SECTION_B_CONTINUATION_SHEET.docx

DOCX document 42 KB Posted

Attached to
Repair UST Fuel Tanks IDIQ Federal contract opportunity
Solicitation number
FA4626-13-R-0007
Issued by
Department of the Air Force Global Strike Command

About this file

Amended Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Repair UST Fuel Tanks IDIQ, newest first.
File Type Posted
Amendment_2-6-2014.docx DOCX document
Amendment_0003.doc DOC document
General_Decision_Number_MT76.docx DOCX document
General_Decision_Number_MT78.docx DOCX document
General_Decision_Number_MT67.docx DOCX document
312300_-_Earthwork.doc DOC document
231113_-_Fuel-Oil_Storage_Tank_Piping_and_Monitoring_Leak_Detection_System.doc DOC document
Amend_3_Drawings.zip ZIP file
Specification_Section_010000.docx DOCX document
Questions_and_Answers.docx DOCX document
Amendment_02.doc DOC document
Amendment_01.doc DOC document
Pre-Proposal_Site_Visit.pdf PDF
Attch_2_Material_Submittal_Schedule.xls XLS spreadsheet
Attach_5-2_Wage_Determination.docx DOCX document
Attch_7_-_Subcontractor_Consent_Form_-_10R0027.docx DOCX document
Attch_5-3_Wage_Determination.docx DOCX document
Solicitation.doc DOC document
Attach_1_Specifications.zip ZIP file
Attach_6_Past_Performance_Questionnaire.docx DOCX document
Attch_8_Base_Entery_Policy.pdf PDF
Attch_5-1_Wage_Determination.docx DOCX document
Attch_4_Drawings.zip ZIP file
Attach_3_Schedule_of_Drawings.doc DOC document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0003 FA4626-13-R-0007

Section B - Supplies or Services and Prices

ITEM NOSUPPLIES/SERVICESEST QTYUNITUNIT PRICEAMOUNT
0001Repair Fuel Tanks100Each
BASE YEAR

FFP

ALL SUB-CLINs IDENTIFIED IN THE SCHEDULE B CONTINUATION SHEET (0001 AA THRU 0001BL) ARE HEREBY INCORPORATED AND MADE A PART OF THIS MAIN CLIN.

FOB: Destination

PURCHASE REQUEST NUMBER: F2W3D33071A001

SIGNAL CODE: A

NET AMT

ITEM NOSUPPLIES/SERVICESEST QTYUNITUNIT PRICEAMOUNT
1001Repair Fuel Tanks100Each
OPTION YEAR 1

OPTION

FFP

ALL SUB-CLINs IDENTIFIED IN THE SCHEDULE B CONTINUATION SHEET (1001 AA THRU 1001BL) ARE HEREBY INCORPORATED AND MADE A PART OF THIS MAIN CLIN.

FOB: Destination

NET AMT

ITEM NOSUPPLIES/SERVICESEST QTYUNITUNIT PRICEAMOUNT
2001Repair Fuel Tanks100Each
OPTIONOPTION YEAR 2

FFP

ALL SUB-CLINs IDENTIFIED IN THE SCHEDULE B CONTINUATION SHEET (2001 AA THRU 2001BL) ARE HEREBY INCORPORATED AND MADE A PART OF THIS MAIN CLIN..

FOB: Destination

NET AMT

SECTION B CONTINUATION SHEET

BASE YEAR

Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.

NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.

ITEM

Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).

0001AA Mobilization-Missile Field, emergency Price to be detrmined upon issuance of delivery order 0001AB Mobilization-Missile Field, urgent Price to be detrmined upon issuance of delivery order

0001AC Mobilization-Missile Field, routinePrice to be detrmined upon issuance of delivery order
0001AD Mobilization-Base, emergencyPrice to be detrmined upon issuance of delivery order
0001AE Mobilization-Base, urgentPrice to be detrmined upon issuance of delivery order
0001AF Mobilization-Base, routinePrice to be detrmined upon issuance of delivery order

0001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).

