FA4661-09-R-0008 Dyess Carpet Tile IDIQ.docx

DOCX document 154 KB Posted

Attached to
Asbestos Abatement and Remove/Replace Carpet and Tile Federal contract opportunity
Solicitation number
FA4661-09-R-0008
Issued by
Department of the Air Force Air Combat Command

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Asbestos Abatement and Remove/Replace Carpet and Tile, newest first.
File Type Posted
MFR Change Time.doc DOC document
FA4661-09-R-0008 Carpet Tile Solicitation Amend 01.doc DOC document
Rev 1 Specs Carpet IDIQ FY10.doc DOC document
FBO Clarification of Ques 11 Sep 09.docx DOCX document
MFR Change Due Date.pdf PDF
A12 Pre-Bid Conf SV Minutes.docx DOCX document
tx17_r5 Jul 09.mht MHT file
Past Performance Survey Carpet.doc DOC document
Dyess Carpet Tile Specs 09R0008.docx DOCX document
Dyess Carpet Tile WD 09R0008.doc DOC document
Past Performance Survey Carpet.doc DOC document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4661-09-R-0008

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
20
Hours

Downtime

FFP

Downtime, Ref. Section 1A, 3.1 of Specifications.

FOB: Destination

NSN: S214-CA-RPE-T000

SIGNAL CODE: A

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100
Each

Asbestos Sampling

The Contractor shall take Asbestos Samples as requested by the Government up to 100 samples, Ref. Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot

Abate Floor Tile and Mastic 1-1000 SF

The Contractor shall abate Floor Tile and Black Mastic (no carpet) 1-1000 Square Feet (SF), Ref. Section 1A, 2.11 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot

Abate Floor Tile and Mastic>1000 SF

The Contractor shall abate Floor Tile and Black Mastic (No carpet) over 1000 SF, Reference Section 1A, 2.11 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot

Abate Floor Tile and Mastic 1-1000 SF

The Contractor shall abate Floor Tile and Black Mastic (Include carpet over tile) 1-1000 SF, Refrence Section 1A, 2.11 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,000
Square Foot

Abate Floor Tile and Mastic>1000 SF

The Contractor shall abate Floor Tile and Black Mastic (Include carpet over tile) over 1000 SF, Refrence Section 1A, 2.11. of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,500
Square Foot

Demo Carpet 1-1000 SF

The Contractor shall demo Carpet (No Asbestos materials) 1-1000 SF, Refrence Section 1A, 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100,000
Square Foot

Demo Carpet > 1000 SF

The Contractor shall demo Carpet (No Asbestos materials) over 1000 SF, Refrence Section 1A, 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
750
Square Foot

Demo Vinyl Composition Tile 1-1000 SF

The Contractor shall demo Vinyl Composition Tile ( No Asbestos materials) 1-1000 SF, refrence Section 1A, 2.10, Reference Section 1A, 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
10,000
Square Foot

Demo Vinyl Composition Tile>1000 SF

The Contractor shall demo Vinyl Composition Tile (No asbestos materials) over 1000 SF, Reference Section 1A, 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
300
Square Foot

Demo Ceramic Tile 1-1000 SF

The Contractor shall demo 1-1000 square feet of Ceramic Tile (No Asbestos Materials), Reference Section 1A, 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,000
Square Foot

Demo Ceramic Tile>1000 SF

The Contractor shall demo over 1000BSF of Ceramic Tile (No Asbestos Materials), Reference Section 1A, 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
200
Square Foot

Demo Quarry Tile 1-1000 SF

The Contactor shall demo 1-1000 SF of Quarry Tile (No Asbestos Materials), Reference Sectoin 1A, 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot

Demo Quarry Tile> 1000 SF

The Contractor shall demo over 1000 SF of Quarry Tile (No Asbestos Materials), Reference Section 1A, 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
200
Square Foot

Demo Mud Bed 1-1000 SF

The Contractor shall demo 1-1000 SF of Mud Bed (No Asbestos Materials), Reference Section 1A, 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot

Demo Mud Bed>1000 SF

The Contractor shall demo over 1000 SF of Mud Bed (No Asbestos Materials), Reference Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,000
Square Foot

Install Glue Down Carpet 1-1000 SF

The Contractor shall install 1-1000 square feet of Glue Down Carpet including Floor Prep. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
115,000
Square Foot

Install Glue Down Carpet> 1000 SF

The Contractor shall install over 1000 SF of Glue Down Carpet including Floor Preparation, Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,500
Square Foot

Install Carpet Tiles 1-1000 SF

Install 1-1000 SF of Carpet Tiles, Including Floor Prep, as needed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
5,000
Square Foot

Install Carpet Tiles > 1000 SF

The Contractor shall install over 1000 SF of Carpet Tiles, including floor prep, as needed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,500
Square Foot

Install 12"x12" Ceramic Tile 1-1000 SF

The Contractor shall install 1-1000 SF of 12 inch by 12 inch Ceramic Tiles. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
20,000
Square Foot

Install 12"x12" Ceramic Tile > 1000 SF

The Contractor shall install over 1000 feet of 12 inch by 12 inch Ceramic Tiles. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot

Install 8"x8" Quarry Tile 1-1000 SF

The Contractor shall install 1-1000 SF of 8 inch by 8 inch Quarry Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot

Install 8"x8" Quarry Tile > 1000 SF

The Contractor shall install over 1000 SF of 8 inch by 8 inch Quarry Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot

Install Mud Bed 1-1000 SF

The Contractor shall install 1-1000 SF of Mud Bed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot

Install Mud Bed > 1000 SF

The Contractor shall install over 1000 SF of Mud Bed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot

Install 12"x12" Vinyl Comp. 1-1000 SF

The Contractor shall install 1-1000 SF of 12 inch by 12 inch Vinyl Composition Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3,000
Square Foot

Install 12'x12' Vinyl Comp. Tile > 1000

The Contractor shall install over 1000 SF of 12 inch by 12 inch Vinyl Composition Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot

Install Rubber Tile 1-1000 SF

The Contractor shall install 1-1000 SF of Rubber Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,000
Square Foot

Install Rubber Tile > 1000 SF

The Contractor shall install over 1000 SF of Rubber Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot

Install Sheet Vinyl Flooring 1-1000 SF

The Contractor shall install 1-1000 SF of Sheet Vinyl Flooring. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot

Install Sheet Vinyl Flooring > 1000 SF

The Contractor shall install over 1000 SF of Sheet Vinyl Flooring. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100
Square Foot

Install Flooring w/Heat Seams 1-1000 SF

The Contractor Shall install 1-1000 SF of Sheet Vinyl Flooring with Heat Welded Seams. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,000
Square Foot

Install Flooring w/Heat Seams> 1000 SF

The Contractor shall install over 1000 SFt of Sheet Vinyl Flooring with Heat Welded Seams. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,500
Linear Foot

Install Vinyl Cover Base 1-1000 SF

The Contractor shall install 1-1000 SF of Vinyl Cover Base. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
20,000
Linear Foot

Install Vinyl Cover Base>1000 LF

The Contractor shall install over 1000 Linear Feet (LF) of Vinyl Cover Base. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Linear Foot

Install Vinyl Tran Strips1-1000 LF

The Contractor shall install 1-1000 Linear Feet (LF) of Vinyl Trasition Strips. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Linear Foot

Install Vinyl Tran Strips >1000 LF

The Contractor shall install over 1000 LF of Vinyl Tranisition Strips. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
30
Each

Install Threshold Doors

The Contractor shall install Thresholds at Doors. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100
Each

Install Stair Treads

The Contractor shall install Stair Treads. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
20
Hours
OPTION
Downtime

