Attach_19-_Sample_Project_SOW.pdf

PDF 124 KB Posted

Attached to
Ellsworth Air Force Base- SABER Federal contract opportunity
Solicitation number
FA4690-16-R-0007
Issued by
Department of the Air Force Air Combat Command

About this file

Attach 19- Sample Project SOW

View the file

Other files for this federal contract opportunity

Other files attached to Ellsworth Air Force Base- SABER, newest first.
File Type Posted
FA4690-16-R-0007_SABER_Amend_0002.pdf PDF
FA4690-16-R-0007_SABER_Amend_0001.pdf PDF
Answers_to_Questions.pdf PDF
Pre-Proposal_Conference_Minutes.pdf PDF
Attach_11_-_Utility_Outages.pdf PDF
Attach_13_WD_-_SD33_-_Building-MEAD_16_Sep_16.pdf PDF
Attach_16_WD_-_SD2_-_Residential-PENN_8_Jan_16.pdf PDF
Attach_2_-_Spec_Section_01000_Ellsworth_AFB_Special_Provisions.pdf PDF
Attach_23_Determination_of_Resp.pdf PDF
Attach_14_WD_-_SD35_-_Building-PENN_16_Sep_16.pdf PDF
Attach_18_-_Bid_Schedule.xlsx XLSX spreadsheet
Attach_3_-_Spec_Section_01800_Environmental_Provisions.pdf PDF
Attach_7_-_Ellsworth_AFB_Fire_Protection_Standards.pdf PDF
Attach_21-_Example_Sample_Project_Proposal_Redacted.pdf PDF
Attach_17_WD_-_SD6_-_Residential-MEADE_5_Aug_16.pdf PDF
FA4690-16-R-0007_Saber_Solicitation.pdf PDF
Attach_4_-_EAFB_Design_Compatability_Standards.pdf PDF
Attach_12_-_Schedule_of_Materials_Submittal.xls XLS spreadsheet
Attach_9_-_EAFB_Exterior_Signs.pdf PDF
Attach_15_WD_-_SD1_-_Heavy_ _Highway-STATEWIDE_8_Jan_16.pdf PDF
Attach_1-_SABER_IDIQ_SOW.pdf PDF
Attach_5_-_Ellsworth_AFB_Underground_Electrical_Requirements.pdf PDF
Attach_10_-_AF_Form_103_Work__BCE_Clearance_Request.pdf PDF
Attach_6_-__AFI_32-1062_Electrical_Systems _Power_Plants_and_Generators.pdf PDF
Attach_8_-_Material_Approval_Submittal.pdf PDF
Attach_22_-_Ellsworth_General_Contract_Administrative_Provisions_-_Jul_15.pdf PDF
Attach_20-_PPQ.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 19

28th Civil Engineer Squadron Ellsworth, South Dakota

7 July 2016

STATEMENT OF WORK

Construct Security Fence

FXBM 16-XXXX

SECTION 1: PROJECT INFORMATION

1.1 PROJECT LOCATION: SABER project FXBM 16-XXXX shall be completed as a routine requirement as shown in the site layout attached.

1.2 UNIQUE REQUIREMENT: None

1.3 PROJECT DESCRIPTION: Install chain link fence that runs along South Gate Rd./Ellsworth St.

approaching the Bismarck Gate as shown in the site layout attached. The fence was damaged in a recent storm and needs to be replaced.

SECTION 2: GENERAL REQUIREMENTS

2.1 WORKMANSHIP: All work shall be accomplished in accordance with all applicable building and fire codes. Contractor shall field verify all measurements, quantities, or value stated by the Government. Liquidated damages shall be assessed for work that is not finished within the scheduled performance period.

2.2 WORKSITE: The contractor shall limit the work to the areas indicated by the government. The contractor shall make every effort not to disturb or obstruct portions of the facilities still occupied by the government. The contractor shall make efforts to minimize interference to Government operations. The contractor shall coordinate and schedule work with the 28 CES/SABER office prior the start of any operation. The contractor shall dispose of all construction debris off base at an approved disposal facility.

2.3 SITE SECURITY AND PROTECTION: The contractor shall make every effort to secure the work site, allowing only authorized personnel to enter the work site. The contractor shall protect the site from damage from weather, vandalism, and/or theft.

2.4 DAMAGE TO EXISTING SITE CONDITIONS: The contractor shall be responsible to repair any and all damage incurred to existing Real Property/Grounds due to poor workmanship at no cost to the government. Contractor shall not park or drive on sidewalk or grassy/snowy areas. Damage incurred shall be repaired at no cost to the government.

2.5 HEALTH/SAFETY: The contractor shall be responsible for compliance with OSHA and AFOSH standards. The contractor shall maintain a clean and debris free site at all times. The contractor shall keep driveways and entrances into and around the work site clear at all times. The contractor shall not use driveways or entrances as employee parking or storage of materials unless otherwise stated. The contractor shall minimize storage of materials and equipment on site.

2.6 GREEN PROCURMENT: Contractor must incorporate “green procurement” principles into the design of their projects. Specifically, consult the EPA’s web site at www.epa.gov/cpg/products.htm for a listing of the products that have been mandated as green procurement requirements for purchases.

SECTION 3: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS

3.1 Demo

3.1.1 Demo security fences, 12' to 16' high (approx. 1000 LF)

3.2 Earthwork

3.2.1 Borrow, clay, till, or blasted rock, 1-1/2 C.Y. (200 B.C.Y.)

3.2.2 Borrow, topsoil or loam, 1-1/2 C.Y. (200 B.C.Y.)

3.2.3 Excavated or borrow, loose cubic yards, small excavation job, (240 C.Y)

3.3 Exterior Improvements

3.3.1 High-security chain link fences, gates & systems, chain link fence, 7' high

3.3.2 Seeding, mechanical seeding, fine grading and seeding, with equipment, includes lime, fertilizer & seed (1000 SY)

SECTION 4: SUBMITTALS

4.1.1 The contractor shall provide, at a minimum, single line electrical, mechanical, and/or civil shop drawings of the proposed renovation. These are required for the government's evaluation of the contractor's proposal.

SECTION 5: DRAWINGS

5.1.1 All drawings shall conform to the standards specified in the SOW and EAFB

Design Compatability Standards. Drawings shall not exceed Minimum Design (35%). Design costs shall not exceed 6% of the construction cost.

SECTION 6: SPECIAL PROVISIONS/NOTES/SPECIFICATIONS

6.1 All work shall be accomplished according to the SOW, Specification 01000 Ellsworth AFB

Special Provisions, Specification 01800 Environmental Provisions, Ellsworth AFB Underground Electrical Requirements, AFI 32-1062 Electrical Systems, Power Plants, and Generators, Ellsworth AFB Fire Protection Standards, and any manufacturer’s specification associated with materials and supplies (e.g. National Electric Code, National Electric Safety Code, and ANSI C2). In the event of a conflict between any of the specifications or codes, the most stringent standard will apply.

SECTION 7: PROJECT MANAGERS

7.1 Lt Conor Favo

7.2 MSgt Daniel Merrill

Attachment 1: Map showing location of fence to be replaced

Ellsw orth Rd

Bismarck Gate

File details come from the government source that posted it. Updated .