Attach_19-_Sample_Project_SOW.pdf
PDF 124 KB Posted
- Attached to
- Ellsworth Air Force Base- SABER Federal contract opportunity
- Solicitation number
- FA4690-16-R-0007
About this file
Attach 19- Sample Project SOW
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 19
28th Civil Engineer Squadron Ellsworth, South Dakota
7 July 2016
STATEMENT OF WORK
Construct Security Fence
FXBM 16-XXXX
SECTION 1: PROJECT INFORMATION
1.1 PROJECT LOCATION: SABER project FXBM 16-XXXX shall be completed as a routine requirement as shown in the site layout attached.
1.2 UNIQUE REQUIREMENT: None
1.3 PROJECT DESCRIPTION: Install chain link fence that runs along South Gate Rd./Ellsworth St.
approaching the Bismarck Gate as shown in the site layout attached. The fence was damaged in a recent storm and needs to be replaced.
SECTION 2: GENERAL REQUIREMENTS
2.1 WORKMANSHIP: All work shall be accomplished in accordance with all applicable building and fire codes. Contractor shall field verify all measurements, quantities, or value stated by the Government. Liquidated damages shall be assessed for work that is not finished within the scheduled performance period.
2.2 WORKSITE: The contractor shall limit the work to the areas indicated by the government. The contractor shall make every effort not to disturb or obstruct portions of the facilities still occupied by the government. The contractor shall make efforts to minimize interference to Government operations. The contractor shall coordinate and schedule work with the 28 CES/SABER office prior the start of any operation. The contractor shall dispose of all construction debris off base at an approved disposal facility.
2.3 SITE SECURITY AND PROTECTION: The contractor shall make every effort to secure the work site, allowing only authorized personnel to enter the work site. The contractor shall protect the site from damage from weather, vandalism, and/or theft.
2.4 DAMAGE TO EXISTING SITE CONDITIONS: The contractor shall be responsible to repair any and all damage incurred to existing Real Property/Grounds due to poor workmanship at no cost to the government. Contractor shall not park or drive on sidewalk or grassy/snowy areas. Damage incurred shall be repaired at no cost to the government.
2.5 HEALTH/SAFETY: The contractor shall be responsible for compliance with OSHA and AFOSH standards. The contractor shall maintain a clean and debris free site at all times. The contractor shall keep driveways and entrances into and around the work site clear at all times. The contractor shall not use driveways or entrances as employee parking or storage of materials unless otherwise stated. The contractor shall minimize storage of materials and equipment on site.
2.6 GREEN PROCURMENT: Contractor must incorporate “green procurement” principles into the design of their projects. Specifically, consult the EPA’s web site at www.epa.gov/cpg/products.htm for a listing of the products that have been mandated as green procurement requirements for purchases.
SECTION 3: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS
3.1 Demo
3.1.1 Demo security fences, 12' to 16' high (approx. 1000 LF)
3.2 Earthwork
3.2.1 Borrow, clay, till, or blasted rock, 1-1/2 C.Y. (200 B.C.Y.)
3.2.2 Borrow, topsoil or loam, 1-1/2 C.Y. (200 B.C.Y.)
3.2.3 Excavated or borrow, loose cubic yards, small excavation job, (240 C.Y)
3.3 Exterior Improvements
3.3.1 High-security chain link fences, gates & systems, chain link fence, 7' high
3.3.2 Seeding, mechanical seeding, fine grading and seeding, with equipment, includes lime, fertilizer & seed (1000 SY)
SECTION 4: SUBMITTALS
4.1.1 The contractor shall provide, at a minimum, single line electrical, mechanical, and/or civil shop drawings of the proposed renovation. These are required for the government's evaluation of the contractor's proposal.
SECTION 5: DRAWINGS
5.1.1 All drawings shall conform to the standards specified in the SOW and EAFB
Design Compatability Standards. Drawings shall not exceed Minimum Design (35%). Design costs shall not exceed 6% of the construction cost.
SECTION 6: SPECIAL PROVISIONS/NOTES/SPECIFICATIONS
6.1 All work shall be accomplished according to the SOW, Specification 01000 Ellsworth AFB
Special Provisions, Specification 01800 Environmental Provisions, Ellsworth AFB Underground Electrical Requirements, AFI 32-1062 Electrical Systems, Power Plants, and Generators, Ellsworth AFB Fire Protection Standards, and any manufacturer’s specification associated with materials and supplies (e.g. National Electric Code, National Electric Safety Code, and ANSI C2). In the event of a conflict between any of the specifications or codes, the most stringent standard will apply.
SECTION 7: PROJECT MANAGERS
7.1 Lt Conor Favo
7.2 MSgt Daniel Merrill
Attachment 1: Map showing location of fence to be replaced
Ellsw orth Rd
Bismarck Gate