Updated Bid Schedule Attach 1- 23 Sep 16

View the file

Other files for this federal contract opportunity

Other files attached to Paving IDIQ Solicitation, newest first.
File Type Posted
SF30 _Amend_4.pdf PDF
Attach_9-_Paving_Contract_FA4690-12-D-0010_Bid_Schedule.pdf PDF
SF_30_Amend_03.pdf PDF
Attach_8 _Questions_and_Answers.pdf PDF
Attach_7-_Site_Visit_Minutes.pdf PDF
Amend_2-_SF_30.pdf PDF
SF30.pdf PDF
Solicitation-Attch_3_Wage_Determination.pdf PDF
16-R-0010 _Paving_Solicitiation.docx DOCX document
Solicitation-Attch_2_Statement_of_Work.pdf PDF
Solicitiation_Attch_5_ _6-_PPQ_Letter_and_Questionarie.pdf PDF
Solicitation-Attch_4_Special_Contract_Requirements.docx DOCX document
Solicitation-_Attch_1_Bid_Schedule.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE YR GE

REPAIR BASE PAVEMENTS

BID SCHEDULE: BASE YEAR

CLIN Description; Specification Section Reference Est. Qty Unit Unit Price Clin Total

1Excavate Confined Areas; 2200100CY$0.00
2Excavate General Areas; 22001,000CY$0.00
3Fill and Compact; 2200500CY$0.00
4Finish Grade and Compact; 22005,000SY$0.00
5Construct Aggregate Base Course; 22311,500TN$0.00
6Place Topsoil; 2480100CY$0.00
7Seed; 248050LB$0.00
8Fertilize; 2480400LB$0.00
9Mulch; 2480400LB$0.00
10Install Silt Fence; 2480100LF$0.00
11Construct 5" Asphalt Patch; 25102,000SF$0.00
12Sawcut 5" Asphalt; 25101,000LF$0.00
13Remove Asphalt Pavement; 20502,000SY$0.00
14Mill Asphalt Pavement, Edges and Small Areas; 25464,000SY$0.00
15Mill Asphalt Pavement, Large mill, Full Areas; 254610,000SY$0.00
16Apply Asphalt Seal Coat; 257310,000GAL$0.00
17Apply Asphalt Tack Coat; 251040,000SY$0.00
18Construct Asphalt Leveling Course; 2510300TON$0.00
19Construct G-1 Asphalt Pavement, 0-500 TON; 25102,000TON$0.00
20Construct G-1 Asphalt Pavement >500 TON; 25102,000TON$0.00
21Construct G-2 Asphalt Pavement; 2510800TON$0.00
22Adjust Manhole Grade; 251010EA$0.00
