BASE YR
REPAIR BASE PAVEMENTS
BASE YEAR
CLIN Description; Specification Section Reference Est. Qty Unit Unit Price Clin Total
| 1 | Excavate Confined Areas; 2200 | 100 | CY | $0.00 |
| 2 | Excavate General Areas; 2200 | 1,000 | CY | $0.00 |
| 3 | Fill and Compact; 2200 | 500 | CY | $0.00 |
| 4 | Finish Grade and Compact; 2200 | 5,000 | SY | $0.00 |
| 5 | Construct Aggregate Base Course; 2231 | 1,500 | TN | $0.00 |
| 6 | Place Topsoil; 2480 | 100 | CY | $0.00 |
| 7 | Seed; 2480 | 50 | LB | $0.00 |
| 8 | Fertilize; 2480 | 400 | LB | $0.00 |
| 9 | Mulch; 2480 | 400 | LB | $0.00 |
| 10 | Install Silt Fence; 2480 | 100 | LF | $0.00 |
| 11 | Construct 5" Asphalt Patch; 2510 | 2,000 | SF | $0.00 |
| 12 | Sawcut 5" Asphalt; 2510 | 1,000 | LF | $0.00 |
| 13 | Remove Asphalt Pavement; 2050 | 100 | CY | $0.00 |
| 14 | Mill Asphalt Pavement; 2546 | 12,000 | SY | $0.00 |
| 15 | Apply Asphalt Seal Coat; 2573 | 10,000 | GAL | $0.00 |
| 16 | Apply Asphalt Tack Coat; 2510 | 40,000 | SY | $0.00 |
| 17 | Construct Asphalt Leveling Course; 2510 | 300 | TON | $0.00 |
| 18 | Construct G-1 Asphalt Pavement; 2510 | 4,000 | TON | $0.00 |
| 19 | Construct G-2 Asphalt Pavement; 2510 | 800 | TON | $0.00 |
| 20 | Adjust Manhole Grade; 2510 | 10 | EA | $0.00 |
| 21 | Adjust Valve Box Grade; 2510 | 5 | EA | $0.00 |
| 22 | Remove 4" PCC Sidewalk; 2050 | 500 | SF | $0.00 |
| 23 | Remove 6" PCC Pavement; 2050 | 400 | SF | $0.00 |
| 24 | Remove 8" PCC Pavement; 2050 | 400 | SF | $0.00 |
| 25 | Remove 12" PCC Pavement; 2050 | 4,000 | SF | $0.00 |
| 26 | Remove 20-22" PCC Pavement; 2050 | 4,000 | SF | $0.00 |
| 27 | Remove PCC Curb & Gutter; 2050 | 800 | LF | $0.00 |
| 28 | Remove PCC Fillet Section and Pan Gutter; 2050 | 400 | SF | $0.00 |
| 29 | Remove Additional PCC Pavement; 2050 | 20 | CY | $0.00 |
| 30 | Sawcut 4" PCC Sidewalk; 2520 | 200 | LF | $0.00 |
| 31 | Sawcut 6" PCC Pavement; 2520 | 100 | LF | $0.00 |
| 32 | Sawcut 8" PCC Pavement; 2520 | 100 | LF | $0.00 |
| 33 | Sawcut 12" PCC Pavement; 2521 | 1,000 | LF | $0.00 |
| 34 | Sawcut 20-22" PCC Pavement; 2521 | 1,000 | SF | $0.00 |
| 35 | Construct 4" Nonreinforced PCC Sidewalk; 2520 | 1,000 | SF | $0.00 |
| 36 | Construct 6" Nonreinforced PCC Pavement; 2520 | 400 | SF | $0.00 |
| 37 | Construct 8" Nonreinforced PCC Pavement; 2520 | 400 | SF | $0.00 |
| 38 | Construct 12" Nonreinforced PCC Pavement; 2521 | 4,000 | SF | $0.00 |
| 39 | Construct 20-22" Nonreinforced PCC Pavement; 2521 | 4,000 | SF | $0.00 |
| 40 | Construct PCC Curb & Gutter 6"x32"; 2520 | 1,000 | LF | $0.00 |
| 41 | Construct PCC Fillet Section and Pan Gutter 6"; 2520 | 600 | SF | $0.00 |
| 42 | Construct Additional Nonreinforced PCC Pvmnt; 2520 | 20 | CY | $0.00 |
| 43 | Drill/Install Dowel Bars in PCC Pavement; 2521 | 800 | LF | $0.00 |
| 44 | Install Reinforcing Steel in PCC Pavement; 2521 | 2,500 | LB | $0.00 |
| 45 | Repair 4" PCC Spalls; 2523 | 400 | SF | $0.00 |
| 46 | Repair 6" PCC Spalls; 2523 | 100 | SF | $0.00 |
| 47 | Install Jet Fuel Resistant Joint & Crack Sealant; 2580 | 400 | LF | $0.00 |
| 48 | Install Silicon PCC Joint & Crack Sealant; 2580 | 4,000 | LF | $0.00 |
| 49 | Install Asphalt Pavement Joint & Crack Sealant; 2579 | 3,000 | LB | $0.00 |
| Repair Major Asphalt Cracks; 2546, 2510 | 500 | LF | $0.00 |
| 50 | Apply Pavement Marking 4"; 2761 | 4,000 | LF | $0.00 |
| 51 | Apply Pavement Marking 6" 2761 | 3,000 | LF | $0.00 |
| 52 | Apply Pavement Marking other; 2761 | 500 | SF | $0.00 |
| 53 | Add Glass Beads for Pavement Marking; 2761 | 2,500 | SF | $0.00 |
| 54 | Remove Pavement Markings; 2761 | 300 | SF | $0.00 |
GRAND TOTAL: $0.00
OPT YR 1
REPAIR BASE PAVEMENTS
OPTION YEAR 1
CLIN Description; Specification Section Reference Est. Qty Unit Unit Price Clin Total
| 1 | Excavate Confined Areas; 2200 | 100 | CY | $0.00 |
| 2 | Excavate General Areas; 2200 | 1,000 | CY | $0.00 |
| 3 | Fill and Compact; 2200 | 500 | CY | $0.00 |
| 4 | Finish Grade and Compact; 2200 | 5,000 | SY | $0.00 |
| 5 | Construct Aggregate Base Course; 2231 | 1,500 | TN | $0.00 |
| 6 | Place Topsoil; 2480 | 100 | CY | $0.00 |
| 7 | Seed; 2480 | 50 | LB | $0.00 |
| 8 | Fertilize; 2480 | 400 | LB | $0.00 |
| 9 | Mulch; 2480 | 400 | LB | $0.00 |
| 10 | Install Silt Fence; 2480 | 100 | LF | $0.00 |
| 11 | Construct 5" Asphalt Patch; 2510 | 2,000 | SF | $0.00 |
| 12 | Sawcut 5" Asphalt; 2510 | 1,000 | LF | $0.00 |
| 13 | Remove Asphalt Pavement; 2050 | 100 | CY | $0.00 |
| 14 | Mill Asphalt Pavement; 2546 | 12,000 | SY | $0.00 |
| 15 | Apply Asphalt Seal Coat; 2573 | 10,000 | GAL | $0.00 |
| 16 | Apply Asphalt Tack Coat; 2510 | 40,000 | SY | $0.00 |
| 17 | Construct Asphalt Leveling Course; 2510 | 300 | TON | $0.00 |
| 18 | Construct G-1 Asphalt Pavement; 2510 | 4,000 | TON | $0.00 |
| 19 | Construct G-2 Asphalt Pavement; 2510 | 800 | TON | $0.00 |
| 20 | Adjust Manhole Grade; 2510 | 10 | EA | $0.00 |
| 21 | Adjust Valve Box Grade; 2510 | 5 | EA | $0.00 |
| 22 | Remove 4" PCC Sidewalk; 2050 | 500 | SF | $0.00 |
| 23 | Remove 6" PCC Pavement; 2050 | 400 | SF | $0.00 |
| 24 | Remove 8" PCC Pavement; 2050 | 400 | SF | $0.00 |
| 25 | Remove 12" PCC Pavement; 2050 | 4,000 | SF | $0.00 |
| 26 | Remove 20-22" PCC Pavement; 2050 | 4,000 | SF | $0.00 |
| 27 | Remove PCC Curb & Gutter; 2050 | 800 | LF | $0.00 |
| 28 | Remove PCC Fillet Section and Pan Gutter; 2050 | 400 | SF | $0.00 |
| 29 | Remove Additional PCC Pavement; 2050 | 20 | CY | $0.00 |
| 30 | Sawcut 4" PCC Sidewalk; 2520 | 200 | LF | $0.00 |
| 31 | Sawcut 6" PCC Pavement; 2520 | 100 | LF | $0.00 |
| 32 | Sawcut 8" PCC Pavement; 2520 | 100 | LF | $0.00 |
| 33 | Sawcut 12" PCC Pavement; 2521 | 1,000 | LF | $0.00 |
| 34 | Sawcut 20-22" PCC Pavement; 2521 | 1,000 | SF | $0.00 |
| 35 | Construct 4" Nonreinforced PCC Sidewalk; 2520 | 1,000 | SF | $0.00 |
| 36 | Construct 6" Nonreinforced PCC Pavement; 2520 | 400 | SF | $0.00 |
| 37 | Construct 8" Nonreinforced PCC Pavement; 2520 | 400 | SF | $0.00 |
| 38 | Construct 12" Nonreinforced PCC Pavement; 2521 | 4,000 | SF | $0.00 |
| 39 | Construct 20-22" Nonreinforced PCC Pavement; 2521 | 4,000 | SF | $0.00 |
| 40 | Construct PCC Curb & Gutter 6"x32"; 2520 | 1,000 | LF | $0.00 |
| 41 | Construct PCC Fillet Section and Pan Gutter 6"; 2520 | 600 | SF | $0.00 |
| 42 | Construct Additional Nonreinforced PCC Pvmnt; 2520 | 20 | CY | $0.00 |
| 43 | Drill/Install Dowel Bars in PCC Pavement; 2521 | 800 | LF | $0.00 |
| 44 | Install Reinforcing Steel in PCC Pavement; 2521 | 2,500 | LB | $0.00 |
| 45 | Repair 4" PCC Spalls; 2523 | 400 | SF | $0.00 |
| 46 | Repair 6" PCC Spalls; 2523 | 100 | SF | $0.00 |
| 47 | Install Jet Fuel Resistant Joint & Crack Sealant; 2580 | 400 | LF | $0.00 |
| 48 | Install Silicon PCC Joint & Crack Sealant; 2580 | 4,000 | LF | $0.00 |
| 49 | Install Asphalt Pavement Joint & Crack Sealant; 2579 | 3,000 | LB | $0.00 |
| Repair Major Asphalt Cracks; 2546, 2510 | 500 | LF | $0.00 |
| 50 | Apply Pavement Marking 4"; 2761 | 4,000 | LF | $0.00 |
| 51 | Apply Pavement Marking 6" 2761 | 3,000 | LF | $0.00 |
| 52 | Apply Pavement Marking other; 2761 | 500 | SF | $0.00 |
| 53 | Add Glass Beads for Pavement Marking; 2761 | 2,500 | SF | $0.00 |
| 54 | Remove Pavement Markings; 2761 | 300 | SF | $0.00 |
GRAND TOTAL: $0.00
OPT YR 2
REPAIR BASE PAVEMENTS
OPTION YEAR 2
CLIN Description; Specification Section Reference Est. Qty Unit Unit Price Clin Total
| 1 | Excavate Confined Areas; 2200 | 100 | CY | $0.00 |
| 2 | Excavate General Areas; 2200 | 1,000 | CY | $0.00 |
| 3 | Fill and Compact; 2200 | 500 | CY | $0.00 |
| 4 | Finish Grade and Compact; 2200 | 5,000 | SY | $0.00 |
| 5 | Construct Aggregate Base Course; 2231 | 1,500 | TN | $0.00 |
| 6 | Place Topsoil; 2480 | 100 | CY | $0.00 |
| 7 | Seed; 2480 | 50 | LB | $0.00 |
