SOW_Attachment_1B.2__Site_Plan.pdf
PDF 2 MB Posted
- Attached to
- FY19 MATOC Federal contract opportunity
- Solicitation number
- FA4620-19-R-A001
About this file
SOW
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Þ
Þ
ÞÞ
Þ
Þ
Þ
Þ
Þ
Þ
Þ
Þ
Þ
Þ
Þ
Þ
X
X
X
X
Spokane County
Projection: UTM, Zone 11N Datum & Spheroid: NAD83/NAVD88 This Material is For Official Use Only.
92 CES/CENME, GeoBase USAF, Air Mobility Command
Fairchild AFB, WA 99011 247-9399
Legend G!. Fire Connection G!. Fire Hydrant X Fitting ! Meter " Valve "\ Back Flow Preventer
!. Water Pump Water Line Service Water Service Line (AB) Water Line Main Deicing Fluid Lines Water Main Line (AB) Water Storage Tank Deicing Fluid Tank
ÕFill Arm Nozzle T Off-Loading Header ÞFaucet #* Chiller
Chiller Lines X Sewer Fitting # Sewer Cleanout "S Sewer Grease Trap ! Sewer Manhole "/ Sewer Oil-Water Separator !. Sewer Pump $1 Sewer Septic Tank " Sewer Valve
Sewer Main Active Sewer Service Active Sewer Line (AB) Septic Tanks Drain Fields
#V Storm Discharge $1 Storm Drain Inlet ! Storm Manhole !. Storm Pump
!. Storm Storage Reservoir " Storm Valve
Storm Line Storm Line (AB) Storm Open Drainage Storm Culvert
X Gas Fitting ! Gas Meter !. Propane Tank " Gas Valve
Gas Line Gas Line (AB)
!< Fuel Filter Strainer G Fuel Fitting G!. Fuel Hydrant ! Fuel Marker
! Fuel Meter
I8 Fuel Pump Station
!. Fuel Tank " Fuel Valve
Fuel Line Fuel Line (AB) Fuel Containment Area Fuel Station Area
" Gas Anode "/ Gas Rectifier # Gas Test Station " Fuel Anode "/ Fuel Rectifier # Fuel Test Station X Thermal Junctions
Thermal Line (AB) "/ Monitoring Well (2013)
Utility Pole b Radio Transmitter b Radio Receiver
Comm Manhole Comm Pedestal Comm Vault Comm Other Comm Line Comm Line Abandoned Comcast Manhole
)Comcast Pedestal Comcast Vault Comcast Other
Comcast Line Burried Line Sensor
O Electrical Exterior Light " Portable Generator " Backup Generator G Electrical Manhole ! Electrical Meter S Photo Cell " Electrical Switch # Electrical Transformer
Electrical Overhead Transmission Electrical Overhead Primary Electrical Underground Primary Electrical Underground Primary (AB) Electrical Underground Secondary Electrical Underground Secondary (AB) Electrical Overhead Secondary Electrical Grounding Slab Slab - Below Ground (AB)
Print Date: 12/3/2018 DigPermit_P_11X17.mxd https:\\geobase.fairchild.af.mil
0 50 10025 Feet
1 inch = 50 feet 1:600Scale
4 Magnetic Declination:
14° 34' E ± 0° 23'
Changing by 0° 8' W per year 04 May 2018
CONSTRUCT RV SEWAGE HOLDING TANK, CLEAR LAKE
Project No.: OPP1071525
FA4620-19-R-A001
FOPR OPP1071525
SOW Attachment 1B.2 – Site Plan 1 of 1
1221643751C Callout Divert sewage from this sewer manhole to proposed lift station. Install valves as needed to switch effluent flow between existing system and new system.
1221643751C Callout Area for placement of proposed sewer storage tanks and containment pad.
1221643751C Rectangle
1221643751C Callout Boat Storage building. Obtain electrical power for proposed lift station and tank monitoring system from electrical panel inside.
1221643751C Callout To entrance/exit gate.
1221643751C Polygonal Line
1221643751C Callout Concept alignment for proposed sewer line
File details come from the government source that posted it.