Atch 2 - Submittal Sch - 11R0014.xls
XLS spreadsheet 31 KB Posted
- Attached to
- Repair Launch Facility Surface Drainage Federal contract opportunity
- Solicitation number
- FA4626-11-R-0014
About this file
Attach 2 Submittal Sched
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit atten List.pdf | ||
| Site Visit Minutes.pdf | ||
| Site Visit Questions.docx | DOCX document | |
| Amend 1.doc | DOC document | |
| Atch 5 - Wage Determination - 11R0014.zip | ZIP file | |
| 01 36 00-A4.doc | DOC document | |
| 01 36 00-A2.doc | DOC document | |
| 03 30 53.doc | DOC document | |
| 01 36 00.doc | DOC document | |
| PG2_3-Layout1.pdf | ||
| 01 36 00-A3.doc | DOC document | |
| 01 36 00-A1.doc | DOC document | |
| 01 00 00.doc | DOC document | |
| PG1_3-Layout1.pdf | ||
| 31 00 00.doc | DOC document | |
| SOL 11R0014.doc | DOC document | |
| 01 10 00.doc | DOC document | |
| Atch 3 - Sch of Dwgs - 11R0014.doc | DOC document | |
| PG3_3-Layout1.pdf | ||
| 01 36 00-A5.doc | DOC document | |
| TOC.doc | DOC document | |
| 01 00 00-A.doc | DOC document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Mar-11 | Solicitation/Contract No. | ||||||||||||||||
| NZAS 02-2024C | LF Surface Drainage | FA4626-11-R-0014 | ||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | |||||||||||||||||||
| Number of Copies Required | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | |||||||||||||||||||
| 1 | 01 00 00 3.12.2 Quality Control Plan | 4 | 10 WD PTSW | |||||||||||||||||
| 2 | 01 00 00 1.8.1 Contractor Design Drawings | 4 | 10 WD PTSW | |||||||||||||||||
| 3 | 01 00 00 1.8.1 Shop Drawings | 4 | 10 WD PTDA | |||||||||||||||||
| 4 | 01 00 00 1.8.1 As-Built Field Data (Red lines) | 4 | 30 CD AFI | |||||||||||||||||
| 5 | 01 00 00 1.8.1 As-Built Corrected Red lines Drawings | 4 | 5 WD AFI | |||||||||||||||||
| 6 | 01 00 00 1.8.1 As-Built Final Drawings | 4 | 10 WD PTFP | |||||||||||||||||
| 7 | 01 00 00 1.8.1 O & M Manuals | 4 | 4 | 10 WD PTSW | ||||||||||||||||
| 8 | 01 00 00 1.8.1 DD1354 Form Transfer & Acceptance of Military Real Property Form | 4 | 10 WD PTSW | |||||||||||||||||
| 9 | 01 00 00 3.21.1 AF 103 Work Clearance Request | 4 | 10 WD PTSW | |||||||||||||||||
| 10 | 01 00 00 3.11.1 Utility Outage | 4 | 7WD PTO | |||||||||||||||||
| 11 | 01 10 00 3.1.1 Entry Authorization List | 2 | 20 WD PTSW | |||||||||||||||||
| 12 | 01 36 00 7.1.2. AF Form 3952 Chem/Haz Material Request | 4 | 10 WD PTSW | |||||||||||||||||
| ACA = After Contract Award | BMD = Before Material Delivery | PTFA = Prior to Final Acceptance | ||||||||||||||||||
| AEO = After Each Occurrence | CD = Calendar Day | PTFI = Prior to Final Inspection | ||||||||||||||||||
| AFA = After Final Acceptance | EEWD = Each Work Day | PTFP = Prior to Final Payment | ||||||||||||||||||
| AFI - After Final Inspection | ||||||||||||||||||||
| AN = Advanced Notification | PTCA = Prior to Contract Award | PTND = Prior to Notice Date | ||||||||||||||||||
| ANTP = After Notice to Proceed | PTCW = Prior to Completing Work | PTO = Prior to Outage | ||||||||||||||||||
| AWC = After Work Completed | PTD = Prior to Delivery | PTSW = Prior to Starting Work | ||||||||||||||||||
| ATT - After Test is Taken | PTDA = Prior to Delivery Award | WD = Working Days | ||||||||||||||||||
| 13 | 01 36 00 11.6. Attachment 1. Waste Management Plan | 4 | 10 WD PTSW | |||||||||||||||||
| 14 | 01 36 00 12.1, Affirmative Procurement | 4 | 10 WD PTSW | |||||||||||||||||
| 15 | 03 30 53 1.3 Ready Mix Concrete | 4 | 4 | 10 WD PTSW | ||||||||||||||||
| 16 | 01 00 00 Geotextile Fabric | 4 | 4 | 10 WD PTSW | ||||||||||||||||
| 17 | ||||||||||||||||||||
| 18 | ||||||||||||||||||||
| 19 | ||||||||||||||||||||
| 20 | ||||||||||||||||||||
| 21 | ||||||||||||||||||||
| 22 | ||||||||||||||||||||
| 23 | ||||||||||||||||||||
| 24 | ||||||||||||||||||||
| ACA = After Contract Award | BMD = Before Material Delivery | PTFA = Prior to Final Acceptance | ||||||||||||||||||
| AEO = After Each Occurrence | CD = Calendar Day | PTFI = Prior to Final Inspection | ||||||||||||||||||
| AFA = After Final Acceptance | EEWD = Each Work Day | PTFP = Prior to Final Payment | ||||||||||||||||||
| AFI - After Final Inspection | ||||||||||||||||||||
| AN = Advanced Notification | PTCA = Prior to Contract Award | PTND = Prior to Notice Date | ||||||||||||||||||
| ANTP = After Notice to Proceed | PTCW = Prior to Completing Work | PTO = Prior to Outage | ||||||||||||||||||
| AWC = After Work Completed | PTD = Prior to Delivery | PTSW = Prior to Starting Work | ||||||||||||||||||
| ATT - After Test is Taken | PTDA = Prior to Delivery Award | WD = Working Days |
&L&"Times New Roman,Regular"&12Attachment 2&R&"Times New Roman,Regular"&12FA4626-11-R-0014 &L&"Times New Roman,Regular"&12AF Form 66
02: 000510_AC01_00_90-
&F-&D&C&"Times New Roman,Regular"&12SS-&P of &N