| 8 | Fertilize; 2480 | 400 | LB | $0.00 |
| 9 | Mulch; 2480 | 400 | LB | $0.00 |
| 10 | Install Silt Fence; 2480 | 100 | LF | $0.00 |
| 11 | Construct 5" Asphalt Patch; 2510 | 2,000 | SF | $0.00 |
| 12 | Sawcut 5" Asphalt; 2510 | 1,000 | LF | $0.00 |
| 13 | Remove Asphalt Pavement; 2050 | 100 | CY | $0.00 |
| 14 | Mill Asphalt Pavement; 2546 | 12,000 | SY | $0.00 |
| 15 | Apply Asphalt Seal Coat; 2573 | 10,000 | GAL | $0.00 |
| 16 | Apply Asphalt Tack Coat; 2510 | 40,000 | SY | $0.00 |
| 17 | Construct Asphalt Leveling Course; 2510 | 300 | TON | $0.00 |
| 18 | Construct G-1 Asphalt Pavement; 2510 | 4,000 | TON | $0.00 |
| 19 | Construct G-2 Asphalt Pavement; 2510 | 800 | TON | $0.00 |
| 20 | Adjust Manhole Grade; 2510 | 10 | EA | $0.00 |
| 21 | Adjust Valve Box Grade; 2510 | 5 | EA | $0.00 |
| 22 | Remove 4" PCC Sidewalk; 2050 | 500 | SF | $0.00 |
| 23 | Remove 6" PCC Pavement; 2050 | 400 | SF | $0.00 |
| 24 | Remove 8" PCC Pavement; 2050 | 400 | SF | $0.00 |
| 25 | Remove 12" PCC Pavement; 2050 | 4,000 | SF | $0.00 |
| 26 | Remove 20-22" PCC Pavement; 2050 | 4,000 | SF | $0.00 |
| 27 | Remove PCC Curb & Gutter; 2050 | 800 | LF | $0.00 |
| 28 | Remove PCC Fillet Section and Pan Gutter; 2050 | 400 | SF | $0.00 |
| 29 | Remove Additional PCC Pavement; 2050 | 20 | CY | $0.00 |
| 30 | Sawcut 4" PCC Sidewalk; 2520 | 200 | LF | $0.00 |
| 31 | Sawcut 6" PCC Pavement; 2520 | 100 | LF | $0.00 |
| 32 | Sawcut 8" PCC Pavement; 2520 | 100 | LF | $0.00 |
| 33 | Sawcut 12" PCC Pavement; 2521 | 1,000 | LF | $0.00 |
| 34 | Sawcut 20-22" PCC Pavement; 2521 | 1,000 | SF | $0.00 |
| 35 | Construct 4" Nonreinforced PCC Sidewalk; 2520 | 1,000 | SF | $0.00 |
| 36 | Construct 6" Nonreinforced PCC Pavement; 2520 | 400 | SF | $0.00 |
| 37 | Construct 8" Nonreinforced PCC Pavement; 2520 | 400 | SF | $0.00 |
| 38 | Construct 12" Nonreinforced PCC Pavement; 2521 | 4,000 | SF | $0.00 |
| 39 | Construct 20-22" Nonreinforced PCC Pavement; 2521 | 4,000 | SF | $0.00 |
| 40 | Construct PCC Curb & Gutter 6"x32"; 2520 | 1,000 | LF | $0.00 |
| 41 | Construct PCC Fillet Section and Pan Gutter 6"; 2520 | 600 | SF | $0.00 |
| 42 | Construct Additional Nonreinforced PCC Pvmnt; 2520 | 20 | CY | $0.00 |
| 43 | Drill/Install Dowel Bars in PCC Pavement; 2521 | 800 | LF | $0.00 |
| 44 | Install Reinforcing Steel in PCC Pavement; 2521 | 2,500 | LB | $0.00 |
| 45 | Repair 4" PCC Spalls; 2523 | 400 | SF | $0.00 |
| 46 | Repair 6" PCC Spalls; 2523 | 100 | SF | $0.00 |
| 47 | Install Jet Fuel Resistant Joint & Crack Sealant; 2580 | 400 | LF | $0.00 |
| 48 | Install Silicon PCC Joint & Crack Sealant; 2580 | 4,000 | LF | $0.00 |
