Atch_06_-_Environmental_Special_Conditions_.docx

DOCX document 134 KB Posted

Attached to
Multipla Award Construction Contract (MACC) at JBLE Langley-Ft Eustis, VA Federal contract opportunity
Solicitation number
FA4800-16-R-0004
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 6 - Environment Special Conditions

View the file

Other files for this federal contract opportunity

Other files attached to Multipla Award Construction Contract (MACC) at JBLE Langley-Ft Eustis, VA, newest first.
File Type Posted
Atch_15_TOPR_Atch_5_DrawingsF.50060_Fam_Camp_Showers.pdf PDF
Atch_1_-_17-4005_Remodel_FAM_Camp_Restrooms_F_50060_-_SOW_Rev_H.docx DOCX document
Atch_15_TOPR_Atch_4_-_Pics_of_F.50060_-_Rev_C.pdf PDF
Attachment_29_MACC_Site_Visit_Sign_In_Sheet.pdf PDF
Attachment_28_QUESTIONS_&_ANSWERS_42-280.docx DOCX document
Attachment_03R_Langley__01_11_00_General_Specification_-_2014Jun20.docx DOCX document
Atch_15_TOPR_Atch_6_Cover_Sheet_Template_March_2010.dwg DWG drawing
FA4800-16-R-0004_Amendment_02.pdf PDF
Attachment_05R_Section_01_12_00_-_Environmental_Managemtne_Special_Conditions.docx DOCX document
Atch_01R_Special_Contract_Requirements.docx DOCX document
Atch_15_TOPR.docx DOCX document
QUESTIONS_&_ANSWERS.docx DOCX document
TOPR.docx DOCX document
TOPR_Atch_2_-_General_Decision_Number_VA170022.docx DOCX document
F._50060_Map.pptx PPTX presentation
FA4800-16-R-0004_MACC_Solicitation_Amendment_1.pdf PDF
Atch_22_-_Bonding_Information_Request.docx DOCX document
Atch_23_-_ConsentLetter.doc DOC document
Atch_12_-_633_CES_Operation_Instruction_32-103.doc DOC document
Atch_4_-_Pics_of_F.50060_-_Rev_A.pdf PDF
Atch_18_-_Past_Performance_Questionnaire.docx DOCX document
Atch_11_-_Specification_28_31_66_Conventional_System.docx DOCX document
TOPR.docx DOCX document
Atch_25_-_Teaming_List.doc DOC document
Atch_14_-_Ft_Eustis_Specific_Instructions.docx DOCX document
Atch_2_-_General_Decision_Number_170170.docx DOCX document
Atch_1_-_SOW_Remodel_FAM_Camp_Restrooms_F_50060,_MUHJ_17-4005.docx DOCX document
Atch_03_-_Section_01110_General_Specification_(Jun_07).doc DOC document
Atch_05_-_Section_01_12_00_Asset_Management_Special_Conditions.docx DOCX document
Atch_24_-_Client_Authorization_Letter.doc DOC document
Atch_10_-_Specification_28_31_65_Addressable_System.docx DOCX document
Atch_04_-_LAFB_01_06_00_Regulatory_Requirements.docx DOCX document
Atch_13_-_UFC_1-300-02_Unified_Facilities_Guide_Specs.pdf PDF
Atch_16_-_AF_3064_Contract_Progress_Report.xfd —
FA4800-16-R-0004_-_MACC.docx DOCX document
Atch_01_Special_Contract_Requirements.docx DOCX document
Atch_21_-_Financial_Information_Request.docx DOCX document
Atch_26_-_Non-Disclosure_Agreement.doc DOC document
Atch_3_-_008_A-1_Floorplan_Schedule.PDF PDF
Atch_08_-_LAFB_PremisesDistributionSpecs_-_Revised_June10.docx DOCX document
Atch_07_-_LAFB_ETL_01-18_Fire_Protection_Engineering.pdf PDF
Atch_09_-_Section_27_10_10_BUILDING_TELECOMMUNICATIONS_WIRING.docx DOCX document
Atch_02_-_General_Provisions_for_MACC.DOCX DOCX document
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

1. Environmental Policy

2. Environmental Requirements

3. Contractor Environmental Stewardship

4. Environmental Management System

5. Environmental Awareness and Competency Training

6. Contractor Environmental Deliverables

7. Air Quality Pollution Management

8. Wastewater/Stormwater Management

9. Pollution Prevention, Recycling and Green Procurement

10. Hazardous Materials Management (HMM)

11. Solid Waste Management (SWM)

12. Hazardous Waste Management (HWM)

13. Natural Resources

14. Cultural Resources

15. Pest Management

16. Asbestos and Lead Based Paint Abatement

17. Storage Tank Management

18. Environmental Restoration Program (ERP) Requirements

19. Spill Response & Reporting

20. Clean Soil Program (CSP)

Attachment 1 - Contractor Hazardous Material Worksheet
Attachment 2 – Contractor’s Monthly Report for HazMats
Attachment 3 - Construction/Demolition Debris Recycling and Reporting Guidelines
Attachment 4 - Contract Submittal and Contractor Reporting Form
Attachment 5 - Recovered Materials Determination Form
Attachment 6 – Aboveground Storage Tank Inspection Record

1. Environmental Policy: Joint Base Langley-Eustis (JBLE) is dedicated to the conservation, protection, and enhancement of the environment. This is accomplished by planning and implementing JBLE environmental programs to: attain and maintain environmental compliance; to prevent pollution; to continually improve environmental stewardship; and to achieve a sustainable facility by providing coordination between JBLE, the regulatory agencies, and JBLE Activities including facility or process owners, contractors, and tenants. All services and work provided by contractors will be performed in such a manner to adhere to this policy.

2. Environmental Requirements: The contractor shall comply with all: local, state, and federal laws, ordinances and regulations; and installation policies and procedures. The contractor shall comply with the most stringent environmental requirements between differing regulations. The contractor shall immediately submit in writing to the Contracting Officer (CO) for determination any conflict between requirements and the aforementioned regulations. Without such determination, any actions taken shall be at the contractor’s own risk and expense.

3. Contractor Environmental Stewardship: The contractor shall perform work under this contract:

3.1. Consistent with the JBLE policy and objectives identified in Environmental Management Systems (EMSs)

3.2. In a manner that conforms to all appropriate Environmental Management Procedures and Operational Controls identified in the EMSs

3.3. In the case of a noncompliance, the contractor shall respond and take corrective actions per guidance and the time schedule established by the respective JBLE Environmental Office.

3.4. The contractor shall ensure that their employees are aware of the roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract.

4. Environmental Management Systems:

4.1. Both JBLE-Langley and JBLE-Eustis have ISO14001 based EMSs to manage environmental program requirements. Although the separate EMSs are similar, each has unique environmental management procedures to address specific Activity (Mission Partner) and base operational requirements.

4.2. JBLE-Eustis codifies all base environmental requirements and management procedures in JBLE Instruction 32-101, Environmental Management, (JBLE I 32-101) and associated Environmental Management Procedures (EMPs). JBLE I 32-101 articulates policies and requirements while the various EMPs provide the specific what, when, and how to comply with the requirements. JBLE I 32-101 and the EMPs can be obtained at: https://esohtn.com/

4.3. JBLE activities are defined as DOD Mission Partners, Non-DOD government tenants, 633 Air Base Wing (ABW) Organizations, Contractors and Subcontractors, Government –Owned-Contractor-Operated facilities (GOCO), Corps of Engineer (COE) sites and facilities, Defense Commissary Agency (DECA) facilities, Army and Air Force Exchange Service (AAFES) and lessees, or any other organization resident or doing work on the installation.

4.4. Referenced publications change over time due to changing regulatory requirements. The contractor will ensure that the latest referenced publication is being used to meet compliance.

5. Environmental Awareness and Competency Training:

5.1. JBLE-Eustis:

5.1.1. All contract personnel performing work on JBLE-Eustis are required to take either the Basic Environmental Management Awareness (BEMA) training or the Leadership Environmental Management Awareness and Competency (LEMAC) training. See EMP 4.4.2 Environmental Awareness & Competency Training.

5.1.2. Contractors that have contracts for more than one year, to include option years, are required to appoint in writing a primary and alternate Activity Environmental Coordinator (AEC). AECs must complete the Advanced Environmental Management (AEM) training.

5.1.3. Training sites: BEMA and LEMAC training can be found on the Environmental Safety Occupational Health Training Network (ESOHTN) at http://esohtn.com/. This is a public site. Login procedures are found in JBLE I 32-101, EMP 4.4.2 Tab 5, ESOHTN Login & Training Procedures.

5.2. JBLE-Langley:

5.2.1. All on-site contractor personnel shall complete annual EMS Awareness Training to meet Langley specific requirements. Upon inclusion in the contract Statement of Work, the Contracting Officer's Representative will verify that all contractor personnel have acquired EMS Awareness Training at their appropriate site or location. Training is provided at www.esohtn.com. Instructions follow:

1. Go to the ESOH-TN website: http://esohtn.com/

2. Click Enter.

3. Click on “Air Combat Command” to get to the log in page.

4. At the Welcome to ESOHTN screen, click Enter.

5. On the next screen, refer to the REGISTER - New Users box. The registration password is ESOH-TN. Enter that password in the box “Registration Password” box.

6. Click Create An Account.

7. This will take you through a series of registration steps. In each step, just fill in the requested information. After completing each step, click Next Step.

8. When you get to “Step 4-Organizational Information” no information is required.

9. At the final step, read the User Agreement. To complete registration, you must accept the User Agreement by clicking I Agree - Complete Registration.

10. By clicking I Agree - Complete Registration, you agree to personally respond to the test questions and not allow others to respond to the questions on your behalf.

11. After you successfully register, you will be taken to the ESOHTN home page for your installation.

12. Select “All Available Training.”

13. Select “Environmental Training.”

14. Select “Environmental Management System Awareness Training.”

15. Once finished with training and test, print certificate for records.

You may choose to end your session by logging out. The next time you enter the site, you will login by typing the username and password that you just created.

Long-term contractors must maintain training certificates and must ensure any employee that is on site longer than 1 year accomplish annual refresher.

Short-term contractors on site for 1 month or less are not required to take ESOH-TN awareness training. However, contractors will be provided awareness materials to distribute to employees and post on safety or information boards. Materials can be posters, brochures, information cards and/or power point slides.

6. Contractor Environmental Deliverables: The contract deliverables are due to the respective JBLE SABER Project Manager and Contracting Officer Representative (COR) who will in turn provide them to the respective Environmental Element:

JBLE-Eustis 733 Civil Engineer Directorate (CED)

ATTN: 733 CED/CEIE

1407 Washington Blvd Fort Eustis VA 23604

JBLE-Langley

633 CES/CEIE

37 Sweeney Blvd Bldg. 328, Room 253 Langley AFB VA 23665

6.1. Before Project Start (30 days):

· Asbestos Abatement Plan (if applicable)

· Lead-Based Paint Abatement Plan (if applicable)

· Hazardous Material Usage Request Forms

· Green Procurement Planning Use Forms

· Environmental Management training and certifications

* Erosion and Sedimentation Control Plans (if applicable)

* Stormwater Permit (if applicable)

* Stormwater Pollution Prevention Plan (if applicable)

* Soil Management Plan (SMP) (if applicable) (* Allow 35 - 60 days for this)

** Wetland Permits if applicable (Joint Permit Application (JPA) submitted to and approved by the Virginia Marine Resources Commission) (** Allow 60 - 90 days for this)

6.2. During Contract:

· Monthly Hazardous Materials Usage Report

· Quarterly Refuse/Recycling Reports

· Soil Management Plan (SMP) (if applicable)

· Generator permit information

*Hazardous Waste/Lead/Asbestos Manifests (*Must be signed by JBLE-Eustis or JBLE-Langley Environmental Staff)

6.3. End of Contract before contract close:

· Green Procurement Exemption Form (if applicable)

· Green Procurement Final Usage Report

· All return Asbestos Manifest (signed by receiving landfill)

7. Air Quality Pollution Management:

7.1. Volatile Organic Compounds (VOC): All coatings and solvents used in the performance of this contract shall meet the required performance specifications and shall not exceed the volatile organic compound limits of the Air Pollution Control Districts where they are used.

