Attachment_2c,_Architectural_Drawings.pdf
PDF 25 MB Posted
- Attached to
- GFAFB Add/Repair Squadron Operations GSMP B541 Federal contract opportunity
- Solicitation number
- FA4659-18-R-0005
About this file
Architectural Drawings
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2, FA465918R0005
SCALE: 1/8" = 1'-0" 8' 4' 0 8'
SECOND FLOOR PLAN
N1
1. NEW SPANDREL GLASS WINDOW UNIT
2. KEY CABINET.
3. NEW EIFS/METAL STUD/GWB WALL INFILL. SEE DETAIL 6/A-401.
4. GALVANIZED STEEL CHANNEL/BAR GRATING RAMP/LANDING
ASSEMBLY FOR EQUIPMENT MOVEMENT.
5. SEE MECHANICAL FOR EQUIPMENT IN THIS ROOM.
6. LOUVER; SEE MECHANICAL.
7. STEEL TUBES AND BEAM; SEE STRUCTURAL AND 7/S-502.
8. GUARDRAIL AROUND FLOOR OPENING SEE DETAIL 4/A-502.
9. SHAFT ENCLOSURE AND ACCESS DOOR; SEE MECHANICAL.
10. CABINET UNIT HEATER; SEE MECHANICAL.
11. ELECTRICAL PANEL; SEE ELECTRICAL.
12. INFILL FLOOR OPENING; SEE STRUCTURAL.
13. SEMI-RECESSED FIRE EXTINGUISHER CABINET
14. SURFACE-MOUNTED FIRE EXTINGUISHER CABINET
15. BRACKET-MOUNTED FIRE EXTINGUISHER
16. PROVIDE BLANK COVER PLATE AT DOOR OPERATOR AT DOOR
LOCATION.
17. NOT USED.
18. DTW-1 LOCKERS ON 4" CURB; SEE LOCKER CURB DETAIL 9/A-504.
19. ELECTRICAL PANEL; SEE ELECTRICAL AND DETAIL 15/A-504.
20. STEEL FRAMING SEE STRUCTURAL.
21. PLYWOOD IN WALL FROM 3'-0" TO 8'-0"x 6'-0" WIDE AT EACH MONITOR
LOCATION. SEE DETAIL 6/A-401.
22. DE-MOUNTABLE PARTITION WALL BY OTHERS N.I.C. SHOWN DASHED.
23. PROVIDE ROLLER WINDOW SHADES AT THIS WINDOW.
24. EXISTING EXPOSED STEEL COLUMN AND CONCRETE BASE TO REMAIN.
FLOOR PLAN KEY NOTES
DN
A A.5 B.1 B.2 C D D.1 E F F.1 G H I.1 I.2 I.5 J
1.B
1.A
1.5
1.7
1.9
2.3
2.5
A-501
A-501
A-501
A-502
A-502
TYP. TYP. 4
A-501
DN
F.D.
F.D.
WOMEN
MEN
STAIR 2
S-2
STAIR 1
S-1
UP
UP
RAMP DN
CRAC
COCKPIT 1
DEBRIEF 3
SOC
UP 6 3/4"UP 6 3/4"MX.
MAINT.
CORR.
MECH.
COCKPIT 2
ELECT.
COCKPIT 3
COCKPIT 4
245 COCKPIT 6
COCKPIT 5
CORR.
CORR.
CORR.
COCKPIT 7
COCKPIT 8
COCKPIT 9
COCKPIT 10
DEBRIEF 2
DEBRIEF 1
DEBRIEF 4
DEBRIEF 5
DEBRIEF 6
DEBRIEF 7
DEBRIEF 8
COMM.
COPY
204CORR.
CORR.
MECH.
JAN.
CORR.
CORR.
CORR.
CORR.
LOBBY
ELECT.
COMM.
VTC
CONF.
ROOM
FOLDING PANEL PARTITION
OPEN TO BELOW
CORR.
ELEV.
E-1
RAMP DNUP
UP
CR
AC
S-
S-
MON.
MO
N.
MB
MB
MBMB
MB
MB
MB MB MB
MO
N.
MO
N.
MON. MON. MON. MON.
MO
N.
MON.
TI
ME
Z
ON
E
CL
OC
K
N.
I.C
MON. MON. MON. MON. MON. MON. MON. MON. MON. MON.MON. MON.
MO
N.
(2) MON. (2) MON.(2) MON. (2) MON.(2) MON. (2) MON.(2) MON. (2) MON.
(2) MON.
MO
N.
MO
N.
MO
N.
MO
N.
DB
DB
MON.
MB
(2) MON.
E F
UPPER
LOBBY
SCALE: 1/8" = 1'-0" 8' 4' 0 8'
CLERESTORY PLAN
N2
N
TRUEPLAN
N
TRUEPLAN
1 1 11
1 1 1 1 1 1 1
3 3
A-501
A-402
M1
C2
N1 N1 N1 N1 N1 C2
G1
G1
G1
G1
G1 E1
G1
D2
M1
12'-8" 26'-4" 10'-6"
'-3
9/
'-7
1/
AL
IG
N
D1
E1
E1
31'-0"
'-0
7/
5'-
0"8'- 5 3
/8"
72'-2 1/4"
A1H1G14'-0" 26'-4"
G1 G1
20'-5 1/2"
G1
G1
G1
J1
G1
'-4
'-1 0"
'-3
1/ 2"
'-3
1/ 2"
G1
G1
J1
J1
J1
G1
G1 E1
G1
C1C2
C2
C2
M1
12'-10 3/8"
G228 '-1
1/ 8"
'-2
1/ 8"
26'-4 1/2" 26'-4 1/2"
'-4
7/ 8"
JI A1
J1
'-6
1/
"O1
O1 O1
ALL SIDES
AROUND
COLUMN
18'-3 1/4"
'-0
1/ 4"
J1
E1
'-0
5'-
4 7 /8"
'-9
3/ 8"
G1
G1
G1
G1
G1
N1
N1 N1
H1
J1
J1
N1 N1
J1
J1 J1
19'-3 3/4" 19'-6 3/4" 24'-6 3/8" 24'-7 5/8"
M1 C2C2
J1
L1
L1
J1
J2 J2
J1
J1
'-1
7/ 8"
5'- 7" 1'-6"
C3
ALL SIDES
4'-6"
J1
L2
L2
M1A1
'-8
3/ 4"
F .V
'-7 3/
8"
'-4 3/
16'-2"
B1 B1
EQ. EQ. EQ. EQ.
7'-9 3/4"
10'-3"
1O A-403
17'-7 1/4"
C2
G1
45°
E1
G1
C2
M1
M1
WALLS WITHOUT
WALL TYPES ARE
EXISTING TO
REMAIN (TYP.)
4'-7 1/2
3'-4 7/8
45°
A-504
A-403
1K
3'- 4"
C2C2
'-5
/16
4'-8"
4'-10 5/8"
5'-5 13/16" 7'-
7 1 /4"
2'- 4 7
/8"
4'-1 11/16"
A-102
S E
C O
N D
F
L O
O R
A
D
C L E
R E
S T
O R
Y
P
L A
N S
J F
S D
A
D
W G
J F
S D
A
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
E
B
I
C
O N
S T
R U
C T
I O
C D
WEST ELEVATION
ELEV. = 114'-3"
SECOND FLOOR
ELEV. = 100'-0"
FIRST FLOOR
A A.5 B.1 B.2 D.1 E F F.1 G H I.1 I.2 I.5 J
CJCJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJCJ
CJ
CJ
CJCJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
EXISTING EIFS (TYP.)
EXISTING STANDING SEAM
METAL ROOF SYSTEM (TYP.)
EXISTING METAL WALL
PANELS BELOW RIBBON
WINDOWS (TYP.)
EXISTING SPANDREL GLASS
RIBBON WINDOWS (TYP.)
SCALE: 1/8" = 1'-0" 8' 4' 0 8'
EAST ELEVATION
E
ELEV. = 114'-3"
SECOND FLOOR
ELEV. = 100'-0"
FIRST FLOOR
B.1 A.5J I.5 I.2 I.1 H G F.1 F D.1 D C B.2 A
CJ
CJ
CJ
CJ CJCJ CJ CJCJ CJ
CJ
CJ
CJ
CJ
CJ CJ
CJ CJ CJ CJ CJ CJ CJ CJ CJ
CJ
CJCJCJ
CJ CJ
CJ
CJ CJ
CJ
CJ
CJ
EJ
CJ
CJ CJ
CJ
EXISTING EIFS (TYP.)
EXISTING STANDING SEAM
METAL ROOF SYSTEM (TYP.)
EXISTING SPANDREL GLASS
RIBBON WINDOWS (TYP.)
EXISTING METAL WALL PANELS
BELOW RIBBON WINDOWS (TYP.)
SCALE: 1/8" = 1'-0" 8' 4' 0 8'
SOUTH ELEVATION
3 2.5 2.3 2 1.9 1.7 1.5 1
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ CJCJCJ
CJ
EXISTING EIFS (TYP.)
EXISTING STANDING SEAM
METAL ROOF SYSTEM (TYP.)
ELEV. = 114'-3"
SECOND FLOOR
ELEV. = 100'-0"
FIRST FLOOR
SCALE: 1/8" = 1'-0" 8' 4' 0 8'
NORTH ELEVATION
1.7 1.91 1.5 2.32 2.5 3
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJCJ CJ CJ
CJ
12EXISTING EIFS (TYP.)
EXISTING STANDING SEAM
METAL ROOF SYSTEM (TYP.)
4 2
2 11
6 6
7 7
1 1
9 9 9 9
99 999 9 9
99 9 9 9 92
1. INFILL EIFS AT REMOVED DOOR/WINDOW/HOOD/LOUVER OPENING.
SEE DETAIL 6/A-401.
2. REPAIR AND REFINISH EIFS AT DAMAGED EIFS.
3. PATCH SEAL EIFS AT REMOVED ANTENNA SUPPORT BRACKET.
4. REPAIR AND REFINISH EIFS AT REMOVED EQUIPMENT.
5. MATCH EXISTING JOINT PATTERNS WHERE OCCURS.
6. NEW VISION GLASS WINDOW UNIT
7. NEW METAL WALL PANELS SHOWN HATCHED
8. PROVIDE EIFS JOINTS IN NEW EIFS TO MATCH EXISTING JOINTS.
9. NEW SPANDREL GLASS WINDOW UNIT IN EXISTING ALUMINUM RIBBON
WINDOW FRAME SHOWN CROSSHATCHED
10. LOUVER; SEE MECHANICAL AND DETAILS 1B/A-702, 1G/A-702, 1M/A-702.
11. ON ENTIRE BUILDING PERIMETER; SEE TYPICAL EIFS AND SHEET
METAL BASE SECTION 7/A-502 FOR REQUIRED WORK.
12. REPAIR AND REFINISH EIFS AT REMOVED CAMERA/JUNCTION
BOX/HOSE BIB.
