Attachment_3,_Submittal_Register.pdf

PDF 2 MB Posted

Attached to
GFAFB Add/Repair Squadron Operations GSMP B541 Federal contract opportunity
Solicitation number
FA4659-18-R-0005
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 3, Submittal Register

View the file

Other files for this federal contract opportunity

Other files attached to GFAFB Add/Repair Squadron Operations GSMP B541, newest first.
File Type Posted
19_JFSD_0541_A-101_-_Rev_26Jun18.pdf PDF
135_JFSD_0541_EP403_-_Rev_26Jun18.pdf PDF
27_10_00_Rev_29Jun18.pdf PDF
20_JFSD_0541_A-102_-_Rev_26Jun18.pdf PDF
155_JFSD_0541_E-601_-_Rev_27Jun18.pdf PDF
FA465918R00050003.pdf PDF
01_JFSD_0541_G-001COVR_-_Rev_26Jun18.pdf PDF
Amend_003_Questions_28Jun18.pdf PDF
134_JFSD_0541_EP402_-_Rev_26Jun18.pdf PDF
05_50_13_-_Rev_19Jun18.pdf PDF
Amend_2_Questions_21Jun18.pdf PDF
FA465918R00050002.pdf PDF
16_JFSD_0541_AD101_-_Rev_20Jun18.pdf PDF
08_34_73_-_Rev_21Jun18.pdf PDF
Attachment_10,_Updated_Specifications_and_Drawings.pdf PDF
Amendment_1_Q&A_18Jun18.pdf PDF
FA465918R0005P00001.pdf PDF
Attachment_7,_PP_Questionnaire.pdf PDF
Attachment_9,_RFP_Cover_Letter.pdf PDF
Attachment_2g,_Mechanical_Drawings.pdf PDF
Attachment_2e,_Fire_Protection_Drawings.pdf PDF
Attachment_2d,_Structural_Drawings.pdf PDF
Attachment_8,_Construction_Wage_Rate_Determination.pdf PDF
Attachment_6,_Financial_Institution_Ref_Sheet.pdf PDF
Attachment_4,_Climatological_Summary.pdf PDF
Attachment_5,_Green_Procurement_Waiver_Form.pdf PDF
Attachment_2h,_Electrical_Drawings.pdf PDF
Attachment_2c,_Architectural_Drawings.pdf PDF
Attachment_2a,_Schedule_of_Drawings.pdf PDF
Attachment_2f,_Plumbing_Drawings.pdf PDF
FA465918R0005.pdf PDF
Attachment_1,_Technical_Specifications.pdf PDF
Attachment_2b,_Civil_and_Landscape_Drawings.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01000 Contractor Warranty 3.3 G Base CE Work Clearance Request 4.1 G Welding Certification 4.2 G AF Form 592 Project Site Plan 7.2.1 G Dirt and Dust Control Plan 7.2.2 G Contractor's Health and Safety Plan 7.2.3 G Site Superintendent/ Project 10.1.2 G Manager Designation Letter Critical Path Method (CPM) 12.6 G Network Schedule Schedule Showing Procurement 12.6.1.1 G Plans for Materials and Equipment As-Built Redline Markup 12.7.3 G Drawings Final As-Built Drawings 12.8.3 G Real Property Record - 12.9 G Form DD1354 GPS Data 12.10.3 G Environmental Pollution Control 13.3.1 G Plans Industrial Storm Water Protection 13.5 G Plan Solid Waste Disposal Plan 13.6 G Hazardous Materials List 13.7.1 G Spill Control Plan 13.8 G Dust Control Plan 13.1 G Contractor Quality Control Plan 14.4 G O & M Manuals 16 G

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Attachment 3, FA465918R0005

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A

H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

01 14 00 List of Contact Personnel 1.3 G Site Security Plan 1.4 G Personnel Lists and Data 1.4.3.2 Delivery Invoices 1.4.1.6

01 33 29 SD-01 Preconstruction Submittals Preliminary High Performance 1.5.3.1 G and Sustainable Building Checklist Sustainability Action Plan 1.4.1 G Preliminary Sustainability 1.5.3.1 G eNotebook

SD-11 Closeout Submittals Final High Performance and 1.5.3.1 G Sustainable Building Checklist Final Sustainability eNotebook 1.5.3.1 G Amended Final Sustainability 1.5.3.1 G eNotebook Amended Final High 1.5.3.1 G Performance and Sustainable Building Checklist Third Party Certification 3.2 G Certificates or Validation

01 45 00.00 10 SD-01 Preconstruction Submittals Contractor Quality Control (CQC) 3.2 G Plan

01 45 35 SD-06 Test Reports Weekly Reports

SD-07 Certificates Special Inspector 1.5 G Qualification Records 3.1.2

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

SD-11 Closeout Submittals Interim Final Report 3.1.2 Comprehensive Final Report 3.1.2 G

01 91 00.15 SD-01 Preconstruction Submittals Commissioning Firm 1.7 G Lead Commissioning Specialist 1.7.1 G Technical Commissioning 1.7.2 G Specialists Commissioning Firm's Contract 1.7 G