Government Delays Price to be detrmined upon issuance of delivery order

0001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as ton (TN).

UnitUnit PriceEst. QtyTotal Est. Price
Contaminated SoilTN$________25$__________

0001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).

UnitUnit PriceEst. QtyTotal Est. Price
Replacement SoilCY$________1$__________

0001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).

UnitUnit PriceEst. QtyTotal Est. Price
Tank VentingEach$________1$__________

0001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).

UnitUnit PriceEst. QtyTotal Est. Price
Leak Detection Monitoring SystemEach$________1$__________

0001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.

UnitUnit PriceEst QtyTotal Est. Price
Underground Conduits-Sensor WiringLF$________100$__________

0001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.

UnitUnit PriceEst. QtyTotal Est. Price
Underground Conduits-ElectricalLF$________100$___________

Wiring

0001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).

UnitUnit PriceEst QtyTotal Est Price
Sump Tightness TestingEach$_________1$___________

0001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection); preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).

UnitUnit PriceEst QtyTotal Est Price
Piping Sump RepairsHr$_________16$___________

0001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.

Bonding Price to be detrmined upon issuance of delivery order

0001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 0001AX or CLIN 001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).

UnitUnit PriceEst QtyTotal Est Price
InvestigationCr-Hr$________1$__________

Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.

UnitUnit PriceEst QtyTotal Est Price
0001AT Line RepairCRHr$________1$__________
0001A Line ReplacementLF$________100$___________

0001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).

UnitUnit PriceEst QtyTotal Est Price
Line Tightness TestingEach$________1$__________

0001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).

UnitUnit PriceEst QtyTotal Est Price
Tank Tightness TestingEach$________1$__________

0001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).

UnitUnit PriceEst QtyTotal Est Price
UST RepairCr-Hr$________1$__________

0001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.

UnitUnit PriceEst QtyTotal Est Price
UST ReplacementEach$________1$__________

0001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.

UnitUnit PriceEst QtyTotal Est Price
Utility LocatesEach$________1$__________

Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).

UnitUnit PriceEst QtyTotal Est Price
0001BA Fuel RemovalHr$________1$__________
0001 B Fuel RemovalGal$________12,000.00$__________

0001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 0001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 0001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.

Unit Unit Price Est Qty Total Est Credit

Fuel Credit Gal $_________ 1 $____________

0001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.

UnitUnit PriceEst QtyTotal Est Price
Training and Recommendation LetterEach$________1$__________

0001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.

UnitUnit PriceEst QtyTotal est Price
Anti-siphon valveEach$________1$___________

0001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.

UnitUnit PriceEst QtyTotal est Price
DELETEDDO NOT PROPOSE

0001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.

UnitUnit PriceEst QtyTotal est Price
Tank RemovalEach$________1$___________

0001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.

UnitUnit PriceEst QtyTotal est Price
Dispenser RemovalEach$________1$___________

0001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.

UnitUnit PriceEst QtyTotal est Price
Dispenser ReplacementEach$________1$___________

0001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.

UnitUnit PriceEst QtyTotal est Price
Frozen Ground ExcavationEach$________1$___________

0001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.

UnitUnit PriceEst QtyTotal est Price
Sensor/Probe ReplacementEach$________1$___________

EST TOTAL BASE YEAR $___________________________ (enter this amount on CLIN 0001)

PROPOSAL SCHEDULE BREAKDOWN

OPTION YEAR 1

For “Repair/Replacement of Underground Storage Tank (UST) systems at Malmstrom Air Force Base, MAFs and LFs” Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.

NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.

ITEM

Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).

