Attach 1 - Specs

View the file

Other files for this federal contract opportunity

Other files attached to Repair Launch Facility Surface Drainage, newest first.
File Type Posted
Site Visit atten List.pdf PDF
Site Visit Minutes.pdf PDF
Site Visit Questions.docx DOCX document
Amend 1.doc DOC document
Atch 5 - Wage Determination - 11R0014.zip ZIP file
31 00 00.doc DOC document
SOL 11R0014.doc DOC document
01 10 00.doc DOC document
Atch 3 - Sch of Dwgs - 11R0014.doc DOC document
PG3_3-Layout1.pdf PDF
01 36 00-A5.doc DOC document
TOC.doc DOC document
Atch 2 - Submittal Sch - 11R0014.xls XLS spreadsheet
01 36 00-A4.doc DOC document
01 36 00-A2.doc DOC document
03 30 53.doc DOC document
01 36 00.doc DOC document
PG2_3-Layout1.pdf PDF
01 36 00-A3.doc DOC document
01 36 00-A1.doc DOC document
01 00 00.doc DOC document
PG1_3-Layout1.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LF SURFACE DRAINAGE

FA4626-11-P-0009

QUALITY CONTROL REPORT TO INSPECTOR

Date: ____________

CONTRACT NO.

FA4626-

TITLE AND LOCATION

MALMSTROM AFB MT

REPORT NO.

CONTRACTOR (Prime or Subcontractor)

NAME OF SUPERINTENDENT OR QC REP

WEATHER
TEMPERATURE

WEATHER EFFECTS

PRIME CONTRACTORS/SUBCONTRACTOR WORKFORCE

(If space provide below is inadequate, use additional sheets

NUMBER
TRADE
HOURS
EMPLOYER
ACTIVITY/TASK PERFORMED
COMP
NON

COMP

TOTAL WORK HOURS ON JOB SITE THIS DATE______

CUMULATIVE TOTAL OF WORK HOURS FROM PREVIOUS REPORT_______

TOTAL WORK HOURS FROM START OF CONSTRUCTION

KTR INITIALS CERTIFY INSPECTION OF ACTIVITY INITIALS

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

( YES ( NO

IF YES, A COPY OF THE COMPLETED OSHA REPORT IS REQUIRED

CONSTRUCTION AND PLANT EQUIPMENT LEFT ON JOB SITE UNTIL USE IS COMPLETED

DESCRIPTION
DATE FIRST ON JOB (FIRST TIME ONLY)
HOURS WORKED THIS DATE
HOURS IDLED
DATE OF FINAL

REMOVAL FROM JOB SITE

CONSTRUCTION AND PLANT EQUIPMENT NOT LEFT ON JOB SITE PERMANENTLY

(This will include pickup trucks and mobile mounted items, such as compressor, that are also used for transportation to and from the job)

DESCRIPTION
HOURS WORKED
HOURS IDLED
SPEC PARA AND/OR DRAWING NO.
LOCATION AND DESCRIPTION OF DEFICIENCIES

(Materials, Equipment, Safety, and/or Workmanship) ACTION TAKEN OR TO BE TAKEN

REFERENCE

DEFICIENCIES CORRECTED THIS DATE
REPORT NO.
COMPLIANCE NOTICE NO.
INSPECTION AND/OR TESTING PERFORMED TODAY-FOLLOW WITH REPORT
LOCATION AND/OR ELEMENT OF WORK
REMARKS

RESULTS OF INSPECTION/TESTING

SPEC PARA/ DRAWING NO.
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (Description, Sizes, Quantity)
SUBMITTAL NO. OR CERTIFICATION
DATE APPROVED

REMARKS:

(Document Total QC Hours for this Day, Directions Received from Government, and Compliance Notices, Etc)

Quality Control Rep Date

CONSTRUCTION REPRESENTATIVES REMARKS AND/OR EXCEPTIONS TO THIS REPORT

Construction Representative Date