SD-06 Test Reports Interim Construction Phase 3.1.2.1 G Commissioning Plan Final Construction Phase 3.1.2.2 G Commissioning Plan Template Building Envelope 3.1.2.1.3 G Inspection Checklists Building Envelope Inspection G Checklists Pre-Functional Checklists 3.1.4.2 G Issues Log 1.9 Commissioning Report 3.2 G

SD-07 Certificates Certificate of Readiness 1.10 G

SD-10 Operation and Maintenance Data Training Plan 3.1.5 G Training Attendance Rosters 3.1.5 G Systems Manual 3.1.6 G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Maintenance and Service Life 3.1.7 G Plans

SD-11 Closeout Submittals Construction Phase 3.1.2.1 S Commissioning Plan Final Commissioning Report 3.2 S

02 41 00 SD-01 Preconstruction Submittals Demolition Plan 1.2.1 G Existing Conditions 1.10

SD-07 Certificates Notification 1.6 G Notification of Demolition and Renovation Form

SD-11 Closeout Submittals Receipts 3.2.3 G

03 20 00.00 10 SD-02 Shop Drawings Reinforcement 3.1 G

SD-03 Product Data Reinforcing Steel 2.2 G

03 30 00.00 10 SD-01 Preconstruction Submittals Quality Control Plan 1.4.2 Laboratory Accreditation 1.4.1

SD-03 Product Data Cementitious Materials 2.2 Chemical Admixtures 2.4

SD-05 Design Data Mixture Proportions 2.1.1 G

SD-06 Test Reports Testing and Inspection for CQC 3.8

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Aggregates 2.3 Air Content 3.8.5.1 Slump 3.8.5.3 Compressive Strength 3.8.5.6 Water 2.5

SD-07 Certificates Ready-Mix Plant

05 12 00 SD-02 Shop Drawings Fabrication Drawings 1.6.2 G

SD-03 Product Data Shop Primer 2.5.2 Non-Shrink Grout 2.4.2

SD-07 Certificates Steel 2.2 Bolts, Nuts, and Washers 2.3 AISC Fabrication Plant Quality 1.5 Certification AISC Erector Quality Certification 1.5 Welding Procedures and 1.6.3.1 Qualifications

05 40 00 SD-03 Product Data Studs 2.1 G

05 52 00 SD-02 Shop Drawings Fabrication Drawings G

SD-03 Product Data Glass Guardrail System G Anchorage and Fastening G Systems

06 20 00 SD-02 Shop Drawings

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Detail Drawings Indicating All 1.3 G Wood Assemblies

SD-11 Closeout Submittals VOC Content for Softwood 2.2.4 S Plywood Indoor Air Quality for 2.7.1.2 S Non-Aerosol Adhesives Indoor Air Quality for Aerosol 2.7.1.2 S Adhesives

06 41 16.00 10 SD-02 Shop Drawings Shop Drawings 2.12 G

SD-03 Product Data Wood Materials 2.2 G Finish Schedule G Cabinet Hardware G

SD-04 Samples Plastic Laminates 2.4 G Door Pulls G

SD-11 Closeout Submittals Indoor Air Quality for S Particleboard Indoor Air Quality for Hardwood S Veneer Particleboard

06 61 16 SD-02 Shop Drawings Detail Drawings G

SD-03 Product Data Solid Polymer Material 2.1 G Qualifications 1.4.1

SD-04 Samples

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Material 2.1 G SD-06 Test Reports

Solid Polymer Material 2.1 SD-07 Certificates

Fabrications 2.3 Qualifications 1.4.1

SD-10 Operation and Maintenance Data Clean-up 3.2 G

SD-11 Closeout Submittals Indoor Air Quality for Adhesives G

07 21 16 SD-03 Product Data Blanket Insulation 2.2 G

SD-08 Manufacturer’s Instructions Insulation 3.3.1

SD-11 Closeout Submittals Recycled Content for Insulation 2.1.1 S Materials Reduce Volatile Organic 2.1.2 S Compounds (VOC)

07 24 00 SD-03 Product Data Mechanical Fasteners 2.3 Accessories 2.10 Base Coat 2.5 G Portland Cement 2.6 G Reinforcing Fabric 2.7 G Finish Coat 2.8 G Joint Sealant 2.11 G Sealant Primer 2.9

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Bond Breaker 2.12 Backer Rod 2.13 Insulation Board 1.4.4 G Warranty 1.7 G

SD-04 Samples Sample Boards 1.2.3.7 G Mock-up Installation of EIFS 1.2.1.4 G

SD-05 Design Data Wind Load 1.2.1.2 Moisture Analysis 1.2.4

SD-06 Test Reports Accelerated Weathering 1.2.3.2 Impact Resistance 1.2.2.3 Mildew Resistance 1.2.3.3 Vapor Transmission 1.2.4 Absorption-Freeze-Thaw 1.2.3.6 Wall Fire Test 1.2.1.3 Water Penetration 1.2.1.1 Water Resistance 1.2.3.5 Full Scale or Intermediate Scale 1.2.1.3 Fire Test Surface Burning Characteristics 1.2.2.1 Radiant Heat 1.2.2.2 Substrate 3.1 Wind Load 1.2.1.2

SD-08 Manufacturer’s Instructions Installation 3.3

07 27 10.00 10 SD-03 Product Data Air and Water Barrier System G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Air and Water Barrier System G Accessories

07 42 13 SD-02 Shop Drawings Installation Drawings G

SD-03 Product Data Wall Panels 2.3.1 G Factory Color Finish 2.3.2 G Closure Materials 1.6.4 Pressure Sensitive Tape 2.5.4.4 Sealants and Caulking 2.5.4.1 Repair Paint Accessories 1.6.4 Accessories 2.5

SD-08 Manufacturer’s Instructions Installation 3.3

SD-11 Closeout Submittals Warranty 1.9 G 20 year 'No Dollar Limit' warranty 1.9.1 for labor and material

07 57 13 SD-03 Product Data Spray urethane foam 2.2 G Protective coating 2.3 G

SD-07 Certificates Qualification of Manufacturer 1.4.1 Qualification of Applicator 1.4.2

SD-11 Closeout Submittals Reduced VOC Content for SPF S Insulation

07 60 00 SD-02 Shop Drawings

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Gutters 3.1.12 G Downspouts 3.1.13 G Flashing G

07 84 00 SD-03 Product Data Firestopping Materials 2.2 G

SD-06 Test Reports Inspection 3.3 G

SD-07 Certificates Installer Qualifications 1.5.1

07 92 00 SD-03 Product Data Sealants 2.3 G Compression Seals G Primers 2.4 Bond Breakers 2.5 Backstops 2.6

SD-04 Samples Sealants 2.3 G Compression Seals G

SD-07 Certificates Indoor Air Quality 1.4.1

SD-11 Closeout Submittals Indoor Air Quality For Interior 2.3.1 S Sealants

08 11 13 SD-02 Shop Drawings Doors 2.1 G Doors 2.1 G Frames 2.5 G Frames 2.5 G

SD-03 Product Data

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Doors 2.1 G Frames 2.5 G Accessories 2.3 G Weatherstripping 2.7 G

08 11 16 SD-02 Shop Drawings Door and Frame Assembly 1.5.1 G

SD-03 Product Data Door and Frame Assembly 1.5.1 G

SD-04 Samples Finish Samples G

SD-05 Design Data Calculations 1.2.1 G Design Analysis 1.5.2 G Air Infiltration 1.2.2 G Water Penetration 1.2.3 G Adjustments, Cleaning, and 1.5.3 Maintenance

08 14 00 SD-02 Shop Drawings Doors 2.2 G

SD-03 Product Data Doors 2.2 G Accessories 2.3 G Water-resistant Sealer 2.4.6 G Warranty 1.4 G Fire Resistance Rating 2.2.2 G

SD-04 Samples Door Finish Colors 2.4.5.2 G

SD-06 Test Reports Cycle-Slam 2.5

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Hinge Loading Resistance 2.5 SD-11 Closeout Submittals

Indoor Air Quality for Agrifiber S Door Cores Reduced VOC Content for S Finishes Warranty 1.4 G

08 34 73 SD-02 Shop Drawings Hollow Metal Sound Retardant 2.2 G Doors Wood Sound Retardant Doors 2.2 G Door Frames 2.2 G

SD-03 Product Data Hollow Metal Sound Retardant 2.2 G Doors Wood Sound Retardant Doors 2.2 G Door Frames 2.2 G Door Hardware 2.2 G

Intumescent Seals, Gasketing 1.3.1.2 G and Door Bottoms Thresholds 2.2 G

SD-06 Test Reports Wind Loading Tests 2.5.4 G Water Leakage Tests 2.5.4 G Acoustical Tests 2.5.4 G Air Infiltration Tests 2.5.4 G Positive Pressure Tests 2.5.4 G

SD-07 Certificates Hollow Metal Sound Retardant 2.2 G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Doors Wood Sound Retardant Doors 2.2 G Door Frames 2.2 G Door Hardware 2.2 G

Intumescent Seals, Gasketing 1.3.1.2 G and Door Bottoms Thresholds 2.2 G

SD-11 Closeout Submittals Reduced VOC Content for S Finishes

08 51 13 SD-02 Shop Drawings Windows 2.2 G Fabrication Drawings 1.9

SD-03 Product Data Windows 2.2 G Window Performance 1.10 G Mullions 2.5 G Weatherstripping 2.3.2 G Fasteners 2.3.3 Accessories 2.3.8

SD-04 Samples Finish Samples G

SD-05 Design Data Structural Calculations for G Deflection and Antiterrorism Design Analysis 1.4.2 G

SD-06 Test Reports Air Infiltration G Water Penetration G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Minimum Condensation 1.4.3 G Resistance Factor

SD-11 Closeout Submittals Recycled Content of Aluminum 2.1.1 S Windows

08 71 00 SD-02 Shop Drawings Manufacturer's Detail Drawings 1.3 G Verification of Existing Conditions 1.3 G Hardware Schedule 1.5 G Keying System 2.3.8 G