FFP

Downtime, Reference Section 1A 3.1 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100
Each
OPTION
Asbestos Sampling

FFP

The Contractor shall take Asbestos Samples as requested by the Government up to 100 samples, Ref. Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Abate Tile Mastic (no carpet) 1-1000 SF

FFP

The Contractor Shall abate 1-1000 square feet of Floor Tile and Mastic (No Carpet), Reference Section 1A 2.11 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Abate Floor Tile and Mastic>1000 SF

FFP

The Contractor shall abate over 1000 SF of Floor Tile and Mastic (no carpet). Reference Section 1A 2.11 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Abate Tile Mastic (w/carpet) 1-1000 SF

FFP

The Contractor shall abate 1-1000 SF of Floor Tile and Mastic (Include carpet over tile). Reference Section 1A 2.11 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,000
Square Foot
OPTION
Abate FloorTile&Mastic > 1000 SF

FFP

The Contractor shall abate over 1000 SF of Floor Tile and Mastic (include carpet over tile). Reference Section 1A 2.11 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,500
Square Foot
OPTION
Demo Carpet, 1-1000 SF

FFP

The Contractor shall demo 1-1000 SF of carpet (no asbestos materials) Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100,000
Square Foot
OPTION
Demo Carpet, > 1000 SF

FFP

The Contractor shall demo over 1000 SF of carpet (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
750
Square Foot
OPTION
Demo Vinyl Comp Tile, 1-1000 SF

FFP

The Contractor shall demo 1-1000 SF of Vinyl Composition Tile (No asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
10,000
Square Foot
OPTION
Demo Vinyl Comp Tile > 1000 SF

FFP

The Contractor shall demo over 1000 SF of Vinyl Composition Tile (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
300
Square Foot
OPTION
Demo Ceramic Tile, 1-1000 SF

FFP

The Contractor shall demo 1-1000 SF of Ceramic Tile (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,000
Square Foot
OPTION
Demo Ceramic Tile, > 1000 SF

FFP

The Contractor shall demo over 1000 SF (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
200
Square Foot
OPTION
Demo Quarry Tile, 1-1000 SF

FFP

The Contractor shall demo 1-1000 SF of Quarry Tile. Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Demo Quarry Tile, > 1000 SF

FFP

The Contractor shall demo over 1000 SF of Quarry Tile, (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
200
Square Foot
OPTION
Demo Mud Bed, 1-1000 SF

FFP

The Contractor shall demo 1-1000 SF of Mud Bed (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Demo Mud Bed, > 1000 SF

FFP

The Contractor shall demo over 1000 SF of Mud Bed. Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,000
Square Foot
OPTION
Install Glue Down Carpet, 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of Glue Down Carpet, Including Floor Prep. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
115,000
Square Foot
OPTION
Install Glue Down Carpet, > 1000 SF

FFP

The Contractor shall install over 1000 SF of Glue Down Carpet, Including Floor Prep. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,500
Square Foot
OPTION
Install Carpet Tiles 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of Carpet Tiles Including Floor Prep, as needed. Reference Section 1A of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
5,000
Square Foot
OPTION
Install Carpet Tiles > 1000 SF

FFP

The Contractor shall install over 1000 SF of Carpet Tiles, Including Floor Prep, as needed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,500
Square Foot
OPTION
Install Ceramic Tile, 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of Ceramic Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
20,000
Square Foot
OPTION
Install 12"x12" Cermaic Tile > 1000 SF

FFP

The Contractor shall install over 1000 SF of 12 inch by 12 inch cermic tile of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Install 8"x8" Quarry Tile, 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of 8 inch by 8 inch Quarry Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Install 8"x8" Quarry Tile, > 1000 SF

FFP

The Contractor shall install over 1000 SF of 8 inch by 8 inch Quarry Tiles. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Install Mud Bed, 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of Mud Bed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Install Mud Bed, > 1000 SF

