tx17_r5 Jul 09.mht

MHT file 6 KB Posted

Attached to
Asbestos Abatement and Remove/Replace Carpet and Tile Federal contract opportunity
Solicitation number
FA4661-09-R-0008
Issued by
Department of the Air Force Air Combat Command

About this file

Updated Wage Determination Jul 09

Text of this file

From: "Saved by Windows Internet Explorer 7" Subject:

Date: Tue, 18 Aug 2009 10:35:38 -0500 MIME-Version: 1.0 Content-Type: text/html;

charset="Windows-1252" Content-Transfer-Encoding: 7bit Content-Location: http://www.wdol.gov/wdol/scafiles/archive/davisbacon/2008/tx17.r5 X-MimeOLE: Produced By Microsoft MimeOLE V6.0.6001.18049

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">

<HTML><HEAD>

<META http-equiv=Content-Type content="text/html; charset=windows-1252"> <META content="MSHTML 6.00.6001.18294" name=GENERATOR></HEAD>

<BODY><PRE>TX080017 MOD 5 REVISED 07/24/09 TX17

******** THIS WAGE DETERMINATION WAS REPLACED ON 07/24/09********

General Decision Number: TX080017 07/24/2009

Superseded General Decision Number: TX20070017

State: Texas

Construction Type: Building

Counties: Callahan, Jones and Taylor Counties in Texas.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 02/08/2008 1 05/09/2008 2 06/27/2008 3 07/25/2008 4 06/19/2009 5 07/24/2009

BRTX0001-003 05/01/2008

Rates Fringes

BRICKLAYER.......................$ 20.90 6.70

* SUTX1990-031 02/12/1990

Rates Fringes

Acoustical Ceiling Installer.....$ 10.083

CARPENTER (Excluding Drywall Hanging &amp; Acoustical Work).......$ 10.103 2.73

CEMENT MASON/CONCRETE FINISHER...$ 8.345

DRYWALL HANGER...................$ 9.261

ELECTRICIAN......................$ 11.75 2.532

FLOOR LAYER: CARPET (SOFT)

FLOOR............................$ 9.50

HVAC MECHANIC (Including duct &amp; pipe work).....................$ 10.75

IRONWORKER, STRUCTURAL

(Excluding Metal Building Erectors)........................$ 8.517

Laborer, common..................$ 7.25

PAINTER: Brush Only.............$ 10.119

PLUMBER (Excluding HVAC Work)....$ 9.00

Power equipment operators:

Front End Loaders...........$ 11.066

ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 8.483

SHEETMETAL WORKER (Excluding HVAC Duct Work/ Metal Building Erection)...............$ 13.00 .77

TILE SETTER......................$ 11.833

TRUCK DRIVER.....................$ 7.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

</PRE></BODY></HTML>

Other files for this federal contract opportunity

Other files attached to Asbestos Abatement and Remove/Replace Carpet and Tile, newest first.
File Type Posted
MFR Change Time.doc DOC document
FA4661-09-R-0008 Carpet Tile Solicitation Amend 01.doc DOC document
Rev 1 Specs Carpet IDIQ FY10.doc DOC document
FBO Clarification of Ques 11 Sep 09.docx DOCX document
MFR Change Due Date.pdf PDF
A12 Pre-Bid Conf SV Minutes.docx DOCX document
Past Performance Survey Carpet.doc DOC document
FA4661-09-R-0008 Dyess Carpet Tile IDIQ.docx DOCX document
Dyess Carpet Tile WD 09R0008.doc DOC document
Past Performance Survey Carpet.doc DOC document
Dyess Carpet Tile Specs 09R0008.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .