Attachment_6_-_Submittal_Register.pdf

PDF 709 KB Posted

Attached to
REPAIR STORM DRAIN AT MACDILL STREE Federal contract opportunity
Solicitation number
FA466419BA008
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 11 PAGES

Repair Storm Drain at Macdill ST.

01 11 00 SD-01 Preconstruction Submittals

1.3 GAf Form 3064, Contract Progress

Schedule And Af Form 3065, Contract Progress Report

1.4 GWork Plan

1.5 GAf Form 103 Work Clearance

Request SD-11 Closeout Submittals

1.6Property Control Records 01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal Register

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan

SD-06 Test Reports 1.9.2Quarterly Reports 1.9.3Annual Report

SD-11 Closeout Submittals

1.10 SFinal Construction Waste

Diversion Report 02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.11Existing Conditions

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Attachment 6

FA466419BA008

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 11 PAGES

02 41 00 3.3.4Receipts 02 66 00 SD-03 Product Data

2.3Materials Handling Plan SD-04 Samples

2.1Select Fill 2.2Topsoil

SD-06 Test Reports

3.1 GBorrow Source Assessment

Report 3.4.1Select Fill and Topsoil Material

Tests 3.4.2Moisture Content and Density

Tests of In-Place Select Fill 02 81 00 SD-03 Product Data

2.1.1Packaging Notifications

3.1 GHazardous Waste Management

Plan

3.2 GOnsite Hazardous Waste

Management 3.3Notices of Non-Compliance and

Notices of Violation SD-06 Test Reports

3.6 GRecordkeeping

3.6 GException Report

3.7Spill Response

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 11 PAGES

02 81 00 1.4.1 GTransportation and Disposal Coordinator

1.4.2 GTraining

1.4.3Certification

3.3.3 GShipping Documents and

Packagings Certification 3.3.4Security Plan 3.3.5Certificates of Disposal 3.5Waste Minimization

03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Plan

1.6.7 GQuality Control Personnel

Certifications 1.6.7Quality Control Organizational

Chart

1.6.9 GLaboratory Accreditation

1.6.2.1 GForm Removal Schedule

3.3.10Maturity Method Data

SD-02 Shop Drawings

1.6.2.2 GReinforcing Steel

1.6.2.1Formwork

SD-03 Product Data 2.4.5Joint Sealants 2.4.4Joint Filler 2.1Formwork Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 11 PAGES

03 30 00 2.3.3.3Recycled Aggregate Materials 2.3.1Cementitious Materials 2.4.6Vapor Retarder and Vapor

Barrier 2.4.1Concrete Curing Materials 2.6Reinforcement 2.4.3.1Liquid Chemical Floor Hardeners and Sealers 2.3.4Admixtures 2.6.6Reinforcing Fibers 2.6.2Mechanical Reinforcing Bar

Connectors 2.2.2Waterstops 1.8.1Local/Regional Materials 2.2.3Biodegradable Form Release

Agent 1.6.3.2Pumping Concrete 1.6.3.4Finishing Plan 2.4.2Nonshrink Grout

SD-04 Samples 1.6.5.1Slab Finish Sample 1.6.5.2Surface Finish Samples

SD-05 Design Data

1.6.1.2 GConcrete Mix Design

1.6.1.1Formwork Calculations

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 11 PAGES

03 30 00 1.6.1.2 GConcrete Mix Design 1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Slag Cement 1.6.4.3Aggregates

1.6.4.4 GFiber-Reinforced Concrete

3.10.2.1Tolerance Report

3.14.2.3 GCompressive Strength Tests

3.14.2.5Unit Weight of Structural

Concrete 3.14.2.6Chloride Ion Concentration 3.14.2.4Air Content 3.14.2.1Slump Tests 2.3.2Water

SD-07 Certificates 2.6.1Reinforcing Bars 1.9Welder Qualifications 1.6.3.3Silica Fume Manufacturer's

Representative 1.6.3.5VOC Content for Form Release

Agents, Curing Compounds, and Concrete Penetrating Sealers

1.6.3.6Safety Data Sheets 1.8.2Forest Stewardship Council

(FSC) Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 11 PAGES

03 30 00 1.6.7.2Field Testing Technician and Testing Agency

SD-08 Manufacturer’s Instructions 2.4.3.1Liquid Chemical Floor Hardeners and Sealers 2.4.5Joint Sealants 2.4.1Curing Compound

03 42 13.00 10 SD-01 Preconstruction Submittals 1.3.2.2Quality Control Procedures

SD-02 Shop Drawings

2.1.1 GStandard Precast Units

2.1.2 GCustom-Made Precast Units

3.2.4.3Special Finishes

SD-03 Product Data 2.1.1Standard Precast Units 2.1.3Proprietary Precast Units 3.1.3Embedded Items 2.2.5Accessories

SD-05 Design Data

2.1.2 GDesign Calculations

2.1.5.1Concrete Mix Proportions

SD-06 Test Reports 1.3.2.4Test Reports

SD-07 Certificates 1.3.2.2Quality Control Procedures

31 00 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 11 PAGES

31 00 00 3.3 GShoring

1.3.3 GDewatering Work Plan

SD-03 Product Data

3.7 GUtilization of Excavated Materials

1.3.1.2Rock Excavation 3.2Opening of any Excavation or

Borrow Pit 3.13Shoulder Construction

SD-06 Test Reports 3.15Testing

SD-07 Certificates 3.15Testing

31 11 00 SD-03 Product Data 2.1.1Tree Wound Paint

32 01 13.63 SD-03 Product Data

1.4 GContractor Qualifications

1.4.1Manufacturer Representative’s

Experience

1.2.1 GEquipment List

3.1 GInspection Reports

2.2 GAggregate

SD-04 Samples 1.4.2Gilsonite Modified Asphalt

Emulsion SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 11 PAGES

32 01 13.63 1.4Manufacturer's Certificate of Compliance

2.1Manufacturer's Certificate of Compliance

2.1Bituminous Material

1.4.3 GBituminous Materials

32 01 19 SD-03 Product Data 3.1Equipment

SD-04 Samples

1.3.1 GMaterials

32 11 23 SD-03 Product Data

1.4 GPlant, Equipment, and Tools

SD-06 Test Reports

2.3.1 GInitial Tests

3.13.1 GIn-Place Tests

32 12 13 SD-06 Test Reports 3.7Sampling and Testing

32 12 16 SD-03 Product Data

2.4 GMix Design

3.10 GQuality Control

3.11 GMaterial Acceptance

SD-04 Samples 2.3Asphalt Cement Binder 2.2Aggregates

SD-06 Test Reports

2.2 GAggregates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 11 PAGES

32 12 16 3.10.3.10QC Monitoring SD-07 Certificates

2.3 GAsphalt Cement Binder

3.6Testing Laboratory

32 13 13.06 SD-03 Product Data

2.1.6 GCuring Materials

2.1.4 GAdmixtures

2.1.5.1 GDowel

SD-05 Design Data

2.3 GMix Design

SD-06 Test Reports

2.1.3 GAggregate

3.7.2 GConcrete Slump Tests

3.7.4 GAir Content Tests

3.7.3 GFlexural Strength Tests

SD-07 Certificates

1.5.1 GReady-mixed Concrete Plant

1.5.4 GBatch Tickets

2.1.1 GCementitious Materials

32 92 23 SD-03 Product Data 2.4Fertilizer

SD-06 Test Reports 2.2.3Topsoil composition tests

SD-07 Certificates 2.1sods

33 05 23 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 11 PAGES

33 05 23 1.4 GStatement of Contractor Qualifications

SD-03 Product Data

2.3.1 GPipe casing

2.3.3 GLubricating Fluid

SD-05 Design Data

2.1.1.2 GDesign calculations for pipe

casing

1.4 GAccess Shaft Construction Plan

3.1.1 GAccess Shaft Construction Plan

SD-06 Test Reports

3.5.1.1 GMonitoring Survey

SD-08 Manufacturer’s Instructions

3.3 GInstallation

1.8.1.2 GSafety Data Sheets

SD-11 Closeout Submittals

3.6.3 GRecord Drawings

3.6.3 GDaily Work Logs of installation

operations 33 40 00 SD-04 Samples

2.1Pipe for Culverts and Storm Drains

SD-07 Certificates 2.4.8.1Oil Resistant Gasket 3.9.1.1Leakage Test 3.9.1.2Determination of Density

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 11 PAGES

33 40 00 2.4.7

Environmental Protection Plan

3.9.2.1.3Post-Installation Inspection Report 3.3Placing Pipe

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 57 19 ENVIRONMENTAL GUIDANCE

SD-01 Preconstruction Submittal

1.3.1 SD-06 Test Reports Laboratory Analysis Inspection Reports Solid Waste Management Report

1.3.1.12 1.3.1.13 1.3.1.14

SD-07 Certificates Permit Applications 1.3.1.16 SD-11 Closeout Submittals

Waste Determination Documentation 1.4.1 Disposal Documentation for Hazardous and Regulated Waste

1.4.2

Assembled Employee Training 1.4.3 Solid Waste Management Plan 1.4.4 Contractor Hazardous material 1.4.5 HazardousWaste/Debris MGNT 1.4.5 Regulatory Notifications

1.4.5As-Built Topographic Survey 1.4.5

(HAZMAT) usage totals 1.4.5 Weight Tickets Debris/Recycled 1.4.5

Recovered Materials Determination Para B Percentage of RMDF content for EPA Para D

G

G G G

G

G G

G G

G G G G G G G G

File details come from the government source that posted it.