23Adjust Valve Box Grade; 25105EA$0.00
24Remove 4" PCC Sidewalk; 2050500SF$0.00
25Remove 6" PCC Pavement; 2050400SF$0.00
26Remove 8" PCC Pavement; 2050400SF$0.00
27Remove 12" PCC Pavement; 20504,000SF$0.00
28Remove 20-22" PCC Pavement; 20504,000SF$0.00
29Remove PCC Curb & Gutter; 2050800LF$0.00
30Remove PCC Fillet Section and Pan Gutter; 2050400SF$0.00
31Remove Additional PCC Pavement; 205020CY$0.00
32Sawcut 4" PCC Sidewalk; 2520200LF$0.00
33Sawcut 6" PCC Pavement; 2520100LF$0.00
34Sawcut 8" PCC Pavement; 2520100LF$0.00
35Sawcut 12" PCC Pavement; 25211,000LF$0.00
36Sawcut 20-22" PCC Pavement; 25211,000SF$0.00
37Construct 4" Nonreinforced PCC Sidewalk; 25201,000SF$0.00
38Construct 6" Nonreinforced PCC Pavement; 2520400SF$0.00
39Construct 8" Nonreinforced PCC Pavement; 2520400SF$0.00
40Construct 12" Nonreinforced PCC Pavement; 25214,000SF$0.00
41Construct 20-22" Nonreinforced PCC Pavement; 25214,000SF$0.00
42Construct PCC Curb & Gutter 6"x32"; 25201,000LF$0.00
43Construct PCC Fillet Section and Pan Gutter 6"; 2520600SF$0.00
44Construct Additional Nonreinforced PCC Pvmnt; 252020CY$0.00
45Drill/Install Dowel Bars in PCC Pavement; 2521800LF$0.00
46Install Reinforcing Steel in PCC Pavement; 25212,500LB$0.00
47Repair 4" PCC Spalls; 2523400SF$0.00
48Repair 6" PCC Spalls; 2523100SF$0.00
49Install Jet Fuel Resistant Joint & Crack Sealant; 2580400LF$0.00
50Install Silicon PCC Joint & Crack Sealant; 25804,000LF$0.00
51Install Asphalt Pavement Joint & Crack Sealant; 25793,000LB$0.00
52Repair Major Asphalt Cracks; 2546, 2510500LF$0.00
53Apply Pavement Marking 4"; 27614,000LF$0.00
54Apply Pavement Marking 6" 27613,000LF$0.00
55Apply Pavement Marking other; 2761500SF$0.00
56Add Glass Beads for Pavement Marking; 27612,500SF$0.00
57Remove Pavement Markings; 2761300SF$0.00
58Traffic Control: Flagging20HR$0.00
59Traffic Control: Low-Profile Barricade20EA$0.00

