Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 100 |
| Each |
Repair Fuel Tanks BASE YEAR
FFP
ALL SUB-CLINs IDENTIFIED IN THE SCHEDULE B CONTINUATION SHEET (0001 AA THRU 0001BL) ARE HEREBY INCORPORATED AND MADE A PART OF THIS MAIN CLIN.
FOB: Destination
PURCHASE REQUEST NUMBER: F2W3D33071A001
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 100 |
| Each |
| OPTION |
| Repair Fuel Tanks OPTION YEAR 1 |
FFP
ALL SUB-CLINs IDENTIFIED IN THE SCHEDULE B CONTINUATION SHEET (1001 AA THRU 1001BL) ARE HEREBY INCORPORATED AND MADE A PART OF THIS MAIN CLIN.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 100 |
| Each |
| OPTION |
| Repair Fuel Tanks OPTION YEAR 2 |
FFP
ALL SUB-CLINs IDENTIFIED IN THE SCHEDULE B CONTINUATION SHEET (2001 AA THRU 2001BL) ARE HEREBY INCORPORATED AND MADE A PART OF THIS MAIN CLIN..
NET AMT
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
| 1.00 |
| $5,000.00 |
| 300.00 |
| $1,500,000.00 |
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
| CLIN |
| MINIMUM |
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
SCHEDULE B CONTINUATION SHEET
Section B - Supplies or Services and Prices
SECTION B CONTINUATION SHEET
BASE YEAR
Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.
NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.
ITEM
Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).
Unit Unit Price Est. Qty
Total Est. Price
0001AA
Mobilization-Missile Field, emergency Each
0001AB
Mobilization-Missile Field, urgent
Each
0001AC
Mobilization-Missile Field, routine
Each
0001AD
Mobilization-Base, emergency
Each
0001AE
Mobilization-Base, urgent
Each
0001AF
Mobilization-Base, (routine)
Each
0001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).
Est. Qty
Total Est. Price
Government Delays
Cr-Hr
0001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as Cubic Yard (CY).
Est. Qty
Contaminated Soil
CY
0001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).
Est. Qty
Replacement Soil
0001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).
Est. Qty
Tank Venting
0001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).
Est. Qty
Leak Detection Monitoring System
0001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est Qty
Total Est. Price
Underground Conduits-Sensor Wiring
LF
0001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est. Qty
Total Est. Price
Underground Conduits-Electrical Wiring
LF
0001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).
Est Qty
Total Est Price
Sump Tightness Testing
0001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection); preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).
Est Qty
Piping Sump Repairs
Hr
0001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Est Qty
Bonding
LS
0001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 0001AX or CLIN 001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).
Est Qty
Investigation
Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.
Est Qty
0001AT Line Repair
CRHr
0001AU
Line Replacement
LF
0001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).
Est Qty
Line Tightness Testing
0001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).
Est Qty
Tank Tightness Testing
0001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).
Est Qty
UST Repair
0001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.
Est Qty
UST Replacement
0001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.
Est Qty
Utility Locates
Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).
Est Qty
Total Est Price
0001BA
Fuel Removal
0001 BB
Gal
12,000.00
0001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 0001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 0001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.
Est Qty
Total Est Credit
Fuel Credit
0001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.
Est Qty
Training and Recommendation Letter
0001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.
Est Qty
Total est Price
Anti-siphon valve
0001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.
Est Qty
Interior Piping
0001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Price Est Qty
Tank Removal
0001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Price Est Qty
Dispenser Removal
0001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.
Unit Price Est Qty
Dispenser Replacement
0001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.
Unit Unit Price Est Qty
Frozen Ground Excavation
0001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.
Unit Price Est Qty
Sensor/Probe Replacement
EST TOTAL BASE YEAR $___________________________ (enter this amount on CLIN 0001)
PROPOSAL SCHEDULE BREAKDOWN
OPTION YEAR 1
For “Repair/Replacement of Underground Storage Tank (UST) systems at Malmstrom Air Force Base, MAFs and LFs”
Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.
NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.
Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).
Est Qty
Total Est Price
1001AA Mobilization-Missile Field, emergency Each
1001AB
Mobilization-Missile Field, urgent
Each
1001AC Mobilization-Missile Field, routine Each
1001AD
Mobilization-Base, emergency
Each
1001AE
Mobilization-Base, urgent
1001AF
Mobilization-Base, routine
Each
1001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).
