Attachment 1. Self_Scoring_Work_GC-MATOC v3.xlsx

XLSX spreadsheet 147 KB Posted

Attached to
General Construction Multiple Award Task Order Contract (GC-MATOC)- Beale AFB Federal contract opportunity
Solicitation number
FA468624R0011
Issued by
Department of the Air Force Air Combat Command

About this file

This document is a self-scoring worksheet for the Beale AFB 100% Small Business Multiple Award Task Order Contract (GC-MATOC) solicitation. The GC-MATOC is a competitive indefinite-delivery indefinite quantity (IDIQ) construction contract with a 10-year, $500M estimated value. It encompasses a wide range of construction services at Beale AFB and other locations.

The worksheet details the scoring criteria, including points for relevant experience as a prime contractor on projects over/under $5M, number of subcontracts managed, design-build and bid-build experience, and industry certifications. The minimum required score is 13,680 points, and bonus points are available for certain certifications once the minimum score is reached. The acquisition will use the Highest Technically Rated Offeror (HTRO) evaluation method, focusing on technical factors without considering price.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Self-Score Sheet

Beale AFB 100% Small Business MATOC
Solicitation No.: QTA0016JCA0003FA468624R0011
Section J.: Attachment 1
ElementEnter Yes OR No for each question as applicablePoint ValueScoreFile Name(s), e.g.,CompanyName.VOL1.TOC.pdf
VOLUME 1 – General
Table of Contents: Note this area is not scored, Contractors are to provide all that may apply.N/AN/A
SF1442 (name, address, and acknowledgement of all amendments)N/AN/A
Document Verification And Self Scoring WorksheetN/AN/A
Meaningful Relationship Commitment Letters (MRCL) e.g. A&Es,N/AN/A
Existing Prior to Proposal submittal Joint Venture or Partnership AgreementsN/AN/A
Mentor-Protégé AgreementsN/AN/A
Professional Employee Compensation PlanN/AN/A
Bonding Compacity Minimum $10M-Single per project; $25M AggregateN/AN/A
Representations and CertificationsN/AN/A
VOLUME 2 – RELEVANT EXPERIENCE
Table of Contents:
Primary NAICS GROUP ONE 2362 Commercial & Industrial Bldg.
Submit a Project for each NAICS (up to 4 total projects for each subcategory below)Point Value EachTotal Across
Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts.3000
Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts.1000
Identify the number of subcontracts managed for each project above.0-8 ProjectsPoint Value EachTotal Across
Subcontracts Managed > 5 Note: each project submitted receives a max point value of 300pts.3000
Subcontracts Managed ≤ 5 Note: each project submitted receives a max point value of 100pts.1000
Primary NAICS GROUP TWO 2382 Building Equipment Contractors
Submit a Project for each NAICS (up to 4 total projects for each subcategory below)Point Value EachTotal Across
Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts.3000
Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts.1000
Identify the number of subcontracts managed for each project above.0-8 ProjectsPoint Value EachTotal Across
Subcontracts Managed >5 Note: each project submitted receives a max point value of 300pts.3000
Subcontracts Managed ≤ 5 Note: each project submitted receives a max point value of 100pts.1000
Primary NAICS GROUP THREE 2371 Utility System Construction
Submit a Project for each NAICS (up to 4 total projects for each subcategory below)Point Value EachTotal Across
Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts.3000
Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts.1000
Identify the number of subcontracts managed for each project above.0-8 ProjectsPoint Value EachTotal Across
Subcontracts Managed >5 Note: each project submitted receives a max point value of 300pts.3000
Subcontracts Managed ≤ 5 Note: each project submitted receives a max point value of 100pts.1000
SUBTOTAL SCORE FOR SECTION GROUPS 1-3 ONLY:0
Experience as Prime on Design-Build Projects (KTR Designing then Building)
Submit a Project pertaining to any of the above NAICS (up to 4 total projects for each subcategory below)0-4 ProjectsPoint Value EachTotal Across
Prime Contractor Over $5M: Note: each project submitted receives a max point value of 500pts.5000
Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts.1000
SUBTOTAL SCORE FOR SECTION GROUPS 1-3 ONLY:0
Experience as Prime on Bid-Build Projects (Building of provided Designs)
Submit a Project pertaining to any of the above NAICS (up to 4 total projects for each subcategory below)0-4 ProjectsPoint Value EachTotal Across
Prime Contractor Over $5M: Note: each project submitted receives a max point value of 500pts.5000
Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts.1000
SUBTOTAL SCORE FOR SECTION Other Agencies GROUP ONLY:0
Experience with Environmental Permitting Required
Environmental Permitting pick only one.Yes or NoPoint ValueTotal Across
<5 Projects as a Prime Note: Only one Yes which = 100pts max /No = 0pts.1000
6-10 Projects as a Prime: Note: Only one Yes, which = 200pts. Max/No = 0pts2000
>10 Projects as a Prime: Note Only one Yes which = 300pts. Max/No = 0pts3000
SUBTOTAL SCORE FOR THIS SECTION ONLY:0
VOLUME 3 Bonus Area – CERTIFICATIONS/TRAINING DOCUMENTS
Industry Certifications:
Does the Offeror have each or any of the following? Type the word Yes or No in Column C.Note: Bonus points will only be added once a contractor meets or exceeds in minimum score of 12,500pts. Only then with the bonus points be added. Bonus points will not be used to bring up scores to get to the minimum score of 12,500pts.
CCM - Certified Construction ManagerYes or NoPoint Value EachTotal Across
Certified Construction Manager: Only one Yes which = 200pts max /No = 0pts.2000
Certified Associate Const Manager Only one Yes which = 100pts max /No = 0pts.1000
Construction Manager in Training Only one Yes which = 50pts max /No = 0pts.500
Certified Professional Constructor
LVL-II: Only one Yes which = 200pts max /No = 0pts.2000
LVL-I: Only one Yes which = 100pts max /No = 0pts.1000
Certified Safety Manager
Certificate: Only one Yes which = 100pts max /No = 0pts.1000
Certified Project Manager Professional
Certificate: Only one Yes which = 200pts max /No = 0pts.2000
Certified Construction Quality Control Professional
Certificate: Only one Yes which = 200pts max /No = 0pts.2000
Fire Protection QC Specialist
Certificate: Only one Yes which = 200pts max /No = 0pts.2000
SUBTOTAL SCORE FOR SECTION L.5.4.100
VOLUME 4 – Responsibility
BAFB Form 527: Note this area is not scoredN/AN/A
TOTAL POINTS SCORED:- 0
MAXIMUM POINTS (not adding Bonus pts)- 0
MINIMUM SCORE REQUIRED = 13,680 (before bonus points can be added)

HTRO Methodology

This acquisition will be conducted in accordance with the procedures outlined in FAR Part 15, Source Selection Processes and Techniques. In accordance with FAR Part 15, the acquisition will utilize the Highest Technically Rated Offeror (HTRO) method to select offerors based on their self-scored points, with a minimum score requirement.

The HTRO option-1, which excludes price and other non-technical factors, will be employed for the evaluation methodology. This option is particularly suitable for multiple award Indefinite Delivery/Indefinite Quantity (ID/IQ) contracts when awarding to all offerors who score above a threshold technical score; i.e. A&AS. The Government will evaluate all offerors' self-score above the threshold to validate their submitted scores. Cost/Price and, if necessary, past performance will be evaluated at the task order level.

Example Max Pts.

Example of Maximum Points Possible
Beale AFB 100% Small Business MATOC
Solicitation No.: QTA0016JCA0003FA468624R0011
Section J.: Attachment 1
ElementEnter Yes OR No for each question as applicablePoint ValueScoreFile Name(s), e.g.,CompanyName.VOL1.TOC.pdf
VOLUME 1 – General
Table of Contents: Note this area is not scored, Contractors are to provide all that may apply.N/AN/A
SF1442 (name, address, and acknowledgement of all amendments)N/AN/A
Document Verification And Self Scoring WorksheetN/AN/A
Meaningful Relationship Commitment Letters (MRCL) e.g. A&Es,N/AN/A
Existing Joint Venture or Partnership AgreementsN/AN/A
Mentor-Protégé AgreementsN/AN/A
Professional Employee Compensation PlanN/AN/A
Bonding Compacity Minimum $10M-Single per project; $25M AggregateN/AN/A
Representations and CertificationsN/AN/A
VOLUME 2 – RELEVANT EXPERIENCE
NAICS Group Relevant Experience Projects: (The submitted projects must meet the conditions listed )
Primary NAICS GROUP ONE 2362 Commercial & Industrial Bldg.
Submit a Project for each NAICS (up to 4 total projects for each subcategory below)Point Value EachTotal Across
Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts.43001200
Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts.4100400
Identify the number of subcontracts managed for each project above0-8 ProjectsPoint Value EachTotal Across
Subcontracts Managed >5 Note: each project submitted receives a max point value of 300pts.83002400
Subcontracts Managed ≤ 5 Note: each project submitted receives a max point value of 100pts.01000
Primary NAICS GROUP TWO 2382 Building Equipment Contractors
Submit a Project for each NAICS (up to 4 total projects for each subcategory below)Point Value EachTotal Across
Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts.43001200
Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts.4100400
Identify the number of subcontracts managed for each project above0-8 ProjectsPoint Value EachTotal Across
Subcontracts Managed >5 Note: each project submitted receives a max point value of 300pts.83002400
Subcontracts Managed ≤ 5 Note: each project submitted receives a max point value of 100pts.01000
Primary NAICS GROUP THREE 2371 Utility System Construction
Submit a Project for each NAICS (up to 4 total projects for each subcategory below)Point Value EachTotal Across
Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts.43001200
Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts.4100400
Identify the number of subcontracts managed for each project above0-8 ProjectsPoint Value EachTotal Across
Subcontracts Managed >5 Note: each project submitted receives a max point value of 300pts.83002400
Subcontracts Managed ≤ 5 Note: each project submitted receives a max point value of 100pts.01000
SUBTOTAL SCORE FOR SECTION GROUPS 1-3 ONLY:12000
Experience as Prime on Design-Build Projects (KTR Designing then Building)
Submit a Project pertaining to any of the above NAICS (up to 4 total projects for each subcategory below)Point Value EachTotal Across
Prime Contractor Over $5M: Note: each project submitted receives a max point value of 500pts.45002000
Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts.4100400
SUBTOTAL SCORE FOR SECTION GROUPS 1-3 ONLY:2400
Experience as Prime on Bid-Build Projects (Building of provided Designs)
Submit a Project pertaining to any of the above NAICS (up to 4 total projects for each subcategory below)0-4 ProjectsPoint Value EachTotal Across
Prime Contractor Over $5M: Note: each project submitted receives a max point value of 500pts.45002000
Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts.4100400
SUBTOTAL SCORE FOR SECTION Other Agencies GROUP ONLY:2400
Experience with Environmental Permitting Required
Environmental Permitting (pick only one)Yes or NoPoint ValueTotal Across
<5 Projects as a Prime Note: Only one Yes which = 100pts max /No = 0pts.1000
6-10 Projects as a Prime: Note: Only one Yes, which = 200pts. Max/No = 0pts2000
>10 Projects as a Prime: Note Only one Yes which = 300pts. Max/No = 0ptsyes300300
SUBTOTAL SCORE FOR THIS SECTION ONLY:300
VOLUME 3 Bonus Area – CERTIFICATIONS/TRAINING DOCUMENTS
Industry Certifications:
Does the Offeror have each or any of the following? Type the word Yes or No in Column C.Note: Bonus points will only be added once a contractor meets or exceeds in minimum score of 12,500pts. Only then with the bonus points be added. Bonus points will not be used to bring up scores to get to the minimum score of 12,500pts.
CCM - Certified Construction ManagerYes or NoPoint Value EachTotal Across
Certified Construction Manager: Only one Yes which = 200pts max /No = 0pts.yes200200
Certified Associate Const Manager Only one Yes which = 100pts max /No = 0pts.yes100100
Construction Manager in Training Only one Yes which = 50pts max /No = 0pts.yes5050
Certified Professional Constructor
LVL-II: Only one Yes which = 200pts max /No = 0pts.yes200200
LVL-I: Only one Yes which = 100pts max /No = 0pts.yes100100
Certified Safety Manager
Certificate: Only one Yes which = 100pts max /No = 0pts.yes100100
Certified Project Manager Professional
Certificate: Only one Yes which = 200pts max /No = 0pts.yes200200
Certified Construction Quality Control Professional
Certificate: Only one Yes which = 200pts max /No = 0pts.yes200200
Fire Protection QC Specialist
Certificate: Only one Yes which = 200pts max /No = 0pts.yes200200
SUBTOTAL SCORE FOR SECTION L.5.4.10950
VOLUME 4 – Responsibility
BAFB Form 527: Note this area is not scoredN/AN/A
TOTAL POINTS SCORED:18,050
MAXIMUM POINTS not adding Bonus pts = 17,100
MINIMUM SCORE REQUIRED = 13,680 (before bonus points can be added)