Attachment 1. Self_Scoring_Work_GC-MATOC.xlsx
XLSX spreadsheet 147 KB Posted
- Attached to
- General Construction Multiple Award Task Order Contract (GC-MATOC)- Beale AFB Federal contract opportunity
- Solicitation number
- FA468624R0011
About this file
This document is a Self-Scoring Work Sheet for the General Construction Multiple Award Task Order Contract (GC-MATOC) solicitation at Beale AFB, Solicitation No. FA468624R0011. The GC-MATOC is a competitive indefinite-delivery, indefinite-quantity (IDIQ) construction contract with a $500M estimated value over a 10-year period. It is a total small business set-aside, with eligible small businesses required to have offices within the San Francisco, Fresno, or Sacramento SBA regional office territories. The worksheet provides instructions and scoring criteria for submitting relevant experience projects under NAICS codes for commercial and industrial building construction. Contractors must submit up to 4 projects over $5M and up to 4 projects under $5M, with points awarded based on project size and number of subcontracts managed. The worksheet also includes a list of required proposal volumes and documents, though these are not scored.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Self-Score Sheet
| Beale AFB 100% Small Business MATOC | ||||
| Solicitation No.: QTA0016JCA0003 | FA468624R0011 | |||
| Section J.: Attachment 1 | ||||
| Element | Enter Yes OR No for each question as applicable | Point Value | Score | File Name(s), e.g.,CompanyName.VOL1.TOC.pdf Reference L.4 PROPOSAL FORMAT TABLE |
| VOLUME 1 – General | ||||
| Table of Contents: Note this area is not scored, Contractors are to provide all that may apply. | N/A | N/A | ||
| SF1442 (name, address, and acknowledgement of all amendments) | N/A | N/A | ||
| Document Verification And Self Scoring Worksheet | N/A | N/A | ||
| Meaningful Relationship Commitment Letters (MRCL) e.g. A&Es, | N/A | N/A | ||
| Existing Prior to Proposal submittal Joint Venture or Partnership Agreements | N/A | N/A | ||
| Mentor-Protégé Agreements | N/A | N/A | ||
| Professional Employee Compensation Plan | N/A | N/A | ||
| Bonding Compacity Minimum $10M-Single per project; $25M Aggregate | N/A | N/A | ||
| Representations and Certifications | N/A | N/A | ||
| VOLUME 2 – RELEVANT EXPERIENCE | ||||
| NAICS Group Relevant Experience Projects: (The submitted projects must meet the conditions listed. All project work samples must be completed contracts dated within the past seven (7) years from the date of solicitation. Any work samples exceeding this time frame will not be considered for evaluation.) | ||||
| Primary NAICS GROUP ONE 2362 Commercial & Industrial Bldg. | ||||
| Submit a Project for each NAICS up to 4 total projects for each | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts. | 2 | 300 | 600 | |
| Prime Contractor under $5M: Note: each project submitted receives a max point value of 100pts. | 4 | 100 | 400 | |
| Identify the number of subcontracts managed for each project above. | 0-4 Projects | Point Value Each | Total Across | |
| Subcontracts Managed >5 Note: each project submitted receives a max point value of 300pts. | 300 | 0 | ||
| Subcontracts Managed <5 Note: each project submitted receives a max point value of 100pts. | 100 | 0 | ||
| Primary NAICS GROUP TWO 2382 Building Equipment Contractors | ||||
| Submit a Project for each NAICS up to 4 total projects for each | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts. | 300 | 0 | ||
| Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts. | 100 | 0 | ||
| Identify the number of subcontracts managed for each project above. | 0-4 Projects | Point Value Each | Total Across | |
| Subcontracts Managed >5 Note: each project submitted receives a max point value of 300pts. | 300 | 0 | ||
| Subcontracts Managed <5 Note: each project submitted receives a max point value of 100pts. | 100 | 0 | ||
| Primary NAICS GROUP THREE 2371 Utility System Construction | ||||
| Submit a Project for each NAICS up to 4 total projects for each | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts. | 300 | 0 | ||
| Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts. | 100 | 0 | ||
| Identify the number of subcontracts managed for each project above. | 0-4 Projects | Point Value Each | Total Across | |
| Subcontracts Managed >5 Note: each project submitted receives a max point value of 300pts. | 300 | 0 | ||
| Subcontracts Managed <5 Note: each project submitted receives a max point value of 100pts. | 100 | 0 | ||
| SUBTOTAL SCORE FOR SECTION GROUPS 1-3 ONLY: | 1000 | |||
| Experience as Prime on Design-Build Projects (KTR Designing then Building) | ||||
| Submit a Project for each NAICS up to 4 total projects for each | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor Over $5M: Note: each project submitted receives a max point value of 500pts. | 500 | 0 | ||
| Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts. | 100 | 0 | ||
| SUBTOTAL SCORE FOR SECTION GROUPS 1-3 ONLY: | 0 | |||
| Experience as Prime on Bid-Build Projects (Building of provided Designs) | ||||
| Submit a Project for each up to 4 total projects for each | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor Over $5M: Note: each project submitted receives a max point value of 500pts. | 500 | 0 | ||
| Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts. | 100 | 0 | ||
| SUBTOTAL SCORE FOR SECTION Other Agencies GROUP ONLY: | 0 |
| Experience with Environmental Permitting Required | |||
| Environmental Permitting up to 4 total projects pick only one. | Yes or No | Point Value | Total Across |
| <5 Projects as a Prime Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |
| 6<10 Projects as a Prime: Note: Only one Yes, which = 200pts. Max/No = 0pts | 200 | 0 | |
| >10 Projects as a Prime: Note Only one Yes which = 300pts. Max/No = 0pts | 300 | 0 | |
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | ||
| VOLUME 3 Bonus Area – CERTIFICATIONS/TRAINING DOCUMENTS | |||
| Industry Certifications: | |||
| Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | Note: Bonus points will only be added once a contractor meets or exceeds in minimum score of 12,500pts. Only then with the bonus points be added. Bonus points will not be used to bring up scores to get to the minimum score of 12,500pts. | ||
| CCM - Certified Construction Manager | Yes or No | Point Value Each | Total Across |
| Certified Construction Manager: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |
| Certified Associate Const Manager Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |
| Construction Manager in Training Only one Yes which = 50pts max /No = 0pts. | 50 | 0 | |
| Certified Professional Constructor | |||
| LVL-II: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |
| LVL-I: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |
| Certified Safety Manager | |||
| Certificate: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |
| Certified Project Manager Professional | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |
| Certified Construction Quality Control Professional | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |
| Fire Protection QC Specialist | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |
| SUBTOTAL SCORE FOR SECTION L.5.4.10 | 0 | ||
| VOLUME 4 – Responsibility | |||
| GSA Form 527: Note this area is not scored | N/A | N/A | |
| TOTAL POINTS SCORED: | 1,000 | ||
| MAXIMUM POINTS not adding Bonus pts = 14,700 | |||
| MINIMUM SCORE REQUIRED = 12,500 (before bonus points can be added). |
HTRO Methodology
This acquisition will be conducted in accordance with the procedures outlined in FAR Part 15, Source Selection Processes and Techniques. In accordance with FAR Part 15, the acquisition will utilize the Highest Technically Rated Offeror (HTRO) method to select offerors based on their self-scored points, with a minimum score requirement.
The HTRO option-1, which excludes price and other non-technical factors, will be employed for the evaluation methodology. This option is particularly suitable for multiple award Indefinite Delivery/Indefinite Quantity (ID/IQ) contracts when awarding to all offerors who score above a threshold technical score; i.e. A&AS. The Government will evaluate all offerors' self-score above the threshold to validate their submitted scores. Cost/Price and, if necessary, past performance will be evaluated at the task order level.
Example Max Pts.
| Beale AFB 100% Small Business MATOC | ||||
| Solicitation No.: QTA0016JCA0003 | FA468624R0011 | |||
| Section J.: Attachment 1 | ||||
| Element | Enter Yes OR No for each question as applicable | Point Value | Score | File Name(s), e.g.,CompanyName.VOL1.TOC.pdf Reference L.4 PROPOSAL FORMAT TABLE |
| VOLUME 1 – General | ||||
| Table of Contents: Note this area is not scored, Contractors are to provide all that may apply. | N/A | N/A | ||
| SF1442 (name, address, and acknowledgement of all amendments) | N/A | N/A | ||
| Document Verification And Self Scoring Worksheet | N/A | N/A | ||
| Meaningful Relationship Commitment Letters (MRCL) e.g. A&Es, | N/A | N/A | ||
| Existing Joint Venture or Partnership Agreements | N/A | N/A | ||
| Mentor-Protégé Agreements | N/A | N/A | ||
| Professional Employee Compensation Plan | N/A | N/A | ||
| Bonding Compacity Minimum $10M-Single per project; $25M Aggregate | N/A | N/A | ||
| Representations and Certifications | N/A | N/A | ||
| VOLUME 2 – RELEVANT EXPERIENCE | ||||
| NAICS Group Relevant Experience Projects: (The submitted projects must meet the conditions listed ) | ||||
| Primary NAICS GROUP ONE 2362 Commercial & Industrial Bldg. | ||||
| Submit a Project for each NAICS up to 4 total projects for each | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts. | 4 | 300 | 1200 | |
| Prime Contractor under $5M: Note: each project submitted receives a max point value of 100pts. | 4 | 100 | 400 | |
