01 36 00-A1.doc
DOC document 64 KB Posted
- Attached to
- Repair Launch Facility Surface Drainage Federal contract opportunity
- Solicitation number
- FA4626-11-R-0014
About this file
Attach 1 - Specs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit atten List.pdf | ||
| Site Visit Minutes.pdf | ||
| Site Visit Questions.docx | DOCX document | |
| Amend 1.doc | DOC document | |
| Atch 5 - Wage Determination - 11R0014.zip | ZIP file | |
| Atch 2 - Submittal Sch - 11R0014.xls | XLS spreadsheet | |
| 01 36 00-A4.doc | DOC document | |
| 01 36 00-A2.doc | DOC document | |
| 03 30 53.doc | DOC document | |
| 01 36 00.doc | DOC document | |
| 01 00 00.doc | DOC document | |
| PG1_3-Layout1.pdf | ||
| PG2_3-Layout1.pdf | ||
| 01 36 00-A3.doc | DOC document | |
| 31 00 00.doc | DOC document | |
| SOL 11R0014.doc | DOC document | |
| 01 10 00.doc | DOC document | |
| Atch 3 - Sch of Dwgs - 11R0014.doc | DOC document | |
| PG3_3-Layout1.pdf | ||
| 01 36 00-A5.doc | DOC document | |
| TOC.doc | DOC document | |
| 01 00 00-A.doc | DOC document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LF SURFACE DRAINAGE
FA4626-11-R-0014
FAXXXX-XX-X-XXXX
Section 01 36 00-A Page 1
Waste Management Plan
I. Total Project Waste
From: _____________
Project: ____________
Date: ______________
Quantity (tons)
Landfill Site
Tip fee/ton
Total cost of disposal, including hauling, container rental, tip fees
Total cost/ton
II. Alternatives to Landfilling
Type of material
Quantity
(tons)
Destination and means of transportation
Cost to handle and transport
Expected revenue & tip fee earnings
Net cost
Cost if landfilled
Comparison cost (+) /savings (-)
Cardboard
Dimensional wood
Beverage containers
Land debris
Concrete
CMU
Asphalt
Metals – all types
Gypsum board
Paint
Carpet
Insulation
Glass
Cast stone
Wood materials
Electric cable
PVC piping
Rubber flooring
Raised flooring
III. Total net cost (+) or savings (-) from all alternatives to landfilling all project waste
IV. Means of keeping recyclables free of contamination
V. Meetings to be held to address waste management
All similar materials will be grouped together based on the requirements of the recycling center. All dissimilar materials will be kept in separate containers/bins in order to avoid contamination
At regularly scheduled jobsite coordination/progress meetings and at job safety meetings, waste management requirements will be discussed to clarify any confusion with the craftpeople.
File details come from the government source that posted it. Updated .