2nd SITE VISIT
FA4625-17-Q-0005
Steam Heat Plant Services
SIGN-IN SHEET
25 Apr 2017 @ 1300 CST
NAME ORGANIZATION TELEPHONE #
Justin McCarthy Utility Systems Solutions 214-536-3965
Dan Dipple Armstrong Service 563-299-8428
Jerald Belford 509 CONS x1172
Paul Ross Criterion x5095
John Olmeda 509 CES x2533
Roger Williams 509 CES x2530
Questions and answers:
Can you provide a chemical information sheet?
Please see the attachment for this information.
Are there any currently known leaks on boilers and have they been repaired?
Yes, located at boiler #1 (repaired once) and #2 (repaired 3-4 times).
Have any of the boilers been rebricked?
Yes, one of them. Boiler #5.
Is there known asbestos?
Yes, on the tank piping insulation which has already been abated. The Government will ensure abatement of any asbestos found. The only piping with known asbestos is on the diesel fuel tanks outside the plant.
Do the pits require pumping after heavy rains?
Some will depending on how much rain. Some pits have sumps and some do not.
Pits without pumps have drains.
What is normal boiler operation throughout the year?
November to March, typically boiler #5 is used with one other boiler to supplement when needed. April to Oct, typically only one boiler is needed.
How many times has a repair required more than 250 hours?
Approximately Two times in the last five years.