Est Qty
1001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as Cubic Yard (CY).
Est Qty
1001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).
Est Qty
1001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).
Est Qty
1001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).
Est Qty
1001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est Qty
Total Est Price
Underground Conduits-Sensor Wiring
LF
1001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est Qty
Total Est Price
Underground Conduits-Electrical Wiring
LF
1001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).
Est Qty
1001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection); preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).
Est Qty
1001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Est Qty
1001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 1001AX or CLIN 1001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).
Est Qty
Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.
Est Qty
Total Est Price
1001AT
Line Repair
1001AU
Line Replacement
LF
1001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).
Est Qty
1001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).
Est Qty
1001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).
Est Qty
1001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.
Est Qty
1001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.
Est Qty
Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).
Est Qty
Total Est Price
1001BA
1001 BB
12,000.00
1001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 1001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 1001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.
Est Qty
1001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.
Est Qty
Total Est Price
Training and Recommendation Letter
Each
1001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.
Est Qty
1001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.
Est Qty
1001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Price Est Qty
1001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Price Est Qty
1001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.
Unit Price Est Qty
1001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.
Unit Unit Price Est Qty
Total est Price
Frozen Ground Excavation
Each
1001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.
Unit Price Est Qty
EST TOTAL OPTION YEAR 1 $___________________________ (enter this amount on CLIN 1001)
PROPOSAL SCHEDULE BREAKDOWN
OPTION YEAR 2
For “Repair/Replacement of Underground Storage Tank (UST) systems at Malmstrom Air Force Base, MAFs and LFs”
Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.
NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.
Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).
Est Qty
Total Est Price
2001AA Mobilization-Missile Field, emergency Each
2001AB
Mobilization-Missile Field, urgent
Each
2001AC
Mobilization-Missile Field, routine Each
2001AD
Mobilization-Base, emergency
Each
2001AE Mobilization-Base, urgent
2001AF
Mobilization-Base, routine
Each
2001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).
Est Qty
2001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as Cubic Yard (CY).
Est Qty
2001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).
Est Qty
2001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).
Est Qty
2001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).
Est Qty
2001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est Qty
Total Est Price
Underground Conduits-Sensor Wiring
LF
2001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est Qty
Total Est Price
Underground Conduits-Electrical Wiring
LF
2001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).
Est Qty
2001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection) ; preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).
Est Qty
2001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Est Qty
2001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 2001AX or CLIN 2001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).
Est Qty
Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.
Est Qty
Total Est Price
2001AT
Line Repair
2001AU
Line Replacement
LF
2001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).
Est Qty
2001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).
Est Qty
2001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).
Est Qty
2001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.
Est Qty
2001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.
Est Qty
Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).
Est Qty
Total Est Price
2001BA
2001 BB
12,000.00
2001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 2001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 2001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.
Est Qty
2001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.
Est Qty
Total Est Price
Training and Recommendation Letter
Each
2001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.
Est Qty
2001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.
Est Qty
2001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Price Est Qty
2001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Price Est Qty
2001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.
Est Qty
2001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.
Unit Unit Price Est Qty
Frozen Ground Excavation
2001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.
