Attachment_2a,_Schedule_of_Drawings.pdf
PDF 9 MB Posted
- Attached to
- GFAFB Add/Repair Squadron Operations GSMP B541 Federal contract opportunity
- Solicitation number
- FA4659-18-R-0005
About this file
Attachment 2, Schedule of Drawings
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JFSD201801GRAND FORKS AFB, NORTH DAKOTA
10 MAY 2018
GENERAL NOTES
ISSUED FOR BID / CONSTRUCTION
ADD/REPAIR SQ OPS B541 FOR GLOBAL HAWK GSMP
1. CONTRACTOR SHALL PROTECT EXISTING BUILDING AND SITE
MATERIALS SCHEDULED TO REMAIN, AND SHALL BE RESPONSIBLE
FOR DAMAGE TO SAME RESULTING FROM WORK UNDER THIS
CONTRACT. CONTRACTOR SHALL RESTORE DAMAGED EXISTING
BUILDING AND SITE MATERIALS TO THEIR ORIGINAL CONDITION.
CONTRACTOR SHALL REMOVE ALL CONSTRUCTION - RELATED
MATERIALS AND DEBRIS FROM ALL BUILDING AND SITE AREAS.
2. CONTRACTOR SHALL EXERCISE CAUTION TO AVOID ANY DAMAGE
WHEN PERFORMING EARTHWORK, PAVING, OR ANY
CONSTRUCTION IN VICINITY OF EXISTING UTILITIES, BUILDINGS,
AND LANDSCAPING. WHEN NEAR EXPECTED UTILITY LINE
LOCATIONS, HAND-DIG OR HYDRO-EXCAVATE TO LOCATE UTILITIES
PRIOR TO MACHINE DIGGING.
3. CONTRACTOR SHALL INSPECT SITE AND FIELD VERIFY ALL
DIMENSIONS AND CONDITIONS PRIOR TO COMMENCING
CONSTRUCTION. NOTIFY CONTRACTING OFFICER IMMEDIATELY OF
ANY DISCREPANCIES.
4. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, AND SHALL
BE RESPONSIBLE FOR SAME. COORDINATE ALL WORK AND SHOP
DRAWINGS WITH ALL TRADES.
5. CONTRACTOR SHALL COORDINATE ON-SITE STORAGE OF BUILDING
MATERIALS, EQUIPMENT, AND TRASH CONTAINERS WITH
GOVERNMENT CONSTRUCTION REPRESENTATIVE PRIOR TO
COMMENCEMENT OF WORK. SEE SPEC SECTION 01000 FOR
ADDITIONAL REQUIREMENTS, INCLUDING REQUIRED TEMPORARY
FACILITIES PLAN.
6. ALL WORK SHALL COMPLY WITH APPLICABLE CODES,
REGULATIONS, AND ORDINANCES.
7. ALL MATERIALS AND EQUIPMENT OF THE SAME TYPE SHALL BE
SUPPLIED BY THE SAME MANUFACTURER, AND SHALL BE NEW, OF
THE BEST QUALITY AND DESIGN, AND FREE FROM DEFECTS.
8. ALL ITEMS ARE NEW UNLESS SPECIFICALLY IDENTIFIED AS
EXISTING.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL
WORK. CONTRACTOR SHALL ANTICIPATE AREAS WHERE THE
INSTALLATION OF THE WORK WILL BE RESTRICTED, CONGESTED,
OR DIFFICULT TO INSTALL, AND SHALL COORDINATE INSTALLATION
BETWEEN THE TRADES.
10. CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND
ELECTRICAL ITEMS WITH THE GENERAL CONSTRUCTION.
11. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL
NECESSARY UTILITY OUTAGES WITH GOVERNMENT
CONSTRUCTION REPRESENTATIVE PRIOR TO PROCEEDING WITH
SUCH WORK TO INSURE THAT OPERATIONS IN ADJACENT
OCCUPIED BUILDINGS/AREAS ARE NOT INTERRUPTED OR
RESTRICTED WITHOUT PRIOR APPROVAL.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR WEATHER TIGHTNESS
OF EXISTING BUILDING AT ALL TIMES DURING CONSTRUCTION.
CONTRACTOR SHALL INCLUDE ALL NECESSARY PROVISIONS TO
ACCOMPLISH THIS, INCLUDING, BUT NOT LIMITED TO, SEALING OF
ALL ROOF AND WALL PENETRATIONS AT END OF EACH WORKING
DAY.
13. AT ALL EXISTING GWB TO REMAIN EXPOSED, FILL ALL HOLES,
GOUGES, ETC. AND FINISH TO MATCH EXISTING ADJACENT GWB.
14. THE CONTRACTOR SHALL PERFORM ALL TESTING AND
INSPECTIONS AS SPECIFIED, OR AS NECESSARY TO DEMONSTRATE
A COMPLETE AND SATISFACTORY INSTALLATION.
15. ALL BUILDING DIMENSIONS ARE TO FACE OF GWB, OUTSIDE FACE
OF WALL AND EXTERIOR WINDOW OR DOOR ROUGH OPENING.
16. ALL ELEVATIONS INDICATED ON THE DRAWINGS ARE BASED ON A
FIRST FLOOR DATUM OF +100'-0”. WHERE ITEMS ARE LABELED
A.F.F. (ABOVE FINISHED FLOOR), CONTRACTOR SHALL SET THE
ITEM AS MEASURED FROM THE LOCAL FLOOR ELEVATION.
