SOW_Attachment_1B.3__Site_Geologic_Data.pdf

PDF 2 MB Posted

Attached to
FY19 MATOC Federal contract opportunity
Solicitation number
FA4620-19-R-A001
Issued by
Department of the Air Force Air Mobility Command

About this file

SOW

View the file

Other files for this federal contract opportunity

Other files attached to FY19 MATOC, newest first.
File Type Posted
Amendment_3_WD_Attachment_8C_-_WD_WA190001_Highway_Statewide_dated_5_Jul_19.pdf PDF
Amendment_3_WD_Attachment_8D_-_WD_WA190095_Residential_Spokane_County_dated_28_Jun_19.pdf PDF
FA4620-19-R-A0010003_Amendment_3_SF_30.pdf PDF
FA4620-19-R-A001_Atch_1A_-_Price_Schedule.pdf PDF
Amendment_3_WD_Attachment_8A_-_WD_WA190017_Building_Spokane_dated_21_Jun_19.pdf PDF
Amendment_3_WD_Attachment_8B_-_WD_WA190076_Heavy_Spokane_County_dated_21_Jun_19.pdf PDF
FA4620-19-R-A001_Atch_1B_-_Revised_Statement_of_Work_dated_22_May_19.pdf PDF
FA4620-19-R-A001_Atch_1C_-_FOPR_Q&A_dated_22_May_19.pdf PDF
FA4620-19-R-A001_Atch_1_-_FOPR_Amendment_2_dated_22_May_19.pdf PDF
FA4620-19-R-A001_Amendment_2.pdf PDF
FA4620-19-R-A001_Atch_1_-_FOPR_dated_14_May_19.pdf PDF
FA4620-19-R-A001_Amendment_1_15_May_19.pdf PDF
FA4620-19-R-A001_-_Site_Visit_Sign_In_Sheet.pdf PDF
FA4620-19-R-A001_Atch_2_-_MATOC_Orientation_Seminar_Task_Order_SOW,_dated_11_Mar_19.pdf PDF
FA4620-19-R-A001_Atch_3-_MATOC_Specifications,_dated_9_Apr_19.pdf PDF
FA4620-19-R-A001_Atch_10_-_Past_Perf_cover_letter_and_Questionare.pdf PDF
FA4620-19-R-A001_Atch_12_-_Section_L.pdf PDF
FA4620-19-R-A001_Atch_9_-_MATOC_Past_Performance_Info_5_Mar_16.pdf PDF
SOW_Attachment_1B.4__Topo_Site_Plan.pdf PDF
FA4620-19-R-A001_Atch_1A_-_Price_Schedule.pdf PDF
WD_Attachment_8B_-_WD_WA190076_Heavy_Spokane_County.pdf PDF
FA4620-19-R-A001_Atch_13_-_Section_M.pdf PDF
SOW_Attachment_1B.1__Site_Location.pdf PDF
SOW_Attachment_1B.5__Boat_Barn_As-Built.pdf PDF
WD_Attachment_8D_-_WD_WA190095_Residential_Spokane_County.pdf PDF
FA4620-19-R-A001_Atch_6_-_FAFB_Operational_Climactic_Data.pdf PDF
FA4620-19-R-A001_Atch_1_-_FOPR.pdf PDF
WD_Attachment_8A_-_WD_WA190017_Building_Spokane_County.pdf PDF
SOW_Attachment_1B.2__Site_Plan.pdf PDF
WD_Attachment_8C_-_WD_WA190001_Highway_Statewide.pdf PDF
FA4620-19-R-A001_Atch_5_-_Fairchlid_AFB_IFS_2019.pdf PDF
FA4620-19-R-A001_Atch_1B_-_Statement_of_Work,_dated_25_Apr_19.pdf PDF
FA4620-19-R-A001_Atch_4_-_Fairchild_AFB_2018_Base_Design_Standards.PDF PDF
FA4620-19-R-A001_Atch_11_-_Subcontractor_-_Teaming_Arrangement_Release.pdf PDF
FA4620-19-R-A001_Atch_7_-_FAFB_Real_ID_Act_Pamphlet.pdf PDF
FA4620-19-R-A001_1_May_19.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE PLAN

Fairchild Air Force Base

Geotechnical Investigation Clear Lake Water Project

October 2006 GJNB-06-0029 36299187 Clear Lake, Washington

FIGURE 2

Not to scale.

Legend TP-1 Approximate Test

Pit Location

Approximate Location of Fault currently being studied by EWU Geology Department

Well Location And Approx.

Location of Well House

FA4620-19-R-A001

FOPR OPP1071525

SOW Attachment 1B.3 - Site Geological Data

Excavation Equipment Excavation Dimensions

Pit Alignment N/A

N/A

NRC

Project Location: Clear Lake, Washington

Sandy SILT, brown, stiff, dry

Sedimentary rock (fossiliferous siltstone), yellow brown to red brown, moderately fractured, angular, moderately weathered

End of test pit at 6' Test pit backfilled with loose cuttings.

TP-4@1'

TP-4@4'

ML Begin 11:30

End 12:00

Ty pe

M oi st ur e C on te nt

N um be r

D ry

U ni t W ei gh t, pc f

E le va tio n fe et

Fi ne s C on te nt

S ie ve

MATERIAL DESCRIPTION

D ep th fe et

U S

C S

REMARKS AND

OTHER TESTS

G ra ph ic

L og

Sampling Method(s)

LocationCoordinates

Ground Surface Elevation

Checked By

6 feet

K A O'ConnellK A Kees

Grab Samples

Date(s) Excavated

Groundwater Level

Sheet 1 of 1

Log of Test Pit Test Pit 4

Logged By

Project Number: 36298187

Excavation Contractor

Project: Fairchild AFB – Water System

CAT 420E, 2' bucket

8/14/06

2ft x 8ft

Total Depth of Test Pit

Not Encountered

G E

O _S

E A

_T P

T :\O

N E

W O

R

LD

\3

FA

FB

\3

7.

G P

J U

R S

S E

A 3B

.G

LB

U R

S S

E A

3.

G

D T

/7

/0

FA4620-19-R-A001

FOPR OPP1071525

Sandy SILT, brown, firm, dry

Grades to red brown, stiff, less sand, moist

Sedimentary rock (fossiliferous siltstone), yellow brown to red brown, moderately fractured, angular, highly weathered

End of test pit at 10' Test pit backfilled with loose cuttings.

TP-5@3'

TP-5@5'

TP-5@7'

ML Begin 13:10

End 13:35

Ty pe

M oi st ur e C on te nt

N um be r

D ry

U ni t W ei gh t, pc f

E le va tio n fe et

Fi ne s C on te nt

S ie ve

MATERIAL DESCRIPTION

D ep th fe et

U S

C S

REMARKS AND

OTHER TESTS

G ra ph ic

L og

Sampling Method(s)

LocationCoordinates

Ground Surface Elevation

Checked By

10 feet

K A O'ConnellK A Kees

Grab Samples

Excavation Equipment Excavation Dimensions

Pit Alignment N/A

N/A

NRC

Project Location: Clear Lake, Washington

Date(s) Excavated

Groundwater Level

Sheet 1 of 1

Log of Test Pit Test Pit 5

Logged By

Project Number: 36298187

Excavation Contractor

Project: Fairchild AFB – Water System

CAT 420E, 2' bucket

8/14/06

2ft x 8ft

Total Depth of Test Pit

Not Encountered

G E

O _S

E A

_T P

T :\O

N E

W O

R

LD

\3

FA

FB

\3

7.

G P

J U

R S

S E

A 3B

.G

LB

U R

S S

E A

3.

G

D T

/7

/0

FA4620-19-R-A001

FOPR OPP1071525

Checked By

7.5 feet

K A O'ConnellK A Kees

Grab Samples

Excavation Equipment Excavation Dimensions

Pit Alignment N/A

N/A

NRC

Project Location: Clear Lake, Washington

Date(s) Excavated

Groundwater Level

Sheet 1 of 1

Silty SAND (fill), trace gravel, brown, medium dense, dry

Silty, sandy GRAVEL (fill), trace sand, brown and gray brown, medium dense, moist, subangular to 1.5 inches in diameter

Sedimentary rock (fossiliferous siltstone), yellow brown to red brown, moderately fractured, angular, highly weathered

Yellow-tan phyllite

End of test pit at 7.5' Test pit backfilled with loose cuttings.

TP-6@2'

TP-6@4'

TP-6@7.5'

SM

GM

Begin 13:45

End 14:05

Ty pe

M oi st ur e C on te nt

N um be r

D ry

U ni t W ei gh t, pc f

E le va tio n fe et

Fi ne s C on te nt

S ie ve

MATERIAL DESCRIPTION

D ep th fe et

U S

C S

REMARKS AND

OTHER TESTS

G ra ph ic

L og

Sampling Method(s)

LocationCoordinates

Ground Surface Elevation

Log of Test Pit Test Pit 6

Logged By

Project Number: 36298187

Excavation Contractor

Project: Fairchild AFB – Water System

CAT 420E, 2' bucket

8/14/06

2ft x 8ft

Total Depth of Test Pit

Not Encountered

G E

O _S

E A

_T P

T :\O

N E

W O

R

LD

\3

FA

FB

\3

7.

G P

J U

R S

S E

A 3B

.G

LB

U R

S S

E A

3.

G

D T

/7

/0

FA4620-19-R-A001

FOPR OPP1071525

ADP6ECE.tmp
for
NUMBER OF COPIES
AS-BUILTS
ELECTRONIC DATA (CD) (35% design & as-builts)

SUBMITTAL DESCRIPTION

File details come from the government source that posted it.