FFP

The Contractor shall install over 1000 SF of Mud Bed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Install 12"x12" Vinyl Comp, 1-1000 SF

FFP

The Contractor shall install 1-1000 SF 12 inch by 12 inch Vinyl Compostition Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3,000
Square Foot
OPTION
Install 12"x12" Vinyl Comp, > 1000 SF

FFP

The Contractor shall install over 1000 SF of 12 inch by 12 inch Vinyl Composition Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Install Rubber Tile, 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of Rubber Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,000
Square Foot
OPTION
Install Rubber Tile, > 1000 SF

FFP

The Contractor shall install over 1000 SF of Rubber Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Install Sheet Vinyl, 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of Sheet Vinyl Flooring. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Install Sheet Vinyl, > 1000 SF

FFP

The Contractor shall install over 1000 SF of Sheet Vinyl Flooring. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100
Square Foot
OPTION
Install Vinyl Sheet w/seams, 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of Vinyl Sheet Flooring with Heat Welded Seams. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,000
Square Foot
OPTION
Install Sheet Vinyl w/seams, > 1000 SF

FFP

The Contractor shall install over 1000 SF of Sheet Vinyl Flooring with Heat Welded Seams. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,500
Linear Foot
OPTION
Install Vinyl Cove Base, 1-1000 LF

FFP

The Contractor shall install 1-1000 linear feet (LF) of Vinyl Cove Base. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
20,000
Square Foot
OPTION
Install Vinyl Base Core, > 1000 LF

FFP

The Contractor shall install over 1000 LF of of Vinyl Cove Base. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Linear Foot
OPTION
Install Vinyl Trans Strips, 1-1000 LF

FFP

The Contractor shall install 1-1000 LF of Vinyl Transistion Strips. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Linear Foot
OPTION
Install Vinyl Trans Strips > 1000 LF

FFP

The Contractor shall install over 1000 LF of Vinyl Transistion Strips. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
30
Each
OPTION
Install Thresholds at Doors

FFP

The Contractor shall install Thresholds at Door. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100
Each
OPTION
Install Stair Treads

FFP

The Contractor shall install Stair Treads. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
20
Hours
OPTION
Downtime

FFP

Downtime Reference Section 1A 2.1, Ref. Section 1A, 3.1 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100
Each
OPTION
Asbestos Samples

FFP

The Contracor shall take asbestos samples as requested by the Government, Ref. Section 1B, 9.4.1.2 and 9.4.1.3 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Abate Floor Tile and Mastic 1-1000 SF

FFP

The Contractor shall abale 1-1000 square feet (SF) (no carpet). Reference Section 1A 2.11 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Abate Floor Tile and Mastic >1000 SF

FFP

The Contractor shall abate over 1000 SF of tile and floor mastic, Reference Section 1A, 2.11 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Abate Floor Tile and Mastic 1-1000 SF

FFP

The Contractor shall abate 1-1000 SF of Floor Tile and Mastic (include carpet over tile). Reference Section 1A 2.11 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,000
Square Foot
OPTION
Abate Floor Tile and Mastic > 1000 SF

FFP

The Contractor shall abate over 1000 SF of Floor Tile and Mastic (include carpet over tile). Reference Section 1A 2.11 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,500
Square Foot
OPTION
Demo Carpet 1-1000 SF

FFP

The Contractor shall demolish 1-1000 SF of carpet (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100,000
Square Foot
OPTION
Demo Carpet > 1000 SF

FFP

The Contractor shall demolish over 1000 SF of carpet (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
750
Square Foot
OPTION
Demo Vynil Comp Tile, 1-1000 SF

FFP

The Contractor shall demolish 1-1000 SF of Vinyl Composition Tile (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
10,000
Square Foot
OPTION
Demo Vinyl Comp Tile > 1000 SF

FFP

The Contractor shall demolish over 1000 SF of Vinyl Composition Tile. (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
300
Square Foot
OPTION
Demo Ceramic Tile 1-1000 SF

FFP

The Contractor shall demolish 1-1000 SF of Ceramic Tile (no asbestos materials) Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,000
Square Foot
OPTION
Demo Ceramic Tile > 1000 SF

FFP

The Contractor shall demolish over 1000 SF of Ceramic Tile (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
200
Square Foot
OPTION
Demo Quarry Tile 1-1000 SF

FFP

The Contractor shall demolish 1-1000 SF of Quarry Tile (no asbestos materials) Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Demo Quarry Tile > 1000 SF

FFP

The Contractor shall demolish over 1000 SF of Quarry Tile. (no asbestos materials) Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
200
Square Foot
OPTION
Demo Mud Bed 1-1000 SF

FFP

The Contractor shall demolish 1-1000 SF of Mud Bed ( no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Demo Mud Bed > 1000 SF

FFP

The Contractor shall demolish over 1000 SF of Mud Bed (no asbestos materials). Reference Section 1A 2.10 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,000
Square Foot
OPTION
Install Glue Down Carpet, 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of Glue Down Carpet Including Floor Prep. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
115,000
Square Foot
OPTION
Install Glue Down Carpet > 1000 SF

FFP

The Contractor Shall install over 1000 SF Glue Down Carpet including Floor Prep. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,500
Square Foot
OPTION
Install Carpet Tiles 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of Carpet Tiles including Floor Prep as needed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
5,000
Square Foot
OPTION
Install Carpet TIles > 1000 SF

FFP

The Contractor shall install over 1000 SF of Carpet Tiles including Floor Prep as needed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,500
Square Foot
OPTION
Install 12"x12" Ceramic Tiles 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of 12 inch by 12 inch Ceramic Tiles including floor prep as needed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
20,000
Square Foot
OPTION
Install 12"x12" Ceramic Tiles > 1000 SF

FFP

The Contractor shall install over 1000 SF of 12 inch by 12 inch Ceramic Tiles. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Install 8"x8" Quarry Tile 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of 8 inch by 8 inch Quarry Tiles. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Install 8"x8" Quarry Tile > 1000 SF

FFP

The Contractor shall install over 1000 square feet of 8 inch by 8 inch Quarry Tiles. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Install Mud Bed 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of Mud Bed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Install Mud Bed > 1000 SF

FFP

The Contractor shall install over 1000 SF of Mud Bed. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Install 12"x12" Vinyl Comp 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of 12 inch by 12 inch Vinyl Composition Tiles. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
3,000
Square Foot
OPTION
Install 12"x12" Vinyl Comp > 1000 SF

FFP

The Contractor shall install over 1000 SF of 12 inch by 12 inch Vinyl Composition Tile. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Install Rubber Tile 1-1000 SF

FFP

The Contractor shall install 1-1000 SFt of Rubber Tiles. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,000
Square Foot
OPTION
Install Rubber Tile > 1000 SF

FFP

The Contractor shall install over 1000 SF of Rubber Tiles. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Square Foot
OPTION
Install Sheet Vinyl 1-1000 SF

FFP

The Contractor shall install 1-1000 SF of Sheey Vinyl Flooring. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Square Foot
OPTION
Install Sheet Vinyl > 1000 SF

FFP

The Contractor shall install over 1000 SF of Sheet Vinyl Flooring. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100
Square Foot
OPTION
Install Heat Weld 1-1000 SF

FFP

The Contractor Shall install 1-1000 SF Sheet Vinyl Flooring with Heat Welded Seams. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,000
Square Foot
OPTION
Install Heat Weld > 1000 SF

FFP

The Contractor shall install over 1000 SF of Sheet Vinyl Flooring with Heat Welded Seams. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
2,500
Linear Foot
OPTION
Install Vinyl Cove 1-1000 LF

FFP

The Contractor shall install 1-1000 linear feet (LF) of Vinyl Cove. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
20,000
Square Foot
OPTION
Install Vinyl Cove > 1000 SF