13. REMOVE AND INFILL EIFS WALL AS NEEDED FOR NEW STRUCTURAL
TUBES; SEE STRUCTURAL AND DETAIL 6/A-401 AND 1/A-702.
14. EXPANSION JOINT SEE DETAIL 6/A-201
15. LIGHT; SEE ELECTRICAL.
16. LOUVER; SEE MECHANICAL.
17. ANTENNA CABLING BOX; SEE ELECTRICAL.
EXTERIOR ELEVATION KEY NOTES
412 12121212
12 12
41212
PROVIDE 7 SETS OF ANTENNA MOUNTS EACH
SIDE OF RIDGE SEE DETAIL 5/A-201;
14 SETS TOTAL
14 14
15 15
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.TYP.
SCALE: 1/2" = 1'-0" 2' 1' 0 2'
ANTENNA MOUNTING DETAIL
ONE SET OF MOUNTS
4'-0" +/-
4" 4"
4'-0"
1 5/8" UNISTRUT 2'-0" LONG
FASTENED TO STUDS AT 16" O.C.;
PAINT UNISTRUT SAME COLOR AS BUILDING
START FIRST SET 4'-0" +/- FROM RIDGE
DEPENDING ON LOCATION OF STUD
EXISTING ROOF FLASHING
2'- 0"
4"
4"SCALE: 3" = 1'-0" 2"0 8"
EXPANSION JOINT PLAN DETAIL
EXPANSION
JOINT
COVER
EXISTING
EXTERIOR
WALL
EXISTING
EIFS
VARIES
2" TO 2 3/4"
A-201
E X
T E
R I O
R
E
L E
V A
T I O
N S
J F
S D
A
D
W G
J F
S D
A
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
O N
S T
R U
C T
I O
SCALE: 3/4" = 1'-0"
2'1'0 6"
WALL TYPES
6 1/8"
8 1/2" @ J2
J1 3 5/8" METAL STUDS
STC 50 MINIMUM PER GA FILE NO. WP 1052
1/2" ACOUSTICAL SEALANT
EACH SIDE
CONT. TRACK ANCHORED AT 32"
O.C. - BED IN 2 CONT. BEADS OF
SEALANT
TWO LAYERS 5/8" GWB EACH
SIDE
3-1/2" SOUND BATTS - FASTEN
TO METAL STUD FRAMING
DEFLECTION TRACK
3/4" ACOUSTICAL SEALANT
EACH SIDE
T.O. FLOOR SLAB
D1
STRUCTURE
DEFLECTION TRACK
5/8" GYPSUM BOARD EACH
SIDE TO BOTTOM OF DECK
FINISHED CEILING AS
SCHEDULED
3 1/2" ACOUSTIC BATT INSULATION
@ D1 ONLY
3-5/8" METAL STUD FRAMING
AT 16" O.C.
BASE AS SCHEDULED
IN AREAS WITH RAISED FLOOR
WALL SETS ON TOP OF FLOOR
3 5/8" METAL STUDS
F1 3 5/8" METAL STUDS
3 5/8" METAL STUD
FRAMING AT 16" O.C.
5/8" GYPSUM BOARD ONE
SIDE ONLY
FINISHED CEILING AS
SCHEDULED
STOP WALL ABOVE CEILING
WHERE OCCURING
STRUCTURE
BASE AS SCHEDULED
IN AREAS WITH RAISED FLOOR
WALL SETS ON TOP OF FLOOR
4 1/4"
5 1/2"
(7 7/8"
AT H2)
4 7/8"
H1 3 5/8" METAL STUDS
STC 45 MINIMUM PER GA FILE NO. WP 1052
1/2" ACOUSTICAL SEALANT EACH SIDE
CONT. TRACK ANCHORED AT 32"
O.C. - BED IN 2 CONT. BEADS OF
SEALANT
ONE LAYER 5/8" GWB
TWO LAYERS 5/8" GWB
SI
DE
SE
CU
RE
SI
DE
UN
SE
CU
RE
3-1/2" SOUND BATTS - FASTEN
TO METAL STUD FRAMING
3-5/8" METAL STUD FRAMING AT
16" O.C. (6" METAL STUDS AT
WALL TYPE H2)
3-5/8" METAL STUD
FRAMING AT 16" O.C.
DEFLECTION TRACK
3/4" ACOUSTICAL SEALANT EACH SIDE
STRUCTURE
EXTEND TO STRUCTURE IN
AREAS WITHOUT CEILING
E1
STRUCTURE
DEFLECTION TRACK
5/8" GYPSUM BOARD EACH
SIDE TO BOTTOM OF DECK
FINISHED CEILING AS
SCHEDULED
3 1/2" ACOUSTIC BATT
INSULATION
3-5/8" METAL STUD FRAMING
AT 16" O.C.
BASE AS SCHEDULED
3 5/8" METAL STUDS
4 7/8"
H2 6" METAL STUDS
STC 45 MINIMUM PER GA FILE NO. WP 1052
6 1/8"
8 1/2" @ K2
K1 3 5/8" METAL STUDS
2-HOUR FIRE RATED PER UL DESIGN W453
TWO LAYER 5/8" TYPE X GWB
EACH SIDE
3-5/8" METAL STUD FRAMING AT
16" O.C.
DEFLECTION TRACK
STRUCTURE
PROVIDE FIRE STOP SEALANT
AT PERIMETER JOINTS AND
ALL PENETRATIONS AS
APPROPRIATE
3/4" FIRE STOP SEALANT
EACH SIDE
3-1/2" SOUND BATTS
5 1/4"
5 7/8" @ L2
L1
FIRE STOP SEALANT
4" METAL C-H STUD FRAMING
AT 16" O.C.
TWO LAYERS 5/8" GYPSUM
BOARD (THREE LAYERS 5/8"
GYPSUM BOARD AT L2)
1" GYPSUM LINER PANEL
FINISHED CEILING AS
SCHEDULED
STRUCTURE
PROVIDE FIRE-STOP SEALANT
AT PERIMETER JOINTS AND
ALL PENETRATIONS
FIRESTOP DECK FILLER
FIRE STOP SEALANT
INSULATION
8" x 18-GA SHEET METAL PLATE
AS REQUIRED AT METAL DECK
A1 3 5/8" METAL STUDS
A2 3 5/8" METAL STUDS
4 7/8"
7 1/4" @ A3
3-5/8" METAL STUD FRAMING
AT 16" O.C. (6" METAL STUDS
AT WALL TYPE A3)
BASE AS SCHEDULED
FINISHED CEILING AS
SCHEDULED
DEFLECTION TRACK
STRUCTURE
A-401
B1 3 5/8" METAL STUDS
4 7/8"
7 1/4" @ B3
3 1/2" ACOUSTIC BATT INSULATION
@ B1 ONLY
3-5/8" METAL STUD FRAMING
AT 16" O.C. (6" METAL STUDS
AT WALL TYPE B3)
BASE AS SCHEDULED
FINISHED CEILING AS
SCHEDULED
5/8" GYPSUM BOARD EACH
SIDE
B2 3 5/8" METAL STUDS
3 1/2" ACOUSTIC BATT INSULATION
@ A1 ONLY AND 6" ACOUSTIC BATT
INSULATION @ A3 ONLY
5/8" GYPSUM BOARD EACH
SIDE
C1 3 5/8" METAL STUDS
4 1/4"
2 1/4" @ C3
6 5/8" @ C4
3 1/2" ACOUSTIC BATT INSULATION
@ C1 ONLY
3-5/8" METAL STUD FRAMING
AT 16" O.C. (1 5/8" METAL
STUDS AT WALL TYPE C3)
(6" METAL STUDS AT WALL
TYPE C4)
BASE AS SCHEDULED
FINISHED CEILING AS
SCHEDULED
5/8" GYPSUM BOARD
C2 3 5/8" METAL STUDS
V A
R I E
S
S
C
E S
S
F L O
O R
I N
G
P
L A
N S
A-401
G1
FINISHED CEILING AS SCHEDULED
CONT. TRACK ANCHORED
AT 32" O.C. - BED IN 2 CONT.
BEADS OF SEALANT
1/2" ACOUSTICAL SEALANT
EACH SIDE
5 1/2"
7 7/8" @ G2
V A
R I E
S
S
C
E S
S
F L O
O R
I N
G
P
L A
N S
A-401
SI
DE
SE
CU
RE
SI
DE
UN
SE
CU
RE
IN AREAS WITH RAISED FLOOR
WALL SETS ON TOP OF FLOOR
BASE AS SCHEDULED
ONE LAYER 5/8" GWB
TWO LAYERS 5/8" GWB
3-1/2" SOUND BATTS - FASTEN
TO METAL STUD FRAMING
3-5/8" METAL STUD FRAMING AT
16" O.C.
DEFLECTION TRACK
3/4" ACOUSTICAL SEALANT
EACH SIDE
STRUCTURE
A-401
V A
R I E
S
S
C
E S
S
F L O
O R
I N
G
P
L A
N S
V A
R I E
S
S
C
E S
S
F L O
O R
I N
G
P
L A
N S
EXISTING WALL TO REMAIN
A-401
FINISHED CEILING AS
SCHEDULED
A-401
A-401
A-401
NOT TO SCALE
DETAIL
4" METAL C-H STUDS
STC 45 MINIMUM PER GA FILE NO. WP 1052
1 HOUR FIRE RATED PER UL DESIGN W453
L2 4" METAL C-H STUDS
STC 50 MINIMUM PER GA FILE NO. WP 1052
1 HOUR FIRE RATED PER UL DESIGN W453
ACCESS FLOORING WHERE
OCCURRING
A3 6" METAL STUDSB3 6" METAL STUDSC3 1 5/8" METAL STUDS
D2 3 5/8" METAL STUDS
3 5/8" METAL STUDS
STC 45 MINIMUM PER GA FILE NO. WP 1052
ACCESS FLOORING WHERE OCCURRING
3-1/2" SOUND BATTS - FASTEN
TO METAL STUD FRAMING
DEFLECTION TRACK
M1 3 5/8" METAL STUDS
3 5/8" METAL STUD
FRAMING AT 16" O.C.
(6" METAL STUDS AT WALL
TYPE M2)
5/8" GYPSUM BOARD ONE
SIDE ONLY
FINISHED CEILING AS
SCHEDULED
STOP WALL ABOVE CEILING
WHERE OCCURING
STRUCTURE
BASE AS SCHEDULED
4 1/4"
6 5/8" @ M2
EXTEND TO STRUCTURE IN
AREAS WITHOUT CEILINGS
EXISTING WALL TO REMAIN
N1 6" METAL STUDS
EXISTING WALL TO REMAIN
BASE AS SCHEDULED
7 1/4"
INFILL EXISTING WINDOW
OPENING WITH 3 5/8" METAL
STUDS WITH 5/8" GWB AND
3 1/2" BATT INSULATION IN
STUD SPACE
SHEET METAL-BACKED 5/8" GWB
5/8" GYPSUM BOARD
6" HEAVY GAUGE STEEL
STUD
M2 6" METAL STUDS
STRUCTURE
O1 1 5/8" METAL STUDS
2 1/4"
1-5/8" METAL
STUD FRAMING
AT 16" O.C.