1001AA Mobilization-Missile Field, emergency Price to be detrmined upon issuance of delivery order

1001AB Mobilization-Missile Field, urgentPrice to be detrmined upon issuance of delivery order
1001AC Mobilization-Missile Field, routinePrice to be detrmined upon issuance of delivery order
1001AD Mobilization-Base, emergencyPrice to be detrmined upon issuance of delivery order
1001AE Mobilization-Base, urgentPrice to be detrmined upon issuance of delivery order
1001AF Mobilization-Base, routinePrice to be detrmined upon issuance of delivery order

1001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).

Government Delays Price to be detrmined upon issuance of delivery order

1001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as Ton (TN).

UnitUnit PriceEst QtyTotal Est Price
Contaminated SoilTN$________25$__________

1001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).

UnitUnit PriceEst QtyTotal Est Price
Replacement SoilCY$________1$__________

1001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).

UnitUnit PriceEst QtyTotal Est Price
Tank VentingEach$________1$__________

1001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).

UnitUnit PriceEst QtyTotal Est Price
Leak Detection Monitoring SystemEach$________1$__________

1001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.

UnitUnit PriceEst QtyTotal Est Price
Underground Conduits-Sensor WiringLF$________100$___________

1001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.

UnitUnit PriceEst QtyTotal Est Price
Underground Conduits-Electrical WiringLF$________100$__________

1001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).

UnitUnit PriceEst QtyTotal Est Price
Sump Tightness TestingEach$________1$__________

1001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection); preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).

UnitUnit PriceEst QtyTotal Est Price
Piping Sump RepairsHr$________16$__________

1001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.

Bonding Price to be detrmined upon issuance of delivery order

1001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 1001AX or CLIN 1001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).

UnitUnit PriceEst QtyTotal Est Price
InvestigationCr-Hr$________1$___________

Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.

UnitUnit PriceEst QtyTotal Est Price
1001ATLine RepairCRHr$________1$__________
1001AULine ReplacementLF$________100$__________

1001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).

UnitUnit PriceEst QtyTotal Est Price
Line Tightness TestingEach$________1$__________

1001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).

UnitUnit PriceEst QtyTotal Est Price
Tank Tightness TestingEach$________1$__________

1001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).

UnitUnit PriceEst QtyTotal Est Price
UST RepairCr-Hr$________1$__________

1001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.

UnitUnit PriceEst QtyTotal Est Price
UST ReplacementEach$_________1$___________

1001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.

UnitUnit PriceEst QtyTotal Est Price
Utility LocatesEach$_________1$___________

Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).

UnitUnit PriceEst QtyTotal Est Price
1001BAFuel RemovalHr$_________1$____________
1001 BBFuel RemovalGal$__________12,000.00$____________

1001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 1001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 1001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.

Unit Unit Price Est Qty Total Est Credit

Fuel Credit Gal $_________ 1 $____________

1001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.

UnitUnit PriceEst QtyTotal Est Price
Training and Recommendation LetterEach$__________1$____________

1001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.

UnitUnit PriceEst QtyTotal est Price
Anti-siphon valveEach$________1$___________

1001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.

DELETED DO NOT PROPOSE

1001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.

UnitUnit PriceEst QtyTotal est Price
Tank RemovalEach$________1$___________

1001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.

UnitUnit PriceEst QtyTotal est Price
Dispenser RemovalEach$________1$___________

1001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.

UnitUnit PriceEst QtyTotal est Price
Dispenser ReplacementEach$________1$___________

1001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.

UnitUnit PriceEst QtyTotal est Price
Frozen Ground ExcavationEach$________1$___________

1001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.

UnitUnit PriceEst QtyTotal est Price
Sensor/Probe ReplacementEach$________1$___________

EST TOTAL OPTION YEAR 1 $___________________________ (enter this amount on CLIN 1001)

PROPOSAL SCHEDULE BREAKDOWN

OPTION YEAR 2

For “Repair/Replacement of Underground Storage Tank (UST) systems at Malmstrom Air Force Base, MAFs and LFs” Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.

NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.

ITEM

Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).

2001AA Mobilization-Missile Field, emergencyPrice to be detrmined upon issuance of delivery order
2001AB Mobilization-Missile Field, urgentPrice to be detrmined upon issuance of delivery order
2001AC Mobilization-Missile Field, routinePrice to be detrmined upon issuance of delivery order
2001AD Mobilization-Base, emergencyPrice to be detrmined upon issuance of delivery order
2001AE Mobilization-Base, urgentPrice to be detrmined upon issuance of delivery order
2001AF Mobilization-Base, routinePrice to be detrmined upon issuance of delivery order

2001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).

Government Delays Price to be detrmined upon issuance of delivery order

2001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as Ton (TN).

UnitUnit PriceEst QtyTotal Est Price
Contaminated SoilTN$_________25$___________

2001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).

UnitUnit PriceEst QtyTotal Est Price
Replacement SoilCY$_________1$___________

2001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).

UnitUnit PriceEst QtyTotal Est Price
Tank VentingEach$_________1$___________

2001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).

UnitUnit PriceEst QtyTotal Est Price
Leak Detection Monitoring SystemEach$_________1$___________

2001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.

UnitUnit PriceEst QtyTotal Est Price
Underground Conduits-Sensor WiringLF$_________100$___________

2001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.

UnitUnit PriceEst QtyTotal Est Price
Underground Conduits-Electrical WiringLF$_________100$___________

2001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).

UnitUnit PriceEst QtyTotal Est Price
Sump Tightness TestingEach$_________1$___________

2001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection) ; preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).

UnitUnit PriceEst QtyTotal Est Price
Piping Sump RepairsHr$_________16$___________

2001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.

Bonding Price to be detrmined upon issuance of delivery order

2001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 2001AX or CLIN 2001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).

UnitUnit PriceEst QtyTotal Est Price
InvestigationCr-Hr$_________1$___________

Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.

UnitUnit PriceEst QtyTotal Est Price
2001ATLine RepairCRHr$_________1$___________
2001AULine ReplacementLF$_________100$___________

2001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).

UnitUnit PriceEst QtyTotal Est Price
Line Tightness TestingEach$_________1$___________

2001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).

UnitUnit PriceEst QtyTotal Est Price
Tank Tightness TestingEach$_________1$___________

2001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).

UnitUnit PriceEst QtyTotal Est Price
UST RepairCr-Hr$_________1$___________

2001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.

UnitUnit PriceEst QtyTotal Est Price
UST ReplacementEach$_________1$___________

2001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.

UnitUnit PriceEst QtyTotal Est Price
Utility LocatesEach$_________1$___________

Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).

UnitUnit PriceEst QtyTotal Est Price
2001BAFuel RemovalHr$_________1$___________
2001 BBFuel RemovalGal$_________12,000.00$___________

2001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 2001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 2001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.

Unit Unit Price Est Qty Total Est Credit

Fuel Credit Gal $_________ 1 $____________

2001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.

UnitUnit PriceEst QtyTotal Est Price
Training and Recommendation LetterEach$_________1$___________

2001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.

UnitUnit PriceEst QtyTotal est Price
Anti-siphon valveEach$________1$___________

2001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.

DELETED DO NOT PROPOSE

2001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.

UnitUnit PriceEst QtyTotal est Price
Tank RemovalEach$________1$___________

2001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.

UnitUnit PriceEst QtyTotal est Price
Dispenser RemovalEach$________1$___________

2001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.

UnitUnit PriceEst QtyTotal est Price
Dispenser ReplacementEach$________1$___________

2001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.

UnitUnit PriceEst QtyTotal est Price
Frozen Ground ExcavationEach$________1$___________

2001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.

UnitUnit PriceEst QtyTotal est Price
Sensor/Probe ReplacementEach$________1$___________

EST TOTAL OPTION YEAR 2 $___________________________ (enter this amount on CLIN 2001)