COORDINATE ANY DISCREPANCIES REGARDING THIS SITUATION TO
ASSURE THAT ALL BUILDING COMPONENTS ARE PROPERLY SET TO
FUNCTION AS INTENDED. CONTRACTOR SHALL ERECT ALL
PARTITIONS IN A VERTICAL PLANE, NOT NECESSARILY
PERPENDICULAR TO THE FLOOR.
17. INSTALL BLOCKING WITHIN PARTITIONS AS REQUIRED FOR
INSTALLATION OF WALL-MOUNTED CABINETS, MONITORS, TOILET
ACCESSORIES, WALL STOPS, AND MISCELLANEOUS ITEMS.
18. ALL CEILING GRID SHALL BE CENTERED WITHIN THE ROOM OR
CORRIDOR IN WHICH IT OCCURS, UNLESS SHOWN OTHERWISE.
19. ALL CHANGES IN FLOOR MATERIALS OCCUR AT THE FOLLOWING
LOCATIONS, UNLESS NOTED OTHERWISE: 1) AT THE CENTER LINE
OF DOORS IN THE CLOSED POSITION, OR; 2) AT THE CENTER LINE
OF OPENINGS SEPARATING ROOMS.
20. ALL GYPSUM BOARD IS 5/8” THICK, UNLESS NOTED OTHERWISE.
21. ALL METAL STUDS ARE 3-5/8” WIDE, UNLESS NOTED OTHERWISE.
22. IN SOME INSTANCES, THERMAL AND SOUND INSULATION HAS BEEN
OMITTED FROM DETAILS FOR CLARITY. SEE SPECIFICATIONS,
PARTITION TYPES, AND WALL SECTIONS FOR LOCATIONS
REQUIRING INSULATION.
23. EXISTING UTILITY LOCATIONS SHOWN ARE BASED ON A REVIEW OF
GOVERNMENT-PROVIDED DRAWINGS, WHICH SHALL BE VERIFIED
BY THE CONTRACTOR.
24. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH
THE SECURE SPACES CONSTRUCTION SECURITY PLAN.
CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH
THE GFAFB SITE SECURITY MANAGER AND SHALL COMPLY WITH
SPEC. SECTION 01 14 00, WORK RESTRICTIONS.
ASBESTOS AWARENESS
THERE IS NO KNOWN ASBESTOS IN WORK AREAS ASSOCIATED WITH THIS
PROJECT. IF, DURING REMOVAL WORK, THE CONTRACTOR DISCOVERS ANY
MATERIAL WHICH HE SUSPECTS MAY CONTAIN ASBESTOS, HE SHALL
IMMEDIATELY NOTIFY THE GOVERNMENT CONSTRUCTION REPRESENTATIVE
AND CEASE WORK IN CLOSE PROXIMITY TO THE SUSPECTED
ASBESTOS-CONTAINING MATERIALS. THE GOVERNMENT CONSTRUCTION
REPRESENTATIVE WILL THEN COORDINATE WITH THE CONTRACTOR TO
ARRANGE FOR THE TESTING AND REMOVAL OF ANY ASBESTOS MATERIALS, IF
NECESSARY, BY THE CONTRACTOR THROUGH A COST MODIFICATION TO THE
CONSTRUCTION CONTRACT.
LEAD-BASED PAINT AWARENESS
TESTING HAS NOT BEEN PERFORMED ON PAINTED SURFACES IN THE PROJECT
AREA FOR LEAD CONTENT.
THE CONTRACTOR, AT HIS DISCRETION, MAY EMPLOY CHEMICAL SPOT-TESTING
OR OTHER MEANS TO IDENTIFY LEAD COATINGS WHERE MANUAL DEMOLITION IS
DESIRABLE, OR PRIOR TO ANY EMPLOYEE TASK THAT MIGHT SUBJECT
WORKERS TO LEAD HAZARDS. COMPLY WITH OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION (OSHA) 29 CFR 1926.62. THIS REGULATION REQUIRES
THE CONTRACTOR TO DEVELOP WORK STRATEGIES THAT MINIMIZE EXPOSURE
TO LEAD HAZARDS.
ALL COSTS ASSOCIATED WITH LEAD PAINT TESTING, REMOVAL AND
PRECAUTIONS (IF REQUIRED) ARE THE RESPONSIBILITY OF THE CONTRACTOR.
MAIN GATE
ACCESS
CONTRACTOR'S
1599 J St.
HOSPITAL
TO GRAND
FORKS, ND
PROJECT
LOCATION
N S
W
E
SOUTH
GATE
MINOT
BISMARCK
W E
S
N
WILLISTON
FORKS
JAMESTOWN
AFB
GRAND
FORKS
FARGO
GRAND
G-001
C O
V E
R
S
H E
E T
J F
S D
G
C
O V
R D
W G
J F
S D
G
C O
V R
H ST.
