QA_FA4626-25-Q-0003 Grounds Maintenance.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Grounds Maintenance Federal contract opportunity
- Solicitation number
- FA462625Q0003
About this file
This is a Questions and Answers document for solicitation FA4626-25-Q-0003 for grounds maintenance services at Malmstrom Air Force Base, Montana. The Q&A addresses key aspects of the contract including access requirements, work areas, and operational details.
Key details revealed include: contractors will need higher-level access for the Weapons Storage Area (WSA) and escorts in certain areas; communication will flow through the COR and CO as needed; irrigation systems are in varied states of repair with no current maps available; the BASH mowing acreage has doubled from the previous contract; up to 6,000 shrubs and hedges require pruning; no on-base dump site or fuel storage tanks will be provided; and several misalignments between the PWS and Bid Schedule regarding CLINs 0002-0011 were resolved in Amendment 0001. The 2024 growing season was confirmed as 5 months due to a June 1 start date, and a new Wage Determination will be issued to reflect Executive Order 14026's minimum wage requirements effective January 1, 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA_FA4626-25-Q-0003 Grounds Maintenance_7Feb2025.xlsx | XLSX spreadsheet | |
| COMBO_Grounds Maintenance_Update_24January25.pdf | ||
| Attachment 2.2_PWS Appendix B_Updated_24Jan2025.pdf | ||
| Amendment 0001.pdf | ||
| Attachment 1_Bid Schedule_Updated_24Jan2025.xlsx | XLSX spreadsheet | |
| Attachment 2.1_PWS Appendix A_Updated_24Jan2025.xlsx | XLSX spreadsheet | |
| Attachment 1_Bid Schedule .xlsx | XLSX spreadsheet | |
| Attachment 2.4_PWS Appendix D.pdf | ||
| Attachment 2.6_PWS Appendix F.pdf | ||
| Attachment 3_Installation Perimeter Access Control.pdf | ||
| COMBO_Grounds Maintenance.pdf | ||
| Attachment 2.2_PWS Appendix B.pdf | ||
| Attachment 2.3_PWS Appendix C.pdf | ||
| Attachment 2.5_PWS Appendix E.pdf | ||
| Attachment 4_Past Performance Questionnaire.docx | DOCX document | |
| Attachment 2_PWS - Grounds Maintenance - Dec 2024.pdf | ||
| Attachment 2.1_PWS Appendix A.xlsx | XLSX spreadsheet | |
| Attachment 5_QASP_GroundsMaintenance_Dec2024.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FA4626-25-Q-0003 - Grounds Maintenance | ||
| Questions and Answers | ||
| Question # | Question | Answer |
| 1 | Are there any restricted areas that will require a higher-level pass than what is assigned? | Yes, the Weapons Storage Area (WSA) will require a higher-level access than the standard base access for all other areas. |
| 2 | How will correspondence be handled between the contractor, mission partner, and contracting? | Contractor correspondance will be coordinated to the Contracting Officer's Representative (COR) primariliy and the Contracting Officer (CO) as necassary. |
| 3 | Will contractors require escorts when working on site? | Contractors will require escorts when working on certain areas, for example the WSA. |
| 4 | Regarding the types of terrain and roads, are there any special considerations to be made in how the terrain is cared for? | See the Performance Work Statement (PWS) and associated maps provided for instructions on how terrain is to be cared for. |
| 5 | Will there be any limitations on certain areas needed to be accessed? | See questions 1 and 3. |
| 6 | What will set apart a prospective contractor for consideration of award? | See the evaluation factors provided in the COMBO. |
| 7 | Were all the irrigation systems up and running last year? | No. |
| 8 | Is there a minimum nunber of past performances a contractor should reference in the questionnaire? | See section (ix)B.2. in the COMBO for instruction on the completion of the Past Performance Questionnaire. |
| 9 | How old are the irrigation systems on base? | It varies. Some have been upgraded and repaired. |
| 10 | The acreage has doubled on BASH mowing from last contract. Is the new acreage going to be in compliance (potholes, rocks, debri, ect.) by start of new contract? | That is unknown. It has not been surveyed. |
| 11 | Are there Irrigation Maps? | There are not current irrigation maps. Any that exist are outdated and/or inaccurate. |
