Whiteman_AFB_0227_July_2016_Inspection_Reports_for_solicitation.pdf
PDF 874 KB Posted
- Attached to
- Steam Heat Plant Services Federal contract opportunity
- Solicitation number
- FA4625-17-Q-0005
About this file
Heat Plant Specific Document #3
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1of 2
AIR FORCE CONUS BOILER & UPV INSPECTION PROGRAM
BPA Call Letter
Base: Whiteman Required Date(s) of Inspection: I 1-15 July 2016
Inspection Damarc Quality Inspection Funding
F4ATA46028AW02
Contractor:
BPA Number:
Base Contacts
Services Document:
FA8051-13-A-0002 Call Number:
MAJCOM Contact Name: DSN: Commercial: Email:
AFIMSC.DETAFGSC. WORK FLOW us.af.mil
On-site Govern ment Representative
Name Olmeda
(Sign upon completion) John
Signature: _ _ _
Date: _,,,-7---19-2016
Inspector Name: Kevin Hindal
Signature: :2'2:-. --==- Date: 7-19-2016
Primary:
Mr. John Olmeda
DSN:
975-2533
Comm . Ph. # (Include area code):
660-687-2533
Email Address:
iohn.olmeda@us.af.mil
Al ternate:
Mr. Roger Wil liams
DSN:
975-2530
Comm. Ph. # (Include area code):
660-687-2530
Email Address:
roger.williams. l5@us.af.mil
Objects to be Inspected: ( 0 Additional inspections attached) Objects Inspected:
Type of Vessel
Type of Inspection
National Board #
Bldg #
Contract Cost
Inspection Completed
(YIN)
Delay Costs?
(YIN)
Explain in
Comments
#I Boiler BC 316 140 Y N #2 Boiler BA 317 140 Y N #3 Boiler BA 318 140 Y N #4 Boiler BA 2090 140 Y N #5 Boiler BC 2443 140 Y N
Total Contract Cost Total Cost
BCE/ Installation
POC Authorization
Name: Si)) Date:
John Olmeda 7-19-2016 c.11Initials (a -+ tr mailto:iohn.olmeda@us.af.mil mailto:5@us.af.mil
Page 2of 2
COSt Summarv
AIR FORCE CONUS BOILER & UPV INSPECTION PROGRAM
BPA Call Letter (Con't)
Totals
Special Instructions to Inspections Contractors:
U pon receipt of Call Letter, contact Installations to schedule inspections.
Provide a minimum of 48 hours notification before mobilizing to perfonn scheduled inspections.
Notify Contracting of all schedule changes/ inspection change ( 1 for 1 change with no delay is allowed ). Additional i nspection change is not allowed.
Leave one ( I ) copy of each completed and signed inspection report at the base following inspections.
Emai l final reports, approved complete call letter, and invoices to: AFCEC Contracting, M AJCOM and Base POCs.
Send hard copies of final inspection reports to A FCEC Operations.
Contractor shall obtain BCE/Installation POC authorization for payment prior to submittal in WAWF.
Contractor Comments/Explanations:
Additional Instructions to Contractor:
lns-Fection 'vne
Contract
Quantity Ordered
Estimated Cost
(Contract Cost Otv Ordered)
Quantity
Comoleted
Cost of Inspections Completed
(Contract Cost x
Otv Comolctcd)
Del Costs
( IN?)
( Explain in Contractor's Comments. belo\\-)
BA 3 3 N
BC 2 2 N
AF FORM 1222-AF EQUIVALENT (7-12-13)
BOILER OR
PRESSURE VESSEL
INSPECTION
REPORT
1. TYPE OF INSPECTION (B – Boiler ; V – Pressure Vessel ) 2. DATE OF INSPECTION
7-19-2016 INTERNAL AND EXTERNAL BA VA
INTERNAL EXTERNAL UNDER HYDROSTATIC TEST BB VB 3. INSPECTION/DELIVERY ORDER NO.