SD-03 Product Data Hardware Items 2.3 G

SD-08 Manufacturer’s Instructions Installation 3.1

SD-10 Operation and Maintenance Data Hardware Schedule 1.5 G

SD-11 Closeout Submittals Key Bitting 1.6.1

08 81 00 SD-03 Product Data Insulating Glass 1.7.1 G Glazing Accessories 1.4

SD-04 Samples Insulating Glass 1.7.1 G

SD-05 Design Data Structural Calculations For G Deflection and Antiterrorism Design Analysis G

SD-07 Certificates

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Insulating Glass 1.7.1 G SD-08 Manufacturer’s Instructions

Setting and Sealing Materials 2.6 Glass Setting 3.2

09 22 00 SD-03 Product Data Metal Support Systems 2.1 G

09 29 00 SD-03 Product Data Gypsum Board 2.2.1 G Type X Fire-Resistant Gympsum G Board Water-Resistant Gypsum 2.2.2 G Backing Board Shaftwall Liner Panel G

SD-07 Certificates Asbestos Free Materials 2.2 G Indoor Air Quality 1.3.1 S

SD-08 Manufacturer’s Instructions Material Safety Data Sheets 2.2

SD-11 Closeout Submittals Recycled Content for Paper S Facing and Gypsum Cores Indoor Air Quality for Gypsum S Board

VOC Content of Joint Compound 2.2.3 S Indoor Air Quality for Non-aerosol 2.2.5 S

Adhesives 09 30 10 SD-03 Product Data

Porcelain Tile 2.1.1 G Glazed Wall Tile 2.1.2 G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Mortar, Grout and Adhesive 2.3 G SD-04 Samples

Tile 2.1 G Accessories 2.1 G Transition Strips 2.1 G Transition Strips 2.4 G Grout 2.3.2 G

SD-07 Certificates Indoor Air Quality 1.3.1 S

SD-11 Closeout Submittals Recycled Content for Porcelain 2.1.1 S Tile Indoor Air Quality for Adhesives 2.3 S Indoor Air Quality for Sealants 2.3.4 S

09 51 00 SD-03 Product Data Acoustical Ceiling Systems G Wood Acoustical Panel Ceiling G System

SD-04 Samples Acoustic Ceiling Tiles 2.2.1 G

SD-06 Test Reports Ceiling Attenuation Class and Test

SD-07 Certificates Acoustic Ceiling Tiles 2.2.1 S

SD-11 Closeout Submittals Recycled Content S

09 65 00 SD-03 Product Data Resilient Flooring and 2.11 G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Accessories Adhesives 2.7 Vinyl Composition Tile 2.1 G Luxury Vinyl Tile 2.2 G Wall Base 2.3 G Stair Treads and Risers 2.4 G Mouldings G Nosings G

SD-04 Samples Vinyl Composition Tile 2.1 G Luxury Vinyl Tile 2.2 G Wall Base 2.3 G Stair Treads and Risers 2.4 G Mouldings G Nosings G

SD-06 Test Reports Moisture, Alkalinity and Bond 3.3 Tests

SD-07 Certificates Indoor Air Quality S

SD-08 Manufacturer’s Instructions Surface Preparation 3.2 Installation 3.1

SD-10 Operation and Maintenance Data Resilient Flooring and 2.11 G Accessories

SD-11 Closeout Submittals Indoor Air Quality for Resilient S

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Flooring Indoor Air Quality for Adhesives S

09 68 00 SD-03 Product Data Carpet 2.2 G Physical Characteristics 2.2.3 G

SD-04 Samples Carpet 2.2 G

SD-06 Test Reports Moisture and Alkalinity Tests 3.2

SD-07 Certificates Indoor Air Quality 1.3.1 S

SD-08 Manufacturer’s Instructions Surface Preparation 3.1 Installation 3.4

SD-10 Operation and Maintenance Data Carpet 2.2 G Cleaning and Protection 3.5 G

SD-11 Closeout Submittals Recycled Content for Carpeting 2.1.1 S Recycled Content for Carpeting 2.2.1 S Indoor Air Quality for Carpet 2.2.1 S Indoor Air Quality for Adhesives S Warranty 1.6 G

09 69 19 SD-02 Shop Drawings Detailed Installation Drawings 2.4.2 G Fabrication Drawings 2.4.1 G

SD-03 Product Data Stringerless Access Flooring G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

System Rigid Access Flooring System G Panel Support Systems G Accessories G Fascia G Exposed Step and Ramp G Structures Railings G Air Supply Panels G

SD-04 Samples Floor Panels 2.4 G Floor Covering 2.4.4 G

SD-05 Design Data Seismic Calculations 2.3.7

SD-06 Test Reports Factory Tests 2.9 Concentrated Load 2.3.1 Uniform Live Load 2.3.1 Rolling Load 2.3.1 Rolling Load 2.3.1 Impact Load 2.3.1 Ultimate Load Pedestal Axial Load 2.3.4 Bonding Strength of Pedestal 2.3.5 Adhesive Electrical Resistance 3.2.4 Field Tests 3.2

