Attachment 03 - Section 01110 General Specification
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.: FA4800-16-R-0004
ATTACHMENT 03
SECTION 01110
SPECIAL CONDITIONS
03/06
Highlighted text indicates variables in standard notes and standard text. Do not use this text or highlight in guide specifications.
Brackets are used in the text to indicate designer choices or locations where text must be supplied by the designer.
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1
(2003) Safety -- Safety and Health Requirements
1.2 SUBMITTALS
The following items specified herein shall be submitted in accordance with SUBMITTAL PROCEDURES:
SD-03 Product Data Material Safety Data Sheet (MSDS) for each item State and EPA Region 3 Notifications Recycling Report Trip Tickets Affirmative Procurement Report Exemption Form, Annex B to LAFB Affirmative Procurement Plan
32-7080 All Employee Names and Social Security Numbers Work Clearance Requests (Air Force Form 103) Quality Control (QC) Report SD-11 Closeout Submittals Survey Report Metadata Deliverables and Final As-builts Two copies of Computer-Aided Drafting and Design (CADD) digital final as-built drawings on CD’s One As-Built (Redline) Drawings Warranty of Construction Equipment Warranty Certificate Equipment Warranty/Guarantee Record Construction Data Worksheet Provide text explaining submittal requirements for the item, if necessary. Do not repeat information provided in Section 01330 SUBMITTAL PROCEDURES. Indent first line of the explanatory text two spaces to provide clarity when document is printed without color and with tags off.
1.2.1 SUBMITTAL PROCEDURES
1.2.1.1 Schedule of Material Submittals (Air Force Form 66)
Information, shop drawings, certificates, test data, etc., listed on the attached AF Form 66, Schedule of Material Submittals, shall be submitted for approval by the Contracting Officer, or his/her designated representative in accordance with the General Provisions. Whenever in this contract materials or drawings are required to be submitted by the Contractor to the Contracting Officer for approval and the material or drawings submitted are at variance with the specifications or Government drawings, but are, nevertheless, approved by the Contracting Officer, inadvertently and without consciousness of the variance, and regardless that a closer review could have revealed the variance, then such approval shall not be final unless the Contractor expressly noted on the material submittal or drawing that "this material or drawing varies from specifications in the following aspects -" or uses other works of similar clear meaning. In the event of such an inadvertent, erroneous approval, the Contracting Officer, upon discovering the variance at any stage, have the right to require the Contractor to do such rework and/or material replacement as is necessary to obtain compliance with the specifications, and the expense of such rework and/or material replacement shall be borne solely by the Contractor.
a. Submittals for technical compliance of finishes may be made individually for each material. SUBMITTALS FOR PATTERN, COLOR, TEXTURE, ETC., SHALL BE MADE SIMULTANEOUSLY FOR EACH ROOM OR AREA. Finishes shall be scheduled for each room/area to include surface, type material, manufacturer, brand name or product number, and space for the Government selection of pattern/color.
EXAMPLE:
Room 100 Floor: vinyl Tarkett Reliant (62107 Adobe)
Floor: carpet Milliken Magistrate (21 Clan Henna)
Wall: paint Pittsburgh Spread-Flow (white #21)
Wall: vinyl Flex-Wall Pls. In a Roll (Rajah Blue)
Wainscot: paneling Masonic Fireguard (walnut)
Ceiling: acoustic Gold Bond Acoustinet (fissure #21)
Trim: paint Glidden Easy-Enamel (0021 blue)
NOTE: Submittals must be limited to those necessary for adequate quality control. The importance of an item in the project should be one of the primary factors in determining if a submittal for the item should be required.
1.3 SCOPE OF WORK
The work under this project consists of [a general list of items, no quantities; location with building number(s), Langley AFB, Bethel Manor, etc.] as shown on [BCE Drawing XXFYXX] OR [the attached sketches].
1.3.1 Work Hours
Normal duty hours for Langley Air Force Base are 0730 through 1630, Monday through Friday. Work on weekends, recognized Federal holidays, or other than normal duty hours must be coordinated with the Contracting Officer (CO) or his/her designated representative.
1.3.2 General Working Conditions
a. Work shall be performed in such a manner as to cause minimum disruption to the users in the area.
b. The Contractor shall notify the Contracting Officer or his/her designated representative when he intends to work so Government inspection can be provided while work is in progress.
1.4 ORDER OF WORK
The Contractor shall coordinate all work with the Contracting Officer, or his/her designated representative, and the Base Civil Engineer. Before starting work at the job site, provide five days notice to the Contracting Officer or his/her designated representative and the Chief of Contract Management at 764-3268.
1.5 PHASING OF WORK
[SAMPLE ONLY-TAILOR TO MEET NEEDS OF PROJECT. USE ONLY WHEN WORK IS BROKEN INTO PHASES. YOU MAY WANT TO HAVE SEPARATE CONTRACT LINE ITEMS FOR EACH PHASE TO EASE ACCEPTANCE, PAYMENT, AND WARRANTY ISSUES. DISCUSS OPTIONS WITH CONTRACTING.]