FFP

The Contractor shall install over 1000 square feet of Vinyl Cove Base. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
500
Linear Foot
OPTION
Install Trans Strips 1-1000 LF

FFP

The Contractor shall install 1-1000 Linear Feet of Transition Strips. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1,001
Linear Foot
OPTION
Install Trans Strips > 1000 LF

FFP

The Contractor shall install over 1000 LF of Transition Strips. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
30
Each
OPTION
Install Tresholds at Doors

FFP

The Contractor shall install Thresholds at Doors. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
100
Each
OPTION
Install Stair Treads

FFP

The Contractor shall install Stair Treads. Reference Section 1A 2.12 of Specifications.

FOB: Destination

MAX

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
0004
Destination
Government
Destination
Government
0005
Destination
Government
Destination
Government
0006
Destination
Government
Destination
Government
0007
Destination
Government
Destination
Government
0008
Destination
Government
Destination
Government
0009
Destination
Government
Destination
Government
0010
Destination
Government
Destination
Government
0011
Destination
Government
Destination
Government
0012
Destination
Government
Destination
Government
0013
Destination
Government
Destination
Government
0014
Destination
Government
Destination
Government
0015
Destination
Government
Destination
Government
0016
Destination
Government
Destination
Government
0017
Destination
Government
Destination
Government
0018
Destination
Government
Destination
Government
0019
Destination
Government
Destination
Government
0020
Destination
Government
Destination
Government
0021
Destination
Government
Destination
Government
0022
Destination
Government
Destination
Government
0023
Destination
Government
Destination
Government
0024
Destination
Government
Destination
Government
0025
Destination
Government
Destination
Government
0026
Destination
Government
Destination
Government
0027
Destination
Government
Destination
Government
0028
Destination
Government
Destination
Government
0029
Destination
Government
Destination
Government
0030
Destination
Government
Destination
Government
0031
Destination
Government
Destination
Government
0032
Destination
Government
Destination
Government
0033
Destination
Government
Destination
Government
0034
Destination
Government
Destination
Government
0035
Destination
Government
Destination
Government
0036
Destination
Government
Destination
Government
0037
Destination
Government
Destination
Government
0038
Destination
Government
Destination
Government
0039
Destination
Government
Destination
Government
0040
Destination
Government
Destination
Government
1001
Destination
Government
Destination
Government
1002
Destination
Government
Destination
Government
1003
Destination
Government
Destination
Government
1004
Destination
Government
Destination
Government
1005
Destination
Government
Destination
Government
1006
Destination
Government
Destination
Government
1007
Destination
Government
Destination
Government
1008
Destination
Government
Destination
Government
1009
Destination
Government
Destination
Government
1010
Destination
Government
Destination
Government
1011
Destination
Government
Destination
Government
1012
Destination
Government
Destination
Government
1013
Destination
Government
Destination
Government
1014
Destination
Government
Destination
Government
1015
Destination
Government
Destination
Government
1016
Destination
Government
Destination
Government
1017
Destination
Government
Destination
Government
1018
Destination
Government
Destination
Government
1019
Destination
Government
Destination
Government
1020
Destination
Government
Destination
Government
1021
Destination
Government
Destination
Government
1022
Destination
Government
Destination
Government
1023
Destination
Government
Destination
Government
1024
Destination
Government
Destination
Government
1025
Destination
Government
Destination
Government
1026
Destination
Government
Destination
Government
1027
Destination
Government
Destination
Government
1028
Destination
Government
Destination
Government
1029
Destination
Government
Destination
Government
1030
Destination
Government
Destination
Government
1031
Destination
Government
Destination
Government
1032
Destination
Government
Destination
Government
1033
Destination
Government
Destination
Government
1034
Destination
Government
Destination
Government
1035
Destination
Government
Destination
Government
1036
Destination
Government
Destination
Government
1037
Destination
Government
Destination
Government
1038
Destination
Government
Destination
Government
1039
Destination
Government
Destination
Government
1040
Destination
Government
Destination
Government
2001
Destination
Government
Destination
Government
2002
Destination
Government
Destination
Government
2003
Destination
Government
Destination
Government
2004
Destination
Government
Destination
Government
2005
Destination
Government
Destination
Government
2006
Destination
Government
Destination
Government
2007
Destination
Government
Destination
Government
2008
Destination
Government
Destination
Government
2009
Destination
Government
Destination
Government
2010
Destination
Government
Destination
Government
2011
Destination
Government
Destination
Government
2012
Destination
Government
Destination
Government
2013
Destination
Government
Destination
Government
2014
Destination
Government
Destination
Government
2015
Destination
Government
Destination
Government
2016
Destination
Government
Destination
Government
2017
Destination
Government
Destination
Government
2018
Destination
Government
Destination
Government
2019
Destination
Government
Destination
Government
2020
Destination
Government
Destination
Government
2021
Destination
Government
Destination
Government
2022
Destination
Government
Destination
Government
2023
Destination
Government
Destination
Government
2024
Destination
Government
Destination
Government
2025
Destination
Government
Destination
Government
2026
Destination
Government
Destination
Government
2027
Destination
Government
Destination
Government
2028
Destination
Government
Destination
Government
2029
Destination
Government
Destination
Government
2030
Destination
Government
Destination
Government
2031
Destination
Government
Destination
Government
2032
Destination
Government
Destination
Government
2033
Destination
Government
Destination
Government
2034
Destination
Government
Destination
Government
2035
Destination
Government
Destination
Government
2036
Destination
Government
Destination
Government
2037
Destination
Government
Destination
Government
2038
Destination
Government
Destination
Government
2039
Destination
Government
Destination
Government
2040
Destination
Government
Destination
Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
POP 01-OCT-2009 TO

