01_JFSD_0541_G-001COVR_-_Rev_26Jun18.pdf
PDF 1011 KB Posted
- Attached to
- GFAFB Add/Repair Squadron Operations GSMP B541 Federal contract opportunity
- Solicitation number
- FA4659-18-R-0005
About this file
Drawing G-001 Rev 26 June 2018
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JFSD201801GRAND FORKS AFB, NORTH DAKOTA
10 MAY 2018
GENERAL NOTES
ISSUED FOR BID / CONSTRUCTION
ADD/REPAIR SQ OPS B541 FOR GLOBAL HAWK GSMP
1. CONTRACTOR SHALL PROTECT EXISTING BUILDING AND SITE
MATERIALS SCHEDULED TO REMAIN, AND SHALL BE RESPONSIBLE
FOR DAMAGE TO SAME RESULTING FROM WORK UNDER THIS
CONTRACT. CONTRACTOR SHALL RESTORE DAMAGED EXISTING
BUILDING AND SITE MATERIALS TO THEIR ORIGINAL CONDITION.
CONTRACTOR SHALL REMOVE ALL CONSTRUCTION - RELATED
MATERIALS AND DEBRIS FROM ALL BUILDING AND SITE AREAS.
2. CONTRACTOR SHALL EXERCISE CAUTION TO AVOID ANY DAMAGE
WHEN PERFORMING EARTHWORK, PAVING, OR ANY
CONSTRUCTION IN VICINITY OF EXISTING UTILITIES, BUILDINGS,
AND LANDSCAPING. WHEN NEAR EXPECTED UTILITY LINE
LOCATIONS, HAND-DIG OR HYDRO-EXCAVATE TO LOCATE UTILITIES
PRIOR TO MACHINE DIGGING.
3. CONTRACTOR SHALL INSPECT SITE AND FIELD VERIFY ALL
DIMENSIONS AND CONDITIONS PRIOR TO COMMENCING
CONSTRUCTION. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF
ANY DISCREPANCIES.
4. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, AND SHALL
BE RESPONSIBLE FOR SAME. COORDINATE ALL WORK AND SHOP
DRAWINGS WITH ALL TRADES.
5. CONTRACTOR SHALL COORDINATE ON-SITE STORAGE OF BUILDING
MATERIALS, EQUIPMENT, AND TRASH CONTAINERS WITH
GOVERNMENT CONSTRUCTION REPRESENTATIVE PRIOR TO
COMMENCEMENT OF WORK. SEE SPEC SECTION 01000 FOR
ADDITIONAL REQUIREMENTS, INCLUDING REQUIRED TEMPORARY
FACILITIES PLAN.
6. ALL WORK SHALL COMPLY WITH APPLICABLE CODES,
REGULATIONS, AND ORDINANCES.
7. ALL MATERIALS AND EQUIPMENT OF THE SAME TYPE SHALL BE
SUPPLIED BY THE SAME MANUFACTURER, AND SHALL BE NEW, OF
THE BEST QUALITY AND DESIGN, AND FREE FROM DEFECTS.
8. ALL ITEMS ARE NEW UNLESS SPECIFICALLY IDENTIFIED AS
EXISTING.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL
WORK. CONTRACTOR SHALL ANTICIPATE AREAS WHERE THE
INSTALLATION OF THE WORK WILL BE RESTRICTED, CONGESTED,
OR DIFFICULT TO INSTALL, AND SHALL COORDINATE INSTALLATION
BETWEEN THE TRADES.
10. CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND
ELECTRICAL ITEMS WITH THE GENERAL CONSTRUCTION.
11. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL
NECESSARY UTILITY OUTAGES WITH GOVERNMENT
CONSTRUCTION REPRESENTATIVE PRIOR TO PROCEEDING WITH
SUCH WORK TO INSURE THAT OPERATIONS IN ADJACENT
OCCUPIED BUILDINGS/AREAS ARE NOT INTERRUPTED OR
RESTRICTED WITHOUT PRIOR APPROVAL.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR WEATHER TIGHTNESS
OF EXISTING BUILDING AT ALL TIMES DURING CONSTRUCTION.
CONTRACTOR SHALL INCLUDE ALL NECESSARY PROVISIONS TO
ACCOMPLISH THIS, INCLUDING, BUT NOT LIMITED TO, SEALING OF
ALL ROOF AND WALL PENETRATIONS AT END OF EACH WORKING
DAY.
13. AT ALL EXISTING GWB TO REMAIN EXPOSED, FILL ALL HOLES,
GOUGES, ETC. AND FINISH TO MATCH EXISTING ADJACENT GWB.
14. THE CONTRACTOR SHALL PERFORM ALL TESTING AND
INSPECTIONS AS SPECIFIED, OR AS NECESSARY TO DEMONSTRATE
A COMPLETE AND SATISFACTORY INSTALLATION.
15. ALL BUILDING DIMENSIONS ARE TO FACE OF GWB, OUTSIDE FACE
OF WALL AND EXTERIOR WINDOW OR DOOR ROUGH OPENING.
16. ALL ELEVATIONS INDICATED ON THE DRAWINGS ARE BASED ON A
FIRST FLOOR DATUM OF +100'-0”. WHERE ITEMS ARE LABELED
A.F.F. (ABOVE FINISHED FLOOR), CONTRACTOR SHALL SET THE
ITEM AS MEASURED FROM THE LOCAL FLOOR ELEVATION.
COORDINATE ANY DISCREPANCIES REGARDING THIS SITUATION TO
ASSURE THAT ALL BUILDING COMPONENTS ARE PROPERLY SET TO
FUNCTION AS INTENDED. CONTRACTOR SHALL ERECT ALL
PARTITIONS IN A VERTICAL PLANE, NOT NECESSARILY
PERPENDICULAR TO THE FLOOR.
17. INSTALL BLOCKING WITHIN PARTITIONS AS REQUIRED FOR
INSTALLATION OF WALL-MOUNTED CABINETS, MONITORS, TOILET
ACCESSORIES, WALL STOPS, AND MISCELLANEOUS ITEMS.
18. ALL CEILING GRID SHALL BE CENTERED WITHIN THE ROOM OR
CORRIDOR IN WHICH IT OCCURS, UNLESS SHOWN OTHERWISE.
19. ALL CHANGES IN FLOOR MATERIALS OCCUR AT THE FOLLOWING
LOCATIONS, UNLESS NOTED OTHERWISE: 1) AT THE CENTER LINE
OF DOORS IN THE CLOSED POSITION, OR; 2) AT THE CENTER LINE
OF OPENINGS SEPARATING ROOMS.
20. ALL GYPSUM BOARD IS 5/8” THICK, UNLESS NOTED OTHERWISE.
21. ALL METAL STUDS ARE 3-5/8” WIDE, UNLESS NOTED OTHERWISE.
22. IN SOME INSTANCES, THERMAL AND SOUND INSULATION HAS BEEN
OMITTED FROM DETAILS FOR CLARITY. SEE SPECIFICATIONS,
PARTITION TYPES, AND WALL SECTIONS FOR LOCATIONS
REQUIRING INSULATION.
23. EXISTING UTILITY LOCATIONS SHOWN ARE BASED ON A REVIEW OF
GOVERNMENT-PROVIDED DRAWINGS, WHICH SHALL BE VERIFIED
BY THE CONTRACTOR.
24. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH
THE SECURE SPACES CONSTRUCTION SECURITY PLAN.
CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH
THE GFAFB SITE SECURITY MANAGER AND SHALL COMPLY WITH
SPEC. SECTION 01 14 00, WORK RESTRICTIONS.
25. ALL TV'S/MONITORS ARE FURNISHED AND INSTALLED BY OTHERS
(N.I.C.).
ASBESTOS AWARENESS
THERE IS NO KNOWN ASBESTOS IN WORK AREAS ASSOCIATED WITH THIS
PROJECT. IF, DURING REMOVAL WORK, THE CONTRACTOR DISCOVERS ANY
MATERIAL WHICH HE SUSPECTS MAY CONTAIN ASBESTOS, HE SHALL
IMMEDIATELY NOTIFY THE GOVERNMENT CONSTRUCTION REPRESENTATIVE
AND CEASE WORK IN CLOSE PROXIMITY TO THE SUSPECTED
ASBESTOS-CONTAINING MATERIALS. THE GOVERNMENT CONSTRUCTION
REPRESENTATIVE WILL THEN COORDINATE WITH THE CONTRACTOR TO
ARRANGE FOR THE TESTING AND REMOVAL OF ANY ASBESTOS MATERIALS, IF
NECESSARY, BY THE CONTRACTOR THROUGH A COST MODIFICATION TO THE
CONSTRUCTION CONTRACT.
LEAD-BASED PAINT AWARENESS
TESTING HAS NOT BEEN PERFORMED ON PAINTED SURFACES IN THE PROJECT
AREA FOR LEAD CONTENT.
THE CONTRACTOR, AT HIS DISCRETION, MAY EMPLOY CHEMICAL SPOT-TESTING
OR OTHER MEANS TO IDENTIFY LEAD COATINGS WHERE MANUAL DEMOLITION IS
DESIRABLE, OR PRIOR TO ANY EMPLOYEE TASK THAT MIGHT SUBJECT
WORKERS TO LEAD HAZARDS. COMPLY WITH OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION (OSHA) 29 CFR 1926.62. THIS REGULATION REQUIRES
THE CONTRACTOR TO DEVELOP WORK STRATEGIES THAT MINIMIZE EXPOSURE
TO LEAD HAZARDS.
ALL COSTS ASSOCIATED WITH LEAD PAINT TESTING, REMOVAL AND
PRECAUTIONS (IF REQUIRED) ARE THE RESPONSIBILITY OF THE CONTRACTOR.
MAIN GATE
ACCESS
CONTRACTOR'S
1599 J St.
HOSPITAL
TO GRAND
FORKS, ND
PROJECT
LOCATION
N S
W
E
SOUTH
GATE
MINOT
BISMARCK
W E
S
N
WILLISTON
FORKS
JAMESTOWN
AFB
GRAND
FORKS
FARGO
GRAND
G-001
C O
V E
R
S
H E
E T
J F
S D
G
C
O V
R D
W G
J F
S D
G
C O
V R
H ST.
T U
S K
E G
E E
A I R
M E
N
B
L V
D
EIELSON STREET
U S
H
I G
H W
A Y
25TH ST NE
T
H
A V
E
T
H
A
V E
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
E D
F
O R
B
I D
C
O N
S T
R U
C T
I O
N
SHEET # SHEET TITLE
GENERAL:
1. G-001 COVER SHEET
2. G-002 ABBREVIATIONS
3. G-003 LEGENDS
4. G-004 FIRST AND SECOND FLOOR EGRESS PLANS
5. G-005 FIRST AND SECOND FLOOR OCCUPANCY PLANS
6. G-006 FIRST AND SECOND FLOOR FIRE PROTECTION PLANS
7. G-007 FIRST AND SECOND SPECIAL WALL/CEILING PLANS
8. G-008 CODE ANALYSIS
CIVIL AND LANDSCAPE:
9. V-101 TOPOGRAPHIC SURVEY
10. CU101 EXISTING SITE UTILITIES PLAN
11. CD101 SITE DEMOLITION PLAN
12. CD401 ENLARGED SITE DEMOLITION PLAN
13. C-101 SITE PLAN
14. C-401 ENLARGED SITE PLAN
15. C-501 SITE DETAILS
ARCHITECTURAL:
16. AD101 FIRST FLOOR DEMOLITION PLAN
17. AD102 SECOND FLOOR AND CLERESTORY DEMOLITION PLANS
18. AD110 ROOF DEMOLITION PLAN
19. A-101 FIRST FLOOR PLAN
20. A-102 SECOND FLOOR AND CLERESTORY PLANS
21. A-103 FIRST AND SECOND FLOOR RAISED ACCESS FLOORING PLAN
- HEIGHTS
22. A-104 FIRST AND SECOND FLOOR RAISED ACCESS FLOORING PLAN
- TYPES
23. A-110 ROOF PLAN
24. A-201 EXTERIOR ELEVATIONS
25. A-202 EXTERIOR ELEVATION FINISHES
26. A-401 WALL TYPES
27. A-402 ENLARGED FLOOR PLANS
28. A-403 INTERIOR ELEVATIONS
29. A-404 CASEWORK SECTIONS AND DETAILS
30. A-501 BUILDING SECTIONS
31. A-502 WALL SECTIONS
32. A-503 RAMP AND STAIR SECTIONS AND RAISED ACCESS FLOORING
DETAILS
33. A-504 LOADING DOCK DETAILS
34. A-601 ROOM FINISH SCHEDULE
35. A-602 DOOR AND FRAME SCHEDULE
36. A-701 HOLLOW METAL FRAME DETAILS
37. A-702 WINDOW FRAME DETAILS
38. A-801 FIRST FLOOR REFLECTED CEILING PLAN
39. A-802 SECOND FLOOR REFLECTED CEILING PLAN
40. A-810 REFLECTED CEILING DETAILS
41. A-811 REFLECTED CEILING DETAILS
42. AF101 FIRST FLOOR FINISHES PLAN
43. AF102 SECOND FLOOR FINISHES PLAN
44. AG100 FIRST AND SECOND FLOOR SIGNAGE PLANS
45. AG101 SIGNAGE TYPES AND MOUNTING DETAILS
46. AI101 FIRST FLOOR FURNITURE PLAN
47. AI102 SECOND FLOOR FURNITURE PLAN
STRUCTURAL
48. S-100 STRUCTURAL GENERAL NOTES
49. S-101 FOUNDATION PLAN
50. S-102 FLOOR FRAMING PLAN AND LOW ROOF FRAMING PLAN
51. S-103 HIGH ROOF FRAMING PLAN
52. S-201 ELEVATIONS
53. S-501 FOUNDATION DETAILS
54. S-502 FRAMING DETAILS
FIRE PROTECTION
55. FG101 FIRE SUPPRESSION SYMBOLS LEGEND AND GENERAL NOTES
56. FG102 FIRE ALARM SYMBOLS LEGEND AND GENERAL NOTES
57. FD101 FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN
58. FD102 SECOND FLOOR AND CLERESTORY FIRE PROTECTION
DEMOLITION PLANS
59. FX101 FIRST FLOOR FIRE SUPPRESSION PLAN
60. FX102 SECOND FLOOR AND CLERESTORY FIRE SUPPRESSION
PLANS
61. FX201 FIRE SUPPRESSION DETAILS
62. FA101 FIRST FLOOR FIRE ALARM PLAN
63. FA102 SECOND FLOOR AND CLERESTORY FIRE ALARM PLANS
64. FA301 FIRST FLOOR FIRE ALARM RISER DIAGRAM
65. FA302 SECOND FLOOR FIRE ALARM RISER DIAGRAM
PLUMBING
66. PG101 PLUMBING SYMBOLS LEGEND AND GENERAL NOTES
67. PS101 PLUMBING SITE DEMOLITION PLAN
68. PS102 PLUMBING SITE PLAN
69. PD100 FIRST FLOOR UNDERFLOOR PLUMBING DEMOLITION PLAN
70. PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN
71. PD102 SECOND FLOOR PLUMBING DEMOLITION PLAN
72. PD110 ROOF PLUMBING DEMOLITION PLAN
73. PD201 ENLARGED PLUMBING DEMOLITION PLAN
74. PL100 FIRST FLOOR UNDERFLOOR PLUMBING PLAN
75. PL101 FIRST FLOOR PLUMBING PLAN
76. PL102 SECOND FLOOR PLUMBING PLAN
77. PL110 ROOF PLUMBING PLAN
78. P-201 ENLARGED MECHANICAL 131 PLUMBING PLANS
79. P-202 ENLARGED PLUMBING PLANS
80. P-203 ENLARGED PLUMBING PLAN
81. P-301 PLUMBING RISER DIAGRAMS
82. P-302 PLUMBING RISER DIAGRAMS
83. P-401 PLUMBING DETAILS
84. P-402 PLUMBING DETAILS
85. P-501 PLUMBING FIXTURE AND EQUIPMENT SCHEDULES
MECHANICAL:
86. MG101 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES
87. MS101 MECHANICAL SITE DEMOLITION PLAN
88. MS102 MECHANICAL SITE PLAN
89. MD101 FIRST FLOOR HVAC DEMOLITION PLAN
90. MD102 SECOND FLOOR HVAC DEMOLITION PLAN
91. MD201 FIRST FLOOR HVAC PIPING DEMOLITION PLAN
92. MD202 SECOND FLOOR HVAC PIPING DEMOLITION PLAN
93. MD301 ENLARGED MECHANICAL DEMOLITION PLANS
94. MH101 FIRST FLOOR HVAC PLAN
95. MH102 SECOND FLOOR HVAC PLAN
96. MH103 RAISED FLOOR HVAC PLANS
97. MP101 FIRST FLOOR HVAC PIPING PLAN
98. MP102 SECOND FLOOR HVAC PIPING PLAN
99. M-301 ENLARGED MECHANICAL PLANS
100. M-302 ENLARGED MECHANICAL PLANS
101. M-303 MECHANICAL SECTIONS
102. M-401 MECHANICAL CONTROLS
103. M-402 MECHANICAL CONTROLS
104. M-403 MECHANICAL CONTROLS
105. M-404 MECHANICAL CONTROLS
106. M-501 MECHANICAL DETAILS
107. M-502 MECHANICAL DETAILS
108. M-503 MECHANICAL DETAILS
109. M-504 MECHANICAL DETAILS
110. M-601 MECHANICAL SCHEDULES
111. M-602 MECHANICAL SCHEDULES
112. M-603 MECHANICAL SCHEDULES
113. M-701 MECHANICAL AIRFLOW DIAGRAMS
ELECTRICAL:
114. EG101 ELECTRICAL SYMBOLS LEGEND AND GENERAL NOTES
115. ES101 ELECTRICAL SITE DEMOLITION PLAN
116. ES102 ELECTRICAL SITE PLAN
117. ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
118. ED102 SECOND FLOOR AND CLERESTORY ELECTRICAL DEMOLITION
PLANS
119. ED110 ROOF ELECTRICAL DEMOLITION PLAN
120. EL101 FIRST FLOOR LIGHTING PLAN
121. EL102 SECOND FLOOR LIGHTING PLAN
122. EL103 FIRST FLOOR BLUE BEACON LIGHTING PLAN
123. EL104 SECOND FLOOR BLUE BEACON LIGHTING PLAN
124. EL201 LIGHTING CONTROLS STATION DETAILS
125. EL202 LIGHTING CONTROLS SCHEDULES AND NOTES
126. EP101 FIRST FLOOR POWER PLAN
127. EP102 SECOND FLOOR POWER PLAN
128. EP110 ROOF LIGHTNING PROTECTION SYSTEM PLAN
129. EP201 FIRST FLOOR RAISED FLOOR GROUNDING SYSTEM PLAN
130. EP202 SECOND FLOOR RAISED FLOOR GROUNDING SYSTEM PLAN
131. EP301 FIRST FLOOR MECHANICAL EQUIPMENT POWER PLAN
132. EP302 SECOND FLOOR MECHANICAL EQUIPMENT POWER PLAN
133. EP401 ENLARGED FIRST FLOOR POWER PLAN - NORTH
134. EP402 ENLARGED FIRST FLOOR POWER PLAN - SOUTH
135. EP403 ENLARGED SECOND FLOOR POWER PLAN - NORTH
136. EP404 ENLARGED SECOND FLOOR POWER PLAN - SOUTH
137. EY101 FIRST FLOOR SPECIAL SYSTEMS AND PUBLIC ADDRESS PLAN
138. EY102 SECOND FLOOR SPECIAL SYSTEMS AND PUBLIC ADDRESS
PLAN
139. EY201 FIRST FLOOR UNDER FLOOR SPECIAL SYSTEMS PLAN
140. EY202 SECOND FLOOR UNDER FLOOR SPECIAL SYSTEMS PLAN
141. EY301 FIRST FLOOR SECURITY SYSTEMS PLAN
142. EY302 SECOND FLOOR SECURITY SYSTEMS PLAN
143. EY501 ENLARGED FIRST FLOOR SPECIAL SYSTEMS PLAN - NORTH
144. EY502 ENLARGED FIRST FLOOR SPECIAL SYSTEMS PLAN - SOUTH
145. EY503 ENLARGED SECOND FLOOR SPECIAL SYSTEMS PLAN - NORTH
146. EY504 ENLARGED SECOND FLOOR SPECIAL SYSTEMS PLAN - SOUTH
147. E-401 BATTERY/UPS ONE-LINE DIAGRAM
148. E-402 ELECTRICAL ONE-LINE DIAGRAMS
149. E-501 ELECTRICAL DETAILS
150. E-502 ELECTRICAL DETAILS
151. E-503 ELECTRICAL DETAILS
152. E-504 ELECTRICAL DETAILS
153. E-505 ELECTRICAL DETAILS
154. E-506 ELECTRICAL DETAILS
155. E-601 ELECTRICAL SCHEDULES
156. E-602 ELECTRICAL SCHEDULES
157. E-603 ELECTRICAL SCHEDULES
158. E-604 ELECTRICAL SCHEDULES
159. E-605 ELECTRICAL SCHEDULES
160. E-606 ELECTRICAL SCHEDULES
161. E-607 ELECTRICAL SCHEDULES
162. E-608 ELECTRICAL SCHEDULES
163. E-609 ELECTRICAL SCHEDULES
SCHEDULE OF DRAWINGS
NOT TO SCALE
STATE OF NORTH DAKOTA - VICINITY MAP
NOT TO SCALE
PROJECT LOCATION MAP
1 N
COST BREAK-OUT NOTE
1. ALL WORK REGARDING THE GENERATOR AND
GENERATOR PAD SHALL BE UNDER MINOR
CONSTRUCTION AS OUTLINED IN THE BIDDING
DOCUMENTS IN THE PROJECT MANUAL.
03/01/2018
GERALD J. HAHN, AIA
KENNETH HAHN ARCHITECTS, INC.
ARCHITECT
NO
TE
6.2 6.1
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text M
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text A-2169
AutoCAD SHX Text
HAHN
AutoCAD SHX Text
GERALD J.
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text K
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
| Sheets and Views |
| 01_JFSD_0541_G-001COVR |
File details come from the government source that posted it.