01 36 00-A2.doc

DOC document 42 KB Posted

Attached to
Repair Launch Facility Surface Drainage Federal contract opportunity
Solicitation number
FA4626-11-R-0014
Issued by
Department of the Air Force Global Strike Command

About this file

Attach 1 - Specs

View the file

Other files for this federal contract opportunity

Other files attached to Repair Launch Facility Surface Drainage, newest first.
File Type Posted
Site Visit atten List.pdf PDF
Site Visit Minutes.pdf PDF
Site Visit Questions.docx DOCX document
Amend 1.doc DOC document
Atch 5 - Wage Determination - 11R0014.zip ZIP file
Atch 2 - Submittal Sch - 11R0014.xls XLS spreadsheet
01 36 00-A4.doc DOC document
03 30 53.doc DOC document
01 36 00.doc DOC document
PG2_3-Layout1.pdf PDF
01 36 00-A3.doc DOC document
01 36 00-A1.doc DOC document
01 00 00.doc DOC document
PG1_3-Layout1.pdf PDF
31 00 00.doc DOC document
SOL 11R0014.doc DOC document
01 10 00.doc DOC document
Atch 3 - Sch of Dwgs - 11R0014.doc DOC document
PG3_3-Layout1.pdf PDF
01 36 00-A5.doc DOC document
TOC.doc DOC document
01 00 00-A.doc DOC document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LF SURFACE DRAINAGE

FA4626-11-R-0014

Section 01 36 00-A Page 2

Attachment 2 FA4626-10-R-0017

RECOVERED MATERIALS WRITTEN DETERMINATION FORM

This form is needed only if item(s) being procured are subject to the installation’s Affirmative Procurement Program for EPA-Designated Recycled Content Products.

The contracting officer must place in the contract file a written justification if an acquisition of EPA-designated products above the micro-purchase threshold does not contain recovered material. The procurement originator and/or contracting officer must check the appropriate justification(s), provide a written explanation, and sign and date the form.

Procurement Request / Project No.__________________________________________________

EPA Designated Recycled Content Item NOT being Procured: __________________________

___ Designated Item is not competitively available within a reasonable period of time.

(If contract is greater than $25,000, on DD Form 350, line B12F, choose “B.”)

Need Date: ______________ Date Available: ______________

___ Designated Item is at an unreasonable price (recycled item costs more).

(If contract greater than $25,000, on DD Form 350, line B12F, choose “C.”)

Price of Designated Item: __________________

Price of Non-Recycled Item: ________________

___ Designated Item does not meet the installation’s performance standards.

(If contract greater than $25,000, on DD Form 350, line B12F, choose “D.”)

Describe the performance need, document and section number and explain briefly why a recycled content product will not meet that need.

This written determination is made in accordance with FAR 23.405(c).

Procurement Originator Signature Date Contracting Officer Signature Date

1360-B

File details come from the government source that posted it. Updated .