The Contractor will be allowed to work in a maximum of [number] building at any one time. All work in assigned buildings must be completed within [number] days after start of work. Additional buildings will be assigned upon acceptance of assigned buildings.
[OR]
[SAMPLE ONLY-TAILOR TO MEET NEEDS OF PROJECT. USE ONLY WHEN WORK NEEDS TO BE SEQUENCED BUT FORMAL PHASES ARE NOT REQUIRED. WOULD NOT NEED SEPARATE CONTRACT LINE ITEMS.]
The Contractor shall use the following Sequence of Work in preparing his Contract Progress Schedule. It lists only highlights of the construction program and is not intended in any way as a complete scope of work. Each item shall be completed before the next item may be started. Work items not listed may be scheduled at any time.
[List work elements in order they must be completed]
1.6 APPLICABLE CODES AND REGULATIONS
The latest edition of the following Building Codes shall be used for all construction under this contract:
International Building Code
International Mechanical Code
International Plumbing Code
National Electrical Code (NEC)
ANSI C-2, National Electrical Safety Code (QIESC)
Life Safety Code, NFPA 101
National Fire Protection Association (NFPA)
MIL Handbook 1190
Unified Facilities Criteria (UFC) 3-600-01
NOTE: If there is a conflict between these codes or regulations and these contract specifications, the most stringent requirements shall apply at all times.
1.7 SALVAGE
Title to all materials and equipment to be demolished, excepting items indicated as Government salvage, shall be vested to the Contractor upon removal from the base except as noted below. The Government will not be responsible for the condition, loss or damage to such property after notice to proceed. All unsalvageable material will be disposed of legally off-base.
1.7.1 Items Salvaged for the Government
The Contractor shall salvage the following existing materials to the Government as indicated below. Salvaged materials shall be cleaned, sorted, identified, bundled, boxed, etc. and delivered to the collection location identified below.
ITEM DELIVERY LOCATION
[List items to be salvaged and delivery location OR indicate "NONE"]
1.8 CONSTRUCTION STANDARDS
1.8.1 General
The Contractor is reminded that the construction site must be operated and maintained according to these specifications and is subject to inspection and enforcement according to all federal, state and local codes/regulations.
1.8.2 Office Trailers and Storage Units
1.8.2.1 Office Trailers
If a trailer is required for work and at the discretion of the Government, an office trailer may be located at the project site. The Contractor shall request Contracting Officer approval for the trailer location. The Contractor shall make the request in writing at least 14 calendar days prior to placement of trailer at site. All office trailers shall be located in areas as directed by the Contracting Officer or his/her designated representative. Any office trailer shall be not more than 10' x 32' in size, provided with a skirt on all sides, in like new condition, and painted either Langley Brown (Federal Standard 595a, 20100), Langley Beige, or white. Office trailers in need of painting and / or repairs or that are in an unsightly condition will not be al-lowed at the project site. Displayed on the exterior of all trailers shall be a nameplate which has the name of the Contractor's company, name for Contractor's point(s) of contact (POC) and telephone number where he/she can be reached, contract number, project number and title, and date trailer was placed on site where located.
1.8.2.2 Storage Units
The Contractor shall request Contracting Officer approval for the siting, size and color of Storage Units, CONEX boxes, and dumpsters. The Contractor shall not bring any such items to the job site without the Contracting Officer's approval. All storage units shall be painted Langley Brown (Federal Standard 595a, 20100), Langley Beige or white. Displayed on the exterior of all storage units shall be a nameplate which has the name of the Contractor's company, name for Contractor's point(s) of contact (POC) and telephone number where he / she can be reached, contract number, project number and title, and date unit was placed on site where located.
1.8.3 On-Site Storage Units
Availability and size of material lay down area shall be restricted as noted on the contract documents or as discussed during the preconstruction conference. The Contractor shall consolidate all bulk and/or large quantities of materials at the construction site in area(s) approved by the CO. All such items shall be stored neatly grouped together. Bulky or unsightly construction materials, heavy and/or light equipment, or tanks shall not be delivered to or stored on the construction site for any period longer than seven calendar days prior to use, installation in the project, or start of construction. The Contractor shall store all supplies and equipment on project site so as to preclude theft or damage. Protection and security for materials and equipment on site is the sole responsibility of the Contractor. The Contractor shall not use any area(s) for material or equipment storage that has not been approved by the CO, or his/her designated representative.
1.8.4 Fencing and Screening
Contractor shall enclose the lay down area with a chain link fence that has been erected to a minimum height of 6 feet. Contractor's lay down area shall also be screened from view. Screening shall be fabricated of 100% Polypropylene, woven, 92% blockage fabric that has been mechanically attached to the fence for the full height of the fence. The edges of each section of screening fabric shall be finished with a reinforced hem. Attachment points shall be reinforced fabric built into the hem or metal grommets built into the hem. All fabric used for screening of the construction lay down area shall be UV rated and dark brown or dark bronze in color. Fence screening fabric shall be inspected weekly to insure all sections remain properly in-stalled and taut at all times.
