Amendment_2-6-2014.docx

DOCX document 15 KB Posted

Attached to
Repair UST Fuel Tanks IDIQ Federal contract opportunity
Solicitation number
FA4626-13-R-0007
Issued by
Department of the Air Force Global Strike Command

About this file

List of Amendment

View the file

Other files for this federal contract opportunity

Other files attached to Repair UST Fuel Tanks IDIQ, newest first.
File Type Posted
General_Decision_Number_MT76.docx DOCX document
General_Decision_Number_MT78.docx DOCX document
Amendment_0003.doc DOC document
General_Decision_Number_MT67.docx DOCX document
312300_-_Earthwork.doc DOC document
SECTION_B_CONTINUATION_SHEET.docx DOCX document
231113_-_Fuel-Oil_Storage_Tank_Piping_and_Monitoring_Leak_Detection_System.doc DOC document
Amend_3_Drawings.zip ZIP file
Specification_Section_010000.docx DOCX document
Questions_and_Answers.docx DOCX document
Amendment_02.doc DOC document
Amendment_01.doc DOC document
Pre-Proposal_Site_Visit.pdf PDF
Attch_5-1_Wage_Determination.docx DOCX document
Attch_4_Drawings.zip ZIP file
Attch_2_Material_Submittal_Schedule.xls XLS spreadsheet
Attach_5-2_Wage_Determination.docx DOCX document
Attch_7_-_Subcontractor_Consent_Form_-_10R0027.docx DOCX document
Attch_5-3_Wage_Determination.docx DOCX document
Solicitation.doc DOC document
Attach_1_Specifications.zip ZIP file
Attach_6_Past_Performance_Questionnaire.docx DOCX document
Attch_8_Base_Entery_Policy.pdf PDF
Attach_3_Schedule_of_Drawings.doc DOC document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0003 February 6, 2014 Solicitation FA4626-13-R-0007 Repair Malmstrom USTs

NZAS 13-6006

1. Page LF-1 – Delete “Flexible Vent Hose” paragraph from Miscellaneous Equipment Schedule. Insert in its place: “Piping and Vent: Flex-ing Flex-Connector System including, but not limited to, APT Flexible Pipe (XP-150-SC), APT Ducting (DCT-400-xxx), Clamshell Swivel Pipe Fittings (MS-XP-150-150 or MS-XP-150-150SS), Flexible Entry Boots (DEB-150-SC) and Clamshell Secondary Test Boots (STB-150).”

2. Page LF-2, Detail 3: Add General Note “C. Install Morrison Bros. extractor (or equal) with cap in vent system.”

3. Page LF-2: Add Detail 4: “Dual Sump Tank Detail.”

4. Page LF-3, Detail 1: Modify note on sump wall to read “Fiberglass laminated water-tight joint both interior and exterior (factory-installed) for piping sump extension ring. See specification section 231115.”

5. Page LF-3, Detail 5: Add “General Note: Install Morrison Bros. extractor (or equal) with cap in vent system.”

6. Page LF-4, Detail 3: Add “General Note: When installing new piping, extend APT flexible pipe (or equal) through wall into LSB and then make necessary transitions inside building.”

7. Page LF-4, Detail 5: Delete new trench information and notations for new trench excavation. Reduce distance from piping to native material as follows: 6” min. to sides, 4” min. to bottom and 4” min. between pipes per manufacturer instructions.

8. Page LF-5, Detail 1: Add “Note: Program leak detection panel to only print when manually requested by operator.”

9. Specification 010000, 3.21.C: Change phone number to 731-7146. Change second-to-last sentence to read “The Contractor shall be held responsible for any damage to the utility by excavation procedures if within 3 feet of markings (either side) by government.”

10. Specification 231113, 3.6.B: Add “5. Program panel to print only when manually requested by operator.”

11. Specification 312300, 3.5.A: Delete last 3 sentences of paragraph.

12. Line Item BE, Anti-Siphon Valve, is still valid and should remain as a line item option in this contract.