SECTION_B_CONTINUATION_SHEET.docx
DOCX document 42 KB Posted
- Attached to
- Repair UST Fuel Tanks IDIQ Federal contract opportunity
- Solicitation number
- FA4626-13-R-0007
About this file
Amended Bid Schedule
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0003 FA4626-13-R-0007
Section B - Supplies or Services and Prices
| ITEM NO | SUPPLIES/SERVICES | EST QTY | UNIT | UNIT PRICE | AMOUNT | |
| 0001 | Repair Fuel Tanks | 100 | Each | |||
| BASE YEAR |
FFP
ALL SUB-CLINs IDENTIFIED IN THE SCHEDULE B CONTINUATION SHEET (0001 AA THRU 0001BL) ARE HEREBY INCORPORATED AND MADE A PART OF THIS MAIN CLIN.
FOB: Destination
PURCHASE REQUEST NUMBER: F2W3D33071A001
SIGNAL CODE: A
NET AMT
| ITEM NO | SUPPLIES/SERVICES | EST QTY | UNIT | UNIT PRICE | AMOUNT | |
| 1001 | Repair Fuel Tanks | 100 | Each | |||
| OPTION YEAR 1 |
OPTION
FFP
ALL SUB-CLINs IDENTIFIED IN THE SCHEDULE B CONTINUATION SHEET (1001 AA THRU 1001BL) ARE HEREBY INCORPORATED AND MADE A PART OF THIS MAIN CLIN.
FOB: Destination
NET AMT
| ITEM NO | SUPPLIES/SERVICES | EST QTY | UNIT | UNIT PRICE | AMOUNT | |
| 2001 | Repair Fuel Tanks | 100 | Each | |||
| OPTION | OPTION YEAR 2 |
FFP
ALL SUB-CLINs IDENTIFIED IN THE SCHEDULE B CONTINUATION SHEET (2001 AA THRU 2001BL) ARE HEREBY INCORPORATED AND MADE A PART OF THIS MAIN CLIN..
FOB: Destination
NET AMT
SECTION B CONTINUATION SHEET
BASE YEAR
Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.
NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.
ITEM
Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).
0001AA Mobilization-Missile Field, emergency Price to be detrmined upon issuance of delivery order 0001AB Mobilization-Missile Field, urgent Price to be detrmined upon issuance of delivery order
| 0001AC Mobilization-Missile Field, routine | Price to be detrmined upon issuance of delivery order |
| 0001AD Mobilization-Base, emergency | Price to be detrmined upon issuance of delivery order |
| 0001AE Mobilization-Base, urgent | Price to be detrmined upon issuance of delivery order |
| 0001AF Mobilization-Base, routine | Price to be detrmined upon issuance of delivery order |
0001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).
Government Delays Price to be detrmined upon issuance of delivery order
0001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as ton (TN).
| Unit | Unit Price | Est. Qty | Total Est. Price | |||
| Contaminated Soil | TN | $________ | 25 | $__________ |
0001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).
| Unit | Unit Price | Est. Qty | Total Est. Price | |||
| Replacement Soil | CY | $________ | 1 | $__________ |
0001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).
| Unit | Unit Price | Est. Qty | Total Est. Price | ||
| Tank Venting | Each | $________ | 1 | $__________ |
0001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).
| Unit | Unit Price | Est. Qty | Total Est. Price | |
| Leak Detection Monitoring System | Each | $________ | 1 | $__________ |
0001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
| Unit | Unit Price | Est Qty | Total Est. Price | ||||
| Underground Conduits-Sensor Wiring | LF | $________ | 100 | $__________ |
0001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
| Unit | Unit Price | Est. Qty | Total Est. Price | ||||
| Underground Conduits-Electrical | LF | $________ | 100 | $___________ |
Wiring
0001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Sump Tightness Testing | Each | $_________ | 1 | $___________ |
0001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection); preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Piping Sump Repairs | Hr | $_________ | 16 | $___________ |
0001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Bonding Price to be detrmined upon issuance of delivery order
0001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 0001AX or CLIN 001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Investigation | Cr-Hr | $________ | 1 | $__________ |
Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.
| Unit | Unit Price | Est Qty | Total Est Price | ||||
| 0001AT Line Repair | CRHr | $________ | 1 | $__________ | |||
| 0001A Line Replacement | LF | $________ | 100 | $___________ |
0001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Line Tightness Testing | Each | $________ | 1 | $__________ |
0001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Tank Tightness Testing | Each | $________ | 1 | $__________ |
0001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| UST Repair | Cr-Hr | $________ | 1 | $__________ |
0001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.
| Unit | Unit Price | Est Qty | Total Est Price | |||
| UST Replacement | Each | $________ | 1 | $__________ |
0001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Utility Locates | Each | $________ | 1 | $__________ |
Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).
| Unit | Unit Price | Est Qty | Total Est Price | ||||
| 0001BA Fuel Removal | Hr | $________ | 1 | $__________ | |||
| 0001 B Fuel Removal | Gal | $________ | 12,000.00 | $__________ |
0001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 0001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 0001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.