| 49 | Install Asphalt Pavement Joint & Crack Sealant; 2579 | 3,000 | LB | $0.00 |
| Repair Major Asphalt Cracks; 2546, 2510 | 500 | LF | $0.00 |
| 50 | Apply Pavement Marking 4"; 2761 | 4,000 | LF | $0.00 |
| 51 | Apply Pavement Marking 6" 2761 | 3,000 | LF | $0.00 |
| 52 | Apply Pavement Marking other; 2761 | 500 | SF | $0.00 |
| 53 | Add Glass Beads for Pavement Marking; 2761 | 2,500 | SF | $0.00 |
| 54 | Remove Pavement Markings; 2761 | 300 | SF | $0.00 |
GRAND TOTAL: $0.00
OPT YR 3
REPAIR BASE PAVEMENTS
OPTION YEAR 3
CLIN Description; Specification Section Reference Est. Qty Unit Unit Price Clin Total
| 1 | Excavate Confined Areas; 2200 | 100 | CY | $0.00 |
| 2 | Excavate General Areas; 2200 | 1,000 | CY | $0.00 |
| 3 | Fill and Compact; 2200 | 500 | CY | $0.00 |
| 4 | Finish Grade and Compact; 2200 | 5,000 | SY | $0.00 |
| 5 | Construct Aggregate Base Course; 2231 | 1,500 | TN | $0.00 |
| 6 | Place Topsoil; 2480 | 100 | CY | $0.00 |
| 7 | Seed; 2480 | 50 | LB | $0.00 |
| 8 | Fertilize; 2480 | 400 | LB | $0.00 |
| 9 | Mulch; 2480 | 400 | LB | $0.00 |
| 10 | Install Silt Fence; 2480 | 100 | LF | $0.00 |
| 11 | Construct 5" Asphalt Patch; 2510 | 2,000 | SF | $0.00 |
| 12 | Sawcut 5" Asphalt; 2510 | 1,000 | LF | $0.00 |
| 13 | Remove Asphalt Pavement; 2050 | 100 | CY | $0.00 |
| 14 | Mill Asphalt Pavement; 2546 | 12,000 | SY | $0.00 |
| 15 | Apply Asphalt Seal Coat; 2573 | 10,000 | GAL | $0.00 |
| 16 | Apply Asphalt Tack Coat; 2510 | 40,000 | SY | $0.00 |
| 17 | Construct Asphalt Leveling Course; 2510 | 300 | TON | $0.00 |
| 18 | Construct G-1 Asphalt Pavement; 2510 | 4,000 | TON | $0.00 |
| 19 | Construct G-2 Asphalt Pavement; 2510 | 800 | TON | $0.00 |
| 20 | Adjust Manhole Grade; 2510 | 10 | EA | $0.00 |
| 21 | Adjust Valve Box Grade; 2510 | 5 | EA | $0.00 |
| 22 | Remove 4" PCC Sidewalk; 2050 | 500 | SF | $0.00 |
| 23 | Remove 6" PCC Pavement; 2050 | 400 | SF | $0.00 |
| 24 | Remove 8" PCC Pavement; 2050 | 400 | SF | $0.00 |
| 25 | Remove 12" PCC Pavement; 2050 | 4,000 | SF | $0.00 |
| 26 | Remove 20-22" PCC Pavement; 2050 | 4,000 | SF | $0.00 |
| 27 | Remove PCC Curb & Gutter; 2050 | 800 | LF | $0.00 |
| 28 | Remove PCC Fillet Section and Pan Gutter; 2050 | 400 | SF | $0.00 |
| 29 | Remove Additional PCC Pavement; 2050 | 20 | CY | $0.00 |
| 30 | Sawcut 4" PCC Sidewalk; 2520 | 200 | LF | $0.00 |
| 31 | Sawcut 6" PCC Pavement; 2520 | 100 | LF | $0.00 |
| 32 | Sawcut 8" PCC Pavement; 2520 | 100 | LF | $0.00 |
| 33 | Sawcut 12" PCC Pavement; 2521 | 1,000 | LF | $0.00 |
| 34 | Sawcut 20-22" PCC Pavement; 2521 | 1,000 | SF | $0.00 |
| 35 | Construct 4" Nonreinforced PCC Sidewalk; 2520 | 1,000 | SF | $0.00 |
| 36 | Construct 6" Nonreinforced PCC Pavement; 2520 | 400 | SF | $0.00 |
| 37 | Construct 8" Nonreinforced PCC Pavement; 2520 | 400 | SF | $0.00 |
| 38 | Construct 12" Nonreinforced PCC Pavement; 2521 | 4,000 | SF | $0.00 |
| 39 | Construct 20-22" Nonreinforced PCC Pavement; 2521 | 4,000 | SF | $0.00 |
| 40 | Construct PCC Curb & Gutter 6"x32"; 2520 | 1,000 | LF | $0.00 |
| 41 | Construct PCC Fillet Section and Pan Gutter 6"; 2520 | 600 | SF | $0.00 |
| 42 | Construct Additional Nonreinforced PCC Pvmnt; 2520 | 20 | CY | $0.00 |
| 43 | Drill/Install Dowel Bars in PCC Pavement; 2521 | 800 | LF | $0.00 |
| 44 | Install Reinforcing Steel in PCC Pavement; 2521 | 2,500 | LB | $0.00 |
| 45 | Repair 4" PCC Spalls; 2523 | 400 | SF | $0.00 |
| 46 | Repair 6" PCC Spalls; 2523 | 100 | SF | $0.00 |
| 47 | Install Jet Fuel Resistant Joint & Crack Sealant; 2580 | 400 | LF | $0.00 |
| 48 | Install Silicon PCC Joint & Crack Sealant; 2580 | 4,000 | LF | $0.00 |
| 49 | Install Asphalt Pavement Joint & Crack Sealant; 2579 | 3,000 | LB | $0.00 |
| Repair Major Asphalt Cracks; 2546, 2510 | 500 | LF | $0.00 |
| 50 | Apply Pavement Marking 4"; 2761 | 4,000 | LF | $0.00 |
| 51 | Apply Pavement Marking 6" 2761 | 3,000 | LF | $0.00 |
| 52 | Apply Pavement Marking other; 2761 | 500 | SF | $0.00 |
| 53 | Add Glass Beads for Pavement Marking; 2761 | 2,500 | SF | $0.00 |
| 54 | Remove Pavement Markings; 2761 | 300 | SF | $0.00 |
GRAND TOTAL: $0.00
OPT YR 4
REPAIR BASE PAVEMENTS
OPTION YEAR 4
CLIN Description; Specification Section Reference Est. Qty Unit Unit Price Clin Total
| 1 | Excavate Confined Areas; 2200 | 100 | CY | $0.00 |
| 2 | Excavate General Areas; 2200 | 1,000 | CY | $0.00 |
| 3 | Fill and Compact; 2200 | 500 | CY | $0.00 |
| 4 | Finish Grade and Compact; 2200 | 5,000 | SY | $0.00 |
| 5 | Construct Aggregate Base Course; 2231 | 1,500 | TN | $0.00 |
| 6 | Place Topsoil; 2480 | 100 | CY | $0.00 |
| 7 | Seed; 2480 | 50 | LB | $0.00 |
| 8 | Fertilize; 2480 | 400 | LB | $0.00 |
| 9 | Mulch; 2480 | 400 | LB | $0.00 |
| 10 | Install Silt Fence; 2480 | 100 | LF | $0.00 |
| 11 | Construct 5" Asphalt Patch; 2510 | 2,000 | SF | $0.00 |
| 12 | Sawcut 5" Asphalt; 2510 | 1,000 | LF | $0.00 |
| 13 | Remove Asphalt Pavement; 2050 | 100 | CY | $0.00 |
| 14 | Mill Asphalt Pavement; 2546 | 12,000 | SY | $0.00 |
| 15 | Apply Asphalt Seal Coat; 2573 | 10,000 | GAL | $0.00 |
| 16 | Apply Asphalt Tack Coat; 2510 | 40,000 | SY | $0.00 |
| 17 | Construct Asphalt Leveling Course; 2510 | 300 | TON | $0.00 |