GRAND TOTAL: $0.00

OPT YR 1 GE

REPAIR BASE PAVEMENTS

BID SCHEDULE: OPTION YEAR 1

CLIN Description; Specification Section Reference Est. Qty Unit Unit Price Clin Total

1Excavate Confined Areas; 2200100CY$0.00
2Excavate General Areas; 22001,000CY$0.00
3Fill and Compact; 2200500CY$0.00
4Finish Grade and Compact; 22005,000SY$0.00
5Construct Aggregate Base Course; 22311,500TN$0.00
6Place Topsoil; 2480100CY$0.00
7Seed; 248050LB$0.00
8Fertilize; 2480400LB$0.00
9Mulch; 2480400LB$0.00
10Install Silt Fence; 2480100LF$0.00
11Construct 5" Asphalt Patch; 25102,000SF$0.00
12Sawcut 5" Asphalt; 25101,000LF$0.00
13Remove Asphalt Pavement; 20502,000SY$0.00
14Mill Asphalt Pavement, Edges and Small Areas; 25464,000SY$0.00
15Mill Asphalt Pavement, Large mill, Full Areas; 254610,000SY$0.00
16Apply Asphalt Seal Coat; 257310,000GAL$0.00
17Apply Asphalt Tack Coat; 251040,000SY$0.00
18Construct Asphalt Leveling Course; 2510300TON$0.00
19Construct G-1 Asphalt Pavement, 0-500 TON; 25102,000TON$0.00
20Construct G-1 Asphalt Pavement >500 TON; 25102,000TON$0.00
21Construct G-2 Asphalt Pavement; 2510800TON$0.00
22Adjust Manhole Grade; 251010EA$0.00
23Adjust Valve Box Grade; 25105EA$0.00
24Remove 4" PCC Sidewalk; 2050500SF$0.00
25Remove 6" PCC Pavement; 2050400SF$0.00
26Remove 8" PCC Pavement; 2050400SF$0.00
27Remove 12" PCC Pavement; 20504,000SF$0.00
28Remove 20-22" PCC Pavement; 20504,000SF$0.00
29Remove PCC Curb & Gutter; 2050800LF$0.00
30Remove PCC Fillet Section and Pan Gutter; 2050400SF$0.00
31Remove Additional PCC Pavement; 205020CY$0.00
32Sawcut 4" PCC Sidewalk; 2520200LF$0.00
33Sawcut 6" PCC Pavement; 2520100LF$0.00
34Sawcut 8" PCC Pavement; 2520100LF$0.00
35Sawcut 12" PCC Pavement; 25211,000LF$0.00
36Sawcut 20-22" PCC Pavement; 25211,000SF$0.00
37Construct 4" Nonreinforced PCC Sidewalk; 25201,000SF$0.00
38Construct 6" Nonreinforced PCC Pavement; 2520400SF$0.00
39Construct 8" Nonreinforced PCC Pavement; 2520400SF$0.00
40Construct 12" Nonreinforced PCC Pavement; 25214,000SF$0.00
41Construct 20-22" Nonreinforced PCC Pavement; 25214,000SF$0.00
42Construct PCC Curb & Gutter 6"x32"; 25201,000LF$0.00
43Construct PCC Fillet Section and Pan Gutter 6"; 2520600SF$0.00
44Construct Additional Nonreinforced PCC Pvmnt; 252020CY$0.00
45Drill/Install Dowel Bars in PCC Pavement; 2521800LF$0.00
46Install Reinforcing Steel in PCC Pavement; 25212,500LB$0.00
47Repair 4" PCC Spalls; 2523400SF$0.00
48Repair 6" PCC Spalls; 2523100SF$0.00
49Install Jet Fuel Resistant Joint & Crack Sealant; 2580400LF$0.00
50Install Silicon PCC Joint & Crack Sealant; 25804,000LF$0.00
51Install Asphalt Pavement Joint & Crack Sealant; 25793,000LB$0.00
52Repair Major Asphalt Cracks; 2546, 2510500LF$0.00
53Apply Pavement Marking 4"; 27614,000LF$0.00
54Apply Pavement Marking 6" 27613,000LF$0.00
55Apply Pavement Marking other; 2761500SF$0.00
56Add Glass Beads for Pavement Marking; 27612,500SF$0.00
57Remove Pavement Markings; 2761300SF$0.00
58Traffic Control: Flagging20HR$0.00
59Traffic Control: Low-Profile Barricade20EA$0.00

GRAND TOTAL: $0.00

OPT YR 2 GE

REPAIR BASE PAVEMENTS

BID SCHEDULE: OPTION YEAR 2

CLIN Description; Specification Section Reference Est. Qty Unit Unit Price Clin Total