SD-07 Certificates Compliance with ICC-ES AC300 2.3

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Compliance with ICC IBC 2.3 Certificate of Compliance 2.3 Qualification of Manufacturer 1.3.1

SD-10 Operation and Maintenance Data Operation and Maintenance 3.4 G Manuals

SD-11 Closeout Submittals Recycled Content of Access 2.1.1 S Flooring Systems Reduced VOC's for Pedestal 2.1.2 S Adhesive Reduced VOC's for Floor 2.1.3 S Covering Adhesives Lifting Device 2.4.6 G Warranty 1.5 G

09 84 20 SD-02 Shop Drawings Approved Detail Drawings 2.3 G

SD-03 Product Data Acoustical Wall Panels 2.3 G

SD-04 Samples Acoustical Wall Panels 2.3 G

SD-11 Closeout Submittals Recycled Content for Fabric 2.2.1.1 S Panels Indoor Air Quality S Warranty 1.4 G

09 90 00 SD-03 Product Data Coating 2.1 G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Manufacturer's Technical Data 2.1 G Sheets

SD-04 Samples Color 1.9 G

SD-08 Manufacturer’s Instructions Application instructions 3.3.1 Mixing 3.7.2 Manufacturer's Material Safety 1.7.2 Data Sheets

SD-11 Closeout Submittals Reduced VOC's for Paints and S Coatings

10 11 00 SD-03 Product Data Visual Display Board 1.2 G Projection Screen 2.3 G

SD-11 Closeout Submittals Indoor air quality for S markerboards

10 14 00.20 SD-02 Shop Drawings Detail Drawings 1.4.2 G

SD-03 Product Data Installation 3.1 G Warranty 1.6 G

SD-04 Samples Interior Signage 1.4.1 G

SD-10 Operation and Maintenance Data Approved Manufacturer's 3.1 G Instructions

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Protection and Cleaning 3.1.2 G Closeout Submittals Recycled Content for Plastic S Components Indoor Air Quality for Adhesives S

10 21 13 SD-02 Shop Drawings Fabrication Drawings 2.1 G Installation Drawings 3.2

SD-03 Product Data Cleaning and Maintenance 2.1 G Instructions Colors And Finishes 2.7 G Anchoring Devices and 2.2.1 G Fasteners Hardware and Fittings 2.2.3 G Brackets 2.2.2 G Door Hardware 2.2.4 G

SD-04 Samples Colors and Finishes 2.7 G Hardware and Fittings 2.2.3 Anchoring Devices and 2.2.1 Fasteners

SD-07 Certificates Warranty 1.6 G

SD-11 Closeout Submittals Recycled Content for Plastic S Material

10 22 39 SD-01 Preconstruction Submittals Manufacturer's Qualifications 2.1

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Verification of Field 2.1 G Measurements

SD-02 Shop Drawings Layouts 3.1.1 G Fabrication Drawings 2.1 G

SD-03 Product Data Folding Panel Partitions 2.3 G Installation Instructions 2.1

SD-04 Samples Folding Panel Partitions 2.3 G

SD-06 Test Reports Acoustical Test 3.2.3 G Flame and Smoke Development 2.1.2.1 G Tests

SD-10 Operation and Maintenance Data Folding Panel Partitions 2.3 G

SD-11 Closeout Submittals Indoor Air Quality 1.3.1 S Warranty G

10 28 13 SD-03 Product Data Finishes 2.1.2 G Accessory Items 2.2 G

10 44 16 SD-03 Product Data Fire Extinguishers 2.1.1 G Cabinets G Wall Brackets G Replacement Parts List 3.2.1 G

10 51 13 SD-02 Shop Drawings

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Types 2.2 G Location 1.4 G Installation 3.1 G Numbering system 3.2 G

SD-03 Product Data Material 2.3 G Locking Devices 2.4.1 G Handles 2.4.3 G Finish 2.3.3 G components 2.4 G

SD-04 Samples Color chips 1.5.1 G

12 24 13 SD-02 Shop Drawings Window Shades 2.1 G

SD-03 Product Data Window Shades 2.1 G

SD-04 Samples Window Shades 2.1 G

SD-06 Test Reports Window Shades 2.1

SD-08 Manufacturer’s Instructions Window Shades 2.1

SD-10 Operation and Maintenance Data Window Shades 2.1 G

21 13 00.00 40 SD-01 Preconstruction Submittals Record of Existing Conditions 1.2 G

SD-02 Shop Drawings Supporting Elements 2.2.2 G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Fire-Department Connections 2.2.3 G Fire Alarm System 2.2.4.1 G Valves 2.2.4 G

SD-03 Product Data Underground Piping Materials 2.2.1 G Valves 2.2.4 G Materials 2.3 G Supporting Elements 2.2.2 G Equipment and Performance 2.1 G Data

SD-06 Test Reports Pressure Tests 3.3.5 G

21 13 13.00 10 SD-02 Shop Drawings Shop Drawings 1.4.3 G As-Built Drawings 3.9

SD-03 Product Data Fire Protection Related 1.4.1 Submittals Materials and Equipment 2.3 G Spare Parts 1.6 Preliminary Tests 3.8 G Final Acceptance Test 3.9 G Onsite Training 3.10 G Fire Protection Specialist 1.4.1 G Sprinkler System Installer 1.4.2 G

SD-05 Design Data Hydraulic Calculations 1.2.1.3 G

SD-06 Test Reports Preliminary Test Report 3.8

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Final Acceptance Test Report 3.9 SD-07 Certificates

Inspection by Fire Protection 3.3 Specialist

SD-10 Operation and Maintenance Data Operating and Maintenance 3.10 G Manuals

22 00 00 SD-02 Shop Drawings Plumbing System 3.9.1 G

SD-03 Product Data Fixtures 2.5 Flush Valve Water Closets 2.5.3 G Flush Valve Urinals 2.5.4 G Wall Hung Lavatories 2.5.6 G Countertop Lavatories 2.5.7 G Kitchen Sinks 2.5.8 G Drinking-Water Coolers 2.5.9 G Plastic Shower Stalls 2.5.11 G Water Heaters 2.9 G Pumps 2.10 G Backflow Prevention Assemblies 3.9.1.1 G Shower Faucets 2.7.2 G Welding 1.5.1 Vibration-Absorbing Features 3.4 G Plumbing System 3.9.1

SD-06 Test Reports Tests, Flushing and Disinfection 3.9 Test of Backflow Prevention 3.9.1.1 G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Assemblies SD-07 Certificates

Materials and Equipment 1.3 Bolts 2.2.1

SD-10 Operation and Maintenance Data Plumbing System 3.9.1 G

SD-11 Closeout Submittals Water-Efficient Products 2.1.1 S Energy-Efficient Water Heaters 2.1.2 S

23 00 00 SD-02 Shop Drawings Detail Drawings 1.4.5 G

SD-03 Product Data Metallic Flexible Duct 2.10.1.1 Insulated Nonmetallic Flexible 2.10.1.2 Duct Runouts Duct Connectors 2.10.1.2 Duct Access Doors 2.10.2 G Fire Dampers 2.10.3 G Manual Balancing Dampers 2.10.4 G Manual Balancing Dampers 2.10.5 G Automatic Smoke-Fire Dampers 2.10.7 G Automatic Smoke Dampers 2.10.8 G Sound Attenuation Equipment 2.10.11 G Acoustical Duct Liner 2.10.11.3 G Diffusers 2.10.12.1 G Registers and Grilles 2.10.12.3 G Air Vents, Penthouses, 2.10.13 G Louvers,and Goosenecks

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Centrifugal Fans 2.11.1.1 G In-Line Centrifugal Fans 2.11.1.2 G Centrifugal Type Power Wall 2.11.1.3 G Ventilators Ceiling Exhaust Fans 2.11.1.4 G Air Handling Units 2.12 G Constant Volume, Single Duct 2.13.1.1 G Terminal Units Variable Volume, Single Duct 2.13.1.2 G Terminal Units Reheat Units 2.13.1.3 G Energy Recovery Devices 2.14 G Test Procedures 1.4.6 Diagrams 1.2.1.2 G

SD-06 Test Reports Performance Tests 3.14 G Damper Acceptance Test 3.12 G

SD-07 Certificates Certification 1.4.7 Ozone Depleting Substances 1.4.3

SD-08 Manufacturer’s Instructions Manufacturer's Installation 3.3 Instructions Operation and Maintenance 3.16.2 Training

SD-10 Operation and Maintenance Data Operation and Maintenance 3.16.1 G Manuals

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Fire Dampers 2.10.3 G Manual Balancing Dampers 2.10.4 G Manual Balancing Dampers 2.10.5 G Automatic Smoke-Fire Dampers 2.10.7 G Automatic Smoke Dampers 2.10.8 G Centrifugal Fans 2.11.1.1 G In-Line Centrifugal Fans 2.11.1.2 G Centrifugal Type Power Wall 2.11.1.3 G Ventilators Ceiling Exhaust Fans 2.11.1.4 G Air Handling Units 2.12 G Constant Volume, Single Duct 2.13.1.1 G Terminal Units Variable Volume, Single Duct 2.13.1.2 G Terminal Units Reheat Units 2.13.1.3 G Energy Recovery Devices 2.14 G

SD-11 Closeout Submittals Energy Efficient Equipment 2.1.1 S Reduce Volatile Organic 2.1.2 S Compounds (VOC) Indoor Air Quality During 3.1 S Construction Ozone Depleting Substances 2.1.3 S for Refrigerants

23 03 00.00 20 SD-11 Closeout Submittals Energy Efficient Equipment for 2.1.1 S Motors Reduce Volatile Organic 2.1.2 S

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Compounds (VOC) 23 05 93 SD-01 Preconstruction Submittals