| 18 | Construct G-1 Asphalt Pavement; 2510 | 4,000 | TON | $0.00 |
| 19 | Construct G-2 Asphalt Pavement; 2510 | 800 | TON | $0.00 |
| 20 | Adjust Manhole Grade; 2510 | 10 | EA | $0.00 |
| 21 | Adjust Valve Box Grade; 2510 | 5 | EA | $0.00 |
| 22 | Remove 4" PCC Sidewalk; 2050 | 500 | SF | $0.00 |
| 23 | Remove 6" PCC Pavement; 2050 | 400 | SF | $0.00 |
| 24 | Remove 8" PCC Pavement; 2050 | 400 | SF | $0.00 |
| 25 | Remove 12" PCC Pavement; 2050 | 4,000 | SF | $0.00 |
| 26 | Remove 20-22" PCC Pavement; 2050 | 4,000 | SF | $0.00 |
| 27 | Remove PCC Curb & Gutter; 2050 | 800 | LF | $0.00 |
| 28 | Remove PCC Fillet Section and Pan Gutter; 2050 | 400 | SF | $0.00 |
| 29 | Remove Additional PCC Pavement; 2050 | 20 | CY | $0.00 |
| 30 | Sawcut 4" PCC Sidewalk; 2520 | 200 | LF | $0.00 |
| 31 | Sawcut 6" PCC Pavement; 2520 | 100 | LF | $0.00 |
| 32 | Sawcut 8" PCC Pavement; 2520 | 100 | LF | $0.00 |
| 33 | Sawcut 12" PCC Pavement; 2521 | 1,000 | LF | $0.00 |
| 34 | Sawcut 20-22" PCC Pavement; 2521 | 1,000 | SF | $0.00 |
| 35 | Construct 4" Nonreinforced PCC Sidewalk; 2520 | 1,000 | SF | $0.00 |
| 36 | Construct 6" Nonreinforced PCC Pavement; 2520 | 400 | SF | $0.00 |
| 37 | Construct 8" Nonreinforced PCC Pavement; 2520 | 400 | SF | $0.00 |
| 38 | Construct 12" Nonreinforced PCC Pavement; 2521 | 4,000 | SF | $0.00 |
| 39 | Construct 20-22" Nonreinforced PCC Pavement; 2521 | 4,000 | SF | $0.00 |
| 40 | Construct PCC Curb & Gutter 6"x32"; 2520 | 1,000 | LF | $0.00 |
| 41 | Construct PCC Fillet Section and Pan Gutter 6"; 2520 | 600 | SF | $0.00 |
| 42 | Construct Additional Nonreinforced PCC Pvmnt; 2520 | 20 | CY | $0.00 |
| 43 | Drill/Install Dowel Bars in PCC Pavement; 2521 | 800 | LF | $0.00 |
| 44 | Install Reinforcing Steel in PCC Pavement; 2521 | 2,500 | LB | $0.00 |
| 45 | Repair 4" PCC Spalls; 2523 | 400 | SF | $0.00 |
| 46 | Repair 6" PCC Spalls; 2523 | 100 | SF | $0.00 |
| 47 | Install Jet Fuel Resistant Joint & Crack Sealant; 2580 | 400 | LF | $0.00 |
| 48 | Install Silicon PCC Joint & Crack Sealant; 2580 | 4,000 | LF | $0.00 |
| 49 | Install Asphalt Pavement Joint & Crack Sealant; 2579 | 3,000 | LB | $0.00 |
| Repair Major Asphalt Cracks; 2546, 2510 | 500 | LF | $0.00 |
| 50 | Apply Pavement Marking 4"; 2761 | 4,000 | LF | $0.00 |
| 51 | Apply Pavement Marking 6" 2761 | 3,000 | LF | $0.00 |
| 52 | Apply Pavement Marking other; 2761 | 500 | SF | $0.00 |
| 53 | Add Glass Beads for Pavement Marking; 2761 | 2,500 | SF | $0.00 |
| 54 | Remove Pavement Markings; 2761 | 300 | SF | $0.00 |
GRAND TOTAL: $0.00
Sheet5