EXTERNAL UNDER OPERATION ✔ BC VC
EXTERNAL UNDER HYDROSTATIC TEST BD VD 4. CONTRACT NUMBER
FA8051-13-A-002 EXPANSION/RECEIVER TANK BE VE
5. INSTALLATION
Whiteman AFB
6. STATE
MO
7. ZIP CODE
65305
8. LOCATION (Bldg. No.)
BLDG - 140
9. PLANT
☐MANNED ☐UNMANNED
10. OBJECT INSPECTED:
BOILER: ☐FIRE TUBE ☐CAST IRON ☐WATER TUBE ☐OTHER (SPECIFY)
UPV: ☐EXPANSION TANK ☐AIR RECEIVER ☐LP ☐OTHER (SPECIFY)
11. USE: ☐POWER ☐PROCESS ☐HTHW ☐HWH ☐STEAM HEATING ☐STORAGE ☐HEAT EXCHANGE
☐OTHER (SPECIFY)
12. MANUFACTURER
english Boiler
13. MFR. RATING (MBTU or KLBS/HR): 35,000,000 Btu/Hr
14(a). NATIONAL BOARD NO.
14(b). USAF NO.
Boiler-1
15. YEAR BUILT
16. YEAR INSTALLED
17. PRIMARY FUEL (BOILER)
Nat.Gas
18. SECONDARY FUEL
No. 2 Diesel
19. PRESSURE ALLOWED MAWP 250 Psi PSIG at TEMP 650 F_ Previous Inspection MAWP 250 Psi PSIG at TEMP 650 F _
20. ACTUAL OPERATING PRESSURE (PSIG)
100 Psi Operating Pressure
21. SAFETY &/or RELIEF VALVE SETTING
(PSIG &/or ° F) 145 Psi
22. PRESSURE &/or TEMP PRIOR INSPECTION
(PSIG &/or ° F) 145 Psi
23. PRESSURE &/or TEMP THIS INSPECTION
(PSIG &/or ° F) 145 Psi
24. EXPLAIN IF PRESSURE CHANGED
No Change
25. METHOD OF FIRING (BOILERS): Automatic 26. PRESSURE GAGE CALIBRATED? ☐YES ☐NO
27. DATE/TYPE OF LAST INSPECTION
TYPE: BA DATE: 6-2016
28. HYDROSTATIC TEST ☐NEW ☐RETEST ☐REPAIR
DATE: Unknown PSIG: Unknown
29. LAST HYDROSTATIC TEST
DATE: Unknown PSIG: Unknown
30. REPAIRS/ALTERATIONS MADE SINCE LAST INSPECTION? ☐NONE ☐YES (SPECIFY)
No repairs Made
31. INTERNAL INSPECTION (DESCRIBE INSPECTION FULLY):
Internal inspection is not performed on type C inspection
Performed external inspection under operation.
Following devices were tested
-Low Water Fuel Cut-off (Primary)
-Low Water Fuel Cut-off (Secondary)
-Flame Scanner
-Low fuel cut-off switch - Adjust the setting on the low gas switch
All tests were performed satisfactory
No signs of overheating , No signs of leakage
32. EXTERNAL INSPECTION (DESCRIBE INSPECTION FULLY): Chart is N/A for BC inspection without emmissions
FUEL TYPE NG/FO: ENERGY CONTENT (BTU/ft3; BTU/gal)
BOILER EFFICIENCY TEST RESULTS:
TEST
POSITION
O2 %
CO
(ppm)
EFF %
CO2 %
STACK
TEMP
(°F)
AIR
TEMP
(°F)
EXCESS
AIR %
HYDRO-
CARBONS
¾” DIA
½” DIA
¼” DIA
BLDG - 140 316 Boiler-1
33. INSPECTION OF SAFETY DEVICES RELIEVING (lbs/hr)
MANUFACTURER SET PRESSURE-PSIG SIZE CAPACITY TESTED (Y/N?) CONDITION & HOW TESTED Kunkle 145 Psi 2 1/2 Inch 23255 Lbs/Hr Y Hand Tested under Pressure
Kunkle 155 Psi 2 Inch 24715 Lbs/Hr Y Hand Tested under Pressure
TOTAL RELIEVING CAPACITY (lbs/hr)
34. INSPECTION OF PRESSURE GAGES
20,647 Lbs/Hr
GAGE CONDITION CORRECTIONS MADE TESTED (Y/N?) REASONS WHY NOT TESTED
0-300 Satisfactory None N Not tested type BC inspection
35. OTHER APPLIANCES (e.g., WATER COLUMNS, GAGE GLASSES, GAGE COCKS, BLOWOFF PIPE & VALVE OR COCKS, FEED PIPE)
ITEM CONDITION
Pipe Connections No evidence of leakage
Water Column No evidence of leakage
Sight Glass Free and clear from debris
Isolation valve (STOP) No evidence of leakage
36. CSD-1/NFPA 85 COMPLIANT? (FOR BC ONLY)
☐YES ☐NO (EXPLAIN IN BLOCK 37) ☐N/A
37. STATE CONDITION OF OBJECT
□ SATISFACTORY ☐ UNSATISFACTORY (LIST DEFICIENCIES TO BE CORRECTED AND REPAIRS TO BE MADE.
USE A SUPPLEMENTAL SHEET, IF NECESSARY.)
No deficiencies to be corrected
38. CAN THE OBJECT CONTINUE IN OPERATION?
☐YES ☐YES, WITH RESTRICTIONS (EXPLAIN ON SUPPLEMENTAL SHEET) ☐NO (EXPLAIN ON SUPPLEMENTAL SHEET)
39. NAME AND TITLE OF INSPECTOR: 40. SIGNATURE OF INSPECTOR:
Kevin Hindal
41. NATIONAL BOARD COMMISSION NUMBER: 42. DATE:
13540 7-19-2016
43. NAME AND TITLE OF AIR FORCE REPRESENTATIVE ACCOMPANYING INSPECTOR:
John Olmeda Boiler plant supervisor 660-687-2533
44. SIGNATURE: 45. DATE:
7-19-2016
46. ACTIONS TAKEN BY AIR FORCE AT A LATER DATE TO RESOLVE DEFICIENCIES CITED ABOVE:
47. DATE OF ACTIONS TAKEN:
48. NAME AND TITLE OF AUTHORIZING OFFICIAL:
49. SIGNATURE OF AUTHORIZING OFFICIAL: 50. DATE:
AF FORM 1222-AF EQUIVALENT (7-12-13) Supplement Sheet
Supplemental Sheet
Bldg NB USAF #
BLDG - 140 316 Boiler-1
High Limit Pressure Switch Manufacturer (HoneyWell) 0-150 Set at 136 Psi, Tested by jumping(bypass) the operating limit control
High/High Limit Pressure Switch Manufacturer (Honeywell ) 0-140 Set At 140 Tested by closing the steam header causing the steam pressure to reach 140 Psi
Low water Fuel Cutoff Primary (McDonnel Miller) 150 Psi Tested by manually blowing down the water column, Simulating low water within the boiler (probe)
Low Water Fuel Cutoff Secondary (McDonnel Miller ) 150 Psi Tested by manually blowing down the water column, simulating low water (Float type)
Flame scanner manufacture( Fire Eye) – Tested by removing and covering the sensor eliminating light (simulating loss of flame)
Burner - Nat gas 35,000,00 Btu/Hr Max Fire Rate Nat.Gas – After each alarm proceeded to post purge to eliminate unused combustion gasses after each alarm when triggered during the testing process –
Gas valve Electronic (Maxxon) Tested satisfactory during each test of the control switches (Valves closed within 3 seconds of each alarm during tests)
Low Gas Pressure Switch ( Ashcroft ) 0-10 Psi – Tested by slowly closing the fuel vale upstream from sensor- Simulating low fuel pressure
All tests were performed under steam pressure and were satisfactory
INSPECTION
REPORT
1. TYPE OF INSPECTION (B – Boiler ; V – Pressure Vessel ) 2. DATE OF INSPECTION
7-19-2016 INTERNAL AND EXTERNAL ✔ BA VA
INTERNAL EXTERNAL UNDER HYDROSTATIC TEST BB VB 3. INSPECTION/DELIVERY ORDER NO.
EXTERNAL UNDER OPERATION BC VC
EXTERNAL UNDER HYDROSTATIC TEST BD VD 4. CONTRACT NUMBER
FA8051-13-A-002 EXPANSION/RECEIVER TANK BE VE
5. INSTALLATION
Whiteman AFB
6. STATE
MO
7. ZIP CODE
65305
8. LOCATION (Bldg. No.)
BLDG - 140
9. PLANT
☐MANNED ☐UNMANNED
10. OBJECT INSPECTED:
BOILER: ☐FIRE TUBE ☐CAST IRON ☐WATER TUBE ☐OTHER (SPECIFY)
UPV: ☐EXPANSION TANK ☐AIR RECEIVER ☐LP ☐OTHER (SPECIFY)
11. USE: ☐POWER ☐PROCESS ☐HTHW ☐HWH ☐STEAM HEATING ☐STORAGE ☐HEAT EXCHANGE
☐OTHER (SPECIFY)
12. MANUFACTURER
Engligh Boiler
13. MFR. RATING (MBTU or KLBS/HR): 35,000,000 Btu/Hr
14(a). NATIONAL BOARD NO.
14(b). USAF NO.
Boiler-2
15. YEAR BUILT
16. YEAR INSTALLED
17. PRIMARY FUEL (BOILER)
Nat.Gas
18. SECONDARY FUEL
No. 2 Diesel
19. PRESSURE ALLOWED MAWP 250 Psi PSIG at TEMP 650 F_ Previous Inspection MAWP 250 Psi PSIG at TEMP 650 F _
20. ACTUAL OPERATING PRESSURE (PSIG)
100 Psi Operating Pressure
21. SAFETY &/or RELIEF VALVE SETTING
(PSIG &/or ° F) 145 Psi
22. PRESSURE &/or TEMP PRIOR INSPECTION
(PSIG &/or ° F) 145 Psi
23. PRESSURE &/or TEMP THIS INSPECTION
(PSIG &/or ° F) 155 Psi
24. EXPLAIN IF PRESSURE CHANGED
No Change
25. METHOD OF FIRING (BOILERS): Automatic 26. PRESSURE GAGE CALIBRATED? ☐YES ☐NO
27. DATE/TYPE OF LAST INSPECTION
TYPE: BC DATE: 6-2016
28. HYDROSTATIC TEST ☐NEW ☐RETEST ☐REPAIR
DATE: Unknown PSIG: Unknown
29. LAST HYDROSTATIC TEST
DATE: Unknown PSIG: Unknown
30. REPAIRS/ALTERATIONS MADE SINCE LAST INSPECTION? ☐NONE ☐YES (SPECIFY)
No repairs Made
31. INTERNAL INSPECTION (DESCRIBE INSPECTION FULLY):
Internal inspection performed on this boiler in accordance with
NBIC Part 2, section 2
Inspection — detailed requirements for inservice inspection of pressure-retaining items
2.2 Boilers / 2.2.6 INTERNAL INSPECTION
Inspected the water side of steam and mud drum - Small amount of scale was found within the mud drum, Facility manager has conducted the necessary adjustments over an extended time period to significantly reduce the amount of scale.
32. EXTERNAL INSPECTION (DESCRIBE INSPECTION FULLY): Chart is N/A for BC inspection without emmissions
TEMP
(°F)
AIR
HYDRO-
CARBONS
BLDG - 140 317 Boiler-2
Kunkle 145 Psi 2 1/2 Inch 23255 Lbs/Hr Y Not Tested type BA Inspection
Kunkle 155 Psi 2 1/2 Inch 24715 Lbs/Hr Y Not Tested type BA Inspection
47,970 Lbs/Hr
35. OTHER APPLIANCES (e.g., WATER COLUMNS, GAGE GLASSES, GAGE COCKS, BLOWOFF PIPE & VALVE OR COCKS, FEED PIPE)
Pipe Connections No evidence of leakage
Water Column No evidence of leakage
Sight Glass Free and clear from debris
Isolation valve (STOP) No evidence of leakage
Continue to perform preventative maintenance to ensure safe operations
39. NAME AND TITLE OF INSPECTOR: 40. SIGNATURE OF INSPECTOR:
Kevin Hindal
41. NATIONAL BOARD COMMISSION NUMBER: 42. DATE:
13540 7-19-2016
43. NAME AND TITLE OF AIR FORCE REPRESENTATIVE ACCOMPANYING INSPECTOR:
John Olmeda Boiler plant supervisor 660-687-2533
BLDG - 140 317 Boiler-2
Supplemental Sheet is N/A for type BA inspection
INSPECTION
REPORT
1. TYPE OF INSPECTION (B – Boiler ; V – Pressure Vessel ) 2. DATE OF INSPECTION
7-19-2016 INTERNAL AND EXTERNAL ✔ BA VA
INTERNAL EXTERNAL UNDER HYDROSTATIC TEST BB VB 3. INSPECTION/DELIVERY ORDER NO.