1Excavate Confined Areas; 2200100CY$0.00
2Excavate General Areas; 22001,000CY$0.00
3Fill and Compact; 2200500CY$0.00
4Finish Grade and Compact; 22005,000SY$0.00
5Construct Aggregate Base Course; 22311,500TN$0.00
6Place Topsoil; 2480100CY$0.00
7Seed; 248050LB$0.00
8Fertilize; 2480400LB$0.00
9Mulch; 2480400LB$0.00
10Install Silt Fence; 2480100LF$0.00
11Construct 5" Asphalt Patch; 25102,000SF$0.00
12Sawcut 5" Asphalt; 25101,000LF$0.00
13Remove Asphalt Pavement; 20502,000SY$0.00
14Mill Asphalt Pavement, Edges and Small Areas; 25464,000SY$0.00
15Mill Asphalt Pavement, Large mill, Full Areas; 254610,000SY$0.00
16Apply Asphalt Seal Coat; 257310,000GAL$0.00
17Apply Asphalt Tack Coat; 251040,000SY$0.00
18Construct Asphalt Leveling Course; 2510300TON$0.00
19Construct G-1 Asphalt Pavement, 0-500 TON; 25102,000TON$0.00
20Construct G-1 Asphalt Pavement >500 TON; 25102,000TON$0.00
21Construct G-2 Asphalt Pavement; 2510800TON$0.00
22Adjust Manhole Grade; 251010EA$0.00
23Adjust Valve Box Grade; 25105EA$0.00
24Remove 4" PCC Sidewalk; 2050500SF$0.00
25Remove 6" PCC Pavement; 2050400SF$0.00
26Remove 8" PCC Pavement; 2050400SF$0.00
27Remove 12" PCC Pavement; 20504,000SF$0.00
28Remove 20-22" PCC Pavement; 20504,000SF$0.00
29Remove PCC Curb & Gutter; 2050800LF$0.00
30Remove PCC Fillet Section and Pan Gutter; 2050400SF$0.00
31Remove Additional PCC Pavement; 205020CY$0.00
32Sawcut 4" PCC Sidewalk; 2520200LF$0.00
33Sawcut 6" PCC Pavement; 2520100LF$0.00
34Sawcut 8" PCC Pavement; 2520100LF$0.00
35Sawcut 12" PCC Pavement; 25211,000LF$0.00
36Sawcut 20-22" PCC Pavement; 25211,000SF$0.00
37Construct 4" Nonreinforced PCC Sidewalk; 25201,000SF$0.00
38Construct 6" Nonreinforced PCC Pavement; 2520400SF$0.00
39Construct 8" Nonreinforced PCC Pavement; 2520400SF$0.00
40Construct 12" Nonreinforced PCC Pavement; 25214,000SF$0.00
41Construct 20-22" Nonreinforced PCC Pavement; 25214,000SF$0.00
42Construct PCC Curb & Gutter 6"x32"; 25201,000LF$0.00
43Construct PCC Fillet Section and Pan Gutter 6"; 2520600SF$0.00
44Construct Additional Nonreinforced PCC Pvmnt; 252020CY$0.00
45Drill/Install Dowel Bars in PCC Pavement; 2521800LF$0.00
46Install Reinforcing Steel in PCC Pavement; 25212,500LB$0.00
47Repair 4" PCC Spalls; 2523400SF$0.00
48Repair 6" PCC Spalls; 2523100SF$0.00
49Install Jet Fuel Resistant Joint & Crack Sealant; 2580400LF$0.00
50Install Silicon PCC Joint & Crack Sealant; 25804,000LF$0.00
51Install Asphalt Pavement Joint & Crack Sealant; 25793,000LB$0.00
52Repair Major Asphalt Cracks; 2546, 2510500LF$0.00
53Apply Pavement Marking 4"; 27614,000LF$0.00
54Apply Pavement Marking 6" 27613,000LF$0.00
55Apply Pavement Marking other; 2761500SF$0.00
56Add Glass Beads for Pavement Marking; 27612,500SF$0.00
57Remove Pavement Markings; 2761300SF$0.00
58Traffic Control: Flagging20HR$0.00
59Traffic Control: Low-Profile Barricade20EA$0.00

GRAND TOTAL: $0.00

OPT YR 3 GE

REPAIR BASE PAVEMENTS

BID SCHEDULE: OPTION YEAR 3

CLIN Description; Specification Section Reference Est. Qty Unit Unit Price Clin Total

