01 36 00-A2.doc

DOC document 42 KB Posted

Attached to
Repair Launch Facility Surface Drainage
Solicitation number
FA4626-11-R-0014
Issued by

About this file

Attach 1 - Specs

View the file

Other files

File Type Posted
Site Visit atten List.pdf PDF
Site Visit Minutes.pdf PDF
Site Visit Questions.docx DOCX document
Amend 1.doc DOC document
Atch 5 - Wage Determination - 11R0014.zip ZIP file
PG1_3-Layout1.pdf PDF
31 00 00.doc DOC document
SOL 11R0014.doc DOC document
Atch 2 - Submittal Sch - 11R0014.xls XLS spreadsheet
01 10 00.doc DOC document
PG2_3-Layout1.pdf PDF
01 36 00-A3.doc DOC document
Atch 3 - Sch of Dwgs - 11R0014.doc DOC document
PG3_3-Layout1.pdf PDF
TOC.doc DOC document
01 36 00-A5.doc DOC document
01 00 00-A.doc DOC document
01 36 00-A4.doc DOC document
03 30 53.doc DOC document
01 36 00-A1.doc DOC document
01 36 00.doc DOC document
01 00 00.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LF SURFACE DRAINAGE

FA4626-11-R-0014

Section 01 36 00-A Page 2

Attachment 2 FA4626-10-R-0017

RECOVERED MATERIALS WRITTEN DETERMINATION FORM

This form is needed only if item(s) being procured are subject to the installation’s Affirmative Procurement Program for EPA-Designated Recycled Content Products.

The contracting officer must place in the contract file a written justification if an acquisition of EPA-designated products above the micro-purchase threshold does not contain recovered material. The procurement originator and/or contracting officer must check the appropriate justification(s), provide a written explanation, and sign and date the form.

Procurement Request / Project No.__________________________________________________

EPA Designated Recycled Content Item NOT being Procured: __________________________

___ Designated Item is not competitively available within a reasonable period of time.

(If contract is greater than $25,000, on DD Form 350, line B12F, choose “B.”)

Need Date: ______________ Date Available: ______________

___ Designated Item is at an unreasonable price (recycled item costs more).

(If contract greater than $25,000, on DD Form 350, line B12F, choose “C.”)

Price of Designated Item: __________________

Price of Non-Recycled Item: ________________

___ Designated Item does not meet the installation’s performance standards.

(If contract greater than $25,000, on DD Form 350, line B12F, choose “D.”)

Describe the performance need, document and section number and explain briefly why a recycled content product will not meet that need.

This written determination is made in accordance with FAR 23.405(c).

Procurement Originator Signature Date Contracting Officer Signature Date

1360-B

File details come from the government source that posted it. Updated .