BASE AS
SCHEDULED
FINISHED CEILING
AS SCHEDULED
5/8" GYPSUM
BOARD
STRUCTURE
FIRESTOP COMPOUND
K2 6" METAL STUDS
NOT RATED
SCALE: 3/4" = 1'-0"
2'1'0 6"
INFILL EIFS DETAIL
EXISTING EIFS
EXISTING 1/2" EXTERIOR GWB SHEATHING
EXISTING 6" METAL STUD FRAMING
EXISTING EIFS
EXISTING 1/2" EXTERIOR
GWB SHEATHING
EXISTING 6" METAL
STUD FRAMING
EIFS
1/2" EXTERIOR GWB SHEATHING
6" METAL STUD FRAMING @ 16" O.C.
C4 6" METAL STUDS
J2 6" METAL STUDS
STC 50 MINIMUM PER GA FILE NO. WP 1052
G2 6" METAL STUDS
STC 45 MINIMUM PER GA FILE NO. WP 1052
P1 6" CONCRETE CURB
CONCRETE
CURB DOWELED
TO EXISTING
FLOOR WITH
#5's AT 24"
SHAFT
ENCLOSURE; SEE
MECHANICAL
SI
DE
SE
CU
RE
SI
DE
UN
SE
CU
RE
FLOOR EDGE AT SECOND FLOOR
6"
3/4" ACOUSTICAL SEALANT
EACH SIDE
FINISHED FLOOR WHERE OCCURRING
6" BATT INSULATION
3 " ACOUSTIC BATT INSULATION AT
WINDOW LOCATION ONLY
3 " ACOUSTIC BATT INSULATION AT
WINDOW LOCATION ONLY
1. CONTRACTOR IS RESPONSIBLE FOR MEETING THE ACOUSTIC
PERFORMANCE OF STC RATED WALLS AND DOOR/FRAME ASSEMBLIES.
THE GOVERNMENT WILL TEST THE ASSEMBLIES AND THE
CONTRACTOR IS RESPONSIBLE FOR ALL CORRECTIVE WORK AT HIS
OWN EXPENSE TO PASS GOVERNMENT TESTS.
GENERAL SOUND ATTENUATION
PERFORMANCE REQUIREMENTS NOTE:
PIPE OR CONDUIT - SIZE
VARIES
ELECTRICAL DRAWINGS FOR
AND INSPECTION PORTS
NON-CONDUCTIVE BREAKS
DUCT OR BEAM ALL SIDES
DUCT OR BEAM - SIZE
VARIES
METAL BRIDGING TIGHT TO
1/2" x 1-1/2" ACOUSTICAL
SEALANT ALL SIDES
SCALE: 1-1/2" = 1'-0" 8"4"0 16"
ACOUSTIC PENETRATION DETAILS
1/2" x 1-1/2" ACOUSTICAL
SEALANT ALL SIDES
NOTE: SEE MECHANICAL AND
TWO LAYERS 5/8" GYPSUM
BOARD PANELS MINIMUM
8" LARGER THAN DUCT OR
BEAM SIZE ALL SIDES
TWO LAYERS 5/8" GYPSUM
BOARD - 16" x 16" PANELS
FOR PIPES AND CONDUITS
UP TO 4"Ø - 24" x 24" PANELS
FOR PIPES AND CONDUITS
LARGER THAN 4"Ø
4"SCALE: 3" = 1'-0" 2"0 8"
CONTROL JOINT TYPES
TYPICAL WALL
A
SECURE AREA AND STC WALLS
C
FIRE-RATED WALL
B
DRYWALL CONTROL JOINT
DRYWALL CONTROL JOINT
DRYWALL CONTROL JOINT
DRYWALL CONTROL JOINT
DRYWALL GAP
DRYWALL BLOCKING
1/2" AIR GAP
DRYWALL GAP
DRYWALL CONTROL JOINT
DRYWALL CONTROL JOINT
5/8" AIR GAP
2 5/8" TYPE S SCREWS 24" O.C.
5/8" TYPE X GYPSUM STRIPS
FASTENED TO STUD
1/2" MAX GAP
1/2" MAX GAP
4"SCALE: 3" = 1'-0" 2"0 8"
EXPANSION JOINT TYPES - 2" TYPICAL
TYPICAL WALL
A
SECURE AREA WALL
C
FIRE-RATED AND STC WALLS
B
DUAL ELASTOMERIC SEAL
FIRE SAFING INSULATION
FIRE SAFING INSULATION
CLEAR ANODIZED ALUMINUM FACE EXTRUSION
CLEAR ANODIZED ALUMINUM SLIDE PLATE
ALUMINUM WALL EXTRUSIONALUMINUM WALL EXTRUSION
DUAL ELASTOMERIC SEAL
DRYWALL SCREW @ 24" O.C. DRYWALL SCREW @ 24" O.C.
DRYWALL SCREW @ 18" O.C.
ALUMINUM BASE EXTRUSION
SEE WALL TYPE FOR
NUMBER OF GWB LAYERS
AND LOCATIONS
SEE WALL TYPE FOR
NUMBER OF GWB LAYERS
AND LOCATIONS
SEE WALL TYPE FOR
NUMBER OF GWB LAYERS
AND LOCATIONS
SEE WALL TYPE FOR
NUMBER OF GWB LAYERS
AND LOCATIONS
SEE WALL TYPE FOR
NUMBER OF GWB LAYERS
AND LOCATIONS
SEE WALL TYPE FOR
NUMBER OF GWB LAYERS
AND LOCATIONS
FIRE SAFING INSULATION AT RATED WALLS
SCALE: 1-1/2" = 1'-0" 8"4"0 16"
WOOD BLOCKING DETAIL
METAL STUDS
WOOD 2x2 TYP.
3/4" PLYWOOD
5/8" GWB
A-401
W A
L L
T
Y P
E S
J F
S D
A
D
W G
J F
S D
A
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
O N
S T
R U
C T
I O
SCALE: 1/4" = 1'-0" 4' 2' 0 4'
INTERIOR ELEVATIONS
GUEST OFFICE 142
C
AUDITORIUM 145
A
BREAK ROOM 106
B
6'-2 1/2" F.V.
1" SCRIBE
3'- 0"
COUNTERTOP: SS-1
BASE CABINETS: PL-1
6'-10"
3'- 0"
COUNTERTOP: SS-1
BASE CABINETS: PL-1
COUNTERTOP: SS-1
BASE CABINETS: PL-1
UPPER CABINETS: PL-2
3'-0"3'-1 1/2"
NOT USED
D
11'-1"
3'-0" 2'-2"
TOWEL DISPENSER TD-1
3'-0"
TOWEL DISPENSER TD-1
2'-9"2'-9"
DTW-1 LOCKERS
WOMEN 112
F
MEN 110
E
2'-
2'-
3'-0" F.V. 12'-0" F.V.
MO
N.
TI
ME
Z
ON
E
CL
OC
K
N.
I.C
MON. MON. MON. MON. MON. MON. MON. MON. MON. MON.MON. MON.
MO
N.
(2) MON. (2) MON.(2) MON. (2) MON.(2) MON. (2) MON.(2) MON. (2) MON.
(2) MON.
MO
N.
MO
N.
MO
N.
MO
N.
(2) MON.
PLAN - SOC 203
O
5" WALL
2'-
1/ 4"
27'-4 11/16" 17'-0" 27'-4 11/16"
SOC
3'- 0"
MIRROR GLASS
MIRROR
GLASS
SOC 203
P
SOC 203
L
KNEE
SPACE
SOC 203
M
COUNTERTOP: SS-1
BASE CABINETS: PL-1
COUNTERTOP: SS-1
A-403
1M
1P
A-403
1L
A-403
1N
1B 1C1B1B1C
1E1E
1F1F
A-403
1R
A-403
1Q
A-403 1S
MONITORS
SOC 203
Q
MONITORS, TYP.
SOC 203
N
MONITORS
SOC 203
S
SOC 203
R
ANGLED WALL
MONITORS
MONITORS
ANGLED WALL
BASE AS SCHEDULED
BASE AS SCHEDULED
BASE AS SCHEDULED
BASE AS SCHEDULED
WORLD TIME ZONE CLOCK;
SEE ELECTRICAL
ACOUSTICAL WALL PANELS, TYP.
C2 N1
C2
M1
M1
M1
E1
E1
B2 B2A1A1
E1
N1
MONITORS
UP 6 3/4" UP 6 3/4"
2'-
5'-1" F.V.
MIRROR
GLASS1E
WOMEN 112
G
2'-
5'-3 1/8" F.V.
MIRROR
GLASS1E
WOMEN 224
J
2'-
6'-0" F.V.
MIRROR
GLASS1E
MEN 223
H
COUNTERTOP: SS-2
INTEGRAL BOWLS: SS-3
COUNTERTOP: SS-2
INTEGRAL BOWL: SS-3
COUNTERTOP: SS-2
INTEGRAL BOWLS: SS-3
COUNTERTOP: SS-2
INTEGRAL BOWLS: SS-3
COUNTERTOP: SS-2
INTEGRAL BOWLS: SS-3
MICROWAVE (N.I.C.)
1'-7"
ICE MAKER
(N.I.C.)
2'-6" 2'-6"
UNDER COUNTER
REF. N.I.C.
NOTE: ALL CASEWORK DETAILS ARE FOUND
ON SHEET A-404
1K
2'- 0"
2'- 6"
1K
EXISTING CONCRETE FLOOR SLAB
EXISTING CONCRETE FLOOR SLAB
EXISTING CONCRETE FLOOR SLAB EXISTING CONCRETE FLOOR SLAB
RAISED ACCESS FLOORING
RAISED ACCESS FLOORING
RAISED ACCESS FLOORING
8"
RAISED ACCESS FLOORING
REF.
N.I.C.
REF.
N.I.C.
CPW-2
LOCKERS
OPEN
CPW-1
LOCKERS
4" CURB
4 7/8"
11'-3" 3'-0" 3'-0" 2'-4 1/2" 1"
1"
BASE AS SCHEDULEDBASE AS SCHEDULEDBASE AS
SCHEDULED
BASE AS
SCHEDULED
BASE AS
SCHEDULED
BASE AS
SCHEDULED
B2
TO 4'-0" ABOVE
CONCRETE SLAB WITH A
SOLID SURFACE CAP, SS-1
SEE DETAIL 3/A-702
OPENING
MONITORS
1G
SEMI-RECESSED FIRE EXTINGUISHER CABINET
UP 4"
UP 4" RAMP
A-504
A-504
A-504
5 EQUAL SPACES
COPY 204
K
COUNTERTOP: SS-1
BASE CABINETS: PL-1
1A
13'-0"
1" SCRIBE
3'- 0"
3'-3"3'-3"3'-3"3'-0"
1" SCRIBE 1" SCRIBE
COUNTERTOP: SS-1
BASE AS SCHEDULED
OPENING
ALIGN
OPEN
2" END PANEL
BASE AS
SCHEDULED
2'-2"
3'- 6"
2" END PANEL
3'-7"
6" METAL STUD FRAMING @ 16" O.C. WITH PLYWOOD ON TOP AND SIDES
A-404
6 3 /4"
8"
SUPPORT BRACKET
1J
CORRIDOR 205
T
COUNTERTOP: SS-1
BASE CABINETS: PL-1
UPPER CABINETS: PL-2
CORRIDOR 205
U
COUNTERTOP: SS-1
BASE CABINETS: PL-1
UPPER CABINETS: PL-2
1A 1C
TOWEL DISPENSER TD-1
3'-0"1'-0" 2'-0"
1" SCRIBE
2'-0"2'-0"1'-9"
2'-6" 1'-0"
OPEN FOR
TRASH AND
RECYCLING
BINS N.I.C.
1'-3" 1 13/16" SCRIBE
REF.
N.I.C.
REF.
N.I.C.
MICROWAVE (N.I.C.)
1K
3'-0"
1" SCRIBE
3'-0"
1" SCRIBE
3'- 0"
2'- 0"
2'- 6"
1N1J
3'- 0"
2'- 0"
2'- 6"
PLUGSTRIP; SEE
ELECTRICAL
1'-0" 1'-0"
19'-5 5/8"
1" SCRIBE
FINISHED END
OPEN FOR TRASH
AND RECYCLING
BINS N.I.C.
FINISHED END1M1M
1'- 0" 1'-0"
4'-
5/ 8"
4'- 7 3
/8" 9'-
6"
26'-3 11/16"
5°
155°
15'-7"
2 1/2"
5" WALL
1L1L REV.
6"
KNEE
SPACE
KNEE
SPACE
KNEE
SPACE
1B
FINISHED END
FINISHED END
FINISHED END
FINISHED END
FINISHED
END
6 3 /4"
8" 6 3
/4"
1" SCRIBE
2 1/2"
6"
3'-10 1/4"TYP.
1'- 3"
TY
P.
APF-3 APF-2 APF-1APF-3 APF-2 APF-1
APF-3APF-2 APF-1
ACOUSTICAL WALL PANELS, TYP.
APF-3 APF-2APF-1
ACOUSTICAL WALL PANELS, TYP.
4'-0" 1'-7"
R26'-3 7/16"R29'-3 7/16"
WIREWAY GROMMET
A-403
I N
T E
R I O
R
E
L E
V A
T I O
N S
J F
S D
A
D
W G
J F
S D
A
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
O N
S T
R U
C T
I O
SCALE: 1/2" = 1'-0" 2' 1' 0 2'
LOADING DOCK SECTION
1'- 5"
2'-
9'-0"
2"
1'-11"12'-0"
13'-11"
8'-0"
2'-
1'- 5"
2'-
2"
1'- 5"
A-504
A-504
TOP OF LANDING
PAVEMENT
TOP OF
SCALE: 1/2" = 1'-0" 2' 1' 0 2'
LOADING DOCK SECTION
EXISTING BUILDING FACE
A-504
1'- 5"
PAVEMENT
TOP OF
GALVANIZED BAR GRATE; 1"x1/8"
BEARING BARS AT 1 3/16" O.C. WITH
CROSS BARS AT 4" O.C.
GALVANIZED 1 1/4" DIAMETER
STANDARD STEEL PIPE HANDRAIL AND
VERTICALS - WELD ALL JOINTS
GALVANIZED CHANNEL 8x13.75
GALVANIZED CHANNEL 8x13.75
GALVANIZED STEEL TUBE 4x4x1/4
GALVANIZED 6x6x1/2" PLATE WITH
GALVANIZED STEEL SHIMS; ANCHOR TO
CONCRETE SIDEWALK WITH (2) 1/2"
EXPANSION ANCHORS
GALVANIZED STEEL
TUBE 4x4x1/4"
GALVANIZED 1 1/4" DIAMETER
STANDARD STEEL PIPE HANDRAIL AND
VERTICALS - WELD ALL JOINTS
GALVANIZED BAR GRATE
GALVANIZED STEEL TUBE 4x4x1/4"
GALVANIZED 1/4" STEEL PLATE - WELD
TO GALVANIZED BAR GRATE
GALVANIZED CHANNEL 8x13.75 GALVANIZED CHANNEL 8x13.75
CONCRETE SIDEWALK
SCALE: 1/2" = 1'-0" 2' 1' 0 2'
PLATFORM SECTION
SCALE: 1/2" = 1'-0" 2' 1' 0 2'
ENLARGED PLATFORM RAMP PLAN
AUDITORIUM
5C
UP 6 3/4"
RAMP DOWN
RA
MP
D
OW
N
7'-0"
3'- 0"
3'-0"
4'- 0"
LANDING
A-504
A-504
A-504
7'-0"
6 3 /4"
WOOD BASE
O1M1
M1
SEE FLOOR PLAN
FOR WALL TYPE
CARPET AS SCHEDULED
3/4" PLYWOOD
6" METAL STUD
FRAMING AT
16" O.C.
SCALE: 1/2" = 1'-0" 2' 1' 0 2'
PLATFORM SECTION
HARDWOOD BASE; SEE 2B/A-702
SEE FLOOR PLAN FOR
WALL TYPE
CARPET AS
SCHEDULED
3/4" PLYWOODTREATED WOOD
BLOCKING @ 16" O.C.
4'-0"
FLOOR FILLER
SCALE: 1/2" = 1'-0" 2' 1' 0 2'
PLATFORM SECTION
6 3 /4"
HARDWOOD BASE
SEE FLOOR PLAN
FOR WALL TYPE
CARPET AS
SCHEDULED
3/4" PLYWOOD
TREATED WOOD BLOCKING
@ 16" O.C.
4'-0"
3 3 /8"
3 3 /8"
3'-0"
3'-0"
2"
A-504
HARDWOOD;
MATCH SPECIES
AND THICKNESS
OF HARDWOOD
BASE ABOVE
HARDWOOD; MATCH SPECIES AND
THICKNESS OF HARDWOOD BASE ABOVE
WRAP HARDWOOD
BASE BACK TO
DOOR FRAME
A-504
A-504
A-504
SIM.
HARDWOOD CHAIR RAIL; SEE 2A/A-702;
WRAP BACK TO DOOR FRAME
HARDWOOD BASE; SEE 2B/A-702
6" METAL STUD
FRAMING AT 16" O.C.
3/4" PLYWOOD
A-504
2"
1"
EXISTING EXTERIOR
EIFS WALL
4"SCALE: 3" = 1'-0" 2"0 8"
LOADING DOCK DETAIL
GALVANIZED 1 1/4" DIAMETER
STANDARD STEEL PIPE HANDRAIL AND
VERTICALS - WELD ALL JOINTS
GALVANIZED BAR GRATE
GALVANIZED 1/4" STEEL PLATE
GALVANIZED CHANNEL 8x13.75
(BOTTOM TRIMMED OFF)
GALVANIZED ANGLE 2x2x1/4"x0'-6" WITH (2) 1/2" BOLTS
CONCRETE SIDEWALK
GALVANIZED STEEL SHIMS
GALVANIZED 6x6x1/2" PLATE WITH GALVANIZED STEEL SHIMS;
ANCHOR TO EXISTING CONCRETE WITH (2) 1/2" EXPANSION ANCHORS
4"SCALE: 3" = 1'-0" 2"0 8"
LOADING DOCK DETAIL
GALVANIZED BAR GRATE
GALVANIZED STEEL TUBE 4x4x1/4"
GALVANIZED 6x6x1/2" PLATE WITH
GALVANIZED STEEL SHIMS; ANCHOR
TO EXISTING CONCRETE WITH (2) 1/2"
EXPANSION ANCHORS
CONCRETE PAVEMENT
TOP OF SLAB
ACCESS FLOOR LINE
4"SCALE: 3" = 1'-0" 2"0 8"
LOCKER CURB DETAIL
LOCKER SHOWN DASHED
BASE AS SCHEDULED
1x4 x CONTINUOUS WOOD BLOCKING
SEE FLOOR PLAN FOR WALL TYPE
1'-3"
3/4" PLYWOOD
2x6 CONTINUOUS WOOD BLOCKING
1x4 x CONTINUOUS WOOD BLOCKING
4"SCALE: 3" = 1'-0" 2"0 8"
LOCKER DETAIL
LOCKER SHOWN DASHED
BASE AS SCHEDULED
SEE FLOOR PLAN FOR
WALL TYPE
ALIGN TOP OF LOCKER
WITH ADJACENT LOCKER
1x4 x CONTINUOUS
WOOD BLOCKING
4"SCALE: 3" = 1'-0" 2"0 8"
FOLDING PANEL PARTITION DETAIL
FOLDING PANEL
PARTITION
ACOUSTICAL CEILING
TILE AS SCHEDULED
STEEL TUBE BEYOND
SHOWN DASHED; SEE
STRUCTURAL
STEEL BEAM; SEE
STRUCTURAL
CONTINUOUS WOOD
BLOCKING
HANGER RODS AND
DROP ROD BRACKET
BY FOLDING PANEL
PARTITION SUPPLIER
4"SCALE: 3" = 1'-0" 2"0 8"
ELECTRICAL PANEL FRAMING DETAIL
ELECTRICAL PANEL; SEE ELECTRICAL
SECURE SIDE
UNSECURE SIDE
5/8" GWB G2
TREATED WOOD BLOCKING
BATT INSULATION; STRIP TO MATCH
CAVITY THICHNESS
J1
J1
WALL UP TO STRUCTURE
4"SCALE: 3" = 1'-0" 2"0 8"
PLATFORM EDGE DETAIL
CARPET AS
SCHEDULED
3/4"x6 3/4" HARDWOOD
CARPET AS
SCHEDULED
3/4" PLYWOOD
4"SCALE: 3" = 1'-0" 2"0 8"
WOOD BASE DETAIL
WOOD BASE; SEE DETAIL
2A/A-702
HARDWOOD; MATCH
SPECIES AND THICKNESS OF
HARDWOOD BASE ABOVE
VINYL NOSING
6" METAL STUD
FRAMING @ 16" O.C.
CARPET
3/4" PLYWOOD
ELEV. = 114'-3"
2ND FLOOR
G H I.1 I.2
DEBRIEF 8
DEBRIEF 7
DEBRIEF 6
DEBRIEF 5
SCALE: 1/8" = 1'-0" 8' 4' 0 8'
FOLDING PANEL PARTITION SECTION
STEEL BEAM;
SEE STRUCTURAL
ELEV. = 124'-3"
BOTTOM OF STEEL BEAM
STEEL BEAM;
SEE STRUCTURAL
STEEL TUBES IN WALL SHOWN DASHED;
SEE STRUCTURAL
EQ. EQ. EQ. EQ.
A-504
A-504
A-504
L O
A D
I N
G
D
O C
K
D
E T
A I L S
J F
S D
A
D
W G
J F
S D
A
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
O N
S T
R U
C T
I O
NOTES
ROOM FINISH SCHEDULE
NO. DESCRIPTION FLOOR BASE
NORTH WALL EAST WALL SOUTH WALL WEST WALL CEILING
MAT. FIN. MAT. FIN. HEIGHTMAT. FIN. MAT. FIN. MAT. FIN.
ATC ACOUSTICAL TILE CEILING
CONC CONCRETE
CPT CARPET TILE
CT CERAMIC TILE
EX EXISTING
EXP EXPOSED
GWB GYPSUM WALLBOARD
HPL HIGH-PRESSURE LAMINATE FLOORING
LVT LUXURY VINYL TILE
P PAINT
PT PORCELAIN TILE
RB RESILIENT BASE
RT RUBBER TILE/TREAD
SC SPECIAL COATING
VCT VINYL COMPOSITION TILE
WD WOOD
WAPS WOOD ACOUSTICAL PANEL SYSTEM
ROOM FINISH SCHEDULE LEGEND
NOTE: REFER TO COLOR SCHEDULE FOR ALL INTERIOR FINISHES.
100 VESTIBULE CPT-6 RB-1 GWB SC-1 EX GWB SC-1 GWB SC-1 GWB SC-1 GWB P-1 9'-0"
101 WAITING LVT-1, 2A RB-1 GWB SC-6 GWB SC-2 GWB SC-2 GWB SC-2 ATC-1 -- 9'-2" 1
102 CORRIDOR CPT-6 RB-1 GWB SC-2 GWB SC-2 GWB SC-2 GWB SC-2 WAPS-1/GWB WD/P-3 VARIES
103 SSO CPT-2 RB-1 GWB P-2 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
104 CORRIDOR PT-1,2 PT-1 GWB SC-2 GWB SC-2 GWB SC-2 -- -- WAPS-1 -- VARIES 1, 9
105 LOBBY PT-1,1A,2,2A PT-1 GWB SC-1, 6 GWB SC-6 GWB SC-1, 6 GWB SC-2, 6 WAPS-1/GWB WD/P-2 VARIES 1, 9 106 BREAK ROOM LVT-1,2,2A,3,4 RB-1 GWB SC-5 GWB SC-5 GWB SC-3 GWB SC-3 ATC-1 -- 9'-0" 1
107 REST ROOM PT-1 PT-1 GWB GP-1 GWB GP-1 GWB GP-6 GWB GP-1 ATC-1 -- 8'-8" 1
110 MEN EX/PT-3 CT-1 GWB CT-1 GWB CT-1 EX GWB EX CT EX/GWB CT-1 GWB GP-1 8'-8" 1
111 JANITOR EX EX EX GWB GP-1 EX GWB GP-1 EX GWB GP-1 EX GWB GP-1 EX GWB GP-1 9'-0" 112 WOMEN EX/PT-3 CT-1 EX GWB EX CT GWB CT-1 GWB CT-1 EX/GWB CT-1 GWB GP-1 8'-8" 1
113 HEALTH LVT-1 RB-1 GWB P-1 GWB P-1 GWB P-5 GWB P-1 ATC-1 -- 8'-8"
114 CORRIDOR CPT-2,3 RB-1 -- -- GWB SC-2,4 EX GWB SC-6 GWB SC-1,6 ATC-1 -- 9'-2" 1
115 FLIGHT MEDICINE CPT-1 RB-1 GWB P-1 GWB P-3 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
116 WST 4 CPT-3 RB-1 GWB P-4 GWB P-2 GWB P-2 GWB P-2 ATC-1 -- 10'-0"
117 CORRIDOR CPT-2 RB-1 GWB P-6 -- -- GWB P-2 GWB P-2 ATC-1 -- 9'-0"
118 CORRIDOR CPT-2 RB-1 GWB P-2 GWB P-2 GWB P-6 GWB P-6 ATC-1 -- 9'-0"
119 DEBRIEF 1 CPT-1 RB-1 GWB P-3 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
120 DEBRIEF 2 CPT-1 RB-1 GWB P-1 GWB P-3 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
121 DEBRIEF 3 CPT-1 RB-1 GWB P-3 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
122 DEBRIEF 4 CPT-1 RB-1 GWB P-1 GWB P-1 GWB P-3 GWB P-1 ATC-1 -- 9'-0"
123 WST 1 CPT-3 RB-1 GWB P-2 GWB P-4 GWB P-2 GWB P-2 ATC-1 -- 10'-0"
124 WST 2 CPT-3 RB-1 GWB P-2 GWB P-2 GWB P-2 GWB P-4 ATC-1 -- 10'-0"
125 WST 3 CPT-3 RB-1 GWB P-2 GWB P-2 GWB P-2 GWB P-4 ATC-1 -- 10'-0"
130 VESTIBULE CPT-6 RB-1 EX GWB P-1 EX GWB P-1 EX GWB P-1 EX GWB P-1 EX GWB P-1 9'-0" 131 MECHANICAL CONC RB-1 GWB NOTE 3 GWB NOTE 3 EX/GWB NOTE 3 EX/GWB NOTE 3 EXP -- -- 132 ELECTRICAL CONC RB-1 GWB NOTE 3 GWB NOTE 3 EX/GWB NOTE 3 GWB NOTE 3 GWB -- NOTE 7
133 STORAGE CPT-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
134 OPEN CPT-1,5 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-5 ATC-1 -- 9'-0" 1
140 COMMUNICATIONS VCT-1 RB-1 GWB P-1 GWB P-1 EX GWB P-1 GWB P-1 EXP -- --
141 CORRIDOR PT-1,1A,2,2A PT-1 EX/GWB SC-2 -- -- GWB SC-2 GWB SC-4 WAPS-1 WD VARIES 1, 9
142 GUEST OFFICE CPT-1 RB-1 GWB P-1 GWB P-3 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
144 AV/STORAGE CPT-2 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
145 AUDITORIUM CPT-2 NOTE 8 GWB P-5 GWB P-2 GWB P-4 GWB P-2 ATC-1/GWB P-1 VARIES 9
150 ELEVATOR EQUIPMENT CONC EX VB EX GWB -- EX GWB -- EX -- EX GWB -- EX GWB -- 9'-0"
151 CORRIDOR CPT-2,3 RB-1 GWB SC-3 GWB SC-4 -- -- EX/GWB SC-1 ATC-1 -- 9'-2" 1
152 PILOTS PLANNING CPT-1,5 RB-1 GWB P-1 EX/GWB P-1 EX/GWB P-1 GWB P-5 ATC-1 -- 9'-0" 1
153 STORAGE CPT-2 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
160 CORRIDOR CPT-2,3 RB-1 GWB SC-6 GWB SC-3, 4 GWB SC-3 GWB SC-1 GWB P-1 VARIES 1, 9
161 MAINT. BACK SHOP HPL-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 ATC-2 -- 9'-0"
162 CORRIDOR RT-1 RB-1 GWB P-1 GWB P-1 GWB P-1 -- -- EXP P-1 -- 2
163 SERVER ROOM HPL-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 EXP P-1 -- 2
164 SERVER ROOM HPL-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 ATC-2 -- 10'-0"
165 UPS CONC RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 EXP -- --
166 BATTERY CONC RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 EXP -- --
170 VESTIBULE CPT-6 RB-1 EX/GWB P-1 EX GWB P-1 EX/GWB P-1 EX GWB P-1 GWB P-1 9'-0"
171 CORRIDOR CPT-2 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
172 SAP CONFERENCE ROOM CPT-2 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-6 ATC-1 -- 9'-0"
173 OFFICE CPT-1 RB-1 GWB P-3 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
174 CORRIDOR CPT-2 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
175 OFFICE CPT-1 RB-1 GWB P-1 GWB P-1 GWB P-3 GWB P-1 ATC-1 -- 9'-0"
176 OFFICE CPT-1 RB-1 GWB P-1 GWB P-1 GWB P-3 GWB P-1 ATC-1 -- 9'-0"
177 OPEN CPT-1 RB-1 GWB P-1 GWB P-1 GWB P-3 GWB P-1 ATC-1 -- 9'-0"
180 FLIGHT OPERATIONS SUPPORT CPT-1,5 RB-1 GWB P-5 GWB P-3 GWB P-2 GWB P-2,3 ATC-1 -- 9'-0" 1
E-1 ELEVATOR CPT-3 EX EX EX EX EX EX EX EX EX NOTE 5
S-1 STAIR 1 EX PT EX PT EX GWB SC-5 EX GWB SC-2 EX GWB SC-5 EX/GWB SC-2 EX GWB P-1 -- S-2 STAIR 2 EX PT EX PT EX GWB SC-5 EX GWB SC-2 EX GWB SC-5 EX GWB SC-2 EX GWB P-1 --
ROOM FINISH SCHEDULE NOTES
1. SEE FINISHES PLAN FOR FLOOR PATTERNS.
2. PAINT ALL EXPOSED ROOF STRUCTURE, DECK, CONDUIT, JUNCTION
BOXES, DUCTWORK, PIPING, ETC. TO MATCH CEILING COLOR.
3. PRIME ALL NEW WALLS FULL-HEIGHT
4. FOLDING PARTITION (SEE FLOOR PLAN)
5. PROVIDE (3) DROP-IN ACRYLIC 1/4" THICK FROSTED WHITE CEILING
PANELS IN EXISTING SUSPENDED GRID. PANELS SHALL BE APPROX.
22"x48" (FIELD VERIFY).
6. PRIME WALLS FULL-HEIGHT
7. GWB CEILING AS TIGHT AS CAN BE TO STRUCTURE ABOVE.
8. WOOD BASE AND CHAIR RAIL THIS ROOM. SEE DETAIL 2/A-702.
9. SEE REFLECTED CEILING PLAN FOR CEILING HEIGHTS.
NOTES
ROOM FINISH SCHEDULE
NO. DESCRIPTION FLOOR BASE
NORTH WALL EAST WALL SOUTH WALL WEST WALL CEILING
MAT. FIN. MAT. FIN. HEIGHTMAT. FIN. MAT. FIN. MAT. FIN.
