This document contains a pricing worksheet and details of a federal contract opportunity. The pricing worksheet requests pricing breakdowns by division for four items: renovating buildings 6030A and B; furniture relocation, storage, and reinstallation during construction; an optional lightning protection system; and an optional photovoltaic system. Divisions include general conditions, existing conditions, concrete, masonry, and other construction areas. The federal contract opportunity is a solicitation for a Multiple Award Construction Contract Indefinite Delivery Indefinite Quantity at Dyess Air Force Base. Interested offerors must review solicitation FA4661-20-R-0001 and any amendments. A site visit will be held on April 17, 2020, with registration due by April 9. Proposals are due based on instructions in Attachment 2 of the solicitation. The contract will be awarded according to the evaluation factors in Attachment 2. Existing as-builts and answers to pre-solicitation questions are also attached. The soliciting agency is the Department of the Air Force Global Strike Command.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FA4661-20-R-0001 ATTACHMENT 6 / SOW ATTACHMENT G | ||||||||||||
| PRICE BREAKDOWN BY DIVISION | Contractor: | |||||||||||
| Date: | ||||||||||||
| Dyess AFB, TX | Note: Due no later than 2 hours after official bid time. | |||||||||||
| FNWZ 13-0068 | Color Legend: | Formula Areas | Gov't Numbers | |||||||||
| Division Line Items Include the Items Below: | ||||||||||||
| 0001 Base Pricing, Item 1 – Renovate 6030A & B | CONTRACTOR BID | GOVERNMENT ESTIMATE | Division 1: typically bonds, general liability, builders risk, O&P | |||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | IGE | % of Bid | Difference | Notes: If DB, typically includes design fees, geotechnical, CAD as-builts, materials testing, etc. | |||
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 100.00% | $ - 0 | ERROR:#DIV/0! | $ (1.00) | Notes: If Bid-Build, typically includes CAD as-builts, materials testing, superintendent, storage containers, vehicles, small tools, trash dumpsters, portable toilets, project signage, |
bulletin board, plan sets, temporary fencing, cleanup, etc.
| Division 2 - Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 2: earthwork, asbestos abatement, selective building demolition, site grading, tree trimming & removal, termite treatment, seeding, etc. | |
| Division 3 - Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 3: basic concrete materials & methods, forms, accesssories, reinforcement, concrete placement & labor | |
| Division 4 - Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 4: masonry, grout, labor | |
| Division 5 - Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 5: structural framing, metal deck & joists, cold-formed metal framing, ornamental metal, expansion control | |
| Division 6 - Woods & Plastic | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 6: rough & finish carpentry, casework | |
| Division 7 - Thermal/Moisture | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 7: dampproofing, waterproofing, thermal protection, roofing, flashing, roof specialties, fire & smoke protection, joint sealers | |
| Division 8 - Doors & Windows | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 8: doors, frames, windows, entrances & storefronts, skylights, hardware, glazing | |
| 9 | Division 9 - Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 9: metal support facilities, gypsum board, tile, ceilings, flooring, wall finishes, acoustical treatment, paints & coatings |
| Division 10 - Miscellaneous Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 10: visual display boards, grilles & screens, architectural louvers & vents, corner guards, access flooring, flagpoles, identification devices/signage | |
| Division 11 - Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 11: loading dock equipment, residential equipment | |
| Division 12 - Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 12: manufactured casework | |
| Division 13 - Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 13: sound, vibration & seismic control, lightning protection, pre-engineered structures, swimming pools, hazardous material remediation, building automation & control, | |
| Division 15 - Plumbing & HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 15: building services piping, fire protection piping, plumbing fixtures & equipment, HVAC equipment, air distribution, HVAC instrumentation & controls, HVAC testing & balancing | |
| Division 16 - Electrical, Communication, & Fire Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 | Division 16: fire detection & alarms, wiring methods, electrical power, transmission & distribution, lighting, communications | |
| 100.00% | ERROR:#DIV/0! | ||||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | |||||||
| 0001 Base Pricing, Item 1 – Renovate 6030A & B Totals: | 1.00 | 0.00 | 0.00 | 0.00 | $ 1.00 | $ - 0 | $ (1.00) |
| 0002 Base Pricing, Item 2 - Furniture Relocation, Storage during construction and reinstallation | |||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | IGE | % of Bid | Difference | |
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 100.00% | $ - 0 | ERROR:#DIV/0! | $ (1.00) |
| 100.00% | ERROR:#DIV/0! | ||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | |||||
| 0002 Base Pricing, Item 2 - Furniture Relocation, Storage during construction and reinstallation Totals: | 1.00 | 0.00 | 0.00 | 0.00 | $ 1.00 | $ - 0 | $ (1.00) |
| 0003 Pricing Option, Item 3 - Lightning Protect System | |||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | IGE | % of Bid | Difference | |
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 100.00% | $ - 0 | ERROR:#DIV/0! | $ (1.00) |
| Division 2 - Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 |
| Division 13 - Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 |
| 100.00% | ERROR:#DIV/0! | ||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | |||||
| 0003 Pricing Option, Item 3 - Lightning Protect System Totals: | 1.00 | 0.00 | 0.00 | 0.00 | $ 1.00 | $ - 0 | $ (1.00) |
| 0004 Pricing Option, Item 4 - Photo-Voltaic System | |||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | % of Est | IGE | % of Bid | Difference | |
| Division 1 - General Conditions | $ 1.00 | $ - 0 | $ - 0 | $ - 0 | $ 1.00 | 100.00% | $ - 0 | ERROR:#DIV/0! | $ (1.00) |
| Division 2 - Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 |
| Division 16 - Electrical, Communication, & Fire Alarm | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% | $ - 0 | ERROR:#DIV/0! | $ - 0 |
| 100.00% | ERROR:#DIV/0! | ||||||||
| LABOR | MATERIAL | EQUIPMENT | SUBCONTRACT | TOTAL | |||||
| 0004 Pricing Option, Item 4 - Photo-Voltaic System Totals: | 1.00 | 0.00 | 0.00 | 0.00 | $ 1.00 | $ - 0 | $ (1.00) |
Total Construction Cost: $ 4.00 $ - 0