1.9 CONTRACTOR OPERATIONS
1.9.1 Grassy Areas
Grass and weed growth in excavated materials that are stockpiled on site shall be controlled and/or cut weekly. Weeds and grass within the construction site shall also be controlled and/or cut weekly and any bushes or shrubs shall be trimmed monthly. Areas disturbed by construction and/or those areas required by the plans to be "re-seeded" shall be re-established by hydroseeding only. Straw shall not be used as a cover for freshly seeded areas.
1.9.2 Privately Owned Vehicles (POVs)
POVs used by Contractor personnel to commute to work are required to park in existing parking lots. Contractor or Contractor's employees, including subcontractors, shall not park any personally owned vehicle (POV) or company and/or delivery vehicle on grassy areas near or in the construction site without prior approval from the Contracting Officer, or his/her designated representative. When allowed, parking on grassy areas will only be for short-term delivery purposes (to include heavy tools, equipment, construction materials, etc.). Use designated hard surfaces or existing parking lots near or within the project site for parking of POVs or company and/or delivery vehicles. Tire and track impressions (ruts) created on wet or soft soil by vehicles and/or equipment used in the Contractor's operations shall not be left for more than one day after removal of such vehicle or equipment that cased the rutting. The Contractor shall restore the affected area(s) of the site to its original condition within that one-day period.
1.9.3 Site Cleanup
During construction, the Contractor shall maintain all areas in a neat and orderly manner. Contractor shall keep the construction site cleaned daily of all construction trash, trash generated by employees, debris, and/or demolished building materials. If the work areas are not kept neat and orderly, the Contractor must return to the area to correct the unacceptable condition. During the laying of asphalt roads, streets and/or parking surfaces, areas soiled by residual asphalt shall be cleaned daily. The Contractor shall treat with lime entrances and exits to asphalt work site at his/her own expense.
1.9.4 Access Routes
Access routes to this project shall be limited through the Base as shown on the plans. Haul route, when exiting the base, shall be through the West Gate only. The Contractor shall not use the gates at King Street Bridge or West Gate (Sweeney Boulevard) for haul route entry.
1.9.5 Road and Street Clean-Up
The Contractor is solely responsible for spillage from his/her vehicles and such spillage shall be cleaned up immediately. For the duration of this contract and on a daily basis, the Contractor shall remove from all base roads and/or streets asphalt, mud, soil, rocks, trash, and debris that result from his/her construction operation on base. All roads and/or streets affected shall be cleaned before close of business on the particular day affected. In the case of asphalt, roads will be cleaned and/or treated with lime immediately upon detection.
1.9.6 Removal of Formwork
The Contractor shall remove all concrete formwork and boards within fourteen calendar days after concrete pour.
1.9.7 Noise Control
The Contractor shall comply with all applicable state, local and installation laws, ordinances and regulations relative to noise control, to include applicable quiet hours exclusive to Langley Air Force Base. Work site is in a residential area of Langley Air Force Base. There shall be absolutely no construction activities in or around the construction site prior to or after the hours designated in "Work Hours" paragraph above without an approval from the Contracting Officer, or his/her designated representative. This restriction also applies to holidays also.
1.9.8 Excavations
All trenches/excavations shall be back filled and compacted to 85% of maximum density. Trenches will be top dressed with no less than 3 inches of shifted topsoil and then compacted. The finished area will be free of all debris, rocks and then graded to conform to the surrounding area. The area will be hydro seeded with fescue (cool weather) or Bermuda grass (hot weather). Seed shall contain no less than 99% pure seed, 0% weed seed and spread at a rate of 8 - 10 lbs per 1,000 sq ft.
1.9.9 In-Ground Obstructions
Any type of raised obstructions shall have the surrounding soil backfilled, compacted to 85% of maximum density, and graded. The area will be top dressed as above to within 3 inches of the top of obstruction. Ground level obstructions will have the area dressed to the level of the obstruction. The area will be hydro seeded with fescue (cool weather) or Bermuda grass (hot weather). Seed shall contain no less than 99% pure seed, 0% weed seed and spread at a rate of 8 - 10 lbs per 1,000 sq ft.
1.9.10 Architectural Compatibility
Due to Langley AFB's distinct historic architecture and the high visitor traffic it receives, several special actions are required during construction:
a. Tracking mud or asphalt on roads will not be tolerated. Roads will be cleaned and/or treated with lime (in case of asphalt) immediately upon detection.
b. Newly placed concrete curbing and sidewalks shall match existing, adjacent concrete in color and texture.
c. Unprimed or factory-finished equipment installed on the exterior of facilities shall be painted with two coats of brown paint to match existing equipment.
1.9.11 Patching
All holes in walls or other parts of the structure where material or equipment is removed or replaced shall be sealed, painted, caulked, or plugged neatly with original type of materials to match the existing part of the structure so involved. All above work and materials shall be approved by the Contracting Officer or his/her designated representative.
1.9.12 Repairs
Replace or restore all pavement, curb and gutter, and sidewalk disturbed by operations under this contract to the original condition, except where shown or specified otherwise. Compact backfill in pavement repairs with mechanical tampers to affect a density equal to adjacent subgrade. Replace pavement with equal materials and equal thicknesses to that removed, unless indicated otherwise. Each pavement area shall be replaced immediately after the work operation for that area is completed. At the Contractor's option, a temporary repair with a surface of bituminous concrete may be made immediately and removed and the permanent repair made before completion of the contract.
1.9.13 Marking
Contractor shall not mark any curb or pavement with paint.
1.9.14 Protection Requirements
The Contractor shall at all times protect and preserve the property of the Government which is within the work area and could be affected by the accomplishment of the work specified and indicated, and all parties and individuals within or near the work areas who could be endangered by the installation of the work.
1.9.15 Accidental Spills
In the event of fuel spillage during the performance of this contract, the Contractor shall be responsible for its containment, clean-up, and related disposal costs. The operator shall have sufficient spill supplies readily available on the pumping vehicle and/or at the site to contain any spillage. In the Event of a Contractor related release, the Contractor shall immediately notify the Environmental Management Office and take appropriate actions to correct its cause and prevent future occurrences. If the federal, state, or local authorities assess any monetary fine, penalty, or assessment related to the release of any substance by the Contractor, his/her employees, or agents during the performance of this contract, the Contractor shall be solely liable for its payment, authorizes the United States Air Force to withhold such form of payment and otherwise indemnify and hold the United States Air Force harmless.
1.10 ENVIRONMENTAL PROTECTION
1.10.1 Environmental Restoration Program (ERP) Requirements
[Include only if work is in ERP area. Ensure drawings define IRP boundaries and well locations]
1.10.1.1 Contaminated Soil and Free Products
Any material (soil) that is suspected of containing petroleum products shall be reported to the Contracting Officer or his/her designated representative. If discovered, the Contractor shall mitigate any potential threat to the workers, public and environment. The area that will be disturbed under this contract has the potential to have free product migrate into and under the construction site. Comply with VR-680 and record the quantity of any fuel removed from [the line]. Contaminated soil and/or free product shall not be used for backfill or removed from the base without written approval from the Contracting Officer. Once removal is approved, Contractor shall dispose of material under guidance of the Pollution Prevention Officer (1 CES/CEV). All hazardous waste manifests shall be prepared by the Contractor and shall be coordinated, approved and signed by 1 CES/CEV Hazardous Waste Manager (37 Sweeney Boulevard) prior to removal of such waste from the base.
1.10.1.2 Site Safety
Site summaries from our Management Action Plan are furnished with this contract to familiarize personnel with the potential hazards associated with construction and demolition work at these sites. Ensure workers are informed of potential hazardous exposures from working at these sites, and that the appropriate precautions are followed to minimize hazards to human health and the environment. Personnel working at these sites shall have 40-hour HAZWOPER Training. At least one individual on site should have completed the OSHA 8-hour supervisor training course. The plans identify the boundary of these IPR sites. To perform work at these sites, the Contractor must have a Health and Safety Plan and Hazardous Waste Disposal Plan for proper disposal of all regulated materials generated during execution of this project.
1.10.1.3 Monitoring Wells
There are several monitoring wells installed in and around the proposed construction area. Site maps and construction drawings provide the location of these wells. The Contractor shall take all precautions to prevent any damage to wells. If the wells and associated structures are damaged during the project, the Contractor shall repair/replace all damages at no additional expense to the Government. Contractor shall dispose of all regulated materials during repair of the damaged structures and remove any free product as required by VDEQ regulations.
1.10.1.4 Additional Excavation
Prior to any excavation beyond the immediate area or boundary of the construction site, the Contractor shall coordinate with 1 CES/CEV and obtain the Contracting Officer's approval.
1.10.2 HAZARDOUS MATERIALS REPORTING
1.10.2.1 Required Reports
In compliance with AFI 32-7086 and AFI 32-7086 ACC Sup 1, contractors are required to report the usage of all hazardous materials to the government. The contractor shall report the type and estimated usage of all Hazardous Materials and shall submit a copy of the Material Safety Data Sheet (MSDS) for each item to the 1 LRS/HAZMART, 1 CES/CEVQP, and the Contracting Officer (CO) not less than seven calendar days prior to bringing the items on the installation. The Contractor shall submit to the CO the following information along with the Material Safety Data Sheet (MSDS) for each item within 10 days after award of the contract. This information will consist of the title of the project, the project number, project location (i.e. building number, street address, or if new construction, the general area), the contractor company name, point-of-contact and telephone number, the name of the hazardous material, manufacturer of the material, the estimated quantity in gallons or pounds that may be used on the project, and the maximum amounts that will be stored on the job site at any given time.
1.10.2.2 LAFB Hazardous Materials Management Process (HMMP) Team Review The LAFB Hazardous Materials Management Process (HMMP) team will review the listing to ensure there are no concerns with the chemicals being used and/or stored on the installation. The report will be sent to the Contracting Officer and to the following addresses:
1 FW/HAZMART
1 CES/CEVQP
Bldg 330 Bldg 328, Rm 253
23 Sweeney Boulevard 37 Sweeney Boulevard Langley AFB VA 23665 Langley AFB VA 23665
Should the Contractor need to use additional hazardous materials at any time of the project that were not previously submitted, he shall submit a list of those items to the above offices as soon as he is aware of the need for the materials.