30-SEP-2010

N/A
7 CES/CC/ENGINEERING - F1R310

DANIEL FRIEBERG

710 3RD STREET

DYESS AFB TX 79607

325-696-5617 FOB: Destination F1R310

0002
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0003
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0004
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0005
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0006
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0007
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0008
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0009
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0010
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0011
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0012
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0013
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0014
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0015
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0016
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0017
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0018
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0019
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0020
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0021
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0022
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0023
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0024
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0025
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0026
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0027
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0028
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0029
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0030
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0031
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0032
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0033
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0034
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0035
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0036
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0037
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0038
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0039
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

0040
POP 01-OCT-2009 TO

30-SEP-2010

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1001
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1002
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1003
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1004
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1005
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1006
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1007
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1008
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1009
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1010
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1011
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1012
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1013
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1014
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1015
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1016
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1017
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1018
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1019
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1020
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1021
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1022
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1023
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1024
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1025
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1026
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1027
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1028
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1029
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1030
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1031
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1032
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1033
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1034
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1035
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1036
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1037
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1038
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1039
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

1040
POP 01-OCT-2010 TO

30-SEP-2011

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2001
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2002
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2003
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2004
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2005
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2006
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2007
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2008
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2009
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2010
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2011
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2012
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2013
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2014
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2015
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2016
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2017
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2018
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2019
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2020
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2021
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2022
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2023
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2024
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2025
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2026
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2027
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2028
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2029
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2030
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2031
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2032
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2033
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2034
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2035
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2036
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2037
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2038
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2039
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

2040
POP 01-OCT-2011 TO

30-SEP-2012

N/A
(SAME AS PREVIOUS LOCATION)

F1R310

Section G - Contract Administration Data

CONTRACT ADMINISTRATION DATE

G-1
CONTRACT ADMINISTRATION
A.Following award, the 7th Contracting Squadron will administer this contract. The name, address, telephone number, and fax number of the Contracting Officer are:
Mr. Ronald G. Miller