200 LOBBY CPT-2,4/RT-1 RB-1 GWB SC-1 GWB SC-1 GWB SC-6 EX/GWB SC-1 ATC-1/GWB P-4 VARIES 1, 9
201 CORRIDOR CPT-2,4 RB-1 -- -- GWB P-1 -- -- GWB P-1 ATC-1 -- 9'-10" 1
202 MX. MAINTENANCE CPT-2 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 8'-8"
203 SQUADRON OPERATIONS CENTER (SOC) CPT-2,4 RB-1 GWB P-2 GWB P-2 GWB P-2 GWB P-1 ATC-1/GWB P-5, 6 VARIES 1, 9
204 COPY CPT-2 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
205 CORRIDOR CPT-2,4 RB-1 -- -- GWB SC-1 GWB SC-4 EX GWB SC-6 ATC-1 -- 9'-0" 1
210 CORRIDOR CPT-2,4,LVT-2A RB-1 GWB SC-6 -- -- GWB SC-4 -- -- ATC-1 -- 9'-0" 1
211 VTC CONFERENCE ROOM CPT-2 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-6 ATC-1 -- 9'-0"
213 CORRIDOR CPT-2,4 RB-1 -- -- GWB SC-4 GWB SC-4 GWB SC-2 ATC-1 -- 9'-0" 1
214 DEBRIEF 8 CPT-1 RB-1 -- -- GWB P-1 GWB P-1 GWB P-3 ATC-1 -- 9'-0" 4
215 DEBRIEF 7 CPT-1 RB-1 GWB P-1 GWB P-1 -- -- GWB P-3 ATC-1 -- 9'-0" 4
216 DEBRIEF 6 CPT-1 RB-1 -- -- GWB P-1 GWB P-1 GWB P-3 ATC-1 -- 9'-0" 4
217 DEBRIEF 5 CPT-1 RB-1 GWB P-1 GWB P-1 -- -- GWB P-3 ATC-1 -- 9'-0" 4
218 CORRIDOR CPT-2,4 RB-1 GWB SC-6 GWB SC-6 -- -- GWB SC-2 ATC-1 -- 9'-0" 1
220 COMMUNICATIONS VCT-1 EX EX GWB NOTE 6 EX GWB NOTE 6 EX GWB NOTE 6 EX GWB NOTE 6 ATC-2 -- 11'-0" 221 ELECTRICAL CONC EX EX GWB NOTE 6 EX GWB NOTE 6 EX GWB NOTE 6 EX GWB NOTE 6 EX GWB -- 9'-0"
223 MEN EX PT EX PT EX GWB EX CT EX GWB EX CT EX GWB EX CT EX GWB EX CT GWB GP-1 8'-0" 224 WOMEN EX PT EX PT EX GWB EX CT EX GWB EX CT EX GWB EX CT EX GWB EX CT GWB GP-1 8'-0" 225 CORRIDOR CPT-2,4 RB-1 EX/GWB SC-1 EX GWB SC-1 EX GWB SC-4 -- -- ATC-1 -- 9'-0" 1
226 JANITOR CONC RB-1 GWB GP-1 EX/GWB GP-1 GWB GP-1 GWB GP-1 ATC-1 -- 9'-0"
230 CORRIDOR CPT-2,4 RB-1 -- -- GWB SC-6 GWB SC-2 GWB SC-2 ATC-1 -- 9'-0" 1
231 DEBRIEF 4 CPT-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-3 ATC-1 -- 9'-0"
232 DEBRIEF 3 CPT-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-3 ATC-1 -- 9'-0"
240 CORRIDOR CPT-2,4/RT-1 RB-1 GWB SC-2 GWB SC-1 -- -- GWB SC-2 ATC-1 -- 9'-0" 1
241 MECHANICAL CONC RB-1 GWB NOTE 6 GWB NOTE 6 GWB NOTE 6 GWB NOTE 6 ATC-1 -- 9'-0"
242 COCKPIT 6 CPT-3 RB-1 GWB P-2 GWB P-2 GWB P-2 GWB P-4 ATC-1 -- 8'-8"
243 CORRIDOR CPT-2,4 RB-1 -- -- GWB P-6 GWB P-2 GWB P-2 ATC-1 -- 9'-0" 1
244 COCKPIT 5 CPT-3 RB-1 GWB P-2 GWB P-2 GWB P-2 GWB P-4 ATC-1 -- 8'-8"
245 COCKPIT 4 CPT-3 RB-1 GWB P-4 GWB P-2 GWB P-2 GWB P-2 ATC-1 -- 8'-8"
246 COCKPIT 3 CPT-3 RB-1 GWB P-4 GWB P-2 GWB P-2 GWB P-2 ATC-1 -- 9'-0"
250 CORRIDOR CPT-2,4/RT-1 RB-1 GWB P-2 EX/GWB P-2 GWB P-6 -- -- ATC-1 -- 9'-0" 1
251 COCKPIT 7 CPT-3 RB-1 GWB P-2 GWB P-2 GWB P-2 GWB P-4 ATC-1 -- 9'-0"
252 COCKPIT 8 CPT-3 RB-1 GWB P-2 GWB P-2 GWB P-2 GWB P-4 ATC-1 -- 9'-0"
253 COCKPIT 9 CPT-3 RB-1 GWB P-2 GWB P-4 GWB P-2 GWB P-2 ATC-1 -- 9'-0"
254 ELECTRICAL HPL-1 RB-1 GWB NOTE 6 GWB NOTE 6 GWB NOTE 6 EX GWB NOTE 6 EXP -- --
255 COCKPIT 10 CPT-3 RB-1 GWB P-2 GWB P-4 GWB P-2 GWB P-2 ATC-1 -- 9'-0"
256 CORRIDOR CPT-2,4 RB-1 GWB P-2 GWB P-2 GWB P-2 GWB P-6 ATC-1 -- 9'-0" 1
257 COCKPIT 2 CPT-3 RB-1 GWB P-4 GWB P-2 GWB P-2 GWB P-2 ATC-1 -- 8'-8"
258 COCKPIT 1 CPT-3 RB-1 GWB P-2 GWB P-4 GWB P-2 GWB P-2 ATC-1 -- 8'-8"
260 MECHANICAL CONC RB-1 GWB NOTE 6 GWB NOTE 6 GWB NOTE 6 GWB NOTE 6 ATC-1 -- 8'-8"
261 COMMUNICATIONS HPL-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 ATC-2 -- 11'-0"
262 DEBRIEF 1 CPT-1 RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-3 ATC-1 -- 9'-0"
263 DEBRIEF 2 CPT-1 RB-1 GWB P-3 GWB P-1 GWB P-1 GWB P-1 ATC-1 -- 9'-0"
300 UPPER LOBBY -- -- EX GWB P-5 EX GWB P-5 EX GWB P-5 GWB P-5 GWB P-5 18'-0"
SECOND FLOOR FIRST FLOOR
A-601
R O
M
N
I S
H
S
C H
E D
U L E
J F
S D
A
D
W G
J F
S D
A
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
O N
S T
R U
C T
I O
FIRST FLOOR FINISHES PLAN
N1
EXISTING DURAPLEX WALL
FINISHES PLAN LEGEND
1. SKIM COAT WALL FOR NEW FINISH AS SCHEDULED AT DASHED LINE.
2. PAINT EXISTING STEEL CHEVRON BRACING SC-5.
3. INFILL DRYWALL ARCH ABOVE THIS OPENING FLUSH WITH ADJACENT
SURFACES.
4. CHAIR RAIL SHOWN BOLD; VERIFY HEIGHT WITH CONTRACTING
OFFICER WITH CHAIR SELECTION AND SEE DETAIL 2B/A-702.
FINISHES PLAN KEY NOTES
LVT-1
LVT-2/2A
PT-1/1A
PT-2/2A
CPT-1
CPT-2
CPT-3
CPT-4
CPT-5
LVT-3
LVT-4
RT-1
UP
UP
1.A
1.5
1.7
1.9
2.3
2.5
C.O.
F.D.
C.O.
F.D.
C.O.
VEST.
MEN
WOMEN
STAIR 2
S-2
STAIR 1
S-1
VEST.
170 VEST.
ELEV.
EQUIP.
ELECTRICAL
MECHANICAL
UP RAMP DN COMM.
12' RAMP DN
DEBRIEF 1
DEBRIEF 2
DEBRIEF 3
DEBRIEF 4
122 WST 1
WST 4
WST 2
STOR.
CORR.
CORR.
FLIGHT
MEDICINE
CORR.
BREAK
ROOM
CORR.
JAN.
OPEN
HEALTH
AV/STOR.
GUEST OFFICE
AUDITORIUM
LOBBY
CORR.
CORR.
WAITING
SSO
PILOTS
PLANNING
SERVER
ROOM
CORR.
MAINT.
BACK SHOP
BATTERY
UPS
OFFICE
CORR.
FLIGHT OPERATIONS SUPPORT
WST 3
SAP
CONF.
ROOM
OFFICE
CORR.
OFFICE
OPEN
CORR.
CORR.
ELEV.
E-1
CR
AC
T
CR
AC
T
T
SERVER
ROOM
MO
N.
MO
N.
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MON.
T
CR
AC
CR
AC
REST
ROOM
MO
N.
EYE
WASH
MO
N.
MO
N.
MO
N.
MON.
UP 6 3/4"
RAMP
RA
MP
MON. W
AT
ER
SE
RV
IC
E
FI
RE
S
ER
VI
CE
EYE
WASH
CHAIR/TABLE
STOR.
MON.
FD
FD
FD
FD
FD
FD
FCO
FD
DB
DB
DB
DB
T
T
MB
MON. MON.
MON.
MON.
MB
MON.
MON.
MO
N.
MB
N
TRUEPLAN
A A.5 B.1 B.2 C D D.1 E F F.1 G H I.1 I.2 I.5 J
AF101
CPT-1
CPT-5
CPT-2CPT-3
PT-2
PT-1
CPT-1
CPT-5
CPT-2CPT-3CPT-2 CPT-3
CPT-1
CPT-5
PT-1A
PT-2A
2'- 0"
TY
P.
2'- 0"
TY
P.
2'-0" TYP.
2'- 0"
TY
P.
SC-2SC-4
SC-6
HPL-1RT-1HPL-1 RT-1
SC-4
SC
-2
SC-6
SC-1
SC-1
SC-6
SC-2
SC-6
SC
-2
SC-6
SC-1
SC-1
SC-3
SC-4
SCALE: 1/4" = 1'-0" 4' 2' 0 4'
ENLARGED FINISHES PLAN
N2 N
TRUEPLAN
C.O.
F.D.
C.O.
F.D.
C.O.
MO
N.
MON.
MB
1.5
1.7
1.9
D.1 E F F.1 G H
WOMEN
MEN
HEALTH
REST
ROOM
JAN.
EX PTPT-3
EX PT PT-3
LVT-1 LVT-2
LVT-3
LVT-4
BREAK
ROOM
WAITING
CORR.
VEST.
LVT-1LVT-2A
LVT-2A
PT-1
AF101
F I R
S T
O
N
I S
H E
S
P
L A
N
J F
S D
A
F D
W G
J F
S D
A F
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
O N
S T
R U
C T
I O
SECOND FLOOR FINISHES PLAN
N1
EXISTING DURAPLEX WALL
FINISHES PLAN LEGEND
1. SKIM COAT WALL FOR NEW FINISH AS SCHEDULED AT DASHED LINE.
2. PAINT EXISTING STEEL CHEVRON BRACING SC-5.
3. INFILL DRYWALL ARCH ABOVE THIS OPENING FLUSH WITH ADJACENT
SURFACES.
4. CHAIR RAIL SHOWN BOLD; VERIFY HEIGHT WITH CONTRACTING
OFFICER WITH CHAIR SELECTION AND SEE DETAIL 2B/A-702.
FINISHES PLAN KEY NOTES
LVT-1
LVT-2/2A
PT-1/1A
PT-2/2A
CPT-1
CPT-2
CPT-3
CPT-4
CPT-5
LVT-3
LVT-4
RT-1
DN
A A.5 B.1 B.2 C D D.1 E F F.1 G H I.1 I.2 I.5 J
1.B
1.A
1.5
1.7
1.9
2.3
2.5
DN
F.D.
F.D.
WOMEN
MEN
STAIR 2
S-2
STAIR 1
S-1
UP
UP
RAMP DN
CRAC
COCKPIT 1
DEBRIEF 3
SOC
UP 6 3/4"UP 6 3/4"MX.
MAINT.
CORR.
MECH.
COCKPIT 2
ELECT.
COCKPIT 3
COCKPIT 4
245 COCKPIT 6
COCKPIT 5
CORR.
CORR.
CORR.
COCKPIT 7
COCKPIT 8
COCKPIT 9
COCKPIT 10
DEBRIEF 2
DEBRIEF 1
DEBRIEF 4
DEBRIEF 5
DEBRIEF 6
DEBRIEF 7
DEBRIEF 8
COMM.
COPY
204CORR.
CORR.
MECH.
JAN.
CORR.
CORR.
CORR.
CORR.
LOBBY
ELECT.
COMM.
VTC
CONF.
ROOM
FOLDING PANEL PARTITION
OPEN TO BELOW
CORR.
ELEV.
E-1
RAMP DNUP
UP
CR
AC
MON.
MO
N.
MB
MB
MBMB
MB
MB
MB MB MB
MO
N.
MO
N.
MON. MON. MON. MON.
MO
N.
MON.
TI
ME
Z
ON
E
CL
OC
K
N.
I.C
MON. MON. MON. MON. MON. MON. MON. MON. MON. MON.MON. MON.
MO
N.
(2) MON. (2) MON.(2) MON. (2) MON.(2) MON. (2) MON.(2) MON. (2) MON.
(2) MON.
MO
N.
MO
N.
MO
N.
MO
N.
DB
DB
MON.
MB
(2) MON.
E F
UPPER
LOBBY
SCALE: 1/8" = 1'-0" 8' 4' 0 8'
CLERESTORY FINISHES PLAN
N2
N
TRUEPLAN
N
TRUEPLAN
RT-1
CPT-4CPT-2
CPT-4
CPT-2
LVT-2A
CPT-4
CPT-2
CPT-2
CPT-4
CPT-4
CPT-2
RT-1
RT-1
2'-0"
TYP.
2'-0"
TYP.
2'- 0"
TY
P.
CPT-4
CPT-2
CPT-2
CPT-4
CPT-2
CPT-4
CPT-2
CPT-4 CPT-2
CPT-4
CPT-2
CPT-4
CPT-2
AF102
S E
C O
O
D
C L E
R E
S T
O R
Y
F
I N
I S
H E
S
P
L A
N S
J F
S D
A
F D
W G
J F
S D
A F
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
O N
S T
R U
C T
I O
SCALE: 3/32" = 1'-0" 8' 4' 8'0
SECOND FLOOR SIGNAGE PLAN
N2
DN
A A.5 B.1 B.2 C D D.1 E F F.1 G H I.1 I.2 I.5 J
1.B
1.A
1.5
1.7
1.9
2.3
2.5
DN
F.D.
F.D.
WOMEN
MEN
STAIR 2
S-2
STAIR 1
S-1
UP
UP
RAMP DN
CRAC
COCKPIT 1
DEBRIEF 3
SOC
UP 6 3/4"UP 6 3/4"MX.
MAINT.
CORR.
MECH.
COCKPIT 2
ELECT.
COCKPIT 3
COCKPIT 4
245 COCKPIT 6
COCKPIT 5
CORR.
CORR.
CORR.
COCKPIT 7
COCKPIT 8
COCKPIT 9
COCKPIT 10
DEBRIEF 2
DEBRIEF 1
DEBRIEF 4
DEBRIEF 5
DEBRIEF 6
DEBRIEF 7
DEBRIEF 8
COMM.
COPY
204CORR.
CORR.
MECH.
JAN.
CORR.
CORR.
CORR.
CORR.
LOBBY
ELECT.
COMM.
VTC
CONF.
ROOM
FOLDING PANEL PARTITION
OPEN TO BELOW
CORR.
ELEV.
E-1
RAMP DNUP
UP
CR
AC
S-
S-
MON.
MO
N.
MB
MB
MBMB
MB
MB
MB MB MB
MO
N.
MO
N.
MON. MON. MON. MON.
MO
N.
MON.
TI
ME
Z
ON
E
CL
OC
K
N.
I.C
MON. MON. MON. MON. MON. MON. MON. MON. MON. MON.MON. MON.
MO
N.
(2) MON. (2) MON.(2) MON. (2) MON.(2) MON. (2) MON.(2) MON. (2) MON.
(2) MON.
MO
N.
MO
N.
MO
N.
MO
N.
DB
DB
MON.
MB
(2) MON.
N
TRUEPLAN
GENERAL SHEET NOTES
1. VERIFY ALL SIGNAGE TEXT AND NUMBERING
WITH CONTRACTING OFFICER PRIOR TO
FABRICATION.
X
SIGNAGE LEGEND
MOUNTING LOCATION
MOUNTING SURFACE
SIGN TYPE
NOTES
SIGN SCHEDULE
DOOR
NO. SIGN NO. SIGN TYPE MESSAGE MOUNTING
200 203 D SOC A
202 202 D MX MAINTENANCE A
204 204 D SOC A
211 211 C CONFERENCE ROOM A
214 214 C DEBRIEF 8 A
215 215 C DEBRIEF 7 A
216 216 C DEBRIEF 6 A
217 217 C DEBRIEF 5 A
220 220 D COMM A
221 221 D ELECTRICAL A
223 -- B MEN A
224 -- B WOMEN A
226 226 D JANITOR A
231 231 C DEBRIEF 4 A
232 232 C DEBRIEF 3 A
240 240 D FLIGHT A
241 241 D MECHANICAL A
242 242 D COCKPIT 6 B
242 -- E TO BE DETERMINED B
244 244 D COCKPIT 5 B
244 -- E TO BE DETERMINED B
245 245 D COCKPIT 4 B
245 -- E TO BE DETERMINED B
246 246 D COCKPIT 3 B
246 -- E TO BE DETERMINED B
251 251 D COCKPIT 7 B
251 -- E TO BE DETERMINED B
252 252 D COCKPIT 8 B
252 -- E TO BE DETERMINED B
253 253 D COCKPIT 9 B
253 -- E TO BE DETERMINED B
254 254 D ELECTRICAL A
255 255 D COCKPIT 10 B
255 -- E TO BE DETERMINED B
256 256 D FLIGHT A
257 257 D COCKPIT 2 B
257 -- E TO BE DETERMINED B
258 258 D COCKPIT 1 B
258 -- E TO BE DETERMINED B
260 260 D MECHANICAL A
261 261 D COMM A
262 262 C DEBRIEF 1 A
263 263 C DEBRIEF 2 A
E-1 -- D ELEVATOR A
S-1 -- A STAIR A
S-2 -- A STAIR A
D
D
D
D
D
D
D D
D
D
D
DD
D
B
D
C
C
C
C CC
B
D
C D
D
A
A
D
D
D
C C
D
D
EE
E
E
E
E
E
E
E
E
SCALE: 3/32" = 1'-0" 8' 4' 8'0
FIRST FLOOR SIGNAGE PLAN
N1
UP
UP
A A.5 B.1 B.2 C D D.1 E F F.1 G H I.1 I.2 I.5 J
1.B
1.A
1.5
1.7
1.9
2.3
2.5
C.O.
F.D.
C.O.
F.D.
C.O.
COVERED ENTRY CANOPY
VEST.
MEN
WOMEN
STAIR 2
S-2
STAIR 1
S-1
VEST.
170 VEST.
ELEV.
EQUIP.
ELECTRICAL
MECHANICAL
UP RAMP DN COMM.
12' RAMP DN
DEBRIEF 1
DEBRIEF 2
DEBRIEF 3
DEBRIEF 4
122 WST 1
WST 4
WST 2
STOR.
CORR.
CORR.
FLIGHT
MEDICINE
CORR.
BREAK
ROOM
CORR.
JAN.
OPEN
HEALTH
AV/STOR.
GUEST OFFICE
AUDITORIUM
LOBBY
CORR.
CORR.
WAITING
SSO
PILOTS
PLANNING
SERVER
ROOM
CORR.
MAINT.
BACK SHOP
BATTERY
UPS
OFFICE
CORR.
FLIGHT OPERATIONS SUPPORT
WST 3
SAP
CONF.
ROOM
OFFICE
CORR.
OFFICE
OPEN
CORR.
CORR.
ELEV.
E-1
CR
AC
T
CR
AC
T
T
SERVER
ROOM
175173
170A170B
0B
0B
0A
160A
5A
5B
5C
103A
2A
0A
0B
110 112
1B
131C
131A
5A
130A 130B
MO
N.
MO
N.
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MON.
T
CR
AC
CR
AC
2B
REST
ROOM
107MO
N.
EYE
WASH
2C
MO
N.
MO
N.
MO
N.
MON.
UP 6 3/4"
RAMP
RA
MP
MON. W
AT
ER
SE
RV
IC
E
FI
RE
S
ER
VI
CE
3B
EYE
WASH
5B
CHAIR/TABLE
STOR.
MON.
FD
FD
FD
FD
FD
FD
FCO
FD
DB
DB
DB
DB
T
T
MB
MON. MON.
MON.
MON.
MB
MON.
MON.
MO
N.
MB
N
TRUEPLAN
D
C
B
B
C
A
D
C
C C
C
D
D
D
D
D
C
C
D
D
D D
CC
C
C
D
C
C
C
C
C
C
D
CC
C
NOTES
SIGN SCHEDULE
DOOR
NO. SIGN NO. SIGN TYPE MESSAGE MOUNTING
102A 102A D 69 RG A
103 103 C SSO A
106 106 D BREAK ROOM A
107 -- B REST ROOM A
110 -- B MEN A
111 111 D JANITOR A
112 -- B WOMEN A
113 -- C HEALTH A
114 -- A STAIR A
115A 115A C FLIGHT MEDICINE A
115B 115B FLIGHT MEDICINE A
116 116 C WST 4 A
117 117 C __ A
119 119 C DEBRIEF 1 A
120 120 C DEBRIEF 2 A
121 121 C DEBRIEF 3 A
122 122 C DEBRIEF 4 A
123 123 C WST 1 A
124 124 C WST 2 A
125 125 C WST 3 A
131 131 C ____ A
133 133 C STORAGE A
134 134 C OPEN A
140 140 C COMM A
142 142 D GUEST ROOM A
144 144 D AV A
145A 145 D CONFERENCE ROOM A
150 150 D ELEVATOR EQUIPMENT A
152 152 C OPEN A
153 153 D STORAGE A
161 161 D MAINT. BACK SHOP A
162 162 D SERVER ROOM A
165 165 D UPS A
166 166 D BATTERY A
171 171 C __ A
172 172 C CONFERENCE ROOM A
173 173 C OFFICE A
175 175 C OFFICE A
176 176 C OFFICE A
177 177 C OFFICE A
160B -- A STAIR A
180A 180A C FLIGHT OPERATIONS SUPPORT A
180B 180B C FLIGHT OPERATIONS SUPPORT A
E-1 -- D ELEVATOR A
C
A
B
C
C
C
C
AG100
F I R
C
O N
D
F
L O
O R
S I G
N A
G
P
A
N S
J F
S D
A
G D
W G
J F
S D
A G
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
O N
S T
R U
C T
I O
4"
M
A X
H
E I G
H
B R
A I L
G
W
O
B R
A I L L E
M
O U
A
F F
G
N
C
E N
T E
R
SCALE: 1/2" = 1'-0" 2' 1' 0 2'
SIGNAGE MOUNTING
TYPICAL SIGN
A
CRITICAL PHASE OF FLIGHT SIGN
B
4"
M
A X
H
E I G
H
B R
A I L
G
W
O
B R
A I L L E
M
O U
A
F F
G
N
C
E N
T E
R
TYPICAL ROOM SIGN; SEE
SIGNAGE
A
CRITICAL PHASE OF FLIGHT SIGN
LIGHT FIXTURE; SEE ELECTRICAL
2/90 MODULAR THIN SIGN
2/90 MODULAR THIN SIGN
8"
RESTROOM
1/4"1/4"
8 1/2"
NAME
6"
STAIRS
TEXT
TEXT
8"
1/4"1/4"
8 1/2"
SOLID PLAQUE TOP
PANEL W/ 5/8" INTEGRAL
TACTILE ROOM NUMBER
MIDDLE PANEL W/ PAPER
INSERT FOR RESIDENT NAME
DIVIDER BAR
SOLID PLAQUE
BOTTOM PANEL
TAMPER-RESISTANT
END CAPS
SOLID PLAQUE PANEL
W/ 1" INTEGRAL TACTILE
ROOM NUMBER
DIVIDER BAR
INTEGRAL BRAILLE (TYP.)
SOLID PLAQUE PANEL
W/ 5/8" SILK-SCREENED
ROOM NAME
FIXED END CAPS
SOLID PLAQUE PANEL
ADA-COMPLIANT SILK-
SCREENED PICTOGRAM
FIXED END CAPS
DIVIDER BAR
SOLID PLAQUE PANEL
W/ 5/8" INTEGRAL
TACTILE ROOM NAME
INTEGRAL BRAILLE
SCALE: 6" = 1'-0" 2" 1" 0 2"
SIGNAGE TYPES
STAIRS IDENTIFICATION
A
RESTROOM IDENTIFICATION
B
2/90 PLAQUES PLUS SIGN
ROOM IDENTIFICATION
C
2/90 MODULAR THIN SIGN
ROOM IDENTIFICATION
D
8"
1/4"1/4"
8 1/2"
SOLID PLAQUE PANEL
ADA-COMPLIANT SILK-
SCREENED PICTOGRAM
FIXED END CAPS
DIVIDER BAR
SOLID PLAQUE PANEL
W/ 5/8" INTEGRAL
TACTILE ROOM NAME
INTEGRAL BRAILLE
E INFORMATIONAL
2/90 MODULAR THIN SIGN
CRITICAL
PHASE
OF
FLIGHT
8 1/2"
SOLID PLAQUE PANEL
W/ 5/8" INTEGRAL
TACTILE TEXT
VERIFY WORDING
ON SIGN WITH
GOVERNMENT
FIXED END CAPS
AG101
S I G
N A
G
Y P
D
M O
U N
T I N
G
D
E T
A I L S
J F
S D
A
G D
W G
J F
S D
A G
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
O N
S T
R U
C T
I O
FIRST FLOOR FURNITURE PLAN
N1
1. FURNITURE/EQUIPMENT ITEM PROVIDED BY OTHERS (N.I.C.)
FURNITURE PLAN KEY NOTES
UP
UP
A A.5 B.1 B.2 C D D.1 E F F.1 G H I.1 I.2 I.5 J
1.B
1.A
1.5
1.7
1.9
2.3
2.5
C.O.
F.D.
C.O.
F.D.
C.O.
COVERED ENTRY CANOPY
VEST.
MEN
WOMEN
STAIR 2
S-2
STAIR 1
S-1
VEST.
170 VEST.
ELEV.
EQUIP.
ELECTRICAL
MECHANICAL
UP RAMP DN COMM.
12' RAMP DN
DEBRIEF 1
DEBRIEF 2
DEBRIEF 3
DEBRIEF 4
122 WST 1
WST 4
WST 2
STOR.
CORR.
CORR.
FLIGHT
MEDICINE
CORR.
BREAK
ROOM
CORR.
JAN.
OPEN
HEALTH
AV/STOR.
GUEST OFFICE
AUDITORIUM
LOBBY
CORR.
CORR.
WAITING
SSO
PILOTS
PLANNING
SERVER
ROOM
CORR.
MAINT.
BACK SHOP
BATTERY
UPS
OFFICE
CORR.
FLIGHT OPERATIONS SUPPORT
WST 3
SAP
CONF.
ROOM
OFFICE
CORR.
OFFICE
OPEN
SAFE,
NIC
CORR.
CORR.
ELEV.
E-1
CR
AC
T
CR
AC
T
T
SERVER
ROOM
MO
N.
MO
N.
MB
MB
MB
MB
MB
MB
MB
MB
MB
MB
MON.
T
CR
AC
CR
AC
REST
ROOM
MO
N.
EYE
WASH
MO
N.
MO
N.
MO
N.
MON.
TIME ZONE
CLOCK N.I.C.
UP 6 3/4"
RAMP
RA
MP
MON.
PRINTER
N.I.C.
REF.
N.I.C.
W
AT
ER
SE
RV
IC
E
FI
RE
S
ER
VI
CE
EYE
WASH
CHAIR/TABLE
STOR.
MON.
SERVER
SE
RV
ER
SERVER
SERVER
FD
FD
FD
FD
FD
FD
FCO
FD
DB
DB
DB
DB
T
T
MB
MON. MON.
MON.
MON.
MB
MON.
MON.
MO
N.
MB
WORK BENCH
LAPTOP
CHARGING
WORK BENCH
N
TRUEPLAN
TYP.
AI101
F I R
O
U R
N I T
U R
E
P
L A
N
J F
S D
A
I D
W G
J F
S D
A I
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
O N
S T
R U
C T
I O
SECOND FLOOR FURNITURE PLAN
N1
1. FURNITURE/EQUIPMENT ITEM PROVIDED BY OTHERS (N.I.C.)
FURNITURE PLAN KEY NOTES
DN
A A.5 B.1 B.2 C D D.1 E F F.1 G H I.1 I.2 I.5 J
1.B
1.A
1.5
1.7
1.9
2.3
2.5
DN
F.D.
F.D.
WOMEN
MEN
STAIR 2
S-2
STAIR 1
S-1
UP
UP
RAMP DN
CRAC
COCKPIT 1
DEBRIEF 3
SOC
UP 6 3/4"UP 6 3/4"MX.
MAINT.
CORR.
MECH.
COCKPIT 2
ELECT.
COCKPIT 3
COCKPIT 4
245 COCKPIT 6
COCKPIT 5
CORR.
CORR.
CORR.
COCKPIT 7
COCKPIT 8
COCKPIT 9
COCKPIT 10
DEBRIEF 2
DEBRIEF 1
DEBRIEF 4
DEBRIEF 5
DEBRIEF 6
DEBRIEF 7
DEBRIEF 8
COMM.
COPY
204CORR.
CORR.
MECH.
JAN.
CORR.
CORR.
CORR.
CORR.
LOBBY
ELECT.
COMM.
VTC
CONF.
ROOM
FOLDING PANEL PARTITION
OPEN TO BELOW
COPIER
N.I.C.
PRINTERS
N.I.C.
CORR.
ELEV.
E-1
RAMP DNUP
UP
CR
AC
4 PRINTERS N.I.C.
MON.
MO
N.
MB
MB
MBMB
MB
MB
UNCLASSIFIED
CLASSIFIED
MB MB MB
MO
N.
MO
N.
MON. MON. MON. MON.
MO
N.
MON.
TI
ME
Z
ON
E
CL
OC
K
N.
I.C
MON. MON. MON. MON. MON. MON. MON. MON. MON. MON.MON. MON.
MO
N.
(2) MON. (2) MON.(2) MON. (2) MON.(2) MON. (2) MON.(2) MON. (2) MON.
(2) MON.
MO
N.
MO
N.
MO
N.
MO
N.
DB
DB
MON.
SHREDDER
N.I.C.
MB
(2) MON.
N
TRUEPLAN
TYP.
AI102
S E
C O
O
U R
N I T
U R
E
P L A
N
J F
S D
A
I D
W G
J F
S D
A I
GR
AN
D
FO
RK
S
AF
B, N D
CO
NT
RA
CT
S
EL
EM
EN
T
9 C
IV
IL
EN
GI
NE
ER
S
QU
AD
RO
N
A B C D E F G
Sheet of
NUMBER
REFERENCE
SHEET
AI
R
MO
BI
LIT
Y
CO
MM
AN
D
DE
PA
RT
ME
NT
O
F
TH
E
AI
R
FO
RC
E
DR
AW
IN
G
NU
MB
ER
PL
OT
S
CA
LE
: 1
T O
2 (
FO
R 1/2
-S
IZ
E)
PL
OT
D
AT
E:
CH
K
BY
DW
N
BY
DE
SI
GN
ED
B Y:
FI
LE
N
AM
E:
DA
TE
Sy mb ol De sc rip tio n
Da te
Ap pr ov ed
Sy mb ol Ap pr ov ed Da te De sc rip tio n
M
AY
GJ
H
GJ
H
KL
M
M
AY
JF
SD
A
DD
/R
EP
AI
R
SQ
O
PS
B
FO
R
GL
OB
AL
H
AW
K
GS
MP
GR
AN
D
FO
RK
S
AF
B, N
OR
TH
D
AK
OT
A
H
I S
S U
O N
S T
R U
C T
I O
File details come from the government source that posted it.