6 Pricing Worksheet (SOW att G).xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Dyess AFB MACC Request for Proposals Federal contract opportunity
- Solicitation number
- FA4661-20-R-0001
About this file
This document contains a pricing worksheet attachment for a request for proposals for a Multiple Award Construction Contract at Dyess Air Force Base. The pricing worksheet provides a breakdown of estimated labor, material, equipment, subcontract, and total costs by construction division for three separate renovation items at the base. Item one is for renovating buildings 6030A and 6030C, item two is for furniture relocation and storage during construction and reinstallation, and item three is for installing a new lightning protection system. Offerors are required to provide pricing for the general conditions and any applicable construction divisions for each renovation item. The total estimated construction cost according to the pricing worksheet is $3,000.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FA4661-20-R-0001 ATTACHMENT 6 / SOW ATTACHMENT G | ||||||||||||
| PRICE BREAKDOWN BY DIVISION | Contractor: | |||||||||||
| Date: | ||||||||||||
| Dyess AFB, TX | ||||||||||||
| FNWZ 13-0068 | Color Legend: | Formula Areas | Gov't Numbers | |||||||||
| Division Line Items Include the Items Below: | ||||||||||||
| 0001 Base Pricing, Item 1 – Renovate 6030A & C | CONTRACTOR BID | GOVERNMENT ESTIMATE | Division 1: typically bonds, general liability, builders risk, O&P | |||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | IGE | % of Bid | Difference | Notes: If DB, typically includes design fees, geotechnical, CAD as-builts, materials testing, etc. | |||
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 100.00% | $ - 0 | ERROR:#DIV/0! | $ (1.00) | Notes: If Bid-Build, typically includes CAD as-builts, materials testing, superintendent, storage containers, vehicles, small tools, trash dumpsters, portable toilets, project signage, |
bulletin board, plan sets, temporary fencing, cleanup, etc.
| Division 2 - Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 2: earthwork, asbestos abatement, selective building demolition, site grading, tree trimming & removal, termite treatment, seeding, etc. | |
| Division 3 - Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 3: basic concrete materials & methods, forms, accesssories, reinforcement, concrete placement & labor | |
| Division 4 - Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 4: masonry, grout, labor | |
| Division 5 - Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 5: structural framing, metal deck & joists, cold-formed metal framing, ornamental metal, expansion control | |
| Division 6 - Woods & Plastic | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 6: rough & finish carpentry, casework | |
| Division 7 - Thermal/Moisture | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 7: dampproofing, waterproofing, thermal protection, roofing, flashing, roof specialties, fire & smoke protection, joint sealers | |
| Division 8 - Doors & Windows | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 8: doors, frames, windows, entrances & storefronts, skylights, hardware, glazing | |
| 9 | Division 9 - Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 9: metal support facilities, gypsum board, tile, ceilings, flooring, wall finishes, acoustical treatment, paints & coatings |
| Division 10 - Miscellaneous Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 10: visual display boards, grilles & screens, architectural louvers & vents, corner guards, access flooring, flagpoles, identification devices/signage | |
| Division 11 - Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 11: loading dock equipment, residential equipment | |
| Division 12 - Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 12: manufactured casework | |
| Division 13 - Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 13: sound, vibration & seismic control, lightning protection, pre-engineered structures, swimming pools, hazardous material remediation, building automation & control, | |
| Division 15 - Plumbing & HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 15: building services piping, fire protection piping, plumbing fixtures & equipment, HVAC equipment, air distribution, HVAC instrumentation & controls, HVAC testing & balancing | |
| Division 16 - Electrical, Communication, & Fire Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 16: fire detection & alarms, wiring methods, electrical power, transmission & distribution, lighting, communications | |
| 100.00% | ERROR:#DIV/0! | ||||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | |||||||
| 0001 Base Pricing, Item 1 – Renovate 6030A & C Totals: | 1.00 | 0.00 | 0.00 | 0.00 | $ 1.00 | $ - 0 | $ (1.00) |
| 0002 Pricing Option, Item 2 - Furniture Relocation, Storage during construction and reinstallation | |||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | IGE | % of Bid | Difference | |
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 100.00% | $ - 0 | ERROR:#DIV/0! | $ (1.00) |
| 100.00% | ERROR:#DIV/0! | ||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | |||||
| 0002 Pricing Option, Item 2 - Furniture Relocation, Storage during construction and reinstallation Totals: | 1.00 | 0.00 | 0.00 | 0.00 | $ 1.00 | $ - 0 | $ (1.00) |
| 0003 Pricing Option, Item 3 - Lightning Protect System | |||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | IGE | % of Bid | Difference | |
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 100.00% | $ - 0 | ERROR:#DIV/0! | $ (1.00) |
| Division 2 - Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 |
| Division 13 - Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 |
| 100.00% | ERROR:#DIV/0! | ||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | |||||
| 0003 Pricing Option, Item 3 - Lightning Protect System Totals: | 1.00 | 0.00 | 0.00 | 0.00 | $ 1.00 | $ - 0 | $ (1.00) |
Total Construction Cost: $ 3.00 $ - 0