1.10.3 NOTIFICATION OF ABESTOS CONTAINING MATERIALS (ACM)
[Specifier Select One of the Following Paragraph]
1.10.3.1 Asbestos Notification
Tests have indicated that Asbestos Containing Materials (ACM) are not present in the areas affected by this work. However, if ACM are exposed that were not previously known to exist, the Contractor shall cease work in the affected area and notify the Contracting Officer. If the Contractor is tasked to remove the discovered the ACM, all asbestos removal work is subject to OSHA, EPA and Commonwealth of Virginia compliance and inspection for asbestos abatement. Contractor must perform asbestos removal work in accordance with these specifications and EPA National Emissions Standards for Hazardous Air Pollutants (NESHAPs) for asbestos and any subsequent updates thereto. This includes State and EPA Region 3 Notifications that shall be accomplished at least 20 days prior to starting any asbestos abatement or removal. A copy of the notifications shall be submitted to the Contracting Officer. All hazardous waste manifests shall be signed by 1 CES/CEV (37 Sweeney Boulevard) prior to removal of such waste from the base. Only CEV is authorized to sign these manifests. The Asbestos Program Manager is Mr. Robert Jones who can be contacted at (757) 764-1126. Please contact him if you have any questions.
[OR]
1.10.3.2 Asbestos Notification
Tests have indicated the presence of Asbestos Containing Materials (ACM) in the areas affected by this work. Contractor is reminded that all asbestos removal work is subject to OSHA, EPA and Commonwealth of Virginia compliance and inspection for asbestos abatement. Contractor must perform asbestos removal work in accordance with these specifications and EPA National Emissions Standards for Hazardous Air Pollutants (NESHAPs) for asbestos and any subsequent updates thereto. This includes State and EPA Region 3 Notifications that shall be accomplished at least 20 days prior to starting any asbestos abatement or removal. A copy of the notifications shall be submitted to the Contracting Officer. All hazardous waste manifests shall be signed by 1 CES/CEV (37 Sweeney Boulevard) prior to removal of such waste from the base. Only CEV is authorized to sign these manifests. The Asbestos Program Manager is Mr. Robert Jones who can be contacted at (757) 764-1126. Please contact him if you have any questions.
1.10.4 Fuel Spills
In the event of a fuel spillage during the performance of this contract, the Contractor shall be responsible for its containment, clean up, and related disposal costs. The operator shall have sufficient spill supplies readily available on the pumping vehicle and / or at the site to contain any spillage. In the event of a Contractor-related release, the Contractor shall immediately notify the Environmental management Office and the Contracting Officer and take appropriate actions to correct its cause and prevent future occurrences. If the federal, state, or local authorities assess any monetary fine, penalty, or assessment related to the release of any substance by the Contractor, his/her employees, or agents during the performance of this contract, the Contractor shall be solely liable for its payment, authorizes the United States Air Force to withhold such from payment and otherwise indemnify and hold the United States Air Force harmless.
1.10.5 Waste Disposal
1.10.5.1 Waste Handling, Storage, Transportation, and Disposal
All waste materials generated by any work under this contract performed on a Government installation shall be handled, transported, stored, and disposed of by the Contractor and by his/her subcontractors at any time in accordance with these specifications, all applicable Federal, state, or local laws, ordinances, regulations, court orders, or other types of rules or rulings having the same effect of law. These include but are not limited to Executive Order 120S, 13 October 1978; the Federal Water Pollution Control Act, as amended (33 USC Sec 1251 ET SEQ); The Clean Air Act, as amended (42 USC Sec 1857 ET SEQ); The Endangered Species Act, as amended (16 USC Sec 1531, ET SEQ); The Toxic Substances Control Act, as amended (15 USC Sec 2601, ET SEQ); The Solid Waste Disposal Act, as amended (42 USC 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 USC Sec 469, ET SEQ).
1.10.5.2 Construction/Demolition Debris Recycling/Reporting
As good stewards of the environment, the government is committed to recycling to the greatest extent practicable. The Air Force goal is to divert greater than 40% of its waste away from landfills. The government must report quarterly to higher headquarters the amount of construction / demolition debris that is both recycled and disposed of in tons; therefore, the contractor shall recycle all construction/demolition debris to the maximum extent practicable. The Contractor shall make every effort to recycle materials such as but not limited to concrete, bricks, asphalt, and metals. The following are some suggested sites for disposal of recyclable materials:
Some Recycling Center Sources Company Address City Phone Acceptable Items Glass, tin cans
Tidewater Fiber 5602 Chestnut Ave Newport News, paper, occ., plastics
VA 247-5766 aluminum
Aluminum, copper, Old Dominion 1618 W. Pembroke Hampton, steel, iron, metals
Recycling Avenue VA 723-2942 paper, tires
Industrial and
Butler Paper 324 Newport St Suffolk, Commercial Paper
VA 539-2351 Recycling
Aluminum, copper, 2409 Bowdens Norfolk, brass, scrap metals
Dubin Metals Ferry Rd VA 622-3970 batteries, radiators
Gutterman Iron 1206 East Norfolk, Scrap brass, copper, and Metal Brambleton Ave VA 627-1095 aluminum
Aluminum, copper, Sims Metal 2116 George Yorktown, steel, brass, stain-, Wash Mem Hwy VA 599-4940 les steel, radiators
All C&D materials, (i.e. lumber, asphalt
Waterways 1401 Precon Chesapeake, concrete, concrete w/
Marine Drive VA 333-3427 rebar)
All C&D materials, (i.e. lumber, asphalt
2972 North Hampton, concrete, concrete w/
K.F. Wilson Armistead Ave VA 865-7182 rebar)
1.10.5.3 Recycling Report
The Contractor shall report the tonnage of the items recycled and the amounts disposed of to the project manager, the Contracting Officer, and 1 CES Environmental Flight by the 5th day of each quarter (Jan, Apr, Jul, Oct) during the period of performance. The report shall list the title of the project, the project number, the Contractor's company name and point-of-contact, phone number, the type items (i.e. concrete, asphalt, scrap metal, etc) and the tonnage of those items recycled and the tonnage of the items disposed of. For the items disposed of, one total figure can be given instead of reporting disposal figures for the various items.
If this information is mailed to the government, please mail it to:
1 CES/CEVQP
Attn: Pollution Prevention Mgr
Bldg 328, Room 253
37 Sweeney Boulevard Langley AFB VA 23665
1.10.5.4 Protection from Loose Debris
Loose debris on trucks leaving the site shall be loaded in a manner that shall prevent dropping of materials on streets and conform to local ordinances/laws. Fasten suitable cover, such as a tarpaulin, over the load before entering surrounding streets.
1.10.5.5 Submitting Trip Tickets
Contractor shall document all debris and material that are delivered and disposed of at local landfills. Contractor shall submit to the Contracting Officer all trip tickets from the landfill facility to show all debris and materials that have been landfilled in accordance with all Federal requirements and in an approved location. At the completion of the project and within 14 calendar days of final acceptance, the Contractor shall also provide to the Contracting Officer a report of tonnage of debris and materials legally disposed of in local landfills.
1.10.6 Use of Recycled-Content Products (Affirmative Procurement)
Whenever the potential for the use of a non-recycled content product exists during the construction stage of the project, the Contractor shall incorporate in this project, as a substitute, recycled-content products that are listed and identified in the Environmental Protection Agency (EPA) Comprehensive Procurement Guidelines (CPG) for recycled-content products. The Contractor shall use recycled-content products as required by EPA and other governmental agencies and Federal Acquisition Regulation (FAR) clauses.
It is mandated by Executive Order 13101 (Greening the Government through Waste Prevention, Recycling, and Federal Acquisition) and Section 6002 of the Resource Conservation and Recovery Act (RCRA) that the Federal Government use recycled-content products in the construction and/or renovation of facilities. It is the intent of the Government to comply with the Environ-mental Protection Agency (EPA) requirement 100% of the time and use as many of the applicable listed recycled-content products as feasible and economically practical. The Contractor shall consider this a standard requirement for all aspects of the project construction.
The recycled-content products listed in the CPG can be found in the EPA website at www.epa.gov/cpg/products.htm. These products are also listed at Annex C to LAFB Affirmative Procurement Plan 32-7080 (See C-1 through C-3 Attached). This list is subject to change at any time so it is the Contractor's responsibility to be aware of any updates or additions.
Such products shall also comply with the requirements of the EPA Recovered Materials Advisory Notice (RMAN). The RMANs recommend recycled-content ranges for CPG products based on current information on commercially available recycled-content products. The recommended recovered materials content percentage can be obtained by clicking on the product on the web-site.
1.10.6.1 Affirmative Procurement Report
Before starting the project, the Contractor shall complete Annex C to LAFB Affirmative Procurement Plan 32-7080 (See C-1 through C-3 Attached) indicating the items he plans to use. The Contractor will provide this to the Contracting Officer and the Project Manager. Then during the accomplishment of the project construction, the Contractor shall complete the form again. At this time, the Contractor shall indicate the use and non-use of products that are contained in the CPG and will list the recycled-content percentage for the applicable item. In each instance where a recycled-content construction product is not used, the Contractor shall provide to the Contracting Officer (or his/her designated representative) and the Project Manager a completed Exemption Form, Annex B to LAFB Affirmative Procurement Plan 32-7080, "Recovered Materials Determination Form" (See B1 and B2 Attached).
The Contractor shall complete this form for all items for which he or she desires an exemption from the Affirmative Procurement Program for Recovered Materials that are being procured. Exemptions can only be taken if (1) the item is not available within a reasonable period of time (2) item fails to meet a performance standard in the specifications and (3) the item was only available at an unreasonable price i.e., the recycled-content product costs more than the non-recycled content product. The fourth reason on the Recovered Materials Determination Form, (4) the item is not available from 2 or more sources, does not apply to construction/renovation contractors as the Government will not specify where you can get your materials from. Specific reasons why an exemption is taken will be specified on the form and documentation supporting this reason will be provided and attached.
The Contractor will sign the form as the "Procurement Originator" and the completed form will also be signed by the 1 CES Engineering Flight Chief or Deputy Flight Chief. These forms will be kept in the project folder indefinitely.
1.10.7 Volatile Organic Compounds
All coatings and solvents used in the performance of this contract shall meet the required performance specifications and shall not exceed the volatile organic compound limits of the Air Pollution Control Districts where they are used.
1.10.8 Above-Ground Storage Tanks
Any above ground storage tanks (ASTs) allowed on site shall have secondary containment, venting and spill/overfill protection. Anti-siphon valves are required. The Contractor shall visually inspect such tanks daily for leaks. All ASTs shall be installed or erected in accordance with VR 680-14-13, NFPA 30, and 40 CFR 112.7.
1.10.9 Erosion and Sediment Control
All construction operations shall comply with the requirements of the Virginia Erosion and Sediment Control Act. Hay bales shall not be used for erosion control and inlet protection from storm water run-off. The Contractor shall submit alternate method of protection to the Contracting Officer at the preconstruction conference for review and approval. The Contracting Officer will notify the Contractor of his/her decision prior to issuance of Notice to Proceed (NTP).
1.10.10 Resolution of Environmental Contractual Conflicts
In case of a conflict or discrepancy between environmental regulations or laws and the contract specifications, the Contractor shall immediately submit the matter in writing to the Contracting Officer for a determination. Without such determination any actions taken shall be at the Contractor's own risk and expense.
1.11 PROTECTION OF GOVERNMENT PROPERTY
1.11.1 General
The Contractor shall at all times protect and preserve the property of the Government which is within the work area and could be affected by the accomplishment of the work specified and indicated, and all parities and individuals within or near the work areas who could be endangered by the installation of the work. Protection requirements include protecting the interior of the facility from inclement weather. Any actions necessary for adequate protection are solely the Con-tractor's responsibility. Any temporary boarding of windows or doors must be painted Langley Brown or Langley Beige to match the exterior.
1.11.2 Protection of Equipment
Contractor is required to cover equipment that is to remain in place within the area of contract operations and protect it against damage or loss and store equipment that is removed in performance of work where directed or use in work as required by drawings and specifications. Equipment temporarily removed shall be protected and returned equal to its condition prior to starting work at no additional expense to the Government. Security for equipment or material that is to be reused and is removed for temporary storage shall be the sole responsibility of the Contractor.
1.11.3 Protection of Grounds
Contractor shall provide protective barriers for all grass, trees, shrubs, sidewalks, curbs and gutters within the construction boundary. Furthermore, such items, including grass, outside the construction boundary shall also be protected during delivery of materials and/or moving of equipment. Damages caused by the Contractor to existing grounds, plants, pavements, utilities, work by others, fixtures, or furnishings shall be repaired by the Contractor. Such repairs shall be of as good condition as exited before the damaging, unless such existing work is scheduled for removal or replacement by the work requirements of the contract. This requirement also pertains to grading of site to remove all clods and grade irregularities prior to final inspection and acceptance. The Contractor may be required to install temporary fencing to protect the site, at no cost to the Government.
1.12 SAFETY
1.12.1 Safety Barriers and Signs
Contractor shall provide barricades, traffic control signs and construction safety signs that meet industry standards. Actual location, size and final arrangement of these items shall be discussed and approved by the Contracting Officer prior to installation. Such approved items shall be of uniform size, design and color. All cones, barricades, warning lights, temporary signs and protective devices shall conform to the current requirements of the Manual of Uniform Traffic Control Devices for Streets and Highways (MUTCD) and the US Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1.
1.12.2 Employee Health and Safety
1.12.2.1 Compliance
In order to provide safety controls for protection to the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with all pertinent provisions of the Corps of Engineers Manual, EM 385-1-1 (2003), entitled "Safety and Health Requirements Manual," as amended. The Contractor will also take or cause to be taken such additional measures as the Contracting Officer, or his/her designated representative may determine to be reasonably necessary for the purpose. A copy of the manual is available for review in the Civil Engineering Contract Management Section office (Bldg. 328) or copies can be obtained from the Government Printing Office, Washington DC 20402.
1.12.2.2 Subcontractor’s Compliance
Compliance with the provisions of this clause by subcontractors will be the responsibility of the Contractor.
1.12.2.3 Safety Records
The Contractor will maintain an accurate record of, and will report to the Contracting Officer or his/her designated representative in the manner and on the forms prescribed by the Contracting Officer or his/her designated representative, exposure data and all accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies and equipment incident to work performed under this contract.
1.12.2.4 Notification of Non-Compliance and Corrective Action
The Contracting Officer or his/her designated representative will notify the Contractor of any noncompliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately take corrective action. Such notice, when delivered to the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the Contracting Officer or his/her designated representative may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop orders shall be made the subject of claim for extension of time or for excess costs or damages by the Contractor.
1.12.3 Applicable Publications
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
a. Code of Federal Regulations (CFR):
(1) OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206, OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both Parts 1910 and 1926 as they relate to construction safety and health. They are for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.
b. National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).
c. Federal Standard (Fed. Std.):
(1) 313A Material Safety Data Sheets, Preparation and the Submission to the BioEnvironmental Office on Langley AFB. Safety and Health Requirements Manual, EM 385-1-1
(2) Use of Asbestos Containing Material or any Class 1 ozone depleting chemical compounds is prohibited at Langley AFB, DA Circular 40-83-4
(3) Work covered by this section: This section is applicable to all work covered by this contract.
(4) Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std. 313. Those most commonly encountered include asbestos, lead paint, polychlorinated biphenyl's (PCBs), explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging, and pipe covering.
1.12.4 Precautions Against Hazards
1.12.4.1 Welding, Cutting and Burning
All welding and cutting operations shall be done in accordance with nationally recognized good practice. The current publications of the American Welding Society, 2501 NW 7th Street, Miami FL 33125, and the National Fire Protection Association, 470 Atlantic Ave., Boston MA 02110, shall be used as a minimum standard of nationally recognized safety procedures in welding and cutting.
The Contractor shall provide the necessary methods of fire extinguishment and fire prevention, and before operations begin, clear all welding and cutting operations with the representative of the Contracting Officer or his/her designated representative. The Contractor shall request and receive an AF Form 592, USAF Welding and Brazing Permit, before preparing for such operations.
The Contractor shall discontinue all burning, welding or cutting operations one hour prior to the end of the normal workday. The Contractor shall provide a workman to remain at the site for thirty minutes after discontinuing the above operations. This workman shall make a thorough inspection of the area for possible sources of latent combustion. Any unsafe conditions shall be reported to the Fire Department for their investigation - EMERGENCY PHONE NO 911.
1.12.4.2 Open Flames
The use of open-flame heating devices will not be allowed except by special permission of the Contracting Officer or his/her designated representative. Such permission will not be granted unless the Contractor has taken all venting precautions. Burning trash, brush or trees on the job site will not be allowed unless specific approval is granted for each incident by the Contracting Officer or his/her designated representative. Approval for the use of open fires and open-flame heating devices will in no way relieve the Contractor from the responsibility of any damage incurred because of fires
1.12.4.3 Flammable Liquid Storage
Flammable liquids shall be stored and handled in accordance with the Flammable Liquids Code (No. 30) of the National Fire Protection Association. Flammable liquids shall not be stored in the Contractors storage trailers.
1.12.4.4 Technical Services
The Langley Fire Department, Technical Services Section, (757) 764-4275, is available for assistance concerning fire hazard questions.
1.13 SECURITY
1.13.1 General Base Requirements
Access to Langley AFB is restricted to those Contractor and subcontractor employees required for the performance of this contract and only for the performance period of this contract. Contractor passes are issued by the Pass and Registration Section, Bldg 15 (Room 103), after a signed letter from the Contractor listing all employee names and social security numbers has been delivered to and approved by the Contracting Officer or his/her designated representative. Procedures for requesting Base Passes for employees and Contractor vehicles will be further explained during the preconstruction conference.
1.13.2 Emergency Security Situations
If a security violation is detected from any cause, it may result in the cessation of all work and evacuation of the area by all Contractor personnel to a point to be determined by the Security Police Supervisor at the scene. The control of construction personnel under these conditions is a Security Police Officer and their orders shall be followed in detail. Construction will be permitted to resume as quickly as possible. The individual causing the violation may be apprehended, and if so, will be processed and released to a responsible supervisor; such person might be away from his/her work site as long as 1 to 1½ hours. If a hostile situation is detected as a result of the construction activity, the entire crew may be removed from the area and detained until competent authority approved their release. All Security Police exercises will be scheduled to not interfere with construction personnel or with their work.
1.13.3 Work In Special Security Areas
1.13.3.1 Escorts
Government shall provide all escorts required for access to security areas while working on construction projects at LAFB.
1.13.3.2 Applicable Security Criteria
AFI 31-101, The Air Force Installation Security Program shall apply to construction projects at Langley AFB.
1.13.4 Restricted Areas
[Include only if work will be performed in a restricted / secure area]
1.13.4.1 General
All work to be performed on this project is within the boundary of a USAF Restricted Area and will be confined to the immediate vicinity of ____ [PROVIDE FACILITY NUMBER]. Full operational status of the mission and Security Forces will be maintained throughout the contract period. To facilitate contract work while preserving strict security, a Contractor free zone will be established around each work area, and a combination of entry control, internal movement and surveillance techniques will be employed. Security procedures and USAF Security Police actions will take precedence over all concerns at the time of emergencies or mission operations. The use of deadly force is authorized to protect government resources.
1.13.4.2 Entry Control
Entry into the work areas will be through the use of Air Force Form 75, Visitor Pass, and an Entry Authority List provided by the Contractor to the Chief of Security Police. The Base Commander retains the authority to deny entry to any person(s). Security Police and Escort Officials execute this authority for the Base Commander.
1.13.4.3 Identification Permits
The Contractor is responsible for requiring each employee to display an identification permit while within the area. All identification permits shall be immediately delivered to the Contracting Officer, or his/her designated representative, for cancellation upon release of any employee or termination of contract work, whichever is sooner. All Contractor personnel shall stay within the boundaries of the guarded work zone.