Unit Price Est Qty
EST TOTAL OPTION YEAR 2 $___________________________ (enter this amount on CLIN 2001) Section C - Descriptions and Specifications
DESCRIPTIONS AND SPECIFICATION
Section C – Descriptions and Specifications
DESCRIPTIONS & SPECIFICATIONS
C-1 SPECIFICATION, STANDARDS AND DRAWINGS IAW FAR 11-201
Furnish all labor, materials, supervision, quality control, testing, equipment and transportation necessary to perform the work required by the drawings and specifications applicable to Malmstrom AFB, Project Number NZAS 13-6006 and that are identified as attachments to this solicitation in Section J hereof.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 1001 |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-12 |
| Inspection of Construction |
| AUG 1996 |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| POP 03-SEP-2013 TO |
02-SEP-2014
| N/A |
| F2W3D5 341CES/CECR-BASE SRMC |
KEN MURPHY
39 78TH ST N BLDG 470
MALMSTROM AFB MT 59402
406-731-6865
F2W3D5
| 1001 |
| POP 03-SEP-2014 TO |
02-SEP-2015
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2W3D5
| 2001 |
| POP 03-SEP-2015 TO |
02-SEP-2016
| N/A |
| (SAME AS PREVIOUS LOCATION) |
F2W3D5
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than “As specified in each delivery/task order in accordance with the scope of work” . * The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $242.69 for each calendar day of delay until the work is completed or accepted for all delivery/task orders where the project is within the Malmstrom Air Force Base proper and in the amount of $829.30 for each calendar day of delay until the work is completed or accepted for all delivery/task orders within the Malmstrom Air Force Base missile complex.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
Section G - Contract Administration Data
CLAUSES INCORPORATED BY FULL TEXT
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUNE 2012)
(a) Definitions. As used in this clause–
(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal Acquisition Regulation.
(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.
(3) Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.
(4) Receiving report means the data required by the clause at 252.246-7000, Material Inspection and Receiving Report.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when–
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);
(3) DoD makes payment for rendered health care services using the TRICARE Encounter Data System (TEDS) as the electronic format; or
(4) When the Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required.
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.
(End of clause)
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
| 52.202-1 |
| Definitions |
| JAN 2012 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| APR 1984 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| SEP 2006 |
| 52.203-7 |
| Anti-Kickback Procedures |
| OCT 2010 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| JAN 1997 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| JAN 1997 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| DEC 2010 |
| 52.211-18 |
| Variation in Estimated Quantity |
| APR 1984 |
| 52.215-2 |
| Audit and Records--Negotiation |
| OCT 2010 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-11 |
| Price Reduction for Defective Certified Cost or Pricing Data--Modifications |
| AUG 2011 |
| 52.215-21 |
| Requirements for Certified Cost or Pricing Data or Information Other Than Certified Cost or Pricing Data--Modifications |
| OCT 2010 |
| 52.219-6 |
| Notice Of Total Small Business Set-Aside |
| NOV 2011 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| JAN 2011 |
| 52.219-14 |
| Limitations On Subcontracting |
| NOV 2011 |
| 52.222-1 |
| Notice To The Government Of Labor Disputes |
| FEB 1997 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-4 |
| Contract Work Hours and Safety Standards Act - Overtime Compensation |
| JUL 2005 |
| 52.222-6 |
| Davis Bacon Act |
| JUL 2005 |
| 52.222-7 |
| Withholding of Funds |
| FEB 1988 |
| 52.222-8 |
| Payrolls and Basic Records |
| JUN 2010 |
| 52.222-9 |
| Apprentices and Trainees |
| JUL 2005 |
| 52.222-10 |
| Compliance with Copeland Act Requirements |
| FEB 1988 |
| 52.222-11 |
| Subcontracts (Labor Standards) |
| JUL 2005 |
| 52.222-12 |
| Contract Termination-Debarment |
| FEB 1988 |
| 52.222-13 |
| Compliance with Davis-Bacon and Related Act Regulations. |
| FEB 1988 |
| 52.222-14 |
| Disputes Concerning Labor Standards |
| FEB 1988 |
| 52.222-15 |
| Certification of Eligibility |
| FEB 1988 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| FEB 1999 |
| 52.222-26 |
| Equal Opportunity |
| MAR 2007 |