| 12 | It is our understanding the 2024 Grounds Contract growing season was for 5 months because of the June 1 start up date. Is this correct? | Yes. |
| 13 | Were all 6,000 shrubs and hedges pruned last year? | Yes, the quantity will be up to 6,000. |
| 14 | Is there a dump site on base for tree limbs, ect? | No. |
| 15 | Will fuel storage tanks be provided? | No. |
| 16 | Will there be a new Wage Determination issued for this bid, updated from Rev 22, dated 07/22/2024, considering the new minimum wage for federal contracts covered by Executive Order 14026 effective January 1, 2025? | Yes. |
| 17 | There seems to be misalignment between PWS’s Description of Services, and where these sections should be priced in the Bid Schedule, for at least CLINs 0002-0011; there are multiple CLINs misaligned/shifted to their PWS Section Numbers (ie, CLIN 0004 on the Bid Sheet States “Irrigation Maintenance/Operation (PWS 1.1.7).” In the PWS, 1.1.7 is “Remove Debris/ Police Grounds.” Irrigation mentions in the PWS are 1.1.6 thru 1.1.6.5. Looks like multiple were shifted downward) | This misalignment has been resolved in the documents uploaded in Amendment 0001. |
| 18 | It seems portions of the PWS Descriptions are omitted from the Bid Schedule’s descriptions. For example, CLIN 0002 Supplies/Services Description references “PWS 1.1 thru 1.1.4,” however the PWS section for Maintaining IG does not end at 1.1.4, and omits 1.1.5’s Trimming language. In this example, does this CLIN 0002 not include pricing to include PWS’s 1.1.5 Trim? Does the government want bidders to ONLY bid on the PWS sections mentioned explicitly in the “SUPPLIES/SERVICES” PWS Reference, or should bidders assume if not specifically mentioned in the Price Schedule, to NOT include pricing for these sections/activities? | Similar to the previous question, this issue of PWS/Bid Schedule misalignment has been resolved in Amendment 0001. |
| 19 | There is also confusion about the “Max QTY of the Price Schedule and how the government plans to utilize services for the CLINS, as the unit totals are not aligning to the Attachment 2.1_PWS Appendix A. |
-Example- CLIN 0002 has a max quantity of 780 Acres on the Price Schedule, PWS Appendix A states 26-34 Times Annually. Meanwhile, the Maps/Appendices and PWS state there are 143.44 Acres of IG.
| - If the maximum Acreage for CLIN 0002 is 780 acres, then that would only allow for a total number of 5.44 mowings. Alternatively, if the government is expecting the 143.44 Acres of IG to be mowed the full growing season, then, as example, if the contractor mows all of IG an average of 30 times, then that would require a total MAX QTY on the pricing sheet to be 4,303.2 Acres. | Errors in the bid schedule generation have been resolved in Amendment 0001 to align the quantities to the data provided throughout the package. | |
| 20 | When there is conflicting information, should bidders consider the PWS descriptions or the Appendixes as accurate/basis for pricing? Asking this because we found one more clarification below in regards to PWS Standards v Appendix/ Area Categorization: In the PWS, under 1.1 Maintain Improved Grounds: |
1.1.2.2. Standard 2: Maintain vegetation height between 3 to 5 inches for non-irrigated areas. These areas include the firing ranges, missile handling areas, and K-9 Exercise Area and others as identified in Appendices A and B.
| However, these areas are marked in Appendix B as "Semi Improved" with the 7-14" standard. Wanted to bring this to your attention. | The conflicting information between documents has been reconciled in Amendment 0001. |
| 21 | |
| 22 | |
| 23 | |
| 24 | |
| 25 | |
| 26 | |
| 27 | |
| 28 | |
| 29 | |
| 31 | |
| 32 | |
| 33 | |
| 34 | |
| 35 | |
| 36 | |
| 37 | |
| 38 | |
| 39 | |
| 40 | |
| 41 | |
| 42 | |
| 43 | |
| 44 | |
| 45 | |
| 46 | |
| 47 | |
| 48 | |
| 49 | |
| 50 | |
| 51 | |
| 52 | |
| 53 | |
| 54 | |
| 55 | |
| 56 | |
| 57 | |
| 58 | |
| 59 | |
| 60 | |
| 61 | |
| 62 | |
| 63 | |
| 64 | |
| 65 | |
| 66 | |
| 67 | |
| 68 | |
| 69 | |
| 70 | |
| 71 | |
| 72 | |
| 73 | |
| 74 | |
| 75 | |
| 76 | |
| 77 | |
| 78 | |
| 79 | |
| 80 | |
| 81 | |
| 82 | |
| 83 | |
| 84 | |
| 85 | |
| 86 | |
| 87 | |
| 88 | |
| 89 | |
| 90 |
&"Times New Roman,Regular"&P of &N
Sheet2
File details come from the government source that posted it. Updated .