Records of Existing Conditions 1.3.3 G Records of Existing Conditions 1.3.3 G Independent TAB Agency and 1.5.1 G Personnel Qualifications TAB Design Review Report 1.5.4.1 G TAB Design Review Report 1.6.1.1 G TAB Firm 1.5.8.1 G TAB Team Assistants 1.2 G TAB Team Engineer 1.2 G TAB Specialist 1.5.8.2 G TAB Team Field Leader 1.2 G

SD-02 Shop Drawings TAB Schematic Drawings and 1.3.3 G Report Forms

SD-03 Product Data Equipment and Performance 1.3 G Data TAB Related HVAC Submittals 1.5.1.3 G TAB Related HVAC Submittals 1.5.8.4 G TAB Procedures 1.5.6 G Calibration 1.5.6 G Systems Readiness Check 1.3.3 G TAB Execution 1.5.9 G TAB Verification 1.5.9.3 G

SD-06 Test Reports Completed Pre-Final DALT 3.3.5 G Report

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Certified Final DALT Report 3.3.8 G Prerequisite HVAC Work 1.5.4.2 G Checkout List Prerequisite HVAC Work 1.5.4.2 G Checkout List Prerequisite HVAC Work 1.5.4.2 G Checkout List Proportional Balancing 3.4.6.1 G Proportional Balancing 3.7 G Season 1 3.4.6.2 G Season 1 3.7 G Season 2 3.4.6.2 G Season 2 3.7 G TAB Design Review Report 1.5.4.1 G TAB Design Review Report 1.6.1.1 G TAB Report for Season 1 1.5.10.2 G TAB Report for Season 2 1.5.10.2 G

SD-07 Certificates Independent TAB Agency and 1.5.1 G Personnel Qualifications DALT and TAB Submittal and 1.5.4.1 G Work Schedule DALT and TAB Submittal and 1.6.1 G Work Schedule TAB Pre-Field Engineering 1.5.4.2 G Report TAB Pre-Field Engineering 1.6.1.3 G Report Instrument Calibration 1.5.5 G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Certificates DALT and TAB Procedures 3.7 G Summary Completed Pre-Final DALT Work 3.7 G Checklist Advance Notice of Pre-Final 3.3.2 G DALT Field Work Proportional Balancing 3.4.6.1 G Proportional Balancing 3.7 G Season 1 3.4.6.2 G Season 1 3.7 G Season 2 3.4.6.2 G Season 2 3.7 G TAB Firm 1.5.8.1 G Design Review Report 1.3.3 G Pre-field DALT Preliminary 1.6.1.2 G Notification Advanced Notice for Season 1 1.6.1 G TAB Field Work Prerequisite HVAC Work Check 1.6.1 G Out List For Season 1 Advanced Notice for Season 2 1.6.1 G TAB Field Work Prerequisite HVAC Work Check 1.6.1 G Out List For Season 2

23 07 00 SD-02 Shop Drawings MICA Plates 3.2.2.4 G Pipe Insulation Systems 2.4 Pipe Insulation Systems 3.2

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Duct Insulation Systems 3.3 Equipment Insulation Systems 3.4

SD-03 Product Data Pipe Insulation Systems 2.4 G Pipe Insulation Systems 3.2 G Duct Insulation Systems 3.3 G Equipment Insulation Systems 3.4 G

SD-04 Samples Thermal Insulation 2.3.1.3 G Display Samples 3.1.1 G

SD-08 Manufacturer’s Instructions Pipe Insulation Systems 2.4 G Pipe Insulation Systems 3.2 G Duct Insulation Systems 3.3 G Equipment Insulation Systems 3.4 G

SD-11 Closeout Submittals Reduce Volatile Organic 2.1.1 S Compounds (VOC) Recycled Content 2.1.2 S

23 09 00 SD-02 Shop Drawings DDC Contractor Design Drawings 3.2 G Draft As-Built Drawings 3.2 G Final As-Built Drawings 3.2 G

SD-03 Product Data Programming Software 1.8.3 G Controller Application Programs 1.8.4 G Configuration Software 1.8.1 G Controller Configuration Settings 1.8.2 G Manufacturer's Product Data 2.2 G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Niagara Framework Supervisory 1.8.5 G Gateway Backups Niagara Framework Engineering 1.8.6 G Tool

SD-06 Test Reports Start-Up Testing Report 3.4.2 G PVT Procedures 3.5.1 G PVT Report 3.5.3 G Pre-Construction Quality Control 1.9.1 G (QC) Checklist Post-Construction Quality Control 1.9.2 G (QC) Checklist

SD-10 Operation and Maintenance Data Operation and Maintenance 3.6 G (O&M) Instructions Training Documentation 3.8.1 G

SD-11 Closeout Submittals Enclosure Keys 2.5 G Password Summary Report 3.1.6.1 G Closeout Quality Control (QC) 1.9.3 G Checklist

23 11 25 SD-02 Shop Drawings Gas Piping System 1.5.3 G Gas Piping System 2.2 G Gas Piping System 3.3 G

SD-03 Product Data Pipe and Fittings 1.6.1 G Gas Equipment Connectors 1.5.3 G

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Gas Piping System 1.5.3 G Gas Piping System 2.2 G Gas Piping System 3.3 G Pipe Coating Materials 2.1 G Pressure Regulators 2.6 G Risers 2.4 G Transition Fittings 2.2.9 G Valves 2.3 G Warning and Identification Tape 2.2.5 G

SD-06 Test Reports Testing 3.19 G Pressure Tests 3.19.1 G Test with Gas 3.19.2 G

SD-07 Certificates Welders Procedures and 1.5.1 G Qualifications Assigned Number, Letter, or 1.5.1 G Symbol

SD-08 Manufacturer’s Instructions PE Pipe and Fittings 1.5.2 G Pipe Coating Materials 2.1 G

SD-10 Operation and Maintenance Data Gas Facility System and 1.3.1 G Equipment Operation Gas Facility System Maintenance 1.3.2 G Gas Facility Equipment 1.3.3 G Maintenance

23 21 13.00 20 SD-02 Shop Drawings

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

Hot water heating system 1.3.1 SD-03 Product Data

Pumps 2.3.1 Expansion tanks 2.3.2 Flow measuring equipment 2.3.5 Backflow preventers 2.3.4 External air separation tanks 2.3.3 Hot water heating pipe 2.1.1

SD-06 Test Reports Hydrostatic test of piping system 3.3.1 Auxiliary equipment and 3.3.2 accessory tests

SD-07 Certificates Backflow preventer certification 1.5.4 Report of prior installations 1.5.2.1 Welding procedures 1.5.2.2 Welder's qualifications 1.5.2.3

23 23 00 SD-02 Shop Drawings Refrigerant Piping System 2.3 G

SD-03 Product Data Refrigerant Piping System 2.3 Spare Parts 1.5.2 Qualifications 1.3.1 Refrigerant Piping Tests 3.5 Verification of Dimensions 3.1

SD-06 Test Reports Refrigerant Piping Tests 3.5

SD-07 Certificates Service Organization 2.1

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

SD-10 Operation and Maintenance Data Maintenance 1.5 G Operation and Maintenance 3.4 G Manuals Demonstrations 3.4 G

23 52 43.00 20 SD-02 Shop Drawings Fuel Train 1.3.2.2 Wiring Diagram 1.3.2.2

SD-03 Product Data Boilers 2.2 Boiler Trim and Control 2.4 Equipment Burners and Control Equipment 2.3 Stack, Breeching, and Supports 2.4.16

SD-06 Test Reports Operational Tests 3.4.1 Water Analysis 1.3.3

SD-07 Certificates Boilers 2.2 Burners and Control Equipment 2.3 Boiler Trim and Control 2.4 Equipment

SD-08 Manufacturer’s Instructions Boilers 2.2 Feedwater Treatment Feeder 2.4.6

SD-10 Operation and Maintenance Data Boilers 2.2

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

SD-11 Closeout Submittals Energy Efficient Equipment for 2.1.1 S Boilers boilers 2.2

23 64 26 SD-03 Product Data Grooved Mechanical 2.2.2.4 G Connections For Steel Grooved Mechanical 2.3.3 G Connections For Copper Calibrated Balancing Valves 2.4.6 G Automatic Flow Control Valves 2.4.7 G Water Pressure Reducing Valve 2.4.8 Pressure Relief Valve 2.4.9 Combination Pressure and 2.4.10 Temperature Relief Valves Pumps 2.6 G Combination Strainer and Pump 2.5.3 Suction Diffuser Expansion Tanks 2.7 Air Separator Tanks 2.8 Water Treatment Systems 2.9 G

SD-06 Test Reports Piping Welds NDE Report 3.1.1.3 Pressure Tests Reports 3.4.2 G

SD-07 Certificates Employer's Record Documents 3.1.1.1 (For Welding) Welding Procedures and 3.1.1.2 Qualifications

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACTOR

ACTION APPROVING AUTHORITY

TITLE AND LOCATION CONTRACTOR

CONTRACT NO.SUBMITTAL REGISTER

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

JFSD201801 Add/Repair B541 Global Hawk GSMP-Grand Forks AFB, ND

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

R A G R A

L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR:

SCHEDULE DATES

SD-08 Manufacturer’s Instructions Lesson plan for the Instruction 3.5 G Course

SD-10 Operation and Maintenance Data Water Treatment Systems 2.9 G Calibrated Balancing Valves 2.4.6 G Automatic Flow Control Valves 2.4.7 G Water Pressure Reducing Valve 2.4.8 G Pressure Relief Valve 2.4.9 G Combination Pressure and 2.4.10 G Temperature Relief Valves Pumps 2.6 G Combination Strainer and Pump 2.5.3 G Suction Diffuser Expansion Tanks 2.7 G Air Separator Tanks 2.8 G

23 81 00.00 20 SD-02 Shop Drawings Field-Assembled Refrigerant 2.5.2 Piping Control System Wiring Diagrams 1.4.2

SD-03 Product Data Air Conditioners 2.2 Filters 2.3 Thermostats 2.2.10 Refrigerant 1.5 Refrigerant Piping and 2.5 Accessories

SD-06 Test Reports

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE OF

ACTION

DATE

FWD TO

APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.