7.2. Dust: As applicable, mitigation of fugitive dust emissions shall be accomplished in accordance with 9 VAC5-40-90, Standards for Fugitive Dust/Emissions.

7.3. Heating, Ventilation and Air Conditioning (HVAC): To meet permit requirements, new boiler systems must be added to the appropriate JBLE Air Permit prior to installation. The contractor will submit required data (mmBtu/hour) for each boiler installed to the civil engineer SABER project manager. If installing an oil-fired boiler, contractor shall comply with Subpart JJJJJJ (6J) requirements for initial tune-up and provide the initial notification form to the civil engineer SABER project manager.

7.4. Generators: To meet permit requirements, new generators must be added to the appropriate JBLE Air Permit prior to installation. The contractor will submit required data (Kilowatt (KW) rating) for each emergency generator installed to the civil engineer SABER project manager 60 days prior to installation. The contractor shall also provide to the civil engineer SABER project manager a copy of the manufacturer's certification of compliance with applicable New Source Performance Standards for stationary diesel engines. If installing a generator set with an incorporated fuel tank, the contractor shall comply with Above Ground Storage Tank requirements

7.5. Ozone Depleting Substances (ODS): Contracts may not include any specification, standard, drawing, or other document that requires the use of a Class I or Class II ODS in the design, manufacture, test, operation or maintenance of any system, subsystem, item, component, or process. Contracts may not require the delivery of any items of supply that contains a Class I or Class II ODS or any service that includes the use of a Class I or Class II ODS, except for the servicing of existing systems containing a Class II ODS. All refrigerants shall be recovered or recycled during HVAC repairs and demolition projects.

8. Wastewater/Stormwater Management:

8.1. Erosion and Sediment Control: All construction operations shall comply with the requirements of the Virginia Erosion and Sediment Control Act. The contractor shall provide erosion control fencing (silt) and hay bales IAW local, state and federal regulations where applicable, to prevent site runoff. Hay bales shall not be used for inlet protection from storm water run-off. The contractor shall submit alternate method of protection to the CO at the pre-construction conference for review and approval. The CO will notify the contractor of his/her decision prior to issuance of NTP.

8.1.1. For projects disturbing >2,500 sf of land but <10,000 sf, an Erosion and Sediment Control (E&SC) Plan shall be prepared IAW Virginia Department of Environmental Quality (VDEQ) Erosion and Sediment Control Handbook. Two copies of plans and two full sized sets of drawings will be submitted to the appropriate Water program manager for review and approval.

8.1.2. For projects disturbing >10,000 sf of land but <1 acre, an E&SC Plan shall also be prepared IAW the VDEQ Erosion and Sediment Control Handbook. The E&SC Plan and full sized drawings must be submitted to and approved by the VDEQ prior to initiating groundbreaking activities. A copy of the E&SC Plan shall be forwarded to the appropriate civil engineer SABER project manager.

8.1.3. For projects disturbing >1 acre (43,560 sq. ft.), the contactor must obtain a Stormwater General Construction Permit from the VDEQ. The contractor, as the operator of construction sites, is solely responsible for applying, obtaining, funding, and complying with the terms of the permit. A copy of the final permit must be posted on site, prior to the construction start date. A stormwater pollution prevention plan (SWPPP) which supports the stormwater permit shall be prepared and maintained onsite. A copy of the permit and SWPPP shall be forwarded to the appropriate civil engineer SABER project manager. After construction is completed, a Notice of Termination must be sent to the VDEQ and a copy provided to the appropriate Water Program Manager.

Instructions, forms, and required submittals (e.g., E&SC Plan, full sized drawings, Stormwater Management Plan (SWMP), stormwater calculations, permit fee, etc.) for the General Permit for Discharges of Stormwater from Construction Activities can be found on the DEQ’s Stormwater Management website: http://www.deq.virginia.gov/Programs/Water/StormwaterManagement.aspx

8.1.4. Temporary Stabilized Construction Entrance: The contractor shall provide a temporary stabilized construction entrance at transitions from non-paved to paved areas to adequately remove sediment from vehicle tires. The entrance shall be constructed IAW the Sediment and Storm Water Management Plan Permit drawings. The contractor shall maintain this entrance to function as designed. Stones shall periodically be rotated or exchanged to ensure vehicle tires are clean when exiting the worksite. The contractor shall remove stones and restore all entrances prior to final inspection.

8.2. Wastewater: Any wastewater encountered during construction must be contained and not discharged to the storm sewer system. The wastewater must be tested to meet the installations discharge limits and the results approved by appropriate Water Program Manager before it is allowed to be discharged into the sanitary sewer system.

9. Pollution Prevention, Recycling, and Green Procurement:

9.1. All submittals, correspondence, reports, written/printed/copied documents, or products developed for the government will be accomplished using Green Procurement principles.

9.2. Costs associated with meeting Federal Green Procurement requirements shall be incorporated into the contractor's coefficient, and shall be at no additional cost to the government.

9.3. Use of Recycled-Content Products (Green Procurement): Whenever the potential for use of non-recycled content products exists during the construction stage of the project, the contractor shall incorporate in this project, as a substitute, recycled-content products that are listed and identified in the Environmental Protection Agency (EPA) Comprehensive Procurement Guidelines (CPG) for recycled-content products. The contractor shall use recycled-content products as required by EPA and other governmental agencies and Federal Acquisition Regulation (FAR) clauses.

9.3.1. It is mandated by Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and Section 6002 of the Resource Conservation and Recovery Act (RCRA) that the Federal Government use recycled-content products in the construction and/or renovation of facilities. It is the intent of the Government to comply with the Environmental Protection Agency (EPA) requirement 100% of the time and use as many of the applicable listed recycled-content products as feasible and economically practical. The contractor shall consider this a standard requirement for all aspects of the project construction.

9.3.2. The recycled-content products listed in the CPG can be found in the EPA website www.epa.gov/cpg/products.htm.

9.3.3. Such products shall also comply with the requirements of the EPA Recovered Materials Advisory Notice (RMAN). The RMANs recommend recycled-content ranges for CPG products based on current information on commercially available recycled-content products. The recommended recovered materials content percentage can be obtained by clicking on the product on the website.

9.3.4. Exemptions from the use of Recycled-Content Products: In accordance with Section 6002 of RCRA, the contractor decision not to procure such items shall be based on a determination that such procurement items (A) are not reasonably available within a reasonable period of time (B) fail to meet the performance standards set forth in the applicable specifications or fail to meet the reasonable performance standards of the procuring agencies or (C) are only available at an unreasonable price.

9.3.5. Reporting: The contractor will report the usage and non-usage of recycled-content items to the COR, the SABER project manager and the Environmental Element. The contractor and SABER project manager will maintain documentation on items purchased, items were not utilized, and on why they were not utilized. Reporting will be conducted on forms provided at attachments 4 and 5. Documents will be maintained in each individual project files.

10. Hazardous Materials Management (HMM):

10.1. Hazardous Materials (HMs) Usage and Reporting: Contractors are required to report the usage of hazardous materials to the government for all projects and contracts, including service contracts. Each offer or contractor must provide the Contracting Office with a list of proposed HMs they plan to use on the installation during the performance of the contract. Contractors must obtain Air Force authorization prior to using HMs on an Air Force installation, and must report usage data to the HazMart.

10.2. The SABER contractor and all subcontractors utilizing hazardous materials for projects must abide by and include with each project/contract submittal the information required from the following Federal Acquisition Regulation (FAR) clauses:

· FAR Clause 52.223-3, Hazardous Material Identification and Material Safety Data.

· FAR Clause 52.223-5, Pollution Prevention and Right-to-Know Information.

· FAR Clause 52.223-19, Compliance with Environmental Management Systems.

· AFFARS Clause 5352.223-9001, Health and Safety on Government Installations.

· FAR Clause 52.223-7, Notice of Radioactive Materials.

10.3. Hazardous materials are any substance defined by OSHA as a hazardous substance requiring a Safety Data Sheet (SDS). Hazardous materials that need to be reported include but are not limited to; paints, thinners, sealing compounds, strippers, glues, solvents, all petroleum products including oils, hydraulic fluids, and fuels stored on-site (fuels in vehicles are exempt), pesticides, adhesives, acids, flammables, corrosives, oxidizers, compressed gases (such as but not limited to oxygen, acetylene, propane, flammable and non-flammable gases), all aerosols, and all materials containing hazardous substances.

10.4. Hazardous Material Storage: Hazardous materials will be managed properly at all times. Containers will be in good condition and properly labeled with the contents and hazard class (flammable, corrosive, oxidizer, etc.). Containers will be closed at all times when not in use. Hazardous materials will be kept under cover to protect them from the elements and to prevent stormwater runoff contamination IAW JBLE-Eustis EMP 4.4.6.6 Tab 1 Hazardous Materials Storage and Container Management.

10.5. Hazmat/Non-Hazmat Removal: At the end of the performance of the contract and before facilities/projects are turned over to the government, the contractor will remove all hazardous and non-hazardous materials from the installation. No materials will be left behind in the possession of the government. This includes but is not limited to all solvents, paints, fuels, oils, greases, adhesives, etc. Hazardous Materials that are wastes will be handled at JBLE-Eustis IAW EMP 4.4.6.8 Hazardous Waste Management (HWM) and at JBLE-Langley IAW JBLE-Langley Hazardous Waste Management Plan (HWMP).

10.6. JBLE-Eustis Procedures:

10.6.1. The contractor shall request the proposed usage of all Hazardous Materials IAW EMP 4.4.6.6.1 HazMart Operations paragraph 6.D. The contractor shall also submit a copy of the Safety Data Sheet (SDS) for each item to the CO prior to bringing the items on the installation. If the contractor requires additional hazardous materials not previously submitted for approval, they shall submit the request as stated above prior to bringing the item on the base.

10.6.2. HazMart: All HMs used or brought on to the installation must use EMP 4.4.6.6.1 Tab 4 Contractor HazMart Registration Form FEVA Form 32-682 for approval. If there are any questions on how to fill out the Contractor Hazardous Material Worksheet, contact:

JBLE Eustis HazMart Building 1205, Taylor Road 757-878-2781 Monday thru Friday (0730-1630)

10.7. JBLE-Langley Hazardous Materials Procedures:

10.7.1. Hazardous Materials Usage and Reporting: In compliance with local procedures developed at the direction of AFI 32-7086, Hazardous Materials Management, all contractors are required to report the usage of all hazardous materials to the government for all projects and contracts including service contracts executed on JBLE-Langley. In accordance with FAR Clause 52.223-3, each offer or (contractor) must provide the Contracting Office with a list of proposed hazardous materials they plan to use on the installation during the performance of the contract. In accordance with procedures in para 10.7.3, contractors must obtain Air Force authorization prior to using hazardous materials on an Air Force installation, and must report usage data to the HAZMART.

10.7.2. Hazardous materials are any substance defined by OSHA as a hazardous substance requiring a Safety Data Sheet (SDS). The following Hazardous Materials are required to be reported, but are not limited to; paints, thinners, sealing compounds, strippers, glues, solvents, all petroleum products including oils, hydraulic fluids, and fuels stored on-site (fuels in vehicles are exempt), pesticides, adhesives, acids, flammables, corrosives, oxidizers, compressed gases (such as but not limited to oxygen, acetylene, propane, flammable and non-flammable gases), all aerosols, and all materials containing hazardous substances.

10.7.3. The contractor shall request the proposed usage of all Hazardous Materials by completing the “Contractor Hazardous Material Worksheet” at Attachment 1 (Contractor Hazardous Material Worksheet) for each hazardous material and shall submit a copy of the Safety Data Sheet (SDS) for each item to the CO prior to bringing the items on the installation. The contractor shall submit to the CO the information for each item within 10 days after award of the contract or project and/or not less than fourteen calendar days prior to bringing the items on the installation. For short notice contracts or projects, the contractor will submit this information to the CO as soon as possible. An electronic version of the contractor Hazardous Material Worksheet can be obtained through the Project Manager or 633 CES/CEIE.

10.7.4. The CO will immediately provide this information to the Project Manager who will in turn provide it to 633 CES/CEIE immediately.

10.7.5. After the project starts, monthly usage information will be provided to the CO who will in turn provide this information to the Project Manager who will in turn provide it to 633 CES/CEIE. Attachment 2 (Monthly Report for HAZMAT) of this section will be used to report monthly usage. For contracts/projects exceeding six months, this form is required to be filled out on a monthly basis. For contracts less than six months, this form is required at the beginning and at the completion of work.

10.7.6. If there are any questions on how to fill out the contractor Hazardous Material Worksheet or the monthly report, contact the JBLE-Langley HAZMART at 757-764-3837 Monday thru Friday between the hours of 0730-1630 or visit them at:

633 LRS/HAZMART

Bldg. 330 23 Sweeney Blvd Langley AFB VA 23665

10.7.7. Hazardous Materials Management Process (HMMP): The JBLE-Langley HMMP team will meet on an as-needed basis to review the Contractor Hazardous Material Worksheets and SDSs to ensure there are no concerns with the chemicals being used and/or stored on the installation. If there are concerns about any chemicals and is determined the contractor plans to use an extremely hazardous chemical on JBLE-Langley, the HMMP team will notify the Project Manager and the Contracting Officer (CO) who will in-turn notify the contractor of JBLE-Langley concern. The contractor will not bring any extremely hazardous chemicals on JBLE-Langley or any other chemicals that the HMMP team determines cannot be used on JBLE-Langley. The HMMP team will also notify the Project Manager if all hazardous materials are authorized for use.

10.7.8. If the contractor requires additional hazardous materials not previously submitted for approval, they shall submit the request as stated above seven days prior to bringing the item on the base.

NOTE: If it is determined at any time that hazardous materials are on site that were not reported in advance, the CO will be notified and the project can be stopped until the materials are submitted and approved as stated above.

11. Solid Waste Management (SWM):

11.1. Compliance With Regulations: All waste materials generated by any work under this contract performed on a Government installation shall be handled, transported, stored, recycled, and disposed of by the contractor and by his/her subcontractors at any time in accordance with these specifications, all applicable Federal, state, or local laws, ordinances, regulations, court orders, or other types of rules or rulings having the same effect of law. These include but are not limited to the Resource Conservation and Recovery Act (RCRA) (40 CFR 260-270); Federal Water Pollution Control Act, as amended (33 USC Sec 1251 ET SEQ); The Clean Air Act, as amended (42 USC Sec 1857 ET SEQ); The Endangered Species Act, as amended (16 USC Sec 1531, ET SEQ); The Toxic Substances Control Act, as amended (15 USC Sec 2601, ET SEQ); The Solid Waste Disposal Act, as amended (42 USC 6901 ET SEQ); the Archaeological and Historic Preservation Act, as amended (16 USC Sec 469, ET SEQ), and the Virginia Solid Waste Management Regulations (9VAC20-81).

11.2. The contractor shall collect all solid wastes generated during the performance of the contract in a container/area provided by the contractor and approved by the Contracting Officer. The contractor shall provide appropriate containers for the collection and segregation of solid wastes, recyclables, and C&D debris generated directly and indirectly by work under this contract. The contractor is prohibited from using base dumpsters or other government owned/leased waste receptacles for the disposal of any solid wastes. All solid wastes shall be reclaimed, recycled, or disposed of prior to completion of work on JBLE.

11.3. As proof of proper disposition of solid wastes, the contractor shall provide legible weight receipts for solid waste disposed and materials recycled bearing the name, address, and phone number of the receiving facilities for every load of materials delivered. The weight ticket shall detail the type of material, weight of the material in pounds or tons, the date of the transaction, and a signature from a representative of the receiving facility. Receipts shall be submitted to the appropriate civil engineer SABER project manager within ten (10) calendar days after the transaction.

11.4. Under no circumstances will any solid waste or hazardous materials be left at JBLE at the end of the project. Before the project is turned over to the government, the contractor will remove all solid wastes and hazardous materials from the installation. Those items include but are not limited to dirt piles, concrete piles, asphalt piles, and rubbish piles. No materials will be left for the future use of the government UNLESS instructed to do so in writing by the government. This is to include the before mentioned items and also regular or touch-up paint, plaster, solvents, etc. If it is determined that the contractor left materials behind, services may be terminated and/or a penalty payment to include the cost of disposal of the material by the government may be withheld from the project payment. NOTE: Hazardous materials are different from hazardous wastes so be careful not to confuse the two. Hazardous Wastes will be accumulated, identified, and disposed at JBLE-Eustis IAW EMP 4.4.6.8 Hazardous Waste Management (HWM) and at JBLE-Langley IAW JBLE-Langley Hazardous Waste Management Plan at the contractor’s cost.

11.5. Refuse Containers: All refuse containers shall be free from graffiti, and be equipped with a securable tarpaulin or cover (NOTE: THE COVER SHALL BE IN PLACE AT ALL TIMES, EXCEPT WHEN WASTE IS BEING DEPOSITED OR REMOVED). Location of all refuse containers shall be annotated on the Worksite Layout Plan.

11.6. Landfills: The contractor shall submit all trip tickets from the approved landfill facility reflecting all debris being disposed, to include weight of materials, IAW the current local, state, and federal regulations. A copy shall be provided to the appropriate civil engineer SABER project manager.

11.7. Salvage: Title to all materials and equipment to be demolished, except items specified as Government salvage, shall be vested to the contractor upon removal from JBLE. When materials and equipment are not designated as Government salvage, the items shall become the property of the contractor. While not enforceable, the contractor is highly encouraged to partner with a local non-profit agency such as, but not limited to Re-Store or Habitat for Humanity Re-Store in disposing of items not identified for government salvage or recycling (i.e.; sinks, toilets, windows, doors). This voluntary action goes towards the recycling count and should be reported as tonnage recycled or donated. The Government will not be responsible for the condition, loss or damage to such materials and equipment after issue of the NTP.

11.8. Pavements Cleaning: The contractor shall include pavement-cleaning methods in the Dust Control Plans to prevent the generation and/or accumulation of dirt, debris, dust or other foreign matter due to worksite activities on all adjacent Pedestrian ways/Roadways/Parking Lots. All pavements shall be cleaned daily or as directed by the CO. Approved methods of cleaning shall remove, not displace all accumulations. The contractor is solely responsible for all spillage from vehicles and refuse containers, and shall be cleaned immediately (in the case of spilled asphalt, roads will be cleaned and/or treated with lime immediately upon detection). All labor, equipment, materials and rentals/fees required to perform pavements cleaning due to accidental spillage shall be at no additional cost to the Government.

11.9. Disposal of Contaminants: All waste materials generated by work under this contract and performed on a Government installation shall be handled, transported, stored, and disposed of by the contractor at JBLE-Eustis IAW EMP 4.4.6.8 Hazardous Waste Management (HWM) and JBLE-Langley Hazardous Waste Management Plan (HWMP). The disposal of contaminants shall not be considered 100% complete until all completed and approved manifests have been submitted to the appropriate civil engineer SABER project manager.

11.10. Construction/Demolition Debris Diversion: As good stewards of the environment, the government is committed to diverting its waste away from landfills to the greatest extent possible. This can be done through recycling, reusing (when directed by the government), and donating construction and demolition debris materials. The contractor shall recycle all construction/demolition debris to the maximum extent possible. The contractor shall make every effort to recycle materials such as but not limited to concrete (including concrete with rebar), brick, asphalt, all metals, wood, roofing materials, wallboard, ceiling tiles, etc. With prior coordination through the CO, the appropriate civil engineer SABER project manager, and CE Environmental Element, the contractor may take scrap metals to the JBLE-Eustis Solid Waste and Recycling Center at 1207 Taylor Road, or to the JBLE-Langley Scrap Metal Yard located near building 330.

11.10.1. Recycling and Diversion Reporting: The contractor shall report on a quarterly basis the tonnage of the items recycled and the amounts disposed of by landfill and amounts disposed of by regular or waste-to-energy incineration to the appropriate civil engineer SABER project manager. , the Contracting Officer, and CE Environmental Element by the 5th day of each quarter (Jan, Apr, Jul, Oct) during the period of performance. This report will be for the previous quarter. The report shall list the title of the project, the project number, the contractor’s company name and point-of-contact, phone number, the type items (i.e. concrete, concrete with rebar, asphalt, brick, scrap metals, wood, wallboard, etc.) and the tonnage of those items recycled. For all items that could not be recycled, the contractor will provide a brief reason as to why the items could not be recycled.

11.10.2. For items disposed of, one total tonnage can be given for items landfilled and one total tonnage for items incinerated (specify waste incinerator or waste-to-energy incinerator) instead of reporting disposal figures for the various items. For items that cannot be accurately measured, estimates will be sufficient. Use the form at Attachment 3 (Construction/Demolition Debris Recycling and Reporting) to report this information to the appropriate civil engineer SABER project manager, Contracting Officer, and to CE Environmental Element.

11.10.3. Contain Loose Debris: Loose debris on trucks leaving the site shall be loaded in a manner that shall prevent dropping/releasing of materials on streets and conform to local ordinances/laws. Fasten a suitable cover, such as a tarpaulin, over the load before entering surrounding streets.

12. Hazardous Waste Management (HWM):

12.1. JBLE-Eustis:

12.1.1. Hazardous Waste: JBLE-Eustis is a Large Quantity Generator (LQG) of Hazardous Waste (HW) and all HWs must be properly removed from the installation with 90 days of the Accumulation Start Date and 365 days for Universal Wastes (UWs). All HWs, UWs, and Non Hazardous Waste will be managed IAW EMP 4.4.6.8 Hazardous Waste Management (HWM).

12.1.2. Contractor is responsible for all costs associated with waste management including but not limited to: identification, classifications, accumulation, transportation, disposal, cleanup of spills, etc. 733 CED/CEIE will approve all laboratories, transporters, and disposal facilities prior to waste being shipped.

12.1.3. Manifests: 733 CED/CEIE personnel must sign all manifests/shipping papers prior to removal of such waste from the base.

12.1.4. UW Lamps: The contractor shall use environmentally friendly lamps during lamp replacement. The contractor will properly dispose of lamps with waste manifest being signed by 733 CED/CEIE Hazardous Waste Program Managers. In some limited cases lamps maybe turned-in on post.

NOTE: UNDER NO CIRCUMSTANCES will lamps be crushed

12.2. JBLE-Langley:

12.2.1. Site Management: All material containers must be closed when not in use. Materials are to be covered as protection from weather. Each container is to be properly labeled. Do not store hazardous materials near storm drains. Upon completion of this project, the contractor shall remove all hazardous materials and hazardous waste.

12.2.2. Waste Characterization Samples for Floor Renovation: Waste characterization samples must be collected to determine if its meets the RCRA definition of a hazardous waste. It is the responsibility of the contractor to take and provide the sample analysis to 633 CES/CEIE. Waste debris from floor stripping or floor blasting performed on Langley AFB must be sampled for TCLP Metals for solid debris and must add corrosivity test for liquid stripping. Additionally, it is the contractor’s responsibility to dispose of the waste generated on this project.

12.2.3. Manifests: 633 CES/CEIE will review all lab analysis or SDS of wastes prior to signing manifests. Appointed 633 CES/CEIE personnel must sign all hazardous waste manifests prior to removal of such waste from the base. The generator copy of the manifest must be returned to 633 CES/CEIE, 37 Sweeney Blvd, LAFB VA 23665.

12.2.4. Fluorescent Lamps: The contractor shall use environmentally friendly green tip fluorescent lamps during lamp replacement. Upon removal of old Sylvania lamps and high intensity bulbs, the contractor will box the lamps and manage them as UW. Other lamps (i.e. GE and Phillips) may be disposed directly in to regular trash. Contact the base hazardous waste contractor at 225-5808 or 225-5809 to arrange for pick-up, except in cases where lamp replacement is part of the contract. The contractor will properly dispose of lamps with the waste manifest signed by 633 CES/CEIE Hazardous Waste Program Managers. JBLE-Langley requires that all UW be turned in at the 10-month mark in order to allow JBLE-Langley to dispose of the UW by the 12-month RCRA requirement.

NOTE: UNDER NO CIRCUMSTANCES will lamps be crushed

13. Natural Resources:

13.1. Soils and Vegetation Restoration: The contractor shall restore all areas affected by worksite operations to include all haul roadways prior to final inspection. The contractor shall not delay soil or vegetation restoration operations until the end of worksite operations or TO. The contractor shall promptly soil restore all disturbed grounds immediately upon final backfilling, to include separate phased sections of an approved AFFM 103.

13.1.1. Soils Testing: In addition to pH content, Nutrient content and soluble salts content, all soils will meet the requirements in the Clean Soil Program in paragraph 20.

13.1.2. Topsoil: The contractor shall provide a minimum of four inches topsoil at all excavations performed in vegetation areas. The contractor shall rake prior to sod placement and/or seeding to level topsoil and eliminate all mounds/clods/ruts and rocks larger than a 3/8-inch diameter, and ensure positive drainage.

13.1.3. Vegetation and Re-vegetation: The contractor shall be fully responsible for any destruction to native vegetation or landscaping, which is required to be retained. The contractor shall be responsible for replacing such destroyed vegetation. A list of acceptable native vegetative species is available from the appropriate CE Environmental Element.

13.2. Tree Preservation, Protection, and Planting:

13.2.1. Tree Preservation: Prior to beginning a construction project, the contractor shall be responsible for consulting the appropriate SABER project manager and CE Environmental Element to evaluate and mark trees for preservation in the construction area.

13.2.2. Tree Protection: All construction projects in the vicinity of a preservation tree must erect 4-foot tall orange fencing that protects the Critical Root Zone (CRZ) of the tree from construction activity and equipment. The contractor may be required to place wood chips 4 inches deep around the tree prior to the placement of the fencing. The CRZ is defined as a minimum amount of area, above (for the trunk and crown), below ground (for soil health and the root system) that is required to protect trees, and preserve tree health.

13.2.2.1. The CRZ is equal to 1.5 feet for every inch in trunk diameter at 4.5 feet above the ground. For example, a tree with a trunk diameter (DBH) of 20 inches has a CRZ of 300 feet (20 inches x 1.5) around the tree, while the radius of the CRZ is 60 feet.

13.2.2.2. If the full CRZ cannot be protected, a rigid 4-foot tall structure with 2 x 4 inch framing covered by stapled orange fencing must encompass a minimum of 4 x9 feet.

13.2.2.2.1. The contractor shall not alter or disturb the existing grade within the CRZ.

13.2.2.2.2. The contractor shall not store any construction material, equipment, soil, or debris is prohibited in the CRZ.

13.2.2.2.3. The contractor shall not trench within the CRZ. If mechanical boring is required, boring under the CRZ shall be at a minimum depth of 30 inches.

13.2.2.2.4. The contractor shall water trees within the CRZ every 10 days from May through August.

13.2.3. Tree Pruning: Pruning of all trees should be in accordance with International Society of Arboriculture standards or by a certified arborist. Pruning should be limited to the removal of dead wood and the correction of potentially hazardous conditions, as evaluated by a certified arborist or the appropriate CE Environmental Element.

13.2.4. Tree/Shrub Planting:

13.2.4.1. All tree/shrub materials shall comply with the specifications set forth in the American Standard for Nursery Stock ANSI Z60.1-2004. All plant materials must meet all phytosanitary, nursery inspection, pest freedom, plant regulation, certification, or any other legal requirements of the Virginia Department of Agriculture division of Regulatory Services. All trees/shrubs purchased shall be native species known to occur naturally in the State of Virginia. A list of acceptable native vegetative species is available from the appropriate CE Environmental Element.

13.2.4.2. All nursery stock certificates, registration or certification tags, seals, etc. shall be furnished to the appropriate SABER project manager when plants are shipped to installer or installed. The appropriate SABER project manager or CE Environmental Element may inspect all trees/shrubs at the nursery furnishing the plants before the plants are dug. The appropriate SABER project manager or CE Environmental Element has the right to choose stock or reject stock in order to meet standards set in this specification and the “American Standard for Nursery Stock”.

13.2.4.3. All trees shall be 2-2.5 inches in diameter when planted and shall be guaranteed for 2 years or replaced.

13.2.4.4. All trees shall be planted during the dormant season from 1 November through 1 March. If planted outside this time period, a watering regime shall be in place at the contractor’s expense.

13.2.4.5. Planting hole shall be excavated with sloped side 2 - 3 times the diameter of the container or rootball. Mechanical diggers such as augers may be used but sloped sides of the planting hole must be excavated and scarified with a hand tool to remove glazed surfaces. Before placing the rootball in the hole, the contractor shall determine if the depth of the hole is the same as, or slightly less than the distance between the topmost structural root and the bottom of the rootball. In no case shall the topmost structural root be lower than the adjacent grade. Installations with root balls planted too deep will be rejected. All trees/shrubs shall be set upright and oriented to give the best relationship to adjacent traffic, structures, and trees. The top of the rootball does not denote the topmost structural root, in some instances the top of the rootball shall be removed to expose the root flare or topmost structural root.

13.2.4.6. After putting ¼ of the backfill soil in the hole, all burlap, twine, rope, and wire baskets shall be cut off and removed at least 8 to 10 inches below the topmost structural root. If roots are circling or girdling, they shall be cut and removed. The hole shall be backfilled with the same soil removed from the hole. Soil shall be tamped slightly to pack rootball firmly within the planting hole. When the hole is 2/3 full, water should be applied to eliminate air pockets, and tamping of the soil shall not occur once the soil has been watered. The remaining portion of the rootball shall be filled with remaining excavated soil. No soil shall be placed above the topmost structural root. If excess soil is not necessary for the backfill of the rootball as determined by appropriate SABER project manager or CE Environmental Element, the contractor shall remove it from the site. Excess soil shall not be used to create a planting berm.

13.2.4.7. Trees/shrubs should not be staked unless necessary. If staking materials are installed, the contractor should remove them within one year of installation and/or before trunk girdling can occur. If staking materials are used, they must be approved by the appropriate SABER project manager or CE Environmental Element before installation.

13.2.4.8. Mulch shall be temperature stabilized hardwood or recycled green waste material and shall not exceed 4 inches in length and 0.5 inches in width. No recycled wood waste, fine composted or dyed mulches shall be used. Mulch shall be installed on top of the root system and planting hole and extend to the dripline of the canopy. Mulch shall be 2 inches in depth, uniform in appearance and shall not touch the tree/shrub trunk. The contractor shall supply mulch and if appropriate SABER project manager or CE Environmental Element determines excess mulch, the contractor shall remove it from the site.

13.2.4.9. Containerized trees and shrubs shall be removed from the container before installation. All four sides and the bottom of the root ball shall be cut with a handsaw or electric saw in order to cut circling roots. Cuts should be made approximately 1 to 2 inches from the sides of the rootball.

13.2.4.10. The contractor should water all trees/shrub immediately after they are installed unless a rain event is projected to occur within 24 hours after the tree/shrub is installed.

13.2.4.11. Trees/shrubs will not be installed into wet sites, waterlogged soils, or sites where precipitation has occurred within 72 hours unless approved by the appropriate SABER project manager or appropriate CE Environmental Element.

13.3. Wetlands:

13.3.1. Wetland Permits:

13.3.1.1. The contractor is responsible for project compliance with federal, state and local wetland regulations. It is incumbent upon design and contracting personnel and contractors to determine wetland permitting and mitigation requirements. This process should begin with the preparation of the DD 1391 and AF Form 813 routed for coordination through CE Environmental Element. Allow at least 60 - 90 days for the acquisition of a wetlands permit if one is required. For additional information on the application process please refer to this link: http://www.deq.virginia.gov/Programs/Water/WetlandsStreams/PermitsFeesRegulations

13.3.1.2. All wetlands permitting shall be completed prior to the start of construction activities that will affect the waters of the United States.

13.3.1.3. To delineate wetlands and other waters of the United States, the contractor/Consultant selected should be familiar with and utilize the current 1987 Corps Wetlands Delineation Manual, and subsequent guidance, to perform a wetland(s) delineation. The contractor/consultant's findings should then be provided to the Corps in the form of a report. Corps staff will review the validity of the report and make a written and appealable agency determination on the presence and extent of wetlands and other waters of the United States on the property.

13.3.1.4. A Joint Permit Application (JPA) is used to apply for standard permits, also known as individual permits, for work in the waters of the United States (including wetlands) within Virginia. Such work may include construction, dredging, filling, or excavation in the waters or in wetlands. The JPA may be optionally used for a Nationwide Permit (NWP) Preconstruction Notification (PCN), but if used for a PCN must be boldly marked as a PCN and check marked on page 7 of the July 2008 revision as a PCN.

13.3.1.4.1. These applications are used to apply for permits from the Norfolk District Army Corps of Engineers, the Virginia Marine Resources Commission (VMRC), the Virginia Department of Environmental Quality (DEQ), and local wetlands boards. The JPA process and JPA forms are used by the United States Army Corps of Engineers (USACE), the Virginia Marine Resources Commission (VMRC), the Virginia Department of Environmental Quality (DEQ), and the Local Wetlands Boards (LWB) for permitting purposes involving water, wetlands, and/or dune/beach resources, including, but not limited to, construction, dredging, filling, or excavation. Read the directions on the application carefully to determine how many copies must be submitted to the VMRC, who acts as the clearinghouse for permit applications. Permit applicants may obtain paper copies of the Joint Permit Applications by calling the Corps at 757.201.7652, or by download: http://www.nao.usace.army.mil/Missions/Regulatory/JPA.aspx

13.3.1.4.2. There are two different JPA available for use depending on the type of activity that you are proposing. If you propose to impact tidal waters, or wetlands, or dunes/beaches in the Tidewater area of Virginia, you may be eligible to use the TIDEWATER JPA, an abbreviated version of the JPA. Activities eligible to use the Tidewater JPA include piers, boathouses, boat ramps, moorings, marinas, aquaculture facilities, riprap revetments, bulkheads, marsh toe stabilizations, breakwaters, beach nourishment, groins, jetties, road crossings over tidal waterways, and utility lines over or under tidal waterways. Dredging and excavation projects in tidal waterways/wetlands MUST use the Standard JPA.

13.3.1.5.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .