Site Visit Questions.docx

DOCX document 11 KB Posted

Attached to
Repair Launch Facility Surface Drainage Federal contract opportunity
Solicitation number
FA4626-11-R-0014
Issued by
Department of the Air Force Global Strike Command

About this file

Questions

View the file

Other files for this federal contract opportunity

Other files attached to Repair Launch Facility Surface Drainage, newest first.
File Type Posted
Site Visit atten List.pdf PDF
Site Visit Minutes.pdf PDF
Amend 1.doc DOC document
Atch 5 - Wage Determination - 11R0014.zip ZIP file
Atch 2 - Submittal Sch - 11R0014.xls XLS spreadsheet
01 36 00-A4.doc DOC document
01 36 00-A2.doc DOC document
03 30 53.doc DOC document
01 36 00.doc DOC document
01 00 00.doc DOC document
PG1_3-Layout1.pdf PDF
31 00 00.doc DOC document
SOL 11R0014.doc DOC document
01 10 00.doc DOC document
Atch 3 - Sch of Dwgs - 11R0014.doc DOC document
PG3_3-Layout1.pdf PDF
01 36 00-A5.doc DOC document
TOC.doc DOC document
01 00 00-A.doc DOC document
PG2_3-Layout1.pdf PDF
01 36 00-A3.doc DOC document
01 36 00-A1.doc DOC document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Visit Questions

1. Who is responsible for locates and possible cut damaged lines/conduit the contractor or government and where is that direction in the specifications or solicitation?

The contractor will be responsible for utility locates and any damaged lines/conduits. Clin AG specifies utility locations are to be included. Two places in the specs we refer to the gov't completing the utility locates... Section 01 00 00, page 10, 3.21.1 and 31 00 00, page 1, 3.1.

2.If lines /conduit require relocation who is responsible?

The government will be responsible for relocation if required.

3.Will security force (guards) be required for all sites?

The government will make all efforts possible to have guards available for all sites.

4.Will any fill material need to be supplied from offsite sources?

No. The intent of the project is to use on-site material to complete the grading.

5.What exactly is required for "animal barrier reattachment"?

Per clin AA, reattach using steel 9 gauge "hog rings" at a maximum spacing of 18" center to center.

6.Will sites be scheduled in close proximity to minimize travel time and fuel costs?

Yes, to the maximum extent possible.