EXTERNAL UNDER OPERATION BC VC
EXTERNAL UNDER HYDROSTATIC TEST BD VD 4. CONTRACT NUMBER
FA8051-13-A-002 EXPANSION/RECEIVER TANK BE VE
5. INSTALLATION
Whiteman AFB
6. STATE
MO
7. ZIP CODE
65305
8. LOCATION (Bldg. No.)
BLDG - 140
9. PLANT
☐MANNED ☐UNMANNED
10. OBJECT INSPECTED:
BOILER: ☐FIRE TUBE ☐CAST IRON ☐WATER TUBE ☐OTHER (SPECIFY)
UPV: ☐EXPANSION TANK ☐AIR RECEIVER ☐LP ☐OTHER (SPECIFY)
11. USE: ☐POWER ☐PROCESS ☐HTHW ☐HWH ☐STEAM HEATING ☐STORAGE ☐HEAT EXCHANGE
☐OTHER (SPECIFY)
12. MANUFACTURER
Engligh Boiler
13. MFR. RATING (MBTU or KLBS/HR): 35,000,000 Btu/Hr
14(a). NATIONAL BOARD NO.
14(b). USAF NO.
Boiler-3
15. YEAR BUILT
16. YEAR INSTALLED
17. PRIMARY FUEL (BOILER)
Nat.Gas
18. SECONDARY FUEL
No. 2 Diesel
19. PRESSURE ALLOWED MAWP 250 Psi PSIG at TEMP 650 F_ Previous Inspection MAWP 250 Psi PSIG at TEMP 650 F _
20. ACTUAL OPERATING PRESSURE (PSIG)
100 Psi Operating Pressure
21. SAFETY &/or RELIEF VALVE SETTING
(PSIG &/or ° F) 145 Psi
22. PRESSURE &/or TEMP PRIOR INSPECTION
(PSIG &/or ° F) 145 Psi
23. PRESSURE &/or TEMP THIS INSPECTION
(PSIG &/or ° F) 155 Psi
24. EXPLAIN IF PRESSURE CHANGED
No Change
25. METHOD OF FIRING (BOILERS): Automatic 26. PRESSURE GAGE CALIBRATED? ☐YES ☐NO
27. DATE/TYPE OF LAST INSPECTION
TYPE: BA DATE: 6-2016
28. HYDROSTATIC TEST ☐NEW ☐RETEST ☐REPAIR
DATE: Unknown PSIG: Unknown
29. LAST HYDROSTATIC TEST
DATE: Unknown PSIG: Unknown
30. REPAIRS/ALTERATIONS MADE SINCE LAST INSPECTION? ☐NONE ☐YES (SPECIFY)
No repairs Made
31. INTERNAL INSPECTION (DESCRIBE INSPECTION FULLY):
Internal inspection performed on this boiler in accordance with
NBIC Part 2, section 2
Inspection — detailed requirements for
Inspected the water side of steam and mud drum - Small amount of scale was found within the mud drum, Facility manager has conducted the necessary adjustments over an extended time period to significantly reduce
32. EXTERNAL INSPECTION (DESCRIBE INSPECTION FULLY): Chart is N/A for BC inspection without emmissions
TEMP
(°F)
AIR
HYDRO-
CARBONS
BLDG - 140 318 Boiler-3
Kunkle 155 Psi 2 1/2 Inch 24715 Lbs/Hr Y Hand Tested under Pressure
35. OTHER APPLIANCES (e.g., WATER COLUMNS, GAGE GLASSES, GAGE COCKS, BLOWOFF PIPE & VALVE OR COCKS, FEED PIPE)
Pipe Connections No evidence of leakage
Water Column No evidence of leakage
Sight Glass Free and clear from debris
Isolation valve (STOP) No evidence of leakage
39. NAME AND TITLE OF INSPECTOR: 40. SIGNATURE OF INSPECTOR:
Kevin Hindal
41. NATIONAL BOARD COMMISSION NUMBER: 42. DATE:
13540 7-19-2016
43. NAME AND TITLE OF AIR FORCE REPRESENTATIVE ACCOMPANYING INSPECTOR:
John Olmeda Boiler plant supervisor 660-687-2533
BLDG - 140 318 Boiler-3
INSPECTION
REPORT
1. TYPE OF INSPECTION (B – Boiler ; V – Pressure Vessel ) 2. DATE OF INSPECTION
7-19-2016 INTERNAL AND EXTERNAL ✔ BA VA
INTERNAL EXTERNAL UNDER HYDROSTATIC TEST BB VB 3. INSPECTION/DELIVERY ORDER NO.
EXTERNAL UNDER OPERATION BC VC
EXTERNAL UNDER HYDROSTATIC TEST BD VD 4. CONTRACT NUMBER
FA8051-13-A-002 EXPANSION/RECEIVER TANK BE VE
5. INSTALLATION
Whiteman AFB
6. STATE
MO
7. ZIP CODE
65305
8. LOCATION (Bldg. No.)
BLDG - 140
9. PLANT
☐MANNED ☐UNMANNED
10. OBJECT INSPECTED:
BOILER: ☐FIRE TUBE ☐CAST IRON ☐WATER TUBE ☐OTHER (SPECIFY)
UPV: ☐EXPANSION TANK ☐AIR RECEIVER ☐LP ☐OTHER (SPECIFY)
11. USE: ☐POWER ☐PROCESS ☐HTHW ☐HWH ☐STEAM HEATING ☐STORAGE ☐HEAT EXCHANGE
☐OTHER (SPECIFY)
12. MANUFACTURER
Nebraska Boiler
13. MFR. RATING (MBTU or KLBS/HR): 35,000,000 Btu/Hr
14(a). NATIONAL BOARD NO.
14(b). USAF NO.
Boiler-4
15. YEAR BUILT
16. YEAR INSTALLED
17. PRIMARY FUEL (BOILER)
Nat.Gas
18. SECONDARY FUEL
No. 2 Diesel
19. PRESSURE ALLOWED MAWP 250 Psi PSIG at TEMP 650 F_ Previous Inspection MAWP 250 Psi PSIG at TEMP 650 F _
20. ACTUAL OPERATING PRESSURE (PSIG)
100 Psi Operating Pressure
21. SAFETY &/or RELIEF VALVE SETTING
(PSIG &/or ° F) 145 Psi
22. PRESSURE &/or TEMP PRIOR INSPECTION
(PSIG &/or ° F) 145 Psi
23. PRESSURE &/or TEMP THIS INSPECTION
(PSIG &/or ° F) 155 Psi
24. EXPLAIN IF PRESSURE CHANGED
No Change
25. METHOD OF FIRING (BOILERS): Automatic 26. PRESSURE GAGE CALIBRATED? ☐YES ☐NO
27. DATE/TYPE OF LAST INSPECTION
TYPE: BA DATE: 6-2016
28. HYDROSTATIC TEST ☐NEW ☐RETEST ☐REPAIR
DATE: Unknown PSIG: Unknown
29. LAST HYDROSTATIC TEST
DATE: Unknown PSIG: Unknown
30. REPAIRS/ALTERATIONS MADE SINCE LAST INSPECTION? ☐NONE ☐YES (SPECIFY)
No repairs Made
31. INTERNAL INSPECTION (DESCRIBE INSPECTION FULLY):
Internal inspection performed on this boiler in accordance with
NBIC Part 2, section 2
Inspection — detailed requirements for
Inspected the water side of steam and mud drum - Small amount of scale was found within the mud drum, Facility manager has conducted the necessary adjustments over an extended time period to significantly reduce
32. EXTERNAL INSPECTION (DESCRIBE INSPECTION FULLY): Chart is N/A for BC inspection without emmissions
TEMP
(°F)
AIR
HYDRO-
CARBONS
BLDG - 140 2090 Boiler-4
Kunkle 155 Psi 2 1/2 Inch 24715 Lbs/Hr Y Hand Tested under Pressure
35. OTHER APPLIANCES (e.g., WATER COLUMNS, GAGE GLASSES, GAGE COCKS, BLOWOFF PIPE & VALVE OR COCKS, FEED PIPE)
Pipe Connections No evidence of leakage
Water Column No evidence of leakage
Sight Glass Free and clear from debris
Isolation valve (STOP) No evidence of leakage
39. NAME AND TITLE OF INSPECTOR: 40. SIGNATURE OF INSPECTOR:
Kevin Hindal
41. NATIONAL BOARD COMMISSION NUMBER: 42. DATE:
13540 7-19-2016
43. NAME AND TITLE OF AIR FORCE REPRESENTATIVE ACCOMPANYING INSPECTOR:
John Olmeda Boiler plant supervisor 660-687-2533
BLDG - 140 2090 Boiler-4
INSPECTION
REPORT
1. TYPE OF INSPECTION (B – Boiler ; V – Pressure Vessel ) 2. DATE OF INSPECTION
7-19-2016 INTERNAL AND EXTERNAL BA VA
INTERNAL EXTERNAL UNDER HYDROSTATIC TEST BB VB 3. INSPECTION/DELIVERY ORDER NO.
EXTERNAL UNDER OPERATION ✔ BC VC
EXTERNAL UNDER HYDROSTATIC TEST BD VD 4. CONTRACT NUMBER
FA8051-13-A-002 EXPANSION/RECEIVER TANK BE VE
5. INSTALLATION
Whiteman AFB
6. STATE
MO
7. ZIP CODE
65305
8. LOCATION (Bldg. No.)
BLDG - 140
9. PLANT
☐MANNED ☐UNMANNED
10. OBJECT INSPECTED:
BOILER: ☐FIRE TUBE ☐CAST IRON ☐WATER TUBE ☐OTHER (SPECIFY)
UPV: ☐EXPANSION TANK ☐AIR RECEIVER ☐LP ☐OTHER (SPECIFY)
11. USE: ☐POWER ☐PROCESS ☐HTHW ☐HWH ☐STEAM HEATING ☐STORAGE ☐HEAT EXCHANGE
☐OTHER (SPECIFY)
12. MANUFACTURER
Nebraska Boiler
13. MFR. RATING (MBTU or KLBS/HR): 60,000,000 Btu/Hr
14(a). NATIONAL BOARD NO.
14(b). USAF NO.
Boiler-5
15. YEAR BUILT
16. YEAR INSTALLED
17. PRIMARY FUEL (BOILER)
Nat.Gas
18. SECONDARY FUEL
No. 2 Diesel
19. PRESSURE ALLOWED MAWP 250 Psi PSIG at TEMP 650 F_ Previous Inspection MAWP 250 Psi PSIG at TEMP 650 F _
20. ACTUAL OPERATING PRESSURE (PSIG)
100 Psi Operating Pressure
21. SAFETY &/or RELIEF VALVE SETTING
(PSIG &/or ° F) 155 Psi
22. PRESSURE &/or TEMP PRIOR INSPECTION
(PSIG &/or ° F) 155 Psi
23. PRESSURE &/or TEMP THIS INSPECTION
(PSIG &/or ° F) 155 Psi
24. EXPLAIN IF PRESSURE CHANGED
No Change
25. METHOD OF FIRING (BOILERS): Automatic 26. PRESSURE GAGE CALIBRATED? ☐YES ☐NO
27. DATE/TYPE OF LAST INSPECTION
TYPE: BA DATE: 6-2016
28. HYDROSTATIC TEST ☐NEW ☐RETEST ☐REPAIR
DATE: Unknown PSIG: Unknown
29. LAST HYDROSTATIC TEST
DATE: Unknown PSIG: Unknown
30. REPAIRS/ALTERATIONS MADE SINCE LAST INSPECTION? ☐NONE ☐YES (SPECIFY)
No repairs Made
31. INTERNAL INSPECTION (DESCRIBE INSPECTION FULLY):
Internal inspection is not performed on type C inspection
Performed external inspection under operation.
Following devices were tested
-Low Water Fuel Cut-off (Primary)
-Low Water Fuel Cut-off (Secondary)
-Flame Scanner
-Low fuel cut-off switch - Adjust the setting on the low gas switch
All tests were performed satisfactory
No signs of overheating , No signs of leakage
32. EXTERNAL INSPECTION (DESCRIBE INSPECTION FULLY): Chart is N/A for BC inspection without emmissions
TEMP
(°F)
AIR
HYDRO-
CARBONS
BLDG - 140 2443 Boiler-5
Kunkle 155 Psi 2 1/2 Inch 31189 Lbs/Hr Y Hand Tested under Pressure
Kunkle 160 Psi 4 Inch 39821 Lbs/Hr Y Hand Tested under Pressure
71,010 Lbs/Hr
35. OTHER APPLIANCES (e.g., WATER COLUMNS, GAGE GLASSES, GAGE COCKS, BLOWOFF PIPE & VALVE OR COCKS, FEED PIPE)
Pipe Connections No evidence of leakage
Water Column No evidence of leakage
Sight Glass Free and clear from debris
Isolation valve (STOP) No evidence of leakage
USE A SUPPLEMENTAL SHEET, IF NECESSARY.)
High limit and Operating limit switches have a Ball Valve installed between the boiler and the devices. This valve shall be removed.
If valve is closed the high limit and operating limit switches will not work.
39. NAME AND TITLE OF INSPECTOR: 40. SIGNATURE OF INSPECTOR:
Kevin Hindal
41. NATIONAL BOARD COMMISSION NUMBER: 42. DATE:
13540 7-19-2016
43. NAME AND TITLE OF AIR FORCE REPRESENTATIVE ACCOMPANYING INSPECTOR:
John Olmeda Boiler plant supervisor 660-687-2533
BLDG - 140 2443 Boiler-5
High Limit Pressure Switch Manufacturer (HoneyWell) 0-150 Set at 136 Psi, Tested by jumping(bypass) the operating limit control
High/High Limit Pressure Switch Manufacturer (Honeywell ) 0-140 Set At 140 Tested by closing the steam header causing the steam pressure to reach 140 Psi
Low water Fuel Cutoff Primary (McDonnel Miller) 150 Psi Tested by manually blowing down the water column, Simulating low water within the boiler (probe)
Low Water Fuel Cutoff Secondary (McDonnel Miller ) 150 Psi Tested by manually blowing down the water column, simulating low water (Float type)
Flame scanner manufacture( Fire Eye) – Tested by removing and covering the sensor eliminating light (simulating loss of flame)
Burner - Nat gas 35,000,00 Btu/Hr Max Fire Rate Nat.Gas – After each alarm proceeded to post purge to eliminate unused combustion gasses after each alarm when triggered during the testing process –
Gas valve Electronic (Maxxon) Tested satisfactory during each test of the control switches (Valves closed within 3 seconds of each alarm during tests)
Low Gas Pressure Switch ( Ashcroft ) 0-10 Psi – Tested by slowly closing the fuel vale upstream from sensor- Simulating low fuel pressure
All tests were performed under steam pressure and were satisfactory
High limit and Operating limit switches have a Ball Valve installed between the boiler and the devices. This valve shall be removed.
If valve is closed the high limit and operating limit switches will not work.
REMOVE THE VALVE. NO VALVES SHALL EXIST BETWEEN THE BOILER AND HIGH LIMIT
SWITCHES.