7 CONS/LGCA

381 Third Street Dyess AFB, TX 79607 Phone: (325) 696-3685 Fax: (325) 696-4084

B.The Contracting Officer is the only person authorized to approve changes or modify any of the requirements under this contract; notwithstanding any provisions contained elsewhere in this contract, the authority remains solely with the Contracting Officer. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority, and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.
C.Contractual problems, of any nature, which might occur during the life of the contract must be handled in accordance with very specific public laws and regulations (i.e. Federal Acquisition Regulation), and must be referred to the Contracting Officer for resolution. Only the Contracting Officer is authorized to formally resolve such problems. Therefore, the contractor is directed to submit all such contractual problems to the immediate attention of the Contracting Officer.
D.Any request for contract changes/modifications shall be submitted to the Contracting Officer.
E.All correspondence concerning this contract, such as requests for information, explanation of terms, and contract interpretations, shall be submitted to the Contracting Officer.
G-2
INVOICES AND PAYMENTS
A.The Government will pay all invoices per the terms of the Prompt Payment Act for Construction Contracts (Reference FAR 52.232-27), withholding only amounts questioned by the Government or arising from claims or held as retainage.
B.Upon completion of the work and prior to final payment, the contractor shall be required to furnish to the Contracting Officer a Release of Claims as specified by FAR 52.232-5, Payments under Fixed-Price Construction Contracts.

Section H - Special Contract Requirements

SPECIAL CONTRACT REQUIREMENTS

H-1 INSURANCE ENDORSEMENTS: Before commencing work under this contract, the Contractor shall certify in writing to the Contracting Officer that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.

General liability.

(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.

(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.

Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

H-2 NOTICE TO PROCEED: The Notice to Proceed for written orders shall be the date the Contractor receives the order. In rare instances, on those projects deemed emergencies, the Government may issue an oral confirming order prior to the issuance of the written task order. In that case, the notice to proceed shall be the date the Contractor verbally receives confirmation and the task order number from the Contracting Officer.

H-3 PRECONSTRUCTION CONFERENCE SCHEDULE: Any Contractor awarded a contract resulting from this solicitation may be required to attend a preconstruction conference to be held at the 7th Contracting Squadron Conference Room, Dyess AFB, Texas at a date and time designated by the Contracting Officer.

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1
Definitions
JUL 2004
52.203-3
Gratuities
APR 1984
52.203-5
Covenant Against Contingent Fees
APR 1984
52.203-7
Anti-Kickback Procedures
JUL 1995
52.203-8
Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
JAN 1997
52.203-10
Price Or Fee Adjustment For Illegal Or Improper Activity
JAN 1997
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
SEP 2007
52.204-4
Printed or Copied Double-Sided on Recycled Paper
AUG 2000
52.204-7
Central Contractor Registration
APR 2008
52.204-9
Personal Identity Verification of Contractor Personnel
SEP 2007
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
SEP 2006
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.219-14
Limitations On Subcontracting
DEC 1996
52.219-27
Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside
MAY 2004
52.222-6
Davis Bacon Act
JUL 2005
52.222-7
Withholding of Funds
FEB 1988
52.222-8
Payrolls and Basic Records
FEB 1988
52.222-9
Apprentices and Trainees
JUL 2005
52.222-10
Compliance with Copeland Act Requirements
FEB 1988
52.222-11
Subcontracts (Labor Standards)
JUL 2005
52.222-12
Contract Termination-Debarment
FEB 1988
52.222-13
Compliance with Davis-Bacon and Related Act Regulations.
FEB 1988
52.222-14
Disputes Concerning Labor Standards
FEB 1988
52.222-15
Certification of Eligibility
FEB 1988
52.222-21
Prohibition Of Segregated Facilities
FEB 1999
52.222-26
Equal Opportunity
MAR 2007
52.222-27
Affirmative Action Compliance Requirements for Construction
FEB 1999
52.222-35

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .