Attachment_2a,_Schedule_of_Drawings.pdf

PDF 9 MB Posted

Attached to
GFAFB Add/Repair Squadron Operations GSMP B541 Federal contract opportunity
Solicitation number
FA4659-18-R-0005
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 2, Schedule of Drawings

View the file

Other files for this federal contract opportunity

Other files attached to GFAFB Add/Repair Squadron Operations GSMP B541, newest first.
File Type Posted
19_JFSD_0541_A-101_-_Rev_26Jun18.pdf PDF
20_JFSD_0541_A-102_-_Rev_26Jun18.pdf PDF
155_JFSD_0541_E-601_-_Rev_27Jun18.pdf PDF
FA465918R00050003.pdf PDF
01_JFSD_0541_G-001COVR_-_Rev_26Jun18.pdf PDF
Amend_003_Questions_28Jun18.pdf PDF
134_JFSD_0541_EP402_-_Rev_26Jun18.pdf PDF
135_JFSD_0541_EP403_-_Rev_26Jun18.pdf PDF
27_10_00_Rev_29Jun18.pdf PDF
05_50_13_-_Rev_19Jun18.pdf PDF
Amend_2_Questions_21Jun18.pdf PDF
FA465918R00050002.pdf PDF
16_JFSD_0541_AD101_-_Rev_20Jun18.pdf PDF
08_34_73_-_Rev_21Jun18.pdf PDF
Attachment_10,_Updated_Specifications_and_Drawings.pdf PDF
FA465918R0005P00001.pdf PDF
Amendment_1_Q&A_18Jun18.pdf PDF
Attachment_7,_PP_Questionnaire.pdf PDF
Attachment_9,_RFP_Cover_Letter.pdf PDF
Attachment_2g,_Mechanical_Drawings.pdf PDF
Attachment_2e,_Fire_Protection_Drawings.pdf PDF
Attachment_2d,_Structural_Drawings.pdf PDF
Attachment_8,_Construction_Wage_Rate_Determination.pdf PDF
Attachment_6,_Financial_Institution_Ref_Sheet.pdf PDF
Attachment_4,_Climatological_Summary.pdf PDF
Attachment_3,_Submittal_Register.pdf PDF
Attachment_5,_Green_Procurement_Waiver_Form.pdf PDF
Attachment_1,_Technical_Specifications.pdf PDF
Attachment_2b,_Civil_and_Landscape_Drawings.pdf PDF
Attachment_2h,_Electrical_Drawings.pdf PDF
Attachment_2c,_Architectural_Drawings.pdf PDF
Attachment_2f,_Plumbing_Drawings.pdf PDF
FA465918R0005.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JFSD201801GRAND FORKS AFB, NORTH DAKOTA

10 MAY 2018

GENERAL NOTES

ISSUED FOR BID / CONSTRUCTION

ADD/REPAIR SQ OPS B541 FOR GLOBAL HAWK GSMP

1. CONTRACTOR SHALL PROTECT EXISTING BUILDING AND SITE

MATERIALS SCHEDULED TO REMAIN, AND SHALL BE RESPONSIBLE

FOR DAMAGE TO SAME RESULTING FROM WORK UNDER THIS

CONTRACT. CONTRACTOR SHALL RESTORE DAMAGED EXISTING

BUILDING AND SITE MATERIALS TO THEIR ORIGINAL CONDITION.

CONTRACTOR SHALL REMOVE ALL CONSTRUCTION - RELATED

MATERIALS AND DEBRIS FROM ALL BUILDING AND SITE AREAS.

2. CONTRACTOR SHALL EXERCISE CAUTION TO AVOID ANY DAMAGE

WHEN PERFORMING EARTHWORK, PAVING, OR ANY

CONSTRUCTION IN VICINITY OF EXISTING UTILITIES, BUILDINGS,

AND LANDSCAPING. WHEN NEAR EXPECTED UTILITY LINE

LOCATIONS, HAND-DIG OR HYDRO-EXCAVATE TO LOCATE UTILITIES

PRIOR TO MACHINE DIGGING.

3. CONTRACTOR SHALL INSPECT SITE AND FIELD VERIFY ALL

DIMENSIONS AND CONDITIONS PRIOR TO COMMENCING

CONSTRUCTION. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF

ANY DISCREPANCIES.

4. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, AND SHALL

BE RESPONSIBLE FOR SAME. COORDINATE ALL WORK AND SHOP

DRAWINGS WITH ALL TRADES.

5. CONTRACTOR SHALL COORDINATE ON-SITE STORAGE OF BUILDING

MATERIALS, EQUIPMENT, AND TRASH CONTAINERS WITH

GOVERNMENT CONSTRUCTION REPRESENTATIVE PRIOR TO

COMMENCEMENT OF WORK. SEE SPEC SECTION 01000 FOR

ADDITIONAL REQUIREMENTS, INCLUDING REQUIRED TEMPORARY

FACILITIES PLAN.

6. ALL WORK SHALL COMPLY WITH APPLICABLE CODES,

REGULATIONS, AND ORDINANCES.

7. ALL MATERIALS AND EQUIPMENT OF THE SAME TYPE SHALL BE

SUPPLIED BY THE SAME MANUFACTURER, AND SHALL BE NEW, OF

THE BEST QUALITY AND DESIGN, AND FREE FROM DEFECTS.

8. ALL ITEMS ARE NEW UNLESS SPECIFICALLY IDENTIFIED AS

EXISTING.

9. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL

WORK. CONTRACTOR SHALL ANTICIPATE AREAS WHERE THE

INSTALLATION OF THE WORK WILL BE RESTRICTED, CONGESTED,

OR DIFFICULT TO INSTALL, AND SHALL COORDINATE INSTALLATION

BETWEEN THE TRADES.

10. CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND

ELECTRICAL ITEMS WITH THE GENERAL CONSTRUCTION.

11. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL

NECESSARY UTILITY OUTAGES WITH GOVERNMENT

CONSTRUCTION REPRESENTATIVE PRIOR TO PROCEEDING WITH

SUCH WORK TO INSURE THAT OPERATIONS IN ADJACENT

OCCUPIED BUILDINGS/AREAS ARE NOT INTERRUPTED OR

RESTRICTED WITHOUT PRIOR APPROVAL.

12. CONTRACTOR SHALL BE RESPONSIBLE FOR WEATHER TIGHTNESS

OF EXISTING BUILDING AT ALL TIMES DURING CONSTRUCTION.

CONTRACTOR SHALL INCLUDE ALL NECESSARY PROVISIONS TO

ACCOMPLISH THIS, INCLUDING, BUT NOT LIMITED TO, SEALING OF

ALL ROOF AND WALL PENETRATIONS AT END OF EACH WORKING

DAY.

13. AT ALL EXISTING GWB TO REMAIN EXPOSED, FILL ALL HOLES,

GOUGES, ETC. AND FINISH TO MATCH EXISTING ADJACENT GWB.

14. THE CONTRACTOR SHALL PERFORM ALL TESTING AND

INSPECTIONS AS SPECIFIED, OR AS NECESSARY TO DEMONSTRATE

A COMPLETE AND SATISFACTORY INSTALLATION.

15. ALL BUILDING DIMENSIONS ARE TO FACE OF GWB, OUTSIDE FACE

OF WALL AND EXTERIOR WINDOW OR DOOR ROUGH OPENING.

16. ALL ELEVATIONS INDICATED ON THE DRAWINGS ARE BASED ON A

FIRST FLOOR DATUM OF +100'-0”. WHERE ITEMS ARE LABELED

A.F.F. (ABOVE FINISHED FLOOR), CONTRACTOR SHALL SET THE

ITEM AS MEASURED FROM THE LOCAL FLOOR ELEVATION.

COORDINATE ANY DISCREPANCIES REGARDING THIS SITUATION TO

ASSURE THAT ALL BUILDING COMPONENTS ARE PROPERLY SET TO

FUNCTION AS INTENDED. CONTRACTOR SHALL ERECT ALL

PARTITIONS IN A VERTICAL PLANE, NOT NECESSARILY

PERPENDICULAR TO THE FLOOR.

17. INSTALL BLOCKING WITHIN PARTITIONS AS REQUIRED FOR

INSTALLATION OF WALL-MOUNTED CABINETS, MONITORS, TOILET

ACCESSORIES, WALL STOPS, AND MISCELLANEOUS ITEMS.

18. ALL CEILING GRID SHALL BE CENTERED WITHIN THE ROOM OR

CORRIDOR IN WHICH IT OCCURS, UNLESS SHOWN OTHERWISE.

19. ALL CHANGES IN FLOOR MATERIALS OCCUR AT THE FOLLOWING

LOCATIONS, UNLESS NOTED OTHERWISE: 1) AT THE CENTER LINE

OF DOORS IN THE CLOSED POSITION, OR; 2) AT THE CENTER LINE

OF OPENINGS SEPARATING ROOMS.

20. ALL GYPSUM BOARD IS 5/8” THICK, UNLESS NOTED OTHERWISE.

21. ALL METAL STUDS ARE 3-5/8” WIDE, UNLESS NOTED OTHERWISE.

22. IN SOME INSTANCES, THERMAL AND SOUND INSULATION HAS BEEN

OMITTED FROM DETAILS FOR CLARITY. SEE SPECIFICATIONS,

PARTITION TYPES, AND WALL SECTIONS FOR LOCATIONS

REQUIRING INSULATION.

23. EXISTING UTILITY LOCATIONS SHOWN ARE BASED ON A REVIEW OF

GOVERNMENT-PROVIDED DRAWINGS, WHICH SHALL BE VERIFIED

BY THE CONTRACTOR.

24. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH

THE SECURE SPACES CONSTRUCTION SECURITY PLAN.

CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH

THE GFAFB SITE SECURITY MANAGER AND SHALL COMPLY WITH

SPEC. SECTION 01 14 00, WORK RESTRICTIONS.

ASBESTOS AWARENESS

THERE IS NO KNOWN ASBESTOS IN WORK AREAS ASSOCIATED WITH THIS

PROJECT. IF, DURING REMOVAL WORK, THE CONTRACTOR DISCOVERS ANY

MATERIAL WHICH HE SUSPECTS MAY CONTAIN ASBESTOS, HE SHALL

IMMEDIATELY NOTIFY THE GOVERNMENT CONSTRUCTION REPRESENTATIVE

AND CEASE WORK IN CLOSE PROXIMITY TO THE SUSPECTED

ASBESTOS-CONTAINING MATERIALS. THE GOVERNMENT CONSTRUCTION

REPRESENTATIVE WILL THEN COORDINATE WITH THE CONTRACTOR TO

ARRANGE FOR THE TESTING AND REMOVAL OF ANY ASBESTOS MATERIALS, IF

NECESSARY, BY THE CONTRACTOR THROUGH A COST MODIFICATION TO THE

CONSTRUCTION CONTRACT.

LEAD-BASED PAINT AWARENESS

TESTING HAS NOT BEEN PERFORMED ON PAINTED SURFACES IN THE PROJECT

AREA FOR LEAD CONTENT.

THE CONTRACTOR, AT HIS DISCRETION, MAY EMPLOY CHEMICAL SPOT-TESTING

OR OTHER MEANS TO IDENTIFY LEAD COATINGS WHERE MANUAL DEMOLITION IS

DESIRABLE, OR PRIOR TO ANY EMPLOYEE TASK THAT MIGHT SUBJECT

WORKERS TO LEAD HAZARDS. COMPLY WITH OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION (OSHA) 29 CFR 1926.62. THIS REGULATION REQUIRES

THE CONTRACTOR TO DEVELOP WORK STRATEGIES THAT MINIMIZE EXPOSURE

TO LEAD HAZARDS.

