 3 - EXECUTION: NOT USED. XXX END OF SECTION XXX