Attach_21-_Example_Sample_Project_Proposal_Redacted.pdf
PDF 1 MB Posted
- Attached to
- Ellsworth Air Force Base- SABER Federal contract opportunity
- Solicitation number
- FA4690-16-R-0007
About this file
Attach 21- Example Sample Project Proposal_Redacted
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
290.133
290.133/cor/cost proposal 12:00 PM August 20, 2015
August 20, 2015
673d Contracting Squadron/LGCA 10480 Sijan Avenue Joint Base Elmendorf-Richardson, Alaska 99506
Attention: Mr. Patrick Doup
Reference: AF Contract: FA5000-15-D-0007 SABER Project Number: FXSB 15-1052 Project Title: Repair/Upgrade Kenai DFAC to ADA
Subject: Cost Proposal
Mr. Doup, . is pleased to provide our Cost Proposal for the above reference project.
Attached are the following documents:
1. Price Proposal & Performance Period Summary Sheet
2. Contractor Developed Scope of Work
3. Contractor Estimate
4. 60% Design Drawings
Please direct any questions concerning this proposal to me at .
Sincerely, Attachment 21
290.133/cor/price & performance
8/20/2015 12:18 PM
PRICE PROPOSAL & PERFORMANCE PERIOD
SUMMARY SHEET
AF Contract: FA5000-15-D-0007 SABER Project Number: FXSB 15-1052 Project Title: Repair/Upgrade Kenai DFAC to ADA Date: August 20, 2015
PRICE PROPOSAL:
Total of All Priced Items before Coefficient..........................$ 76,779.55
Total of All Non-Priced Items before Coefficient .................$ 0.00 (%)
Contract Coefficient...............................................................$ (2,303.39)
Total Price..............................................................................$ 74,476.16
PERFORMANCE PERIOD:
Planning & Subcontracting ..................................................15 Days
Air Force Submittal Processing ...........................................15 Days
Special Item Ordering ...........................................................0 Days
Long Lead Time for Materials ..............................................0 Days
Winter Weather Delay* ........................................................0 Days
Construction Time ...............................................................70 Days
Pre-Final & Final Inspections ..............................................25 Days
Total Performance Period ...................................................125 Days*
Air Force Need Date ............................................................Unknown
LONG LEAD ITEMS: N/A
*Based on NTP being issued no later than 1 September 2015
WW C.
August 20, 2015
Mr. Patrick Doup
673d Contracting Squadron/LGCA 10480 Sijan Avenue Joint Base Elmendorf-Richardson, Alaska 99506
Re: SABER, Elmendorf AFB, Alaska Contract No. FA5000-15-D-0007
Subj.: Project No. FXSB 15-1052 Repair/Upgrade Kenai DFAC to ADA
1) Contractor Developed SOW
Mr. Doup, The following is a Contractor developed SOW for this project based on the Government Statement of Work, site visits and on-site discussions.
Div. 1 General Requirements
1.1 Provide Work Clearance Permit - Maintain markings
1.2 Equipment Mobilization for Civil Work.
1.3 Full access to site area.
1.4 Rental of equipment to complete job
1.5 Areas will be readily accessible to the contractor on a daily basis.
DIV 2 Existing Conditions / Demo
2.1 Test for ACM & Lead Paint.
2.2 Provide containment for separation and dust control.
2.3 Demo ceramic tile, ceramic base and all thin-set from future restroom floor.
2.4 Demo 6’ double door into restroom.
2.5 Demo all GWB at east wall of restroom,
2.6 Demo all GWB and possibly framing on ceiling of restroom.
2.7 Demo and haul away approx. 30’ of curb and sidewalk at new handicap ramp location.
2.8 Demo and haul away approx. 33’ of 48” sidewalk and approx. 63’ of 72” sidewalk from new handicap ramp to West Entrance.
290.133/cor/Contractor SOW
2.9 Saw cut existing sidewalk and curb & gutter.
2.10 Saw cut existing asphalt
2.11 Demo Sidewalk
2.12 Demo Asphalt
DIV 3 Concrete
3.1 Pour new concrete landing with stairs at west entrance.
3.2 Pour new concrete sidewalk and ADA compliant ramp to west entrance.
3.3 Replace curb and sidewalk with ADA compliant ramps for 2 parking spaces.
DIV 5 Steel Pipe Handrail
5.1 Provide and install painted, steel pipe handrail at landing, stairs and a portion of ramp.
DIV 8 Doors & Hardware
8.1 Install one 3’ x 7’ door and jamb into restroom
8.2 Restroom door to have push/pull hardware with thumb turn deadbolt. Mop plate, kick plate, door stop. No closure.
8.3 Install ADA compliant automatic door openers on both 6’ entry doors. Only one door on each opening will be active with auto function.
8.4 Install new closures on the two remaining inactive entry doors.
DIV 9 Finishes
9.1 Convert 6’ restroom doorway to 3’ x 7’ door. Frame new wall, separating restroom from dish wash room. Reframe ceiling as necessary.
9.2 Replace necessary GWB with moisture resistant and Type X.
9.3 Provide sound insulation where necessary.
9.4 Finish and paint all GWB surfaces – smooth wall.
9.5 Install 60” FRP wainscot on all restroom walls.
9.6 Remove, replace and reinstall woodwork necessary to complete scope.
9.7 Provide and install 2x2 non-skid ceramic tile and cove base. All necessary floor prep included.
9.8 Provide Uni-sex restroom sign.
9.9 Provide and install restroom accessories; Toilet Paper Dispenser, Soap Dispenser, Paper
Towel/Waste Receptacle, ADA Grab Bars, Mirror.
DIV 22 Plumbing
22.1 Install wall hung lavatory and floor mount water closet with flush valve, ADA compliant, in new restroom area.
22.2 Insulate new water piping.
290.133/cor/Contractor SOW
DIV 23 HVAC
23.1 Install one exhaust fan in ceiling of new restroom area.
DIV 26 Electrical
26.1 Install new light fixture and occupancy sensor.
26.2 Install GFI outlet.
26.3 Install new heat detector and relocate existing.
26.4 Install and wire 4 handicapped door buttons.
26.5 Wire power and controls for automatic door openers.
Div. 31 Site Work
31.1 Excavate/backfill/Grade for new side walk.
31.3 Roll grade after sidewalk demo.
Div. 32 Exterior Improvements
32.1 Replace asphalt against new curb.
Exclusions:
Utility conflicts not on plans are not priced in estimate.
Contaminated soil removal.
If you have any questions or require further clarification please contact me at your convenience.
Cordially, FACILITY NUMBER 7535
ELM XXXX
FXSB15-1052
JOINT BASE
ELMENDORF-RICHARDSON
SCHEDULE OF DRAWINGS
SHEET REFERENCE NUMBER SHEET TITLE
G-1 TITLE SHEET
C-1 SITE PLAN
A-1 NEW LAYOUT PLAN
M-1 MECHANICAL LAYOUT
E-1 ELECTRICAL LAYOUT
673RD CIVIL ENGINEER SQUADRON
SCOPE OF WORK:
REMOVE EXISTING SIDEWALK TO THE LEFT ENTRANCE AND INSTALL AN ADA COMPLIANT RAMP
AND AUTO DOOR OPENERS. CONSTRUCT A NEW UNI-SEX ADA COMPLIANT RESTROOM
UPGRADE KENAI DFAC TO ADA
PROJECT LOCATION
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
FI
LE
N O
.JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
UPGRADE KENAI DFAC TO ADA
COVER PAGE
AS SHOWN
FA5000-15-D-0007
15-1052
FXSB151052G01.DWG
G-1 8/20/15
60%
DESIGN
290.133 8/20/15 60%
PRELIMINARY
NOT FOR CONSTRUCTION
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
FI
LE
N O
.JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
UPGRADE KENAI DFAC TO ADA
SITE PLAN
AS SHOWN
FA5000-15-D-0007
151052
FXSB151052C01.DWG
C-1 8/20/15
60%
DESIGN
N
T R
U E
1 DEMOLISH EXISTING SIDEWALK
2 DEMOLISH EXISTING CURB APPROX 30'
DEMOLITION NOTES:
Scale: 1/16"=1'-0"
SITE PLAN - DEMOLITION1
3 COVER EXISTING PARKING STRIPES FOR NEW PARKING STRIPE LAYOUT
Scale: 1/16"=1'-0"
SITE PLAN - NEW LAYOUT2
HILITI ANCHOR
SPACED 24" O.C.
EXISTING
FLOOR
EXISTING
CEILING
4" METAL STUD
16" O.C.
5/8" GYP BOARD
(LEVEL 5
FINISH, PAINT)
5/8" GYP
BOARD
HILITI ANCHOR
SPACED 24" O.C.
FRP WAINSCOT
FINISH (5' A.F.F.)
ADA RESTROOM DISHWASH ROOM
NEW 6" x6" TILE
NEW HARD LID
CEILING
DOOR TYPE 1 FRAME TYPE 1
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
FI
LE
N O
.JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
UPGRADE KENAI DFAC TO ADA
NEW LAYOUT PLAN
AS SHOWN
FA5000-15-D-0007
151052
FXSB151052A01.DWG
A-1 8/20/15
60%
DESIGN
N
T R
U E
1 DEMOLISH EXISTING DOOR COMPLETE
2 DEMOLISH EXISTING FLOORING COMPLETE
DEMOLITION NOTES:
Scale: 1/4"=1'-0"
DEMOLITION LAYOUT1
3 DEMOLISH EXISTING WALL COVERINGS COMPLETE
FACILITY KEY PLAN
PROJECT LOCATION
4 DEMOLISH EXISTING ELECTRICAL DEVICES COMPLETE
5 DEMOLISH EXISTING CEILING COMPLETE
1 MATCH EXISTING HALL WALL FINISH ON WALL INFILL
2 INSTALL WAINSCOT FRP TO 5' ON ALL WALL SURFACE IN RESTROOM
CONSTRUCTION NOTES:
Scale: 1/4"=1'-0"
NEW FLOOR LAYOUT2
3 INSTALL APPROPRIATE SIGNAGE FOR RESTROOM (MATCH EXISTING SIGNAGE)
5 PAINT EVERYTHING
Scale: NTS
WALL DETAIL3
INSTALL (1) MIRROR, (1) SOAP DISPENSER, (1) PAPER TOWEL/GARBAGE
RECEPTACLE, (1) TOILET PAPER DISPENSER, AND ADA COMPLIANT GRAB
BARS
HARDWARE GROUP
SYMBOL
D1
DOOR FINISH SCHEDULE
DOOR
SIZE
DOOR
MATERIAL
WOOD
DOOR
FINISH
MATCH EXISTING
FRAME
MATERIAL
METAL
FRAME
FINISH
GLASS
VISION PANEL
HARDWARE
GROUP REMARKS
PAINT 1
DOOR
TYPE
FRAME
TYPE
GROUP 1:
US26D HD HINGES , LEVER HANDLE PRIVACY LOCKSET, DOOR STOP, 810"x34" ALUMINUM KICK PLATE AND 6" MOP PLATE
N/A
Scale: NTS
DOOR FRAME4
Scale: 1/4"=1'-0"
REFLECTED CEILING LAYOUT5
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
FI
LE
N O
.JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
UPGRADE KENAI DFAC TO ADA
MECHANICAL LAYOUT PLAN
AS SHOWN
FA5000-15-D-0007
151052
FXSB151052M01.DWG
M-1 8/20/15
60%
DESIGN
N
T R
U E
FACILITY KEY PLAN
PROJECT LOCATION
Scale: 1/4"=1'-0" PLUMBING LAYOUT1 Scale: 1/4"=1'-0"
HVAC LAYOUT2
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
FI
LE
N O
.JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DRAWING NO:
UPGRADE KENAI DFAC TO ADA
ELECTRICAL LAYOUT
AS SHOWN
FA5000-15-D-0007
151052
FXSB151052E01.DWG
E-1 8/20/15
60%
DESIGN
N
T R
U E
FACILITY KEY PLAN
PROJECT LOCATION
Scale: 1/4"=1'-0"
LIGHTING LAYOUT1
Scale: 1/4"=1'-0"
POWER LAYOUT2