| 52.222-27 |
| Affirmative Action Compliance Requirements for Construction |
| FEB 1999 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| SEP 2010 |
| 52.222-36 |
| Affirmative Action For Workers With Disabilities |
| OCT 2010 |
| 52.222-37 |
| Employment Reports on Veterans |
| SEP 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| FEB 2009 |
| 52.223-3 Alt I |
| Hazardous Material Identification and Material Safety Data (Jan 1997) - Alternate I |
| JUL 1985 |
| 52.223-5 Alt I |
| Pollution Prevention and Right-to-Know Information (May 2011) Alternate I |
| MAY 2011 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.225-25 |
| Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications. |
| DEC 2012 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-2 |
| Notice And Assistance Regarding Patent And Copyright Infringement |
| DEC 2007 |
| 52.227-4 |
| Patent Indemnity-Construction Contracts |
| DEC 2007 |
| 52.228-2 |
| Additional Bond Security |
| OCT 1997 |
| 52.228-11 |
| Pledges Of Assets |
| JAN 2012 |
| 52.228-12 |
| Prospective Subcontractor Requests for Bonds |
| OCT 1995 |
| 52.228-14 |
| Irrevocable Letter of Credit |
| DEC 1999 |
| 52.228-15 |
| Performance and Payment Bonds--Construction |
| OCT 2010 |
| 52.229-3 |
| Federal, State And Local Taxes |
| APR 2003 |
| 52.232-5 |
| Payments under Fixed-Price Construction Contracts |
| SEP 2002 |
| 52.232-17 |
| Interest |
| OCT 2010 |
| 52.232-23 |
| Assignment Of Claims |
| JAN 1986 |
| 52.232-27 |
| Prompt Payment for Construction Contracts |
| OCT 2008 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--Central Contractor Registration |
| OCT 2003 |
| 52.233-1 |
| Disputes |
| JUL 2002 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.236-2 |
| Differing Site Conditions |
| APR 1984 |
| 52.236-3 |
| Site Investigation and Conditions Affecting the Work |
| APR 1984 |
| 52.236-5 |
| Material and Workmanship |
| APR 1984 |
| 52.236-6 |
| Superintendence by the Contractor |
| APR 1984 |
| 52.236-7 |
| Permits and Responsibilities |
| NOV 1991 |
| 52.236-8 |
| Other Contracts |
| APR 1984 |
| 52.236-9 |
| Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements |
| APR 1984 |
| 52.236-10 |
| Operations and Storage Areas |
| APR 1984 |
| 52.236-11 |
| Use and Possession Prior to Completion |
| APR 1984 |
| 52.236-12 |
| Cleaning Up |
| APR 1984 |
| 52.236-13 |
| Accident Prevention |
| NOV 1991 |
| 52.236-14 |
| Availability and Use of Utility Services |
| APR 1984 |
| 52.236-15 |
| Schedules for Construction Contracts |
| APR 1984 |
| 52.236-17 |
| Layout of Work |
| APR 1984 |
| 52.236-21 Alt I |
| Specifications and Drawings for Construction (Feb 1997) - Alternate I |
| APR 1984 |
| 52.236-26 |
| Preconstruction Conference |
| FEB 1995 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.242-14 |
| Suspension of Work |
| APR 1984 |
| 52.243-4 |
| Changes |
| JUN 2007 |
| 52.244-5 |
| Competition In Subcontracting |
| DEC 1996 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| DEC 2010 |
| 52.248-3 |
| Value Engineering-Construction |
| OCT 2010 |
| 52.249-2 Alt I |
| Termination for Convenience of the Government (Fixed-Price) (Apr 2012) - Alternate I |
| SEP 1996 |
| 52.249-10 |
| Default (Fixed-Price Construction) |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country |
| DEC 2006 |
| 252.215-7000 |
| Pricing Adjustments |
| DEC 2012 |
| 252.223-7001 |
| Hazard Warning Labels |
| DEC 1991 |
| 252.223-7006 |
| Prohibition On Storage And Disposal Of Toxic And Hazardous Materials |
| APR 2012 |
| 252.225-7012 |
| Preference For Certain Domestic Commodities |
| DEC 2012 |
| 252.226-7001 |
| Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns |
| SEP 2004 |
| 252.227-7003 |
| Termination |
| AUG 1984 |
| 252.227-7033 |
| Rights in Shop Drawings |
| APR 1966 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.236-7000 |
| Modification Proposals-Price Breakdown |
| DEC 1991 |
| 252.236-7006 |
| Cost Limitation |
| JAN 1997 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.247-7024 |
| Notification Of Transportation Of Supplies By Sea |
| MAR 2000 |
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (AUG 2012)
(a) Definitions. As used in this clause:
Executive means officers, managing partners, or any other employees in management positions.
First-tier subcontract means a subcontract awarded directly by the Contractor for the purpose of acquiring supplies or services (including construction) for performance of a prime contract. It does not include the Contractor's supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a Contractor's general and administrative expenses or indirect costs.
Month of award means the month in which a contract…