ALL COSTS ASSOCIATED WITH LEAD PAINT TESTING, REMOVAL AND

PRECAUTIONS (IF REQUIRED) ARE THE RESPONSIBILITY OF THE CONTRACTOR.

MAIN GATE

ACCESS

CONTRACTOR'S

1599 J St.

HOSPITAL

TO GRAND

FORKS, ND

PROJECT

LOCATION

N S

W

E

SOUTH

GATE

MINOT

BISMARCK

W E

S

N

WILLISTON

FORKS

JAMESTOWN

AFB

GRAND

FORKS

FARGO

GRAND

G-001

C O

V E

R

S

H E

E T

J F

S D

G

C

O V

R D

W G

J F

S D

G

C O

V R

H ST.

T U

S K

E G

E E

A I R

M E

N

B

L V

D

EIELSON STREET

U S

H

I G

H W

A Y

25TH ST NE

T

H

A V

E

T

H

A

V E

GR

AN

D

FO

RK

S

AF

B, N D

CO

NT

RA

CT

S

EL

EM

EN

T

9 C

IV

IL

EN

GI

NE

ER

S

QU

AD

RO

N

A B C D E F G

Sheet of

NUMBER

REFERENCE

SHEET

AI

R

MO

BI

LIT

Y

CO

MM

AN

D

DE

PA

RT

ME

NT

O

F

TH

E

AI

R

FO

RC

E

DR

AW

IN

G

NU

MB

ER

PL

OT

S

CA

LE

: 1

T O

2 (

FO

R 1/2

-S

IZ

E)

PL

OT

D

AT

E:

CH

K

BY

DW

N

BY

DE

SI

GN

ED

B Y:

FI

LE

N

AM

E:

DA

TE

Sy mb ol De sc rip tio n

Da te

Ap pr ov ed

Sy mb ol Ap pr ov ed Da te De sc rip tio n

M

AY

GJ

H

GJ

H

KL

M

M

AY

JF

SD

A

DD

/R

EP

AI

R

SQ

O

PS

B

FO

R

GL

OB

AL

H

AW

K

GS

MP

GR

AN

D

FO

RK

S

AF

B, N

OR

TH

D

AK

OT

A

H

I S

S U

D

F

O R

I

C

O N

S T

R U

C T

I O

N

SHEET # SHEET TITLE

GENERAL:

1. G-001 COVER SHEET

2. G-002 ABBREVIATIONS

3. G-003 LEGENDS

4. G-004 FIRST AND SECOND FLOOR EGRESS PLANS

5. G-005 FIRST AND SECOND FLOOR OCCUPANCY PLANS

6. G-006 FIRST AND SECOND FLOOR FIRE PROTECTION PLANS

7. G-007 FIRST AND SECOND SPECIAL WALL/CEILING PLANS

8. G-008 CODE ANALYSIS

CIVIL AND LANDSCAPE:

9. V-101 TOPOGRAPHIC SURVEY

10. CU101 EXISTING SITE UTILITIES PLAN

11. CD101 SITE DEMOLITION PLAN

12. CD401 ENLARGED SITE DEMOLITION PLAN

13. C-101 SITE PLAN

14. C-401 ENLARGED SITE PLAN

15. C-501 SITE DETAILS

ARCHITECTURAL:

