Attachment 4 - Cav Indoor Playground QA Document.docx

DOCX document 20 KB Posted

Attached to
Cavalier SFS Indoor Playground Federal contract opportunity
Solicitation number
FA465925QZ006
Issued by
Department of the Air Force Air Mobility Command

About this file

This is a Questions and Answers document for the Cavalier Indoor Playground procurement, containing 14 questions and responses about technical specifications and installation requirements. Key details include confirmation that the playground equipment can be mounted directly to the floor, will be installed on ground level with no staircases, requires ADA-compliant access around the playground, and must include rubber flooring over the existing tile/concrete floor. The installation space has an 18-foot floor-to-ceiling height, requiring 6-8 inches clearance from ceiling for fire code, with 2 feet of clearance required around the structure's perimeter.

Installation work must follow Davis Bacon or Service wage determinations as applicable, with work hours restricted to Monday through Friday, 7:30 AM to 4:30 PM CST. The document notes that no budget information can be disclosed since this is a supply purchase with incidental installation rather than construction. Layout drawings and photos of the installation space were referenced as attachments but not included in this document.

View the file

Other files for this federal contract opportunity

Other files attached to Cavalier SFS Indoor Playground, newest first.
File Type Posted
Amendment 02 - RFQ Cav Playground (Update).pdf PDF
Attachment 1 - NAF Standard Clauses_1 May 2024.pdf PDF
Attachment 2 - NAF Standard Clauses - Full Text - 1 May 2024.pdf PDF
Attachment 7 - Build Site Photo 1.jpg JPG image
Attachment 9 - As Builts.pdf PDF
Attachment 4 - Wage Determination 23 Dec 2024.pdf PDF
Attachment 6 - Playland Floor Plan.docx DOCX document
Attachment 8 - Build Site Photo 2.jpg JPG image
Attachment 3 - Statement of Work 20 Mar 25.pdf PDF
Attachment 5 - Cav Indoor Playground QA Document.docx DOCX document
Attachment 4 - Cav Indoor Playground QA Document.docx DOCX document
Attachment 5 - Playland floor plan.docx DOCX document
Combo Solicitation - Cav Playground Amendment 01.pdf PDF
Attachment 1 - Clauses and Provisions.pdf PDF
Attachment 6 - Build Site Photo 1.jpg JPG image
Attachment 3 - Wage Determination 23 Dec 2024.pdf PDF
Attachment 2 - Statement of Work 12 Feb 25.pdf PDF
Attachment 8 - As Builts.pdf PDF
Attachment 2 - Statement of Work.pdf PDF
Combo Solicitation- Cavalier Playground.pdf PDF
Attachment 2 - Statement of Work.pdf PDF
Attachment 1 - Clauses and Provisions.pdf PDF
Attachment 3 - Wage Determination.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers – Cavalier Indoor Playground

1. Is there any fall room outside of the 18 feet?

a. The equipment will have an area around it for cleaning/safety purposes ideally according to Fire regulations 2 feet around structures perimeter. Floor to ceiling is 18’ and should allow 6-8” for fire code from ceiling

2. Will we be allowed to mount directly to the floor?

a. Yes, it can be attached to floor for more stability

3. We would like to request a floor plan with dimensions and a few photos of the building where both playground installations will take place.

a. See attached files

4. Could you kindly help us with the clear ceiling height, measured from the floor to the lowest hanging item in the ceiling?

a. Area where playland will be installed has flush mounted lighting-photos attached

5. Will the playground be installed on the ground floor or the second floor of the building?

a. This equipment will be installed on ground level area.

6. If the installation area is accessible via a staircase, could you please provide the staircase dimensions, including the width, direction, and measurements from each wall?

a. No stairwell in area of install room

7. Is the staircase the only entrance and exit to the space?

a. This area is ground level with no staircases around

8. Would you like full wheelchair accessibility within the first level of the playground, or just ADA-compliant access around the playground?

a. Just ADA-compliant access

9. Could you confirm what type of flooring is currently in the space?

a. Flooring is tile over concrete flooring but as per SOW rubber flooring must be included.

10. Could you provide us Full Layout or architectural drawings with measurements with all entrances/exits marked including staircase measurements.

a. See attached files

11. To ensure the design fits within the space, could you provide the measurements of all door openings of the space where the playground will be installed?

a. See Attached files

12. Could you please share some actual Photos of the space - if the playground installation is in the existing location so we will require photos from multiple angles and the ceiling.

a. Photos attached

13. What is the budget?

a. Being this is a supply purchase with incidental install, and not construction, there is no cost magnitude that can be disclosed at this time.

14. Does this need to be quoted with Davis Bacon wages? What are the working hours/days for installation?

a. While we anticipate the services wage determination to apply, if the classification of your personnel fall under Davis Bacon, please use that.

b. Working Days and Hours for the installation are Monday through Friday from 7:30 AM to 4:30 PM CST.

File details come from the government source that posted it. Updated .