| Identify the number of subcontracts managed for each project above. | 0-4 Projects | Point Value Each | Total Across | |
| Subcontracts Managed >5 Note: each project submitted receives a max point value of 300pts. | 4 | 300 | 1200 | |
| Subcontracts Managed <5 Note: each project submitted receives a max point value of 100pts. | 4 | 100 | 400 | |
| Primary NAICS GROUP TWO 2382 Building Equipment Contractors | ||||
| Submit a Project for each NAICS up to 4 total projects for each | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts. | 4 | 300 | 1200 | |
| Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts. | 4 | 100 | 400 | |
| Identify the number of subcontracts managed for each project above. | 0-4 Projects | Point Value Each | Total Across | |
| Subcontracts Managed >5 Note: each project submitted receives a max point value of 300pts. | 4 | 300 | 1200 | |
| Subcontracts Managed <5 Note: each project submitted receives a max point value of 100pts. | 4 | 100 | 400 | |
| Primary NAICS GROUP THREE 2371 Utility System Construction | ||||
| Submit a Project for each NAICS up to 4 total projects for each | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor Over $5M: Note: each project submitted receives a max point value of 300pts. | 4 | 300 | 1200 | |
| Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts. | 4 | 100 | 400 | |
| Identify the number of subcontracts managed for each project above. | 0-4 Projects | Point Value Each | Total Across | |
| Subcontracts Managed >5 Note: each project submitted receives a max point value of 300pts. | 4 | 300 | 1200 | |
| Subcontracts Managed <5 Note: each project submitted receives a max point value of 100pts. | 4 | 100 | 400 | |
| SUBTOTAL SCORE FOR SECTION GROUPS 1-3 ONLY: | 9600 | |||
| Experience as Prime on Design-Build Projects (KTR Designing then Building) | ||||
| Submit a Project for each NAICS up to 4 total projects for each | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor Over $5M: Note: each project submitted receives a max point value of 500pts. | 4 | 500 | 2000 | |
| Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts. | 4 | 100 | 400 | |
| SUBTOTAL SCORE FOR SECTION GROUPS 1-3 ONLY: | 2400 | |||
| Experience as Prime on Bid-Build Projects (Building of provided Designs) | ||||
| Submit a Project for each up to 4 total projects for each | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor Over $5M: Note: each project submitted receives a max point value of 500pts. | 4 | 500 | 2000 | |
| Prime Contractor Under $5M: Note: each project submitted receives a max point value of 100pts. | 4 | 100 | 400 | |
| SUBTOTAL SCORE FOR SECTION Other Agencies GROUP ONLY: | 2400 |
| Experience with Environmental Permitting Required | |||
| Environmental Permitting up to 4 total projects pick only one. | Yes or No | Point Value | Total Across |
| <5 Projects as a Prime Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |
| 6<10 Projects as a Prime: Note: Only one Yes, which = 200pts. Max/No = 0pts | 200 | 0 | |
| >10 Projects as a Prime: Note Only one Yes which = 300pts. Max/No = 0pts | yes | 300 | 300 |
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 300 | ||
| VOLUME 3 Bonus Area – CERTIFICATIONS/TRAINING DOCUMENTS | |||
| Industry Certifications: | |||
| Does the Offeror have each or any of the following? Type the word Yes or No in Column C. | Note: Bonus points will only be added once a contractor meets or exceeds in minimum score of 12,500pts. Only then with the bonus points be added. Bonus points will not be used to bring up scores to get to the minimum score of 12,500pts. | ||
| CCM - Certified Construction Manager | Yes or No | Point Value Each | Total Across |
| Certified Construction Manager: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |
| Certified Associate Const Manager Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |
| Construction Manager in Training Only one Yes which = 50pts max /No = 0pts. | 50 | 0 | |
| Certified Professional Constructor | |||
| LVL-II: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |
| LVL-I: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |
| Certified Safety Manager | |||
| Certificate: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | |
| Certified Project Manager Professional | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |
| Certified Construction Quality Control Professional | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |
| Fire Protection QC Specialist | |||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | |
| SUBTOTAL SCORE FOR SECTION L.5.4.10 | 0 | ||
| VOLUME 4 – Responsibility | |||
| GSA Form 527: Note this area is not scored | N/A | N/A | |
| TOTAL POINTS SCORED: | 14,700 | ||
| MAXIMUM POINTS not adding Bonus pts = 14,700 | |||
| MINIMUM SCORE REQUIRED = 12,500 (before bonus points can be added). |
File details come from the government source that posted it. Updated .