16. AD101 FIRST FLOOR DEMOLITION PLAN

17. AD102 SECOND FLOOR AND CLERESTORY DEMOLITION PLANS

18. AD110 ROOF DEMOLITION PLAN

19. A-101 FIRST FLOOR PLAN

20. A-102 SECOND FLOOR AND CLERESTORY PLANS

21. A-103 FIRST AND SECOND FLOOR RAISED ACCESS FLOORING PLAN

- HEIGHTS

22. A-104 FIRST AND SECOND FLOOR RAISED ACCESS FLOORING PLAN

- TYPES

23. A-110 ROOF PLAN

24. A-201 EXTERIOR ELEVATIONS

25. A-202 EXTERIOR ELEVATION FINISHES

26. A-401 WALL TYPES

27. A-402 ENLARGED FLOOR PLANS

28. A-403 INTERIOR ELEVATIONS

29. A-404 CASEWORK SECTIONS AND DETAILS

30. A-501 BUILDING SECTIONS

31. A-502 WALL SECTIONS

32. A-503 RAMP AND STAIR SECTIONS AND RAISED ACCESS FLOORING

DETAILS

33. A-504 LOADING DOCK DETAILS

34. A-601 ROOM FINISH SCHEDULE

35. A-602 DOOR AND FRAME SCHEDULE

36. A-701 HOLLOW METAL FRAME DETAILS

37. A-702 WINDOW FRAME DETAILS

38. A-801 FIRST FLOOR REFLECTED CEILING PLAN

39. A-802 SECOND FLOOR REFLECTED CEILING PLAN

40. A-810 REFLECTED CEILING DETAILS

41. A-811 REFLECTED CEILING DETAILS

42. AF101 FIRST FLOOR FINISHES PLAN

43. AF102 SECOND FLOOR FINISHES PLAN

44. AG100 FIRST AND SECOND FLOOR SIGNAGE PLANS

45. AG101 SIGNAGE TYPES AND MOUNTING DETAILS

46. AI101 FIRST FLOOR FURNITURE PLAN

47. AI102 SECOND FLOOR FURNITURE PLAN

STRUCTURAL

48. S-100 STRUCTURAL GENERAL NOTES

49. S-101 FOUNDATION PLAN

50. S-102 FLOOR FRAMING PLAN AND LOW ROOF FRAMING PLAN

51. S-103 HIGH ROOF FRAMING PLAN

52. S-201 ELEVATIONS

53. S-501 FOUNDATION DETAILS

54. S-502 FRAMING DETAILS

FIRE PROTECTION

55. FG101 FIRE SUPPRESSION SYMBOLS LEGEND AND GENERAL NOTES

56. FG102 FIRE ALARM SYMBOLS LEGEND AND GENERAL NOTES

57. FD101 FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN

58. FD102 SECOND FLOOR AND CLERESTORY FIRE PROTECTION

DEMOLITION PLANS

59. FX101 FIRST FLOOR FIRE SUPPRESSION PLAN

60. FX102 SECOND FLOOR AND CLERESTORY FIRE SUPPRESSION

PLANS

61. FX201 FIRE SUPPRESSION DETAILS

62. FA101 FIRST FLOOR FIRE ALARM PLAN

63. FA102 SECOND FLOOR AND CLERESTORY FIRE ALARM PLANS

64. FA301 FIRST FLOOR FIRE ALARM RISER DIAGRAM

65. FA302 SECOND FLOOR FIRE ALARM RISER DIAGRAM

PLUMBING

66. PG101 PLUMBING SYMBOLS LEGEND AND GENERAL NOTES

67. PS101 PLUMBING SITE DEMOLITION PLAN

68. PS102 PLUMBING SITE PLAN

69. PD100 FIRST FLOOR UNDERFLOOR PLUMBING DEMOLITION PLAN

70. PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN

71. PD102 SECOND FLOOR PLUMBING DEMOLITION PLAN

72. PD110 ROOF PLUMBING DEMOLITION PLAN

73. PD201 ENLARGED PLUMBING DEMOLITION PLAN

74. PL100 FIRST FLOOR UNDERFLOOR PLUMBING PLAN

75. PL101 FIRST FLOOR PLUMBING PLAN

76. PL102 SECOND FLOOR PLUMBING PLAN

77. PL110 ROOF PLUMBING PLAN

78. P-201 ENLARGED MECHANICAL 131 PLUMBING PLANS

79. P-202 ENLARGED PLUMBING PLANS

80. P-203 ENLARGED PLUMBING PLAN

81. P-301 PLUMBING RISER DIAGRAMS

82. P-302 PLUMBING RISER DIAGRAMS

83. P-401 PLUMBING DETAILS

84. P-402 PLUMBING DETAILS

85. P-501 PLUMBING FIXTURE AND EQUIPMENT SCHEDULES

MECHANICAL:

86. MG101 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES

87. MS101 MECHANICAL SITE DEMOLITION PLAN

88. MS102 MECHANICAL SITE PLAN

89. MD101 FIRST FLOOR HVAC DEMOLITION PLAN

90. MD102 SECOND FLOOR HVAC DEMOLITION PLAN

91. MD201 FIRST FLOOR HVAC PIPING DEMOLITION PLAN

92. MD202 SECOND FLOOR HVAC PIPING DEMOLITION PLAN

93. MD301 ENLARGED MECHANICAL DEMOLITION PLANS

94. MH101 FIRST FLOOR HVAC PLAN

95. MH102 SECOND FLOOR HVAC PLAN

96. MH103 RAISED FLOOR HVAC PLANS

97. MP101 FIRST FLOOR HVAC PIPING PLAN

98. MP102 SECOND FLOOR HVAC PIPING PLAN

99. M-301 ENLARGED MECHANICAL PLANS

100. M-302 ENLARGED MECHANICAL PLANS

101. M-303 MECHANICAL SECTIONS

102. M-401 MECHANICAL CONTROLS

103. M-402 MECHANICAL CONTROLS

104. M-403 MECHANICAL CONTROLS

105. M-404 MECHANICAL CONTROLS

106. M-501 MECHANICAL DETAILS

107. M-502 MECHANICAL DETAILS

108. M-503 MECHANICAL DETAILS

109. M-504 MECHANICAL DETAILS

110. M-601 MECHANICAL SCHEDULES

111. M-602 MECHANICAL SCHEDULES

112. M-603 MECHANICAL SCHEDULES

113. M-701 MECHANICAL AIRFLOW DIAGRAMS

ELECTRICAL:

114. EG101 ELECTRICAL SYMBOLS LEGEND AND GENERAL NOTES

115. ES101 ELECTRICAL SITE DEMOLITION PLAN

116. ES102 ELECTRICAL SITE PLAN

117. ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN

118. ED102 SECOND FLOOR AND CLERESTORY ELECTRICAL DEMOLITION

PLANS

119. ED110 ROOF ELECTRICAL DEMOLITION PLAN

120. EL101 FIRST FLOOR LIGHTING PLAN

121. EL102 SECOND FLOOR LIGHTING PLAN

122. EL103 FIRST FLOOR BLUE BEACON LIGHTING PLAN

123. EL104 SECOND FLOOR BLUE BEACON LIGHTING PLAN

124. EL201 LIGHTING CONTROLS STATION DETAILS

125. EL202 LIGHTING CONTROLS SCHEDULES AND NOTES

126. EP101 FIRST FLOOR POWER PLAN

127. EP102 SECOND FLOOR POWER PLAN

128. EP110 ROOF LIGHTNING PROTECTION SYSTEM PLAN

129. EP201 FIRST FLOOR RAISED FLOOR GROUNDING SYSTEM PLAN

130. EP202 SECOND FLOOR RAISED FLOOR GROUNDING SYSTEM PLAN

131. EP301 FIRST FLOOR MECHANICAL EQUIPMENT POWER PLAN

132. EP302 SECOND FLOOR MECHANICAL EQUIPMENT POWER PLAN

133. EP401 ENLARGED FIRST FLOOR POWER PLAN - NORTH

134. EP402 ENLARGED FIRST FLOOR POWER PLAN - SOUTH

135. EP403 ENLARGED SECOND FLOOR POWER PLAN - NORTH

136. EP404 ENLARGED SECOND FLOOR POWER PLAN - SOUTH

137. EY101 FIRST FLOOR SPECIAL SYSTEMS AND PUBLIC ADDRESS PLAN

138. EY102 SECOND FLOOR SPECIAL SYSTEMS AND PUBLIC ADDRESS

PLAN

139. EY201 FIRST FLOOR UNDER FLOOR SPECIAL SYSTEMS PLAN

140. EY202 SECOND FLOOR UNDER FLOOR SPECIAL SYSTEMS PLAN

141. EY301 FIRST FLOOR SECURITY SYSTEMS PLAN

142. EY302 SECOND FLOOR SECURITY SYSTEMS PLAN

143. EY501 ENLARGED FIRST FLOOR SPECIAL SYSTEMS PLAN - NORTH

144. EY502 ENLARGED FIRST FLOOR SPECIAL SYSTEMS PLAN - SOUTH

145. EY503 ENLARGED SECOND FLOOR SPECIAL SYSTEMS PLAN - NORTH

146. EY504 ENLARGED SECOND FLOOR SPECIAL SYSTEMS PLAN - SOUTH

147. E-401 BATTERY/UPS ONE-LINE DIAGRAM

148. E-402 ELECTRICAL ONE-LINE DIAGRAMS

149. E-501 ELECTRICAL DETAILS

150. E-502 ELECTRICAL DETAILS

151. E-503 ELECTRICAL DETAILS

152. E-504 ELECTRICAL DETAILS

153. E-505 ELECTRICAL DETAILS

154. E-506 ELECTRICAL DETAILS

155. E-601 ELECTRICAL SCHEDULES

156. E-602 ELECTRICAL SCHEDULES

157. E-603 ELECTRICAL SCHEDULES

158. E-604 ELECTRICAL SCHEDULES

159. E-605 ELECTRICAL SCHEDULES

160. E-606 ELECTRICAL SCHEDULES

161. E-607 ELECTRICAL SCHEDULES

162. E-608 ELECTRICAL SCHEDULES

163. E-609 ELECTRICAL SCHEDULES

SCHEDULE OF DRAWINGS

NOT TO SCALE

STATE OF NORTH DAKOTA - VICINITY MAP

NOT TO SCALE

PROJECT LOCATION MAP

1 N

COST BREAK-OUT NOTE

1. ALL WORK REGARDING THE GENERATOR AND

GENERATOR PAD SHALL BE UNDER MINOR

CONSTRUCTION AS OUTLINED IN THE BIDDING

DOCUMENTS IN THE PROJECT MANUAL.

03/01/2018

GERALD J. HAHN, AIA

KENNETH HAHN ARCHITECTS, INC.

ARCHITECT

Attachment 2, FA465918R0005

J

JUNCTION

JOINT

JOIST

JUNCTION BOX

K

KICK PLATE

KEY LOCK

KITCHEN

KEYK

KP

JC

JB or J-BOX

JST

JCT

KL

kcmil or KCM

KCP

KIP

KIT

JT

F

F

FA

FC

FCJ

FCG

F.D.

FE

FDN

FEC

FHC

FH

F.E.S

FEB

FD

C (cont.)

COMMUNICATIONS

COMPRESSIBLE

COMMON

COMBUSTION

COMBINATION

CORNER

COVERED

CONSTRUCTION JOINT

CONSTRUCTION

CONNECTION

CORRIDOR

CONTINUOUS

CONFERENCE

CONCRETE

FIRE HOSE CABINET

FOOT CANDLE

FRESH AIR

FAHRENHEIT

FACING

FIRE HYDRANT

FOUNDATION

FIRE DAMPER

FLOOR DRAIN

FIRE EXTINGUISHER CABINET

FLOOR CONSTRUCTION JOINT

FIRE EXTINGUISHER BRACKET

FLARED END SECTION

FIRE EXTINGUISHER

L

LABORATORY

LUMEN

KILOWATT

KILOVOLTS

LENGTH

LOADING

POUNDS

LUMBER

LAVATORY

LAUNDRY

LOAD

L kV kW kvar

LAB

kVA

LG

LD

LDG

LBR

LAT

LAV

LBS

LAU

LONG RADIUS

LIVING ROOM

LIGHT

LOW POINT

LONGITUDINAL

LINTEL

M

MAINTENANCE

THOUSAND

MACHINE

LIGHTING

LIGHT WEIGHT

M

LP

LT

LR

LONG

LNTL

LPS

L.R.

LIS

MAINT.

MACH

LT. WT.

LWT

LTG

LINEARLIN

FIN.

FIG.

FIX.

FLEX

FLG

FL or FLR

FLUOR

FLASH

FPM

FR

FPRF

F.S.

FTG.

FT.

FRG

FP

COURSE

CAST STONE TILE

COUNTER SINK

CEMENT PLASTER

CASEMENT

CARRIAGE

CENTER

TRANSFORMER

CABINET UNIT HEATER

CONDENSING UNIT

CEILING VENT

CUBIC YARDS

CARPET TILE

CERAMIC TILE or CURRENT

CYCLES PER SECOND (HERTZ)

CORROSIVE RESISTANT STEEL

GAS

G

FWC

G

G

GA

GALV

GAL

GEN

GFE

G.F.I. or GFI

G.C.O.

G.F.C.I.

D

DATUM

DOUBLE ACTING

CERAMIC WALL TILE

DRAIN BOX

CYLINDER

DOUBLE

DEGREE

DUMMY CONTOL JOINT

DIRECT CURRENT

DOOR CLOSER

DEPRESSION

DEPARTMENT

DOWELED CONTROL JOINT

PENNY (as in nail - 10d)

COLD WATER

FW

FLUORESCENT

FLOORING

FLEXIBLE

FLASHING

FIXTURE

FINISH

FLOOR

FIGURE

FIRE WATER

FOOTING

FULL SIZE

FURRING

FIRE PROOF

FEET PER MINUTE

FIRE PROTECTION

FEET

FRAME

GALVANIZED

GUTTER

GAGE or GAUGE

GALLON

GENERAL

GOVERNMENT FURNISHED

GOVERNMENT FURNISHED EQUIPMENT

GROUND FAULT INTERRUPTOR

GROUND CLEANOUT

FABRIC WALL COVERING

CONTRACTOR INSTALLED

COM

COMP

COMB

COMB

COMM

CONN

CONSTR

CONF.

COV

COR

CORR

CONT

CONC.

A

AB

A/C

AC

ACSR

ACI

AREA DRAIN

ACOUSTIC

AGGREGATE

ACST

A.D.

AD

A.F.F.

AGG

AHU

AFFF

ADMIN.

AIR CONDITIONING

ANCHOR BOLT

ACCESS DOOR

ADMINISTRATION/ADMINISTRATIVE

AMERICAN CONCRETE INSTITUTE

AQUEOUS FILM FORMING FOAM

AIR HANDLING UNIT

ABOVE FINISH FLOOR

STEEL REINFORCED

ALUMINUM CONDUCTOR

ALTERNATING CURRENT

CRG

CRES

C.P.S. ~

CPL

CSMT

CST

CRSE

CS

CTR

CTL

CU YD

CUH

CV

CU

CT

AREA INLET

ALTERNATE

ALUMINUM

AIC

A.I.

AISC

AL

ALT

A.L.

APPROVED

ANSI

AP

A.R.I.

ARCH

APPROX.

APPD

AMPEREAMP

ACTIVE LEAF

APPROXIMATE

ACCESS PANEL

ARCHITECTURAL OR ARCHITECT

STANDARDS INSTITUTE

AMERICAN NATIONAL

AMERICAN REFRIGERATION

STEEL CONSTRUCTION

AMERICAN INSTITUTE of

CAPACITY (SYM RMS)

AMPS INTERRUPTING

CWT

CYL

D d

DB

DA

D.C.J.

DCJT

DC

DBL

DEPR

DEPT

DEG

DCL

ASSISTANT

ASPHALT

ASBESTOS

AVERAGE

AUTOMATIC

ASPH

ASB

ATC

ASSIST.

AVG

AUTO

AWG

AWC

B

ANGLE

BOUNDARY

BOOKCASE

BOARD

BATT INSUL

BC

BDY

BD

BB BULLETIN BOARD

BATT INSULATION

ACOUSTICAL WALL COVERING

AMERICAN WIRE GAUGE

ACOUSTICAL TILE CEILING

INSTITUTE

CW

CONSTR JT.

METAL

MECHANICAL

MAXIMUM

MATERIAL

METAL LATH

MINIMUM

MANHOLE

MANAGEMENT

MANUFACTURER

MFG

M. B.

MER

MET.

MECH

MCJ

MAX

MC

ML

MGMT

M.H.

MGT

MIN

MG

MFR

MAT or MATL

N

MOTOR

MOUNTED

MASTIC

MONOLITHIC

ASSOCIATION

NORTHN

MO

MT

MOT

MSTC

MTD

MONO

N.C.

NFPA

NEMA

NEC

NCO

MOULDINGMLDG

GL

GOVT.

GPM

GRS

GR

GSU

GRTG

GND or GRND

H

GWB

GWT

GYP

HB

HC

HBD

DOUBLE HUNG

DISSEMANATION

DUCT HEATER

DIRECTOR

DIMENSION

DIAGONAL

DIAMETER

DRINKING FOUNTAIN

DOWN

DRAIN

DOOR

DISCONNECT

DRESSED & MATCHED

DOWN SPOUT

DAMPPROOFING

DISTRIBUTION

HD

HDRL

HDR

HM

HP

HIP

H.PT.

HDW

HR

H.S.

HT

HTR

HTG

HW

H.W.

HSGYP

DOWELS

EAST

EACH

E

DIRECT EXPANSION

EXHAUST AIR

FINISH SYSTEM

EXPANSION JOINT

ELEVATOR

EMERGENCY EYEWASH & SHOWER

EXTERIOR INSULATION &

ELECTRIC or ELECTRICAL

ELEVATION - GRADE OR BUILDING

ENTERING AIR TEMPERATURE

ESTIMATED MAXIMUM DEMAND

DRAWING

HCD

GRATING

GOVERNMENT

GROUND

GRADE

HANDICAPPED

HEAD

HARDBOARD

HOSE BIBB

GYPSUM

HALON CONTAINMENT DAMPER

GALVANIZED RIGID STEEL CONDUIT

GRAZED STRUCTURAL UNITS

GLAZED WALL TILE

GYPSUM WALLBOARD

GALLONS PER MINUTE

HIGH PRESSURE

HIGH STRENGTH

HIGH POINT

HOUR

HEADER

HORSE POWER

HOLLOW METAL

HARDWARE

HANDRAIL

HEIGHT

HOT WATER

HEATER

HEADWALL

HEATING

HIGH-STRENGTH GYPSUM PLASTER

GLASS

NOT REQUIRED

NUMBERNU OR NO.

N.R.

N.O.

I

HYD

Hz

I.E.

I.D.

IC

I or EF

IN

IES

INT.

I.P.

INV.

INSUL.

EQUAL

ENTRANCE

EACH SIDE

ESTIMATE

EQUIPMENT

EXPLOSION PROOF

EXCAVATE

EXPLOSION

EXTERIOR

EXPANSION

EXPOSED

EXISTING

EXHAUST

EXIT DEVICE

ENTERING WATER TEMPERATURE

ELECTRIC WATER COOLER

HYDRAULIC

INCH

INVERT ELEVATION

INSIDE DIAMETER

INTERCOM

IRON

IRON PIPE

INTERIOR

INSULATION

ILLUMINATING ENGINEERING SOCIETY

INVERT or INVERTER

HERTZ

NIC

HOT WATER HEATER

ENCLOSURE

HWH

DIA or Ø

DH

DH

DF

DISSEM

DIR

DIM

DIAG

DISC

D & M

DN

DIST

DRN

DS

DR

DPBUILDING

BLOCK

BITUMINOUS

BOTTOM OF

BLOCKING

BEAM

BIT

BLDG

BLK

BL

BM

BLKG

B.O.

B.M.

BOTTOM

BRIDGING

BRACING

BRACKET

BRICK

BENT

BEARING

BOT

BR

BRDG

BRCG

BRK

BT

BRKT

BRG

BENCH MARK

BUILDING LINE

BULLET RESISTANT

DWLS

DX

E

EA

EAT

EA.

EES

EIFS

EJ

ELEC.

EMD

ELEV

CAPACITY

C

BTUH

BUR

CAP

C or CND

CC

CEMENT

CHIMNEY

CAST IRON

CB

CE

CFM

CEM

CHIM

CFT

CI

C.I.

BTU PER HOUR

COVER ELEVATION

CURB INLET

CATCH BASIN (OR CIRCUIT BREAKER)

CONDUIT (FOR RACEWAY -

CERAMIC FLOOR TILE

CUBIC FEET PER MINUTE

CENTER TO CENTER

BUILT-UP ROOFING

DWG

BTU BRITISH THERMAL UNIT

ENT

EQ.

E.P.

ES

EWT

EWC

EST

EQUIP.

EXC

EXD

EXIST.

EXH

EXT

EXPN

EXPL

EXP

CIRCUIT

CHECKED

CAULKING

CLERK

CEILING

CJ

CKT

CKD

L

CLK

CLKG

CLG

C or CL

CKT BKR or CB

CLOSET

CLOSED

CLEANOUT

COUNTER

CLO

CLOS

CMP

CNTR

CMU

CO

CO

CONTROL JOINT

CENTER LINE

CIRCUIT BREAKER

CARBON DIOXIDE

CONCRETE MASONRY UNITS

CORRUGATED METAL PIPE

COLUMNCOL

ENCL

CIRCULARCIR

EL or ELEV.

MASONRY

BEJ BRICK EXPANSION JOINT

MAS

GALVANIZED IRONGI

DET DETAIL

MATTE - GLAZED TILE

MECHANICAL EQUIPMENT ROOM

MASONRY CONTROL JOINT

LEAVING WATER TEMPERATURE

LAWN IRRIGATION SYSTEM

LEAVING AIR TEMPERATURE

KILOVOLT AMPERES REACTIVE

KILOPOUND (1000 LBS)

KEENE'S CEMENT PLASTER

MANUFACTURERS ASSOCIATION

NATIONAL ELECTRICAL CODE

NON COMMISSIONED OFFICER

NATIONAL FIRE PROTECTION

MANUFACTURING

NORMALLY OPEN

NATIONAL ELECTRICAL

NOT IN CONTRACT

NORMALLY CLOSED

METAL THRESHOLD

MASONRY OPENING

MOTOR GENERATOR

MARKERBOARD

MEDICINE CABINET

LIGHT PROOF SHADE

KILOVOLT AMPERES

KILO CIRCULAR MIL

JANITOR CLOSET

MDF MEDIUM DENSITY FIBERBOARD

FCO FLOOR CLEANOUT

MOTOR STARTERMS

AECS AUTOMATED ENTRY CONTROL SYSTEM

ELECTRICAL SHEETS)

CPT CARPET

CTG CLEAR TEMPERED GLASS

CLEAR TEMPERED INSULATING GLASSCTIG

CATV CABLE TELEVISION

FOS FACE OF STUD

FSF FABRIC SILT FENCE

C.F.C.I. CONTRACTOR FURNISHED

CONTRACTOR INSTALLED

GOVERNMENT INSTALLED

CONTRACTOR FURNISHEDC.F.G.I.

G.F.G.I. GOVERNMENT FURNISHED

GOVERNMENT INSTALLED

HPL HIGH PRESSURE LAMINATE FLOORING

GLASS FIBER REINFORCED PLASTERGFRP

IDS INTRUSION DETECTION SYSTEM

F.O. FIBER OPTIC

G-002

A B

B R

E V

I A

T I O

N S

J F

S D

G

D

W G

J F

S D

G

FAP FIRE ALARM PANEL

FRT FIRE-RETARDANT PLYWOOD

ABBREVIATIONS

GR

AN

D

FO

RK

S

AF

B, N D

CO

NT

RA

CT

S

EL

EM

EN

T

9 C

IV

IL

EN

GI

NE

ER

S

QU

AD

RO

N

A B C D E F G

Sheet of

NUMBER

REFERENCE

SHEET

AI

R

MO

BI

LIT

Y

CO

MM

AN

D

DE

PA

RT

ME

NT

O

F

TH

E

AI

R

FO

RC

E

DR

AW

IN

G

NU

MB

ER

PL

OT

S

CA

LE

: 1

T O

2 (

FO

R 1/2

-S

IZ

E)

PL

OT

D

AT

E:

CH

K

BY

DW

N

BY

DE

SI

GN

ED

B Y:

FI

LE

N

AM

E:

DA

TE

Sy mb ol De sc rip tio n

Da te

Ap pr ov ed

Sy mb ol Ap pr ov ed Da te De sc rip tio n

M

AY

GJ

H

GJ

H

KL

M

M

AY

JF

SD

A

DD

/R

EP

AI

R

SQ

O

PS

B

FO

R

GL

OB

AL

H

AW

K

GS

MP

GR

AN

D

FO

RK

S

AF

B, N

OR

TH

D

AK

OT

A

H

I S

S U

F

O R

I

C

O N

S T

R U

C T

I O

N

U

UNIT HEATER

UNDERGROUND

UNIT COOLER

UNEXCAVATED

V

VOLT

UNIT VENTILATOR

UTILITY

URINAL

UNFINISHED

UNINTERRUPTIBLE POWER SYSTEM

UNDERWRITERS LABORATORIES

VITRIFIED CLAY PIPE

VOLUME

VESTIBULE

VENTILATOR

VENTILATION

VAULT DOOR

VERTICAL

VINYL COMPOSITION TILE

WITH

UC

UG

UH

UNEX

UL

UPS

UT

UR

V

VCP

UV

S

SOUTHS

SB

S.A.

S.B.

SCH

SCREW

SCT

SCR

SECT

SJI

S.D.

SDI

SCUT

SECTION

STEEL DECK INSTITUTE

STEEL JOIST INSTITUTE

STRUCTURAL CLAY TILE

SUBDRAIN

SCUTTLE

SECURITY BARS

SPLASH BLOCK

SCHEDULE

SUPPLY AIR

O

OBSURE

OBSCURE GLASS

OUTSIDE AIR

ON CENTER

OBSCURE WIRE GLASS

OVERHEAD

OFFICE

OPPOSITE

OPENING

OUTSIDE SCREW & YOKE

OPERATIONS

OBSERVATION RISER

OUTSIDE DIAMETER

ON CENTER EACH WAY

O.A.

OBGL

OBSC

OC

OB WG

OD

OH

OFF.

OPP

O.R.

OPS

OS & Y

OPNG

OCEW

V.C.T.

VD

VENT

VENT

VERT

VEST

VOL

SIMILAR

SHEET

SECY

SFU

S.F.

SEQ

SHTG

SHLD.

SIM

SHT.

SQUARE

SP

SPEC

SPF

SPKR

SQ or

SPL

SPH

SOV

STATIC PRESSURE

SPACE HEATER

SPECIFICATIONS

SHUT OFF VALVE

SPECIAL

SPEAKER

SOUNDPROOF

SQUARE FOOTAGE

STRUCTURAL FACING UNIT

SHEATHING

SHOULDER

SEQUENCE

SECRETARY

W/

STATION

STONE

STEEL

S. STL.

SSMR

STC

STA

STGR

STN

STL

STD

SWITCH

SUB FL

STWY

STRUCT

STOR

SW

SWBD

SVF

SUSP

STAIRWAY

STORAGE

STAINLESS STEEL

SOUND TRANSMISSION CLASS

STANDING SEAM METAL ROOFING

STRINGER

STANDARD

SHEET VINYL FLOORING

STRUCTURAL

SWITCHBOARD

SUSPENDED

SUB FLOOR

SQUAD SQUADRON

P

POLE

PARTICLE

PUBLIC ADDRESS

PIONT OF CURVATURE

PUSH BUTTON STATION

PHASE

PLATE

PHARMACY

POLYETHYLENE

PERFORATED

POST INDICATING VALVE

POINT OF INTERSECTION

PIECE

P

PA

PART

PBS

P.C.

P.C.C.

PERF

P.E.

PH or Ø

L

P.I.

P.I.V.

PL or P

PHAR

PC

PLUMBING

PLATFORM

PILING

PORCELAIN

PLYWOOD

POLISH

PANEL

PLASTIC LAMINATE

PAIR

PROJECT

PROCESSING

PROJECTION SCREEN

PREFINISHED

PREFABRICATED

PARTS PER MILLION

PLBG

PLG

PL

PLATF

PNL

PORC

POL

PLY. WD.

PR

P.P.M.

PREFIN

PREFAB

PROJ

P.S.

PRV

PROC

PLASTERPLAS

PRESSURE REGULATING VALVE

PORTLAND CEMENT CONCRETE

UNFIN

WATER PROOF

WITHOUT

WP

W/O

WPF

T

TREADT

TAN.

TC

TCA

T.E.

TBD

TOGGLE

THICK

TECH

TEMP

TER

TEL

TH

THK

TGL

TERM

TECHNICAL

THRESHOLD

TERMINAL

TERRAZZO

TEMPERATURE

TELEPHONE

TILE COUNCIL OF AMERICA

TOP ELEVATION

TOP OF CURB

TACK BOARD

TANGENT

TOILET

TYPICAL

TOIL

TOPO

TRANS

TV

TYP

T'STAT

TELEVISION

THERMOSTAT

TRANSVERSE

TOPOGRAPHY

T.O. TOP OF

PAVEMENT

PAINTED

PARTITION

TRANSFORMER

POINT OF TANGENCY

POLYVINYL-CHLORIDE

POUNDS/SQUARE INCH

Q

QUART

QUARTERS

PASS WINDOW

QUARTER ROUND

QUARRY TILE

PSI

PT

P.T.

PTD

PTN

PVMT

PVC

PW

QT

QTRS

1/4 RD

Q.T.

RISER

RADIUS

REMOTE CONTROL

RESILIENT BASE

RETURN AIR

RETURN AIR REGISTER

RETURN AIR GRILLE

RECEIVER

ROUND

RIDGE

REFERENCE

RECTIFIER

RECEPTACLE

ROOF DRAIN

RECREATION

R.A.

R or RSR

RAD or R

RB

RAR

RC

R.C.P.

RAG

RD

RCVR

RDGE

R.D.

RECP

RECR

REF

RECT.

R

REINFORCED CONCRETE PIPE

POINT or POTENTIAL (VOLTAGE)

REGISTER

REMOVABLE

ROOFING

REVISIONS

RESILIENT

REQUIRED

REPRODUCTION

REINFORCEMENT

RANGE

ROUGH

RUBBER

ROOM

RAISED FLOOR SYSTEM

RELATIVE HUMIDITY

REG

REM

REINF

REQD

RFG

REV

RESIL.

REPRO

RFS

RGE

RH

RGH

RM

RPM

RPRT

RUB

RAISED PATTERN RUBBER TILE

REVOLUTIONS PER MINUTE

REFRIGERATORREFR

PSF POUNDS/SQUARE FOOT

SYM SYMMETRICAL

TOP OF STEELTOS

SK SINK

VFD VARIABLE FREQUENCY DRIVE

PP PAINTED PANEL

PAINT

P

RUBBER TILERT

SC SPECIAL COATING

SS SOLID SURFACE

ST STAIN

TT TERRAZZO TILE

VINYL BASEVB

WEATHER PROOF

W

F (cont.) P (cont.)

File details come from the government source that posted it.