1Excavate Confined Areas; 2200100CY$0.00
2Excavate General Areas; 22001,000CY$0.00
3Fill and Compact; 2200500CY$0.00
4Finish Grade and Compact; 22005,000SY$0.00
5Construct Aggregate Base Course; 22311,500TN$0.00
6Place Topsoil; 2480100CY$0.00
7Seed; 248050LB$0.00
8Fertilize; 2480400LB$0.00
9Mulch; 2480400LB$0.00
10Install Silt Fence; 2480100LF$0.00
11Construct 5" Asphalt Patch; 25102,000SF$0.00
12Sawcut 5" Asphalt; 25101,000LF$0.00
13Remove Asphalt Pavement; 20502,000SY$0.00
14Mill Asphalt Pavement, Edges and Small Areas; 25464,000SY$0.00
15Mill Asphalt Pavement, Large mill, Full Areas; 254610,000SY$0.00
16Apply Asphalt Seal Coat; 257310,000GAL$0.00
17Apply Asphalt Tack Coat; 251040,000SY$0.00
18Construct Asphalt Leveling Course; 2510300TON$0.00
19Construct G-1 Asphalt Pavement, 0-500 TON; 25102,000TON$0.00
20Construct G-1 Asphalt Pavement >500 TON; 25102,000TON$0.00
21Construct G-2 Asphalt Pavement; 2510800TON$0.00
22Adjust Manhole Grade; 251010EA$0.00
23Adjust Valve Box Grade; 25105EA$0.00
24Remove 4" PCC Sidewalk; 2050500SF$0.00
25Remove 6" PCC Pavement; 2050400SF$0.00
26Remove 8" PCC Pavement; 2050400SF$0.00
27Remove 12" PCC Pavement; 20504,000SF$0.00
28Remove 20-22" PCC Pavement; 20504,000SF$0.00
29Remove PCC Curb & Gutter; 2050800LF$0.00
30Remove PCC Fillet Section and Pan Gutter; 2050400SF$0.00
31Remove Additional PCC Pavement; 205020CY$0.00
32Sawcut 4" PCC Sidewalk; 2520200LF$0.00
33Sawcut 6" PCC Pavement; 2520100LF$0.00
34Sawcut 8" PCC Pavement; 2520100LF$0.00
35Sawcut 12" PCC Pavement; 25211,000LF$0.00
36Sawcut 20-22" PCC Pavement; 25211,000SF$0.00
37Construct 4" Nonreinforced PCC Sidewalk; 25201,000SF$0.00
38Construct 6" Nonreinforced PCC Pavement; 2520400SF$0.00
39Construct 8" Nonreinforced PCC Pavement; 2520400SF$0.00
40Construct 12" Nonreinforced PCC Pavement; 25214,000SF$0.00
41Construct 20-22" Nonreinforced PCC Pavement; 25214,000SF$0.00
42Construct PCC Curb & Gutter 6"x32"; 25201,000LF$0.00
43Construct PCC Fillet Section and Pan Gutter 6"; 2520600SF$0.00
44Construct Additional Nonreinforced PCC Pvmnt; 252020CY$0.00
45Drill/Install Dowel Bars in PCC Pavement; 2521800LF$0.00
46Install Reinforcing Steel in PCC Pavement; 25212,500LB$0.00
47Repair 4" PCC Spalls; 2523400SF$0.00
48Repair 6" PCC Spalls; 2523100SF$0.00
49Install Jet Fuel Resistant Joint & Crack Sealant; 2580400LF$0.00
50Install Silicon PCC Joint & Crack Sealant; 25804,000LF$0.00
51Install Asphalt Pavement Joint & Crack Sealant; 25793,000LB$0.00
52Repair Major Asphalt Cracks; 2546, 2510500LF$0.00
53Apply Pavement Marking 4"; 27614,000LF$0.00
54Apply Pavement Marking 6" 27613,000LF$0.00
55Apply Pavement Marking other; 2761500SF$0.00
56Add Glass Beads for Pavement Marking; 27612,500SF$0.00
57Remove Pavement Markings; 2761300SF$0.00
58Traffic Control: Flagging20HR$0.00
59Traffic Control: Low-Profile Barricade20EA$0.00

GRAND TOTAL: $0.00

OPT YR 4 GE

REPAIR BASE PAVEMENTS

BID SCHEDULE: OPTION YEAR 4

CLIN Description; Specification Section Reference Est. Qty Unit Unit Price Clin Total

1Excavate Confined Areas; 2200100CY$0.00
2Excavate General Areas; 22001,000CY$0.00
3Fill and Compact; 2200500CY$0.00
4Finish Grade and Compact; 22005,000SY$0.00
5Construct Aggregate Base Course; 22311,500TN$0.00
6Place Topsoil; 2480100CY$0.00
7Seed; 248050LB$0.00
8Fertilize; 2480400LB$0.00
9Mulch; 2480400LB$0.00
10Install Silt Fence; 2480100LF$0.00
11Construct 5" Asphalt Patch; 25102,000SF$0.00
12Sawcut 5" Asphalt; 25101,000LF$0.00
13Remove Asphalt Pavement; 20502,000SY$0.00
14Mill Asphalt Pavement, Edges and Small Areas; 25464,000SY$0.00
15Mill Asphalt Pavement, Large mill, Full Areas; 254610,000SY$0.00
16Apply Asphalt Seal Coat; 257310,000GAL$0.00
17Apply Asphalt Tack Coat; 251040,000SY$0.00
18Construct Asphalt Leveling Course; 2510300TON$0.00
19Construct G-1 Asphalt Pavement, 0-500 TON; 25102,000TON$0.00
20Construct G-1 Asphalt Pavement >500 TON; 25102,000TON$0.00
21Construct G-2 Asphalt Pavement; 2510800TON$0.00
22Adjust Manhole Grade; 251010EA$0.00
23Adjust Valve Box Grade; 25105EA$0.00
24Remove 4" PCC Sidewalk; 2050500SF$0.00
25Remove 6" PCC Pavement; 2050400SF$0.00
26Remove 8" PCC Pavement; 2050400SF$0.00
27Remove 12" PCC Pavement; 20504,000SF$0.00
28Remove 20-22" PCC Pavement; 20504,000SF$0.00
29Remove PCC Curb & Gutter; 2050800LF$0.00
30Remove PCC Fillet Section and Pan Gutter; 2050400SF$0.00
31Remove Additional PCC Pavement; 205020CY$0.00
32Sawcut 4" PCC Sidewalk; 2520200LF$0.00
33Sawcut 6" PCC Pavement; 2520100LF$0.00
34Sawcut 8" PCC Pavement; 2520100LF$0.00
35Sawcut 12" PCC Pavement; 25211,000LF$0.00
36Sawcut 20-22" PCC Pavement; 25211,000SF$0.00
37Construct 4" Nonreinforced PCC Sidewalk; 25201,000SF$0.00
38Construct 6" Nonreinforced PCC Pavement; 2520400SF$0.00
39Construct 8" Nonreinforced PCC Pavement; 2520400SF$0.00
40Construct 12" Nonreinforced PCC Pavement; 25214,000SF$0.00
41Construct 20-22" Nonreinforced PCC Pavement; 25214,000SF$0.00
42Construct PCC Curb & Gutter 6"x32"; 25201,000LF$0.00
43Construct PCC Fillet Section and Pan Gutter 6"; 2520600SF$0.00
44Construct Additional Nonreinforced PCC Pvmnt; 252020CY$0.00
45Drill/Install Dowel Bars in PCC Pavement; 2521800LF$0.00
46Install Reinforcing Steel in PCC Pavement; 25212,500LB$0.00
47Repair 4" PCC Spalls; 2523400SF$0.00
48Repair 6" PCC Spalls; 2523100SF$0.00
49Install Jet Fuel Resistant Joint & Crack Sealant; 2580400LF$0.00
50Install Silicon PCC Joint & Crack Sealant; 25804,000LF$0.00
51Install Asphalt Pavement Joint & Crack Sealant; 25793,000LB$0.00
52Repair Major Asphalt Cracks; 2546, 2510500LF$0.00
53Apply Pavement Marking 4"; 27614,000LF$0.00
54Apply Pavement Marking 6" 27613,000LF$0.00
55Apply Pavement Marking other; 2761500SF$0.00
56Add Glass Beads for Pavement Marking; 27612,500SF$0.00
57Remove Pavement Markings; 2761300SF$0.00
58Traffic Control: Flagging20HR$0.00
59Traffic Control: Low-Profile Barricade20EA$0.00

GRAND TOTAL: $0.00