Unit Unit Price Est Qty Total Est Credit
Fuel Credit Gal $_________ 1 $____________
0001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.
| Unit | Unit Price | Est Qty | Total Est Price | ||||
| Training and Recommendation Letter | Each | $________ | 1 | $__________ |
0001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Anti-siphon valve | Each | $________ | 1 | $___________ |
0001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.
| Unit | Unit Price | Est Qty | Total est Price | ||
| DELETED | DO NOT PROPOSE |
0001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Tank Removal | Each | $________ | 1 | $___________ |
0001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
| Unit | Unit Price | Est Qty | Total est Price | ||
| Dispenser Removal | Each | $________ | 1 | $___________ |
0001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Dispenser Replacement | Each | $________ | 1 | $___________ |
0001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.
| Unit | Unit Price | Est Qty | Total est Price | ||
| Frozen Ground Excavation | Each | $________ | 1 | $___________ |
0001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.
| Unit | Unit Price | Est Qty | Total est Price | ||
| Sensor/Probe Replacement | Each | $________ | 1 | $___________ |
EST TOTAL BASE YEAR $___________________________ (enter this amount on CLIN 0001)
PROPOSAL SCHEDULE BREAKDOWN
OPTION YEAR 1
For “Repair/Replacement of Underground Storage Tank (UST) systems at Malmstrom Air Force Base, MAFs and LFs” Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.
NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.
ITEM
Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).
1001AA Mobilization-Missile Field, emergency Price to be detrmined upon issuance of delivery order
| 1001AB Mobilization-Missile Field, urgent | Price to be detrmined upon issuance of delivery order | |
| 1001AC Mobilization-Missile Field, routine | Price to be detrmined upon issuance of delivery order | |
| 1001AD Mobilization-Base, emergency | Price to be detrmined upon issuance of delivery order | |
| 1001AE Mobilization-Base, urgent | Price to be detrmined upon issuance of delivery order | |
| 1001AF Mobilization-Base, routine | Price to be detrmined upon issuance of delivery order |
1001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).
Government Delays Price to be detrmined upon issuance of delivery order
1001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as Ton (TN).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Contaminated Soil | TN | $________ | 25 | $__________ |
1001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Replacement Soil | CY | $________ | 1 | $__________ |
1001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Tank Venting | Each | $________ | 1 | $__________ |
1001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | ||||
| Leak Detection Monitoring System | Each | $________ | 1 | $__________ |
1001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
| Unit | Unit Price | Est Qty | Total Est Price | ||||
| Underground Conduits-Sensor Wiring | LF | $________ | 100 | $___________ |
1001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
| Unit | Unit Price | Est Qty | Total Est Price | |||||
| Underground Conduits-Electrical Wiring | LF | $________ | 100 | $__________ |
1001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Sump Tightness Testing | Each | $________ | 1 | $__________ |
1001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection); preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Piping Sump Repairs | Hr | $________ | 16 | $__________ |
1001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Bonding Price to be detrmined upon issuance of delivery order
1001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 1001AX or CLIN 1001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Investigation | Cr-Hr | $________ | 1 | $___________ |
Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.
| Unit | Unit Price | Est Qty | Total Est Price | |||||
| 1001AT | Line Repair | CRHr | $________ | 1 | $__________ | |||
| 1001AU | Line Replacement | LF | $________ | 100 | $__________ |
1001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Line Tightness Testing | Each | $________ | 1 | $__________ |
1001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Tank Tightness Testing | Each | $________ | 1 | $__________ |
1001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| UST Repair | Cr-Hr | $________ | 1 | $__________ |
1001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.
| Unit | Unit Price | Est Qty | Total Est Price | |||
| UST Replacement | Each | $_________ | 1 | $___________ |
1001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Utility Locates | Each | $_________ | 1 | $___________ |
Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).
| Unit | Unit Price | Est Qty | Total Est Price | ||||
| 1001BA | Fuel Removal | Hr | $_________ | 1 | $____________ | ||
| 1001 BB | Fuel Removal | Gal | $__________ | 12,000.00 | $____________ |
1001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 1001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 1001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.
Unit Unit Price Est Qty Total Est Credit
Fuel Credit Gal $_________ 1 $____________
1001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.
| Unit | Unit Price | Est Qty | Total Est Price | ||||
| Training and Recommendation Letter | Each | $__________ | 1 | $____________ |
1001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Anti-siphon valve | Each | $________ | 1 | $___________ |
1001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.
DELETED DO NOT PROPOSE
1001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
| Unit | Unit Price | Est Qty | Total est Price | ||||
| Tank Removal | Each | $________ | 1 | $___________ |
1001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Dispenser Removal | Each | $________ | 1 | $___________ |
1001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Dispenser Replacement | Each | $________ | 1 | $___________ |
1001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Frozen Ground Excavation | Each | $________ | 1 | $___________ |
1001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Sensor/Probe Replacement | Each | $________ | 1 | $___________ |
EST TOTAL OPTION YEAR 1 $___________________________ (enter this amount on CLIN 1001)
PROPOSAL SCHEDULE BREAKDOWN
OPTION YEAR 2
For “Repair/Replacement of Underground Storage Tank (UST) systems at Malmstrom Air Force Base, MAFs and LFs” Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.
NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.
ITEM
Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).
| 2001AA Mobilization-Missile Field, emergency | Price to be detrmined upon issuance of delivery order | |
| 2001AB Mobilization-Missile Field, urgent | Price to be detrmined upon issuance of delivery order | |
| 2001AC Mobilization-Missile Field, routine | Price to be detrmined upon issuance of delivery order | |
| 2001AD Mobilization-Base, emergency | Price to be detrmined upon issuance of delivery order | |
| 2001AE Mobilization-Base, urgent | Price to be detrmined upon issuance of delivery order | |
| 2001AF Mobilization-Base, routine | Price to be detrmined upon issuance of delivery order |
2001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).
Government Delays Price to be detrmined upon issuance of delivery order
2001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as Ton (TN).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Contaminated Soil | TN | $_________ | 25 | $___________ |
2001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Replacement Soil | CY | $_________ | 1 | $___________ |
2001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Tank Venting | Each | $_________ | 1 | $___________ |
2001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | ||||
| Leak Detection Monitoring System | Each | $_________ | 1 | $___________ |
2001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
| Unit | Unit Price | Est Qty | Total Est Price | ||||
| Underground Conduits-Sensor Wiring | LF | $_________ | 100 | $___________ |
2001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
| Unit | Unit Price | Est Qty | Total Est Price | |||||
| Underground Conduits-Electrical Wiring | LF | $_________ | 100 | $___________ |
2001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Sump Tightness Testing | Each | $_________ | 1 | $___________ |
2001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection) ; preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Piping Sump Repairs | Hr | $_________ | 16 | $___________ |
2001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Bonding Price to be detrmined upon issuance of delivery order
2001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 2001AX or CLIN 2001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Investigation | Cr-Hr | $_________ | 1 | $___________ |
Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.
| Unit | Unit Price | Est Qty | Total Est Price | |||||
| 2001AT | Line Repair | CRHr | $_________ | 1 | $___________ | |||
| 2001AU | Line Replacement | LF | $_________ | 100 | $___________ |
2001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Line Tightness Testing | Each | $_________ | 1 | $___________ |
2001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Tank Tightness Testing | Each | $_________ | 1 | $___________ |
2001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).
| Unit | Unit Price | Est Qty | Total Est Price | |||
| UST Repair | Cr-Hr | $_________ | 1 | $___________ |
2001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.
| Unit | Unit Price | Est Qty | Total Est Price | |||
| UST Replacement | Each | $_________ | 1 | $___________ |
2001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.
| Unit | Unit Price | Est Qty | Total Est Price | |||
| Utility Locates | Each | $_________ | 1 | $___________ |
Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).
| Unit | Unit Price | Est Qty | Total Est Price | ||||
| 2001BA | Fuel Removal | Hr | $_________ | 1 | $___________ | ||
| 2001 BB | Fuel Removal | Gal | $_________ | 12,000.00 | $___________ |
2001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 2001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 2001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.
Unit Unit Price Est Qty Total Est Credit
Fuel Credit Gal $_________ 1 $____________
2001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.
| Unit | Unit Price | Est Qty | Total Est Price | ||||
| Training and Recommendation Letter | Each | $_________ | 1 | $___________ |
2001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Anti-siphon valve | Each | $________ | 1 | $___________ |
2001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.
DELETED DO NOT PROPOSE
2001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
| Unit | Unit Price | Est Qty | Total est Price | ||||
| Tank Removal | Each | $________ | 1 | $___________ |
2001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Dispenser Removal | Each | $________ | 1 | $___________ |
2001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Dispenser Replacement | Each | $________ | 1 | $___________ |
2001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Frozen Ground Excavation | Each | $________ | 1 | $___________ |
2001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.
| Unit | Unit Price | Est Qty | Total est Price | |||
| Sensor/Probe Replacement | Each | $________ | 1 | $___________ |
EST TOTAL OPTION YEAR 2 $___________________________ (enter this amount on CLIN 2001)
File details come from the government source that posted it. Updated .