T U
S K
E G
E E
A I R
M E
N
B
L V
D
EIELSON STREET
U S
H
I G
H W
A Y
25TH ST NE
T
H
A V
E
T
H
A
V E
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
D
F
O R
I
C
O N
S T
R U
C T
I O
N
SHEET # SHEET TITLE
GENERAL:
1. G-001 COVER SHEET
2. G-002 ABBREVIATIONS
3. G-003 LEGENDS
4. G-004 FIRST AND SECOND FLOOR EGRESS PLANS
5. G-005 FIRST AND SECOND FLOOR OCCUPANCY PLANS
6. G-006 FIRST AND SECOND FLOOR FIRE PROTECTION PLANS
7. G-007 FIRST AND SECOND SPECIAL WALL/CEILING PLANS
8. G-008 CODE ANALYSIS
CIVIL AND LANDSCAPE:
9. V-101 TOPOGRAPHIC SURVEY
10. CU101 EXISTING SITE UTILITIES PLAN
11. CD101 SITE DEMOLITION PLAN
12. CD401 ENLARGED SITE DEMOLITION PLAN
13. C-101 SITE PLAN
14. C-401 ENLARGED SITE PLAN
15. C-501 SITE DETAILS
ARCHITECTURAL:
16. AD101 FIRST FLOOR DEMOLITION PLAN
17. AD102 SECOND FLOOR AND CLERESTORY DEMOLITION PLANS
18. AD110 ROOF DEMOLITION PLAN
19. A-101 FIRST FLOOR PLAN
20. A-102 SECOND FLOOR AND CLERESTORY PLANS
21. A-103 FIRST AND SECOND FLOOR RAISED ACCESS FLOORING PLAN
- HEIGHTS
22. A-104 FIRST AND SECOND FLOOR RAISED ACCESS FLOORING PLAN
- TYPES
23. A-110 ROOF PLAN
24. A-201 EXTERIOR ELEVATIONS
25. A-202 EXTERIOR ELEVATION FINISHES
26. A-401 WALL TYPES
27. A-402 ENLARGED FLOOR PLANS
28. A-403 INTERIOR ELEVATIONS
29. A-404 CASEWORK SECTIONS AND DETAILS
30. A-501 BUILDING SECTIONS
31. A-502 WALL SECTIONS
32. A-503 RAMP AND STAIR SECTIONS AND RAISED ACCESS FLOORING
DETAILS
33. A-504 LOADING DOCK DETAILS
34. A-601 ROOM FINISH SCHEDULE
35. A-602 DOOR AND FRAME SCHEDULE
36. A-701 HOLLOW METAL FRAME DETAILS
37. A-702 WINDOW FRAME DETAILS
38. A-801 FIRST FLOOR REFLECTED CEILING PLAN
39. A-802 SECOND FLOOR REFLECTED CEILING PLAN
40. A-810 REFLECTED CEILING DETAILS
41. A-811 REFLECTED CEILING DETAILS
42. AF101 FIRST FLOOR FINISHES PLAN
43. AF102 SECOND FLOOR FINISHES PLAN
44. AG100 FIRST AND SECOND FLOOR SIGNAGE PLANS
45. AG101 SIGNAGE TYPES AND MOUNTING DETAILS
46. AI101 FIRST FLOOR FURNITURE PLAN
47. AI102 SECOND FLOOR FURNITURE PLAN
STRUCTURAL
48. S-100 STRUCTURAL GENERAL NOTES
49. S-101 FOUNDATION PLAN
50. S-102 FLOOR FRAMING PLAN AND LOW ROOF FRAMING PLAN
51. S-103 HIGH ROOF FRAMING PLAN
52. S-201 ELEVATIONS
53. S-501 FOUNDATION DETAILS
54. S-502 FRAMING DETAILS
FIRE PROTECTION
55. FG101 FIRE SUPPRESSION SYMBOLS LEGEND AND GENERAL NOTES
56. FG102 FIRE ALARM SYMBOLS LEGEND AND GENERAL NOTES
57. FD101 FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN
58. FD102 SECOND FLOOR AND CLERESTORY FIRE PROTECTION
DEMOLITION PLANS
59. FX101 FIRST FLOOR FIRE SUPPRESSION PLAN
60. FX102 SECOND FLOOR AND CLERESTORY FIRE SUPPRESSION
PLANS
61. FX201 FIRE SUPPRESSION DETAILS
62. FA101 FIRST FLOOR FIRE ALARM PLAN
63. FA102 SECOND FLOOR AND CLERESTORY FIRE ALARM PLANS
64. FA301 FIRST FLOOR FIRE ALARM RISER DIAGRAM
65. FA302 SECOND FLOOR FIRE ALARM RISER DIAGRAM
PLUMBING
66. PG101 PLUMBING SYMBOLS LEGEND AND GENERAL NOTES
67. PS101 PLUMBING SITE DEMOLITION PLAN
68. PS102 PLUMBING SITE PLAN
69. PD100 FIRST FLOOR UNDERFLOOR PLUMBING DEMOLITION PLAN
70. PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN
71. PD102 SECOND FLOOR PLUMBING DEMOLITION PLAN
72. PD110 ROOF PLUMBING DEMOLITION PLAN
73. PD201 ENLARGED PLUMBING DEMOLITION PLAN
74. PL100 FIRST FLOOR UNDERFLOOR PLUMBING PLAN
75. PL101 FIRST FLOOR PLUMBING PLAN
76. PL102 SECOND FLOOR PLUMBING PLAN
77. PL110 ROOF PLUMBING PLAN
78. P-201 ENLARGED MECHANICAL 131 PLUMBING PLANS
79. P-202 ENLARGED PLUMBING PLANS
80. P-203 ENLARGED PLUMBING PLAN
81. P-301 PLUMBING RISER DIAGRAMS
82. P-302 PLUMBING RISER DIAGRAMS
83. P-401 PLUMBING DETAILS
84. P-402 PLUMBING DETAILS
85. P-501 PLUMBING FIXTURE AND EQUIPMENT SCHEDULES
MECHANICAL:
86. MG101 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES
87. MS101 MECHANICAL SITE DEMOLITION PLAN
88. MS102 MECHANICAL SITE PLAN
89. MD101 FIRST FLOOR HVAC DEMOLITION PLAN
90. MD102 SECOND FLOOR HVAC DEMOLITION PLAN
91. MD201 FIRST FLOOR HVAC PIPING DEMOLITION PLAN
92. MD202 SECOND FLOOR HVAC PIPING DEMOLITION PLAN
93. MD301 ENLARGED MECHANICAL DEMOLITION PLANS
94. MH101 FIRST FLOOR HVAC PLAN
95. MH102 SECOND FLOOR HVAC PLAN
96. MH103 RAISED FLOOR HVAC PLANS
97. MP101 FIRST FLOOR HVAC PIPING PLAN
98. MP102 SECOND FLOOR HVAC PIPING PLAN
99. M-301 ENLARGED MECHANICAL PLANS
100. M-302 ENLARGED MECHANICAL PLANS
101. M-303 MECHANICAL SECTIONS
102. M-401 MECHANICAL CONTROLS
103. M-402 MECHANICAL CONTROLS
104. M-403 MECHANICAL CONTROLS
105. M-404 MECHANICAL CONTROLS
106. M-501 MECHANICAL DETAILS
107. M-502 MECHANICAL DETAILS
108. M-503 MECHANICAL DETAILS
109. M-504 MECHANICAL DETAILS
110. M-601 MECHANICAL SCHEDULES
111. M-602 MECHANICAL SCHEDULES
112. M-603 MECHANICAL SCHEDULES
113. M-701 MECHANICAL AIRFLOW DIAGRAMS
ELECTRICAL:
114. EG101 ELECTRICAL SYMBOLS LEGEND AND GENERAL NOTES
115. ES101 ELECTRICAL SITE DEMOLITION PLAN
116. ES102 ELECTRICAL SITE PLAN
117. ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
118. ED102 SECOND FLOOR AND CLERESTORY ELECTRICAL DEMOLITION
PLANS
119. ED110 ROOF ELECTRICAL DEMOLITION PLAN
120. EL101 FIRST FLOOR LIGHTING PLAN
121. EL102 SECOND FLOOR LIGHTING PLAN
122. EL103 FIRST FLOOR BLUE BEACON LIGHTING PLAN
123. EL104 SECOND FLOOR BLUE BEACON LIGHTING PLAN
124. EL201 LIGHTING CONTROLS STATION DETAILS
125. EL202 LIGHTING CONTROLS SCHEDULES AND NOTES
126. EP101 FIRST FLOOR POWER PLAN
127. EP102 SECOND FLOOR POWER PLAN
128. EP110 ROOF LIGHTNING PROTECTION SYSTEM PLAN
129. EP201 FIRST FLOOR RAISED FLOOR GROUNDING SYSTEM PLAN
130. EP202 SECOND FLOOR RAISED FLOOR GROUNDING SYSTEM PLAN
131. EP301 FIRST FLOOR MECHANICAL EQUIPMENT POWER PLAN
132. EP302 SECOND FLOOR MECHANICAL EQUIPMENT POWER PLAN
133. EP401 ENLARGED FIRST FLOOR POWER PLAN - NORTH
134. EP402 ENLARGED FIRST FLOOR POWER PLAN - SOUTH
135. EP403 ENLARGED SECOND FLOOR POWER PLAN - NORTH
136. EP404 ENLARGED SECOND FLOOR POWER PLAN - SOUTH
137. EY101 FIRST FLOOR SPECIAL SYSTEMS AND PUBLIC ADDRESS PLAN
138. EY102 SECOND FLOOR SPECIAL SYSTEMS AND PUBLIC ADDRESS
PLAN
139. EY201 FIRST FLOOR UNDER FLOOR SPECIAL SYSTEMS PLAN
140. EY202 SECOND FLOOR UNDER FLOOR SPECIAL SYSTEMS PLAN
141. EY301 FIRST FLOOR SECURITY SYSTEMS PLAN
142. EY302 SECOND FLOOR SECURITY SYSTEMS PLAN
143. EY501 ENLARGED FIRST FLOOR SPECIAL SYSTEMS PLAN - NORTH
144. EY502 ENLARGED FIRST FLOOR SPECIAL SYSTEMS PLAN - SOUTH
145. EY503 ENLARGED SECOND FLOOR SPECIAL SYSTEMS PLAN - NORTH
146. EY504 ENLARGED SECOND FLOOR SPECIAL SYSTEMS PLAN - SOUTH
147. E-401 BATTERY/UPS ONE-LINE DIAGRAM
148. E-402 ELECTRICAL ONE-LINE DIAGRAMS
149. E-501 ELECTRICAL DETAILS
150. E-502 ELECTRICAL DETAILS
151. E-503 ELECTRICAL DETAILS
152. E-504 ELECTRICAL DETAILS
153. E-505 ELECTRICAL DETAILS
154. E-506 ELECTRICAL DETAILS
155. E-601 ELECTRICAL SCHEDULES
156. E-602 ELECTRICAL SCHEDULES
157. E-603 ELECTRICAL SCHEDULES
158. E-604 ELECTRICAL SCHEDULES
159. E-605 ELECTRICAL SCHEDULES
160. E-606 ELECTRICAL SCHEDULES
161. E-607 ELECTRICAL SCHEDULES
162. E-608 ELECTRICAL SCHEDULES
163. E-609 ELECTRICAL SCHEDULES
SCHEDULE OF DRAWINGS
NOT TO SCALE
STATE OF NORTH DAKOTA - VICINITY MAP
NOT TO SCALE
PROJECT LOCATION MAP
1 N
COST BREAK-OUT NOTE
1. ALL WORK REGARDING THE GENERATOR AND
GENERATOR PAD SHALL BE UNDER MINOR
CONSTRUCTION AS OUTLINED IN THE BIDDING
DOCUMENTS IN THE PROJECT MANUAL.
03/01/2018
GERALD J. HAHN, AIA
KENNETH HAHN ARCHITECTS, INC.
ARCHITECT
Attachment 2, FA465918R0005
J
JUNCTION
JOINT
JOIST
JUNCTION BOX
K
KICK PLATE
KEY LOCK
KITCHEN
KEYK
KP
JC
JB or J-BOX
JST
JCT
KL
kcmil or KCM
KCP
KIP
KIT
JT
F
F
FA
FC
FCJ
FCG
F.D.
FE
FDN
FEC
FHC
FH
F.E.S
FEB
FD
C (cont.)
COMMUNICATIONS
COMPRESSIBLE
COMMON
COMBUSTION
COMBINATION
CORNER
COVERED
CONSTRUCTION JOINT
CONSTRUCTION
CONNECTION
CORRIDOR
CONTINUOUS
CONFERENCE
CONCRETE
FIRE HOSE CABINET
FOOT CANDLE
FRESH AIR
FAHRENHEIT
FACING
FIRE HYDRANT
FOUNDATION
FIRE DAMPER
FLOOR DRAIN
FIRE EXTINGUISHER CABINET
FLOOR CONSTRUCTION JOINT
FIRE EXTINGUISHER BRACKET
FLARED END SECTION
FIRE EXTINGUISHER
L
LABORATORY
LUMEN
KILOWATT
KILOVOLTS
LENGTH
LOADING
POUNDS
LUMBER
LAVATORY
LAUNDRY
LOAD
L kV kW kvar
LAB
kVA
LG
LD
LDG
LBR
LAT
LAV
LBS
LAU
LONG RADIUS
LIVING ROOM
LIGHT
LOW POINT
LONGITUDINAL
LINTEL
M
MAINTENANCE
THOUSAND
MACHINE
LIGHTING
LIGHT WEIGHT
M
LP
LT
LR
LONG
LNTL
LPS
L.R.
LIS
MAINT.
MACH
LT. WT.
LWT
LTG
LINEARLIN
FIN.
FIG.
FIX.
FLEX
FLG
FL or FLR
FLUOR
FLASH
FPM
FR
FPRF
F.S.
FTG.
FT.
FRG
FP
COURSE
CAST STONE TILE
COUNTER SINK
CEMENT PLASTER
CASEMENT
CARRIAGE
CENTER
TRANSFORMER
CABINET UNIT HEATER
CONDENSING UNIT
CEILING VENT
CUBIC YARDS
CARPET TILE
CERAMIC TILE or CURRENT
CYCLES PER SECOND (HERTZ)
CORROSIVE RESISTANT STEEL
GAS
G
FWC
G
G
GA
GALV
GAL
GEN
GFE
G.F.I. or GFI
G.C.O.
G.F.C.I.
D
DATUM
DOUBLE ACTING
CERAMIC WALL TILE
DRAIN BOX
CYLINDER
DOUBLE
DEGREE
DUMMY CONTOL JOINT
DIRECT CURRENT
DOOR CLOSER
DEPRESSION
DEPARTMENT
DOWELED CONTROL JOINT
PENNY (as in nail - 10d)
COLD WATER
FW
FLUORESCENT
FLOORING
FLEXIBLE
FLASHING
FIXTURE
FINISH
FLOOR
FIGURE
FIRE WATER
FOOTING
FULL SIZE
FURRING
FIRE PROOF
FEET PER MINUTE
FIRE PROTECTION
FEET
FRAME
GALVANIZED
GUTTER
GAGE or GAUGE
GALLON
GENERAL
GOVERNMENT FURNISHED
GOVERNMENT FURNISHED EQUIPMENT
GROUND FAULT INTERRUPTOR
GROUND CLEANOUT
FABRIC WALL COVERING
CONTRACTOR INSTALLED
COM
COMP
COMB
COMB
COMM
CONN
CONSTR
CONF.
COV
COR
CORR
CONT
CONC.
A
AB
A/C
AC
ACSR
ACI
AREA DRAIN
ACOUSTIC
AGGREGATE
ACST
A.D.
AD
A.F.F.
AGG
AHU
AFFF
ADMIN.
AIR CONDITIONING
ANCHOR BOLT
ACCESS DOOR
ADMINISTRATION/ADMINISTRATIVE
AMERICAN CONCRETE INSTITUTE
AQUEOUS FILM FORMING FOAM
AIR HANDLING UNIT
ABOVE FINISH FLOOR
STEEL REINFORCED
ALUMINUM CONDUCTOR
ALTERNATING CURRENT
CRG
CRES
C.P.S. ~
CPL
CSMT
CST
CRSE
CS
CTR
CTL
CU YD
CUH
CV
CU
CT
AREA INLET
ALTERNATE
ALUMINUM
AIC
A.I.
AISC
AL
ALT
A.L.
APPROVED
ANSI
AP
A.R.I.
ARCH
APPROX.
APPD
AMPEREAMP
ACTIVE LEAF
APPROXIMATE
ACCESS PANEL
ARCHITECTURAL OR ARCHITECT
STANDARDS INSTITUTE
AMERICAN NATIONAL
AMERICAN REFRIGERATION
STEEL CONSTRUCTION
AMERICAN INSTITUTE of
CAPACITY (SYM RMS)
AMPS INTERRUPTING
CWT
CYL
D d
DB
DA
D.C.J.
DCJT
DC
DBL
DEPR
DEPT
DEG
DCL
ASSISTANT
ASPHALT
ASBESTOS
AVERAGE
AUTOMATIC
ASPH
ASB
ATC
ASSIST.
AVG
AUTO
AWG
AWC
B
ANGLE
BOUNDARY
BOOKCASE
BOARD
BATT INSUL
BC
BDY
BD
BB BULLETIN BOARD
BATT INSULATION
ACOUSTICAL WALL COVERING
AMERICAN WIRE GAUGE
ACOUSTICAL TILE CEILING
INSTITUTE
CW
CONSTR JT.
METAL
MECHANICAL
MAXIMUM
MATERIAL
METAL LATH
MINIMUM
MANHOLE
MANAGEMENT
MANUFACTURER
MFG
M. B.
MER
MET.
MECH
MCJ
MAX
MC
ML
MGMT
M.H.
MGT
MIN
MG
MFR
MAT or MATL
N
MOTOR
MOUNTED
MASTIC
MONOLITHIC
ASSOCIATION
NORTHN
MO
MT
MOT
MSTC
MTD
MONO
N.C.
NFPA
NEMA
NEC
NCO
MOULDINGMLDG
GL
GOVT.
GPM
GRS
GR
GSU
GRTG
GND or GRND
H
GWB
GWT
GYP
HB
HC
HBD
DOUBLE HUNG
DISSEMANATION
DUCT HEATER
DIRECTOR
DIMENSION
DIAGONAL
DIAMETER
DRINKING FOUNTAIN
DOWN
DRAIN
DOOR
DISCONNECT
DRESSED & MATCHED
DOWN SPOUT
DAMPPROOFING
DISTRIBUTION
HD
HDRL
HDR
HM
HP
HIP
H.PT.
HDW
HR
H.S.
HT
HTR
HTG
HW
H.W.
HSGYP
DOWELS
EAST
EACH
E
DIRECT EXPANSION
EXHAUST AIR
FINISH SYSTEM
EXPANSION JOINT
ELEVATOR
EMERGENCY EYEWASH & SHOWER
EXTERIOR INSULATION &
ELECTRIC or ELECTRICAL
ELEVATION - GRADE OR BUILDING
ENTERING AIR TEMPERATURE
ESTIMATED MAXIMUM DEMAND
DRAWING
HCD
GRATING
GOVERNMENT
GROUND
GRADE
HANDICAPPED
HEAD
HARDBOARD
HOSE BIBB
GYPSUM
HALON CONTAINMENT DAMPER
GALVANIZED RIGID STEEL CONDUIT
GRAZED STRUCTURAL UNITS
GLAZED WALL TILE
GYPSUM WALLBOARD
GALLONS PER MINUTE
HIGH PRESSURE
HIGH STRENGTH
HIGH POINT
HOUR
HEADER
HORSE POWER
HOLLOW METAL
HARDWARE
HANDRAIL
HEIGHT
HOT WATER
HEATER
HEADWALL
HEATING
HIGH-STRENGTH GYPSUM PLASTER
GLASS
NOT REQUIRED
NUMBERNU OR NO.
N.R.
N.O.
I
HYD
Hz
I.E.
I.D.
IC
I or EF
IN
IES
INT.
I.P.
INV.
INSUL.
EQUAL
ENTRANCE
EACH SIDE
ESTIMATE
EQUIPMENT
EXPLOSION PROOF
EXCAVATE
EXPLOSION
EXTERIOR
EXPANSION
EXPOSED
EXISTING
EXHAUST
EXIT DEVICE
ENTERING WATER TEMPERATURE
ELECTRIC WATER COOLER
HYDRAULIC
INCH
INVERT ELEVATION
INSIDE DIAMETER
INTERCOM
IRON
IRON PIPE
INTERIOR
INSULATION
ILLUMINATING ENGINEERING SOCIETY
INVERT or INVERTER
HERTZ
NIC
HOT WATER HEATER
ENCLOSURE
HWH
DIA or Ø
DH
DH
DF
DISSEM
DIR
DIM
DIAG
DISC
D & M
DN
DIST
DRN
DS
DR
DPBUILDING
BLOCK
BITUMINOUS
BOTTOM OF
BLOCKING
BEAM
BIT
BLDG
BLK
BL
BM
BLKG
B.O.
B.M.
BOTTOM
BRIDGING
BRACING
BRACKET
BRICK
BENT
BEARING
BOT
BR
BRDG
BRCG
BRK
BT
BRKT
BRG
BENCH MARK
BUILDING LINE
BULLET RESISTANT
DWLS
DX
E
EA
EAT
EA.
EES
EIFS
EJ
ELEC.
EMD
ELEV
CAPACITY
C
BTUH
BUR
CAP
C or CND
CC
CEMENT
CHIMNEY
CAST IRON
CB
CE
CFM
CEM
CHIM
CFT
CI
C.I.
BTU PER HOUR
COVER ELEVATION
CURB INLET
CATCH BASIN (OR CIRCUIT BREAKER)
CONDUIT (FOR RACEWAY -
CERAMIC FLOOR TILE
CUBIC FEET PER MINUTE
CENTER TO CENTER
BUILT-UP ROOFING
DWG
BTU BRITISH THERMAL UNIT
ENT
EQ.
E.P.
ES
EWT
EWC
EST
EQUIP.
EXC
EXD
EXIST.
EXH
EXT
EXPN
EXPL
EXP
CIRCUIT
CHECKED
CAULKING
CLERK
CEILING
CJ
CKT
CKD
L
CLK
CLKG
CLG
C or CL
CKT BKR or CB
CLOSET
CLOSED
CLEANOUT
COUNTER
CLO
CLOS
CMP
CNTR
CMU
CO
CO
CONTROL JOINT
CENTER LINE
CIRCUIT BREAKER
CARBON DIOXIDE
CONCRETE MASONRY UNITS
CORRUGATED METAL PIPE
COLUMNCOL
ENCL
CIRCULARCIR
EL or ELEV.
MASONRY
BEJ BRICK EXPANSION JOINT
MAS
GALVANIZED IRONGI
DET DETAIL
MATTE - GLAZED TILE
MECHANICAL EQUIPMENT ROOM
MASONRY CONTROL JOINT
LEAVING WATER TEMPERATURE
LAWN IRRIGATION SYSTEM
LEAVING AIR TEMPERATURE
KILOVOLT AMPERES REACTIVE
KILOPOUND (1000 LBS)
KEENE'S CEMENT PLASTER
MANUFACTURERS ASSOCIATION
NATIONAL ELECTRICAL CODE
NON COMMISSIONED OFFICER
NATIONAL FIRE PROTECTION
MANUFACTURING
NORMALLY OPEN
NATIONAL ELECTRICAL
NOT IN CONTRACT
NORMALLY CLOSED
METAL THRESHOLD
MASONRY OPENING
MOTOR GENERATOR
MARKERBOARD
MEDICINE CABINET
LIGHT PROOF SHADE
KILOVOLT AMPERES
KILO CIRCULAR MIL
JANITOR CLOSET
MDF MEDIUM DENSITY FIBERBOARD
FCO FLOOR CLEANOUT
MOTOR STARTERMS
AECS AUTOMATED ENTRY CONTROL SYSTEM
ELECTRICAL SHEETS)
CPT CARPET
CTG CLEAR TEMPERED GLASS
CLEAR TEMPERED INSULATING GLASSCTIG
CATV CABLE TELEVISION
FOS FACE OF STUD
FSF FABRIC SILT FENCE
C.F.C.I. CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
GOVERNMENT INSTALLED
CONTRACTOR FURNISHEDC.F.G.I.
G.F.G.I. GOVERNMENT FURNISHED
GOVERNMENT INSTALLED
HPL HIGH PRESSURE LAMINATE FLOORING
GLASS FIBER REINFORCED PLASTERGFRP
IDS INTRUSION DETECTION SYSTEM
F.O. FIBER OPTIC
G-002
A B
B R
E V
I A
T I O
N S
J F
S D
G
D
W G
J F
S D
G
FAP FIRE ALARM PANEL
FRT FIRE-RETARDANT PLYWOOD
ABBREVIATIONS
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
F
O R
I
C
O N
S T
R U
C T
I O
N
U
UNIT HEATER
UNDERGROUND
UNIT COOLER
UNEXCAVATED
V
VOLT
UNIT VENTILATOR
UTILITY
URINAL
UNFINISHED
UNINTERRUPTIBLE POWER SYSTEM
UNDERWRITERS LABORATORIES
VITRIFIED CLAY PIPE
VOLUME
VESTIBULE
VENTILATOR
VENTILATION
VAULT DOOR
VERTICAL
VINYL COMPOSITION TILE
WITH
UC
UG
UH
UNEX
UL
UPS
UT
UR
V
VCP
UV
S
SOUTHS
SB
S.A.
S.B.
SCH
SCREW
SCT
SCR
SECT
SJI
S.D.
SDI
SCUT
SECTION
STEEL DECK INSTITUTE
STEEL JOIST INSTITUTE
STRUCTURAL CLAY TILE
SUBDRAIN
SCUTTLE
SECURITY BARS
SPLASH BLOCK
SCHEDULE
SUPPLY AIR
O
OBSURE
OBSCURE GLASS
OUTSIDE AIR
ON CENTER
OBSCURE WIRE GLASS
OVERHEAD
OFFICE
OPPOSITE
OPENING
OUTSIDE SCREW & YOKE
OPERATIONS
OBSERVATION RISER
OUTSIDE DIAMETER
ON CENTER EACH WAY
O.A.
OBGL
OBSC
OC
OB WG
OD
OH
OFF.
OPP
O.R.
OPS
OS & Y
OPNG
OCEW
V.C.T.
VD
VENT
VENT
VERT
VEST
VOL
SIMILAR
SHEET
SECY
SFU
S.F.
SEQ
SHTG
SHLD.
SIM
SHT.
SQUARE
SP
SPEC
SPF
SPKR
SQ or
SPL
SPH
SOV
STATIC PRESSURE
SPACE HEATER
SPECIFICATIONS
SHUT OFF VALVE
SPECIAL
SPEAKER
SOUNDPROOF
SQUARE FOOTAGE
STRUCTURAL FACING UNIT
SHEATHING
SHOULDER
SEQUENCE
SECRETARY
W/
STATION
STONE
STEEL
S. STL.
SSMR
STC
STA
STGR
STN
STL
STD
SWITCH
SUB FL
STWY
STRUCT
STOR
SW
SWBD
SVF
SUSP
STAIRWAY
STORAGE
STAINLESS STEEL
SOUND TRANSMISSION CLASS
STANDING SEAM METAL ROOFING
STRINGER
STANDARD
SHEET VINYL FLOORING
STRUCTURAL
SWITCHBOARD
SUSPENDED
SUB FLOOR
SQUAD SQUADRON
P
POLE
PARTICLE
PUBLIC ADDRESS
PIONT OF CURVATURE
PUSH BUTTON STATION
PHASE
PLATE
PHARMACY
POLYETHYLENE
PERFORATED
POST INDICATING VALVE
POINT OF INTERSECTION
PIECE
P
PA
PART
PBS
P.C.
P.C.C.
PERF
P.E.
PH or Ø
L
P.I.
P.I.V.
PL or P
PHAR
PC
PLUMBING
PLATFORM
PILING
PORCELAIN
PLYWOOD
POLISH
PANEL
PLASTIC LAMINATE
PAIR
PROJECT
PROCESSING
PROJECTION SCREEN
PREFINISHED
PREFABRICATED
PARTS PER MILLION
PLBG
PLG
PL
PLATF
PNL
PORC
POL
PLY. WD.
PR
P.P.M.
PREFIN
PREFAB
PROJ
P.S.
PRV
PROC
PLASTERPLAS
PRESSURE REGULATING VALVE
PORTLAND CEMENT CONCRETE
UNFIN
WATER PROOF
WITHOUT
WP
W/O
WPF
T
TREADT
TAN.
TC
TCA
T.E.
TBD
TOGGLE
THICK
TECH
TEMP
TER
TEL
TH
THK
TGL
TERM
TECHNICAL
THRESHOLD
TERMINAL
TERRAZZO
TEMPERATURE
TELEPHONE
TILE COUNCIL OF AMERICA
TOP ELEVATION
TOP OF CURB
TACK BOARD
TANGENT
TOILET
TYPICAL
TOIL
TOPO
TRANS
TV
TYP
T'STAT
TELEVISION
THERMOSTAT
TRANSVERSE
TOPOGRAPHY
T.O. TOP OF
PAVEMENT
PAINTED
PARTITION
TRANSFORMER
POINT OF TANGENCY
POLYVINYL-CHLORIDE
POUNDS/SQUARE INCH
Q
QUART
QUARTERS
PASS WINDOW
QUARTER ROUND
QUARRY TILE
PSI
PT
P.T.
PTD
PTN
PVMT
PVC
PW
QT
QTRS
1/4 RD
Q.T.
RISER
RADIUS
REMOTE CONTROL
RESILIENT BASE
RETURN AIR
RETURN AIR REGISTER
RETURN AIR GRILLE
RECEIVER
ROUND
RIDGE
REFERENCE
RECTIFIER
RECEPTACLE
ROOF DRAIN
RECREATION
R.A.
R or RSR
RAD or R
RB
RAR
RC
R.C.P.
RAG
RD
RCVR
RDGE
R.D.
RECP
RECR
REF
RECT.
R
REINFORCED CONCRETE PIPE
POINT or POTENTIAL (VOLTAGE)
REGISTER
REMOVABLE
ROOFING
REVISIONS
RESILIENT
REQUIRED
REPRODUCTION
REINFORCEMENT
RANGE
ROUGH
RUBBER
ROOM
RAISED FLOOR SYSTEM
RELATIVE HUMIDITY
REG
REM
REINF
REQD
RFG
REV
RESIL.
REPRO
RFS
RGE
RH
RGH
RM
RPM
RPRT
RUB
RAISED PATTERN RUBBER TILE
REVOLUTIONS PER MINUTE
REFRIGERATORREFR
PSF POUNDS/SQUARE FOOT
SYM SYMMETRICAL
TOP OF STEELTOS
SK SINK
VFD VARIABLE FREQUENCY DRIVE
PP PAINTED PANEL
PAINT
P
RUBBER TILERT
SC SPECIAL COATING
SS SOLID SURFACE
ST STAIN
TT TERRAZZO TILE
VINYL BASEVB
WEATHER PROOF
W
F (cont.) P (cont.)
File details come from the government source that posted it.