SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 08-Jul-2013 02:00 PM to 07-Mar-2014 02:00 PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
SCHEDULE B CONTINUATION SHEET
Section B - Supplies or Services and Prices
SECTION B CONTINUATION SHEET
BASE YEAR
Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.
NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.
ITEM
Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).
Unit Unit Price Est. Qty
Total Est. Price
0001AA
Mobilization-Missile Field, emergency Price to be detrmined upon issuance of delivery order
0001AB
Mobilization-Missile Field, urgent
Price to be detrmined upon issuance of delivery order
0001AC
Mobilization-Missile Field, routine
Price to be detrmined upon issuance of delivery order
0001AD
Mobilization-Base, emergency
Price to be detrmined upon issuance of delivery order
0001AE
Mobilization-Base, urgent
Price to be detrmined upon issuance of delivery order
0001AF
Mobilization-Base, (routine)
0001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).
Est. Qty
Total Est. Price
Government Delays
0001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as ton (TN).
Est. Qty
Contaminated Soil
TN
0001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).
Est. Qty
Replacement Soil
CY
0001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).
Est. Qty
Tank Venting
Each
0001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).
Est. Qty
Leak Detection Monitoring System
0001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est Qty
Total Est. Price
Underground Conduits-Sensor Wiring
LF
0001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est. Qty
Total Est. Price
Underground Conduits-Electrical Wiring
LF
0001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).
Est Qty
Total Est Price
Sump Tightness Testing
0001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection); preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).
Est Qty
Piping Sump Repairs
Hr
0001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Est Qty
Bonding
0001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 0001AX or CLIN 001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).
Est Qty
Investigation
Cr-Hr
Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.
Est Qty
0001AT Line Repair
CRHr
0001AU
Line Replacement
LF
0001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).
Est Qty
Line Tightness Testing
0001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).
Est Qty
Tank Tightness Testing
0001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).
Est Qty
UST Repair
0001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.
Est Qty
UST Replacement
0001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.
Est Qty
Utility Locates
Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).
Est Qty
Total Est Price
0001BA
Fuel Removal
0001 BB
Gal
12,000.00
0001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 0001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 0001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.
Est Qty
Total Est Credit
Fuel Credit
0001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.
Est Qty
Training and Recommendation Letter
0001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.
Est Qty
Total est Price
Anti-siphon valve
0001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.
Est Qty
Total est Price
DELETED
DO NOT PROPOSE
0001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Price Est Qty
Tank Removal
0001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Price Est Qty
Dispenser Removal
0001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.
Unit Price Est Qty
Dispenser Replacement
0001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.
Unit Unit Price Est Qty
Frozen Ground Excavation
0001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.
Unit Price Est Qty
Sensor/Probe Replacement
EST TOTAL BASE YEAR $___________________________ (enter this amount on CLIN 0001)
PROPOSAL SCHEDULE BREAKDOWN
OPTION YEAR 1
For “Repair/Replacement of Underground Storage Tank (UST) systems at Malmstrom Air Force Base, MAFs and LFs”
Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.
NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.
Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).
Est Qty
Total Est Price
1001AA Mobilization-Missile Field, emergency Price to be detrmined upon issuance of delivery order
1001AB
Mobilization-Missile Field, urgent
Price to be detrmined upon issuance of delivery order 1001AC Mobilization-Missile Field, routine
Price to be detrmined upon issuance of delivery order
1001AD
Mobilization-Base, emergency
Price to be detrmined upon issuance of delivery order
1001AE
Mobilization-Base, urgent
Price to be detrmined upon issuance of delivery order
1001AF
Mobilization-Base, routine
1001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).
Est Qty
1001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as Ton (TN).
Est Qty
1001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).
Est Qty
1001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).
Est Qty
1001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).
Est Qty
1001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est Qty
Total Est Price
Underground Conduits-Sensor Wiring
LF
1001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est Qty
Total Est Price
Underground Conduits-Electrical Wiring
LF
1001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).
Est Qty
1001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection); preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).
Est Qty
1001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Est Qty
1001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 1001AX or CLIN 1001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).
Est Qty
Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.
Est Qty
Total Est Price
1001AT
Line Repair
1001AU
Line Replacement
LF
1001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).
Est Qty
1001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).
Est Qty
1001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).
Est Qty
1001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.
Est Qty
1001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.
Est Qty
Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).
Est Qty
Total Est Price
1001BA
1001 BB
12,000.00
1001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 1001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 1001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.
Est Qty
1001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.
Est Qty
Total Est Price
Training and Recommendation Letter
Each
1001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.
Est Qty
1001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.
Est Qty
DELETED DO NOT PROPOSE
1001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Price Est Qty
1001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Price Est Qty
1001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.
Unit Price Est Qty
1001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.
Unit Unit Price Est Qty
1001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.
Unit Price Est Qty
EST TOTAL OPTION YEAR 1 $___________________________ (enter this amount on CLIN 1001)
PROPOSAL SCHEDULE BREAKDOWN
OPTION YEAR 2
For “Repair/Replacement of Underground Storage Tank (UST) systems at Malmstrom Air Force Base, MAFs and LFs”
Cost for Repair/Replacement and Testing to EACH UST system at the base, MAFs, or LFs.
NOTE: Pricing for each CLIN in Schedule B is based upon the work to be completed for a quantity of 1. An unknown quantity may be awarded for each CLIN at any time during the contract period.
Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for “Mobilization”. The Government will only pay for one mobilization per site. Mobilization is broken into 3 categories: routine is defined as contractor response to the site within 5 working days, urgent is defined as contractor response to the site within 2 working days, and emergency is contractor response to the site within 12 hours. Emergency shall be considered the initial response to a Government or Montana Department of Environmental Quality determined unusual operating condition associated with UST systems. Mobilization for the Repair/Replacement of UST systems at the base, MAFs and LFs shall be paid as Each (EA).
Est Qty
Total Est Price
2001AA Mobilization-Missile Field, emergency Price to be detrmined upon issuance of delivery order
2001AB
Mobilization-Missile Field, urgent
Price to be detrmined upon issuance of delivery order
2001AC
Mobilization-Missile Field, routine
Price to be detrmined upon issuance of delivery order
2001AD
Mobilization-Base, emergency
Price to be detrmined upon issuance of delivery order 2001AE Mobilization-Base, urgent
Price to be detrmined upon issuance of delivery order
2001AF
Mobilization-Base, routine
2001 AG. Government Delays. Should the Contracting Officer determine that the Contractor incurred a work stoppage or could not begin work as scheduled, and that the stoppage or delay was caused by the Government, the Contractor will be paid for delays which result in verifiable lost progress. Cost shall include crew, labor, and equipment time lost when the site is categorized as routine or urgent, government delays will only be paid for time during normal work hours while in a restricted area. i.e. LF, MAF or WSA. Government Delays shall be paid by the Crew-Hour (Cr-Hr).
Est Qty
2001 AH Contaminated Soil. Includes all work and equipment necessary to remove, transport, and dispose of contaminated soil/materials found on the project site. Contaminated soil must be removed and disposed of in an approved disposal area, Contaminated soil must not be disposed of on Federal Government property . Removal of contaminated soil shall be paid as Ton (TN).
Est Qty
2001 AJ. Replacement Soil. Includes all work, materials and equipment necessary to replace contaminated soil/materials with similar materials . Replacement soil shall be paid as Cubic Yard (CY).
Est Qty
2001 AK. Remove & Replace Tank Venting. Includes all work and equipment necessary to provide fuel tank vent piping and pipe/concrete supports. Cost for Tank Venting shall be paid as Each (EA).
Est Qty
2001 AL. Remove & Replace Leak Detection Monitoring System. Includes all work and equipment necessary to provide a new leak detection monitoring system including sensors, cabling, EMI shielding, TVSS, RFI powerline filter, EMC enclosure. Cost for Leak Detection Monitoring System shall be paid as Each (EA).
Est Qty
2001 AM. Underground Conduits-Sensor Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and leak detection sensor wiring with new. Cost for underground conduits and wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est Qty
Total Est Price
Underground Conduits-Sensor Wiring
LF
2001 AN. Underground Conduits-Electrical Wiring. Includes all work and equipment necessary to replace existing unserviceable underground conduits and electrical wiring for leak detection electrical wiring with new. Cost for underground conduits and electrical wiring shall be paid by the Lineal Foot (LF). Conduit and wiring requiring replacement will range from 0 to 200 LF (2 conduits x 100 LF ea) per site.
Est Qty
Total Est Price
Underground Conduits-Electrical Wiring
LF
2001 AP. Sump Tightness Testing. Includes all work and equipment necessary to test sump tightness. Cost for sump tightness testing shall be paid as Each (EA).
Est Qty
2001 AQ. Sump Repairs. Includes all work and equipment necessary to repair sump to tank level (from top of ground level to bottom of sump and tank connection) ; preparation of FRP sump and tank surfaces for repairs; FRP laminate lay-up entire circumference. Cost for sump repairs shall be paid by the Hour (Hr).
Est Qty
2001 AR. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Est Qty
2001AS. Investigation. Includes all work and equipment necessary to determine the UST system problem including trouble shooting the monitoring system, inspecting the visible system components, excavation of area around the sump, vent pipe, interstitial riser, fill port, manway, tank, and piping. The excavation will be limited to the upper portion of the tank and shall not exceed 8 hours unless approved by the Government. If more extensive excavation is required and approved by the Government, work will be conducted under CLIN 2001AX or CLIN 2001AY. Cost for investigation shall be paid by the Crew-Hour (Cr-Hr).
Est Qty
Underground Fuel Lines. Includes all work, material and equipment necessary to repair or replace existing unserviceable underground supply and/or return fuel lines to include secondary containment sleeve material from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for lines repair shall be paid by the Crew-hour (Cr-Hr) and cost for line replacement shall be paid by the linear foot and will range from 0 to 200 LF per tank.
Est Qty
Total Est Price
2001AT
Line Repair
2001AU
Line Replacement
LF
2001AV. Line Tightness Testing. Includes all work, material and equipment to perform line tightness testing on supply or return or both fuel lines from the UST to the Launch Support Building (LSB) at LFs, UST to generator room and/or line from generator room to boiler in the MAF at the MAFs, and UST to the building on base. Cost for line tightness testing shall be paid as each (EA).
Est Qty
2001 AW. Tank Tightness Testing. Includes all work, material and equipment to perform tank tightness testing on tanks at the LFs, MAFs and base tanks. Cost for tank tightness testing shall be paid as each (EA).
Est Qty
2001 AX. UST Repair. Includes all work, material and equipment necessary to repair UST exhibiting unusual operating conditions which indicate there might be a suspected leak in the manway sump, interstitial riser tube, fill port, or secondary tank shell. Minor UST repairs shall consist of fixes that can be done with minor or no excavation and shall not exceed 16 Cr-Hrs. Major UST repairs shall be associated with extensive excavation and take more than 16 Cr-Hrs to repair. Cost for UST system repair shall be paid by the Crew-hour (Cr-Hr).
Est Qty
2001 AY. UST Replacement. Includes all work, material and equipment necessary to replace existing UST and associated components. UST replacement shall include removal and proper disposal of existing UST, all excavation requirements, as well as all requirements for a complete and usable tank system such as venting, electrical connections, fuel piping connections, etc. Cost for UST replacement shall be paid as Each.
Est Qty
2001 AZ. Utility Locates. Includes all work, material and equipment necessary to locate all utilities in the vicinity of work area. Utility locates shall be paid as Each.
Est Qty
Fuel Removal. Includes all work, material and equipment necessary to remove fuel contained in the existing UST and associated components not to exceed 12,000.00 gallons based on tank size. Cost for fuel removal shall be paid as Hourly (Hr) and Gallons (Gal).
Est Qty
Total Est Price
2001BA
2001 BB
12,000.00
2001 BC. Fuel Credit. This line item is for the fair market value of the fuel pumped as identified in line items 2001 BA and BB above. This will be the credit back to the government from the successful offeror as all fule pumped will become the property of the contract. This credit will be subtracted from the issued delivery order when services are required as per line items 2001 BA and BB. Line item credit shall be applied by the actual gallons of fuel pumped.
Est Qty
2001 BD. Training and Recommendation Letter. Includes allowing designated Government personnel to assist in activities to gain experience necessary to obtain licensing through the State of Montana DEQ to become a licensed UST installer/remover. Includes writing and certifying in written letter to DEQ that Government personnel by name participated in work associated with tank installation and/or removal. Written correspondence will be provided to the Government at the end of the job in order to submit to DEQ when submitting application for licensing. Cost for training and recommendation letter shall be paid as Each. Training must be performed by certified DEQ licensed Tank Installer/Remover.
Est Qty
Total Est Price
Training and Recommendation Letter
Each
2001 BE. Anti-Siphon Valve. Includes all work and equipment necessary to replace the anti-siphon valve (Morrison Brothers, Catalog #137B, 1-1/2”) located inside the Launcher Support Building. The Morrison Brothers anti-siphon valve, catalog # 137B, 1-1/2” is the only anti-siphon valve that the government will accept for new installation, or replacement.
Est Qty
2001 BF. Interior Piping. Includes all work and equipment necessary to repair or replace interior or above-ground fuel piping. This Line Item also includes work to install fittings such as the tee with ¼” plug (test port) in the Launch Support Building.
Est Qty
Total est Price
DELETED DO NOT PROPOSE
2001 BG. Tank Removal. Includes all work and equipment necessary to remove underground fuel tanks complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Unit Price Est Qty
2001 BH. Dispenser Removal. Includes all work and equipment necessary to remove UST dispenser, complete, according to all Montana DEQ requirements. This Line Item also includes all fill material required to leave site properly graded to include road mix, gravel or topsoil to match surrounding area.
Unit Price Est Qty
2001 BJ. Dispenser Replacement. Includes all work and equipment necessary to replace existing fuel dispensers with new at BX facility on Malmstrom AFB. New dispenser shall be identical to existing if possible. If not possible, equipment submittals must be submitted and approved by the Government before the work is completed. Contractor is required to supply a full, working system.
Est Qty
2001 BK. Frozen Ground Excavation. This line item is a lump sum price for additional equipment and labor necessary for each excavation in frozen earth conditions. Proper compaction is required at all times in all locations. This line item includes heaters, etc., necessary to complete work in frozen conditions. The context of “Each” in this line item is to include work during all phases for a repair or replacement at an individual site.
Unit Unit Price Est Qty
2001 BL. Sensor/Probe Replacement. Includes all work , matertial, and equipment necessary to replace fuel sensors and probes as needed.
Unit Price Est Qty
EST TOTAL OPTION YEAR 2 $___________________________ (enter this amount on CLIN 2001) (End of Summary of Changes)