RFI Response on Substation Mnx 20241028.pdf

PDF 192 KB Posted

Attached to
Substation Maintenance Services Vandenberg Space Force Base Federal contract opportunity
Solicitation number
FA461024Q0028
Issued by
Department of the Air Force Space Command

About this file

This document is a set of Questions and Answers related to a Request for Quote (RFQ) for Substation Maintenance Services at Vandenberg Space Force Base (VSFB). The RFQ is a 100% Small Business Set-Aside under NAICS 237130 with a $45M size standard. It requests quotes for firm fixed-price contract line items to provide substation maintenance services. Key details include: the current incumbent contractor is Transfluid Services Inc under contract FA461019DA002; the government will not release previous test data or coordination study details to bidders, but will provide these to the successful offeror; the government will not provide detailed Methods of Procedure (MOPs) to bidders; and the solicitation has been extended with quotes due by 4 November 2024. The government will not reimburse any bid preparation costs if the solicitation is cancelled.

View the file

Other files for this federal contract opportunity

Other files attached to Substation Maintenance Services Vandenberg Space Force Base, newest first.
File Type Posted
RFI 3 Response on Substation.pdf PDF
RFI 2 Response on Substation.pdf PDF
PWS Atch 10 Substation Monthly Report.pdf PDF
FA461024Q00280001 Substation Amend 1 20241029.pdf PDF
PWS Atch 1-9 Substation Single Line Diagrams.pdf PDF
PWS Atch 11 Environmental Compliance.pdf PDF
Site Visit Minutes 20241018.pdf PDF
Atch 2 SCA WD 2015-5647 Rev 22 22 July 2024.pdf PDF
FA461024Q0028 Substation Maint RFQ 20240930.pdf PDF
Atch 4 Technical Experience Questionnaire 20240904.docx DOCX document
Atch 1 PWS Substation Maintenance 20240910.docx DOCX document
Atch 5- Mission Essential Contractor Services Plan Template.docx DOCX document
Atch 3 Over and Above Request.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

UNITED STATES SPACE FORCE

SPACE LAUNCH DELTA 30

CONTROLLED UNCLASSIFIED INFORMATION

28 Oct 2024

MEMORANDUM FOR CONTRACTORS

FROM: 30 CONS/PKB

1515 Iceland Ave, Bldg. 8500 Vandenberg SFB, CA 93437-5212

SUBJECT: Questions and Answers on Substation Maintenance Solicitation

Q1: Do you have specs or single line diagrams that you can provide?

A1: The single-line diagrams were inadvertently omitted from the PWS attachments.

They are all shown in a single PDF, one substation per page, now attached. The specifications for our equipment will be provided to the successful offeror at the time of award.

Q2: Can you provide the complete incumbent contract information for this requirement?

A2: The current incumbent is Transfluid Services Inc, the contract number is

FA461019DA002.

Q3: Work Hours: RFQ mentioned that maintenance will be planned but did not provide specific details on the hours available for daily maintenance. Could you get clarification on work hour?

A3: The contractor is free to work any time of day and any day of the week to optimize productivity; however, the grid-level switching operations that are required to create safe clearance and isolate a specific work zone will only occur during normal business hours.

Q4: Air Force Occupational Safety and Health Standard (AFOSH): Could you provide a sample document? Also, how does the contractor register for this standard?

A4: The AFOSH standard is essentially a safety regulation that the contractor must also comply with. It is cited in the PWS as a reference to alert the contractor to the fact that the Air Force also has safety standards that must be observed.

Q5: Single Line Diagram (SLD): Please provide the SLD for each substation, if available.

A5: The single-line diagrams were inadvertently omitted from the PWS attachments.

They are all shown in a single PDF, one substation per page, now attached.

Q6: Can the solicitation be extended an additional 5 days?

A6: The solicitation will be extended, quotes will be due 4 November 2024 at 8:00 AM

Q7: Can the site walk sign in sheet be published?

A7: The site visit attendees are listed on the Site Visit Minutes attachment.

Q8: Will attachments 1-11 from PWS be published?

A8: The single-line diagrams were inadvertently omitted from the PWS attachments.

They are all shown in a single PDF, one substation per page, now attached. In addition, a sample monthly inspection checklist is attached.

Q9: