Solicitation-Attch_4_Special_Contract_Requirements.docx

DOCX document 21 KB Posted

Attached to
Paving IDIQ Solicitation Federal contract opportunity
Solicitation number
FA4690-16-R-0010
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 4 Special Contract Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Paving IDIQ Solicitation, newest first.
File Type Posted
SF30 _Amend_4.pdf PDF
Attach_9-_Paving_Contract_FA4690-12-D-0010_Bid_Schedule.pdf PDF
Attach_1 _Bid_Schedule_23_Sep_16.xlsx XLSX spreadsheet
SF_30_Amend_03.pdf PDF
Attach_8 _Questions_and_Answers.pdf PDF
Amend_2-_SF_30.pdf PDF
Attach_7-_Site_Visit_Minutes.pdf PDF
SF30.pdf PDF
Solicitation-Attch_2_Statement_of_Work.pdf PDF
Solicitiation_Attch_5_ _6-_PPQ_Letter_and_Questionarie.pdf PDF
Solicitation-_Attch_1_Bid_Schedule.xlsx XLSX spreadsheet
Solicitation-Attch_3_Wage_Determination.pdf PDF
16-R-0010 _Paving_Solicitiation.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. INSURANCE-WORK ON A GOVERNMENT INSTALLATION (IAW FAR 28.306)

Reference FAR clause entitled "Insurance . . ." the Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.

a. Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen's Compensation insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.

b. General Liability Insurance. Bodily injury liability insurance in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
c. Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.

2. POLLUTION PREVENTION (P2)

a. In accordance with Air Force Pollution Prevention Strategy, Ellsworth AFB intends to effectively promote pollution prevention by minimizing or eliminating the use of hazardous materials and the release of pollution into the environment. As part of this initiative, contractors shall comply with all federal, state, and local environmental laws, regulations, and guidelines. In addition, the following special requirements shall apply:
(1) The provision at section 3, 5352.223-9000, Elimination of Use of Class I Ozone Depleting Substances
(2) The provision at section 4, Environmental Compliance
b. Contractors are encouraged to participate in the following voluntary programs:
(1) Affirmative Procurement - Purchasing of supplies and services using recycled products (buying green products).
(2) Recycling of waste products to the maximum extent possible.
(3) Energy Conservation.

3. ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS) (As prescribed by AFFARS 5323.890-7 and IAW AFFARS 5352.223-9000)

a. It is Air Force policy to preserve mission readiness while minimizing dependency on Class I Ozone Depleting Substances (ODS), and their release into the environment, to help protect the Earth's stratospheric ozone layer.
(1) Unless a specific waiver has been approved, Air Force procurements:

May not include any specification, standard, drawing, or other document that requires the use of a Class I ODS in the design, manufacture, test, operation, or maintenance of any system, subsystem, item, component, or process; and

(2) May not include any specification, standard, drawing, or other document that establishes a requirement that can only be met by use of a Class I ODS.
b. For the purposes of Air Force policy, the following are Class I ODS:
(1) Halons: 1011, 1202, 1211, 1301, and 2402.
(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503.
(3) Other Controlled Substances: Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.
c. The Air Force has reviewed the requirements specified in this contract to reflect this policy. Where considered essential, specific approval has been obtained to require use of the following substances:

Substance Application/Use Quantity (lbs) [List each Class I ODS, its applications or use and the approved quantities. If "None," so state.]

d. To assist the Air Force in implementing this policy, the offeror/contractor is required to notify the contracting officer if any Class I ODS not specifically listed above is required in the performance of this contract.

4. ENVIRONMENTAL COMPLIANCE (IAW FAR 23.302)

a. HAZARDOUS MATERIAL IDENTIFICATION. The latest version of the Federal Standard No. 313 (Material Safety Data Sheet, Preparation and Submission of) includes criteria for identification of hazardous materials. Hazardous material data (Material Safety Data Sheets (MSDS)) are required:
(1) As specified in the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract);
(2) For any other material designated by a Government technical representative as potentially hazardous and requiring safety controls.
(3) MSDSs must be submitted by the apparent successful offeror prior to contract award, unless the offeror certifies that the supplies are not hazardous. Failure to provide MSDSs or certificate when requested could result in the offeror being considered non-responsive.
b. HAZMART. The Government (HAZMART personnel) will inventory all chemicals that the contractor brings on to Ellsworth AFB or any property under the control of Ellsworth AFB. Any products that meet the criteria for "Hazardous Waste" must be bar coded and tracked until permanently removed from Government property. The inventory will be performed prior to commencement of work. Criteria for identifying hazardous waste, is contained in Subpart C of 40 CFR, Part 261.
c. SPILL RESPONSE. The contractor will be briefed on Ellsworth AFB spill response procedures at the pre-construction conference. The contractor is responsible to report and promptly cleanup all spills in a manner consistent with current environmental regulations. In the event that it is necessary to utilize Government material, equipment or personnel to clean up a contractor caused spill, the contractor shall be required to reimburse the Government for all associated costs.
d. HAZARDOUS MATERIAL / WASTE MANAGEMENT.

The contractor will be briefed on Ellsworth AFB’s Hazardous Material / Waste Management Plan at the pre-construction conference.

5. HAZARDOUS MATERIAL HANDLING

a. The contractor shall have approval from the Base Bio-Environmental (28 MDG/SGOBE) and HAZMART sections prior to purchasing, handling, using, and storing any chemicals, solvents, lubricants, and other products that require Material Safety Data Sheets (MSDS). The contractor shall identify these materials and products on Air Force Form (AF Fm) 3952 - Chemical/Hazardous Material Authorization Request, Process Identification Form, and Shop Disposal Form. The contractor shall provide one copy of the Material Safety Data Sheet (MSDS) for each item to BEE and HAZMART sections for review prior to any chemicals being brought onto Ellsworth AFB (EAFB). The contractor shall maintain one copy of the Material Safety Data Sheets (MSDS) for each hazardous material line item used within the work center.
b. The contractor shall use environmentally safe products when available. The contractor shall submit justification for the use of any Class I Ozone Depleting Substances (ODS). The justification shall include at a minimum: (1) the name of the ODS; (2) the ODS quantity to be used; (3) the frequency of ODS usage; (4) the purpose for using the ODS; and (5) reasons why the ODS cannot be substituted. The contractor shall request waivers for usage of any ODS, and receive approval from the contracting officer in writing prior to using any ODS.
c. The contractor shall ensure all employees complete the local Air Force Hazardous Communication, HAZMART, and Hazardous Waste training. The government will provide training for the local Air Force programs that were mentioned above at no cost to the contractor. Unless otherwise stated in the specifications, the contractor shall provide all other employee training as required in the performance of this contract at no cost to the government. The contractor shall appoint a primary and alternate HAZMART and Hazardous Waste monitor. Monitors shall track hazardous material usage and report consumption data weekly to HAZMART. Monitors are responsible for training all personnel within work center regarding HAZMART procedures. The contractor shall ensure HAZMART Tracking Labels are placed on each hazardous material container maintained within work center and complete Hazardous Material Inventory Sheet immediately upon receipt of new chemicals, products, or materials. The contractor shall submit inventory sheets to HAZMART as required.
d. The contractor shall immediately remove and properly dispose of (in coordination with the contracting officer) any item considered excess by any of the following designated government officials: (in order of precedence) the 28th CES/CC (BCE), the Chief of the 28 CES/CEV Flight, the 28 CES Hazardous Waste Manager, the 28th Supply HAZMART Manager, and the Base Bio-Environmental Engineer.
e. Limit radioactive material (RM) use consistent with AF needs. No items shall remain for AF disposal. Plated or encapsulated sources must meet ANSI or ASTM standards. All of the following should be provided to the base Radiation Safety Officer (RSO) at the Bioenvironmental Engineering Flight, 28 MDOS/SGOBE, 30 calendar days prior to use of RM on base:

(1) A copy of the NRC license or the agreement state license and NRC Form 241. [Reiterated in the EAFB Supplement to AFI 48-101, para A11.3.6.4]

(2) Brief description of proposed activities.
(3) Name, local address, and telephone number for responsible local representative and for the contractors RSO.
(4) Inclusive dates of RM use on base.
(5) Acknowledgment that the installation RSO can make periodic or unannounced checks to ensure contract personnel follow safety requirements to prevent exposures to AF personnel and avoid contamination. In addition, the installation RSO can suspend contractor operations believed to be unsafe.

6. TAXES

It is the responsibility of contractors, particularly out of state contractors, to investigate the South Dakota state sales, use, and excise taxes. It is highly recommended that you contact the South Dakota Department of Revenue, Rapid City Regional Office, 4447 S. Canyon Rd., Suite 6, Rapid City SD 57702-1889. Telephone: 605-394-2332 for information. As a reminder, the contract price includes all applicable federal, state, and local taxes and duties as stated in Contract Clause titled Federal, State, and local Taxes.

7. UTILITIES

The following utilities will be furnished at the job site at no cost to the contractor (Check all that apply):

X
Electricity
X
Water

Natural Gas

8. BASE CIVIL ENGINEER WORK CLEARANCE REQUEST (AF FORM 103), “DIGGING PERMIT.” (If Applicable)

1. Digging Permits: The contractor will be responsible for coordinating a government supplied, Base Civil Engineer Work Clearance Request (AF Form 103) prior to performing digging of any type. The contractor shall process the digging permit by coordinating with and obtaining signatures from responsible representatives of the organizations listed on the AF Form 103 prior to obtaining final approval from the Air Force Base Civil Engineer or his approved representative. The area requested for clearance for each individual permit shall be limited to a maximum of two (2) weeks production for an individual permit. The contractor will be given assistance, by the government, in the execution of the initial two (2) Work Clearance Requests. Thereafter, government assistance will be limited to an as-needed basis in the event of unusual circumstances. It will be the contractor’s responsibility to coordinate the completion of the necessary AF Form 103 and arrange to have existing utilities located as indicated on the completed form, prior to the beginning of digging operations in the individual areas. This coordination is anticipated to take approximately three (3) working days to complete per request, and may require coordination with as many as twenty (20) individuals located on or near the base. A blank copy of the AF Form 103 is available fromhttp://www.e-publishing.af.mil/forms/formlist.asp?puborg=AF&series=0100-0199 . Any unusual delay in obtaining approval from any particular organization will be reported immediately to the Chief of Construction Management.

a. Utility Staking Requirements: The contractor shall layout and mark his intended utility routing before calling for field coordination by utility personnel. This shall be done a minimum of five (5) working days in advance of when digging is expected to begin. Once all responsible utility representatives have field located crossover and/or interference points between the new utility route and existing utilities, they will sign off on the digging permit to signify completion of the field coordination of the digging permit. The permit must then be presented to Civil Engineering Construction Management for final coordination before digging in the area represented by the digging permit may begin. Any utility service markers or markings established by the utility representatives must be maintained by the contractor through the completion of the digging operations.
b. Digging Operations: Digging near established interference or crossover points shall be done by hand, five (5) feet either side of the point along the intended route, in order to prevent disturbing the existing utility. If the existing utility is uncovered in the new excavation, it shall be protected from damage and movement while in the open excavation and during backfill. The contractor shall be responsible for the repairs and associated costs for repairs of any utility damaged by construction, whose location was made known to the contractor.

2. UTILITY OUTAGES: The contractor shall be responsible for coordination of all utility outages at individual facilities. This will include execution of a government-furnished utility outage form which must be reviewed and signed by representatives of all appropriate base organizations prior to approval by the Contracting Officer for the outage. The contractor will be provided a list of building managers and other appropriate points of contact and will be given assistance by the Government, in the execution of the initial two (2) outage forms. Thereafter, government assistance in the execution of the outage clearances will be limited to an “as needed” basis, in the event of unusual circumstances. It shall be the contractor’s responsibility to initiate and coordinate utility outage forms. Coordination of the outage form must be completed a minimum of fourteen (14) calendar days, prior the requested outage date, and require coordination with as many as twenty (20) individuals located on or near the base. A blank copy of the utility outage form is available from Civil Engineering. Any unusual delay in obtaining clearance from any particular organization will be reported immediately to the Contracting Officer’s representative for assistance.

Water service interruptions to the users shall be limited to one day between the hours of 8:30 a.m. and 4:30 p.m. unless otherwise approved by the Contracting Officer.

3. WELDING PERMIT. Contractor must obtain a welding permit from base Fire Department Technical Services prior to any work utilizing an open flame.

9. SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS

1. Listing Of Employees. The contractor shall maintain a current listing of employees. The list shall include the employee's name, social security number and type of investigation if contract work involves unescorted entry to Air Force restricted areas or other sensitive areas designated by the installation commander. The list shall be provided to the Program Manager. An updated listing shall be provided when an employee's status or information changes.

2. Security Training. The contractor ensures all contractor employees receive initial and recurring security education training from the sponsoring agencies security manager. Training must be conducted IAW DOD 5200.1-R, Information Security Program Regulation, and AFI 31-401, "Information Security Program Management". Contractor personnel who work in Air Force controlled/restricted areas must be trained IAW AFI 31- 101, The Air Force Installation Security Program.

3. Pass And Identification Items. The contractor shall ensure the pass and identification items required for contract performance are obtained for employees and non-government owned vehicles.

4. Retrieving Identification Media. The contractor shall retrieve all identification media, including vehicle passes from employees who depart for any reason before the contract expires; e.g. terminated for cause, retirement, etc.

5. Traffic Laws. The contractor and its employees shall comply with base traffic regulations.

6. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on Ellsworth AFB, SD.

7. For Official Use Only (FOUO). The contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

8. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DOD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.

9. Physical Security. The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.

10. ENVIRONMENTAL AND OCCUPATIONAL HEALTH MANAGEMENT SYSTEM (EOHMS) TRAINING REQUIREMENT (In accordance with Executive Order [EO] 13148, Greening the Government through Leadership in Environmental Management).

Ellsworth AFB has an Environmental and Occupational Health Management System (EOHMS) in place. The purpose of this EOHMS is to reduce impacts of base activities on the environment and occupational health. As part of the overall base EOHMS, specific EOHMS plans have been developed to address the activities conducted by contractors on Ellsworth. To obtain a copy of this mandatory training, contact the EOHMS Program Manager at extension 605-385-6625. Each contractor shall comply with the EOHMS plan and review the training and the specific EOHMS plan with all employees. Once training has been completed, the contractor shall submit a listing of employees on company letterhead with their full name, job title/specialty, and date training was received to the EOHMS Program Office at:

EOHMS Program Manager

28 CES/CEVC

2103 Scott Drive Ellsworth AFB SD 57701

This training is only required one-time for each employee. New employees shall be trained within 30 days of starting work. For questions on EOHMS, contact the Base EOHMS Program Manager at 605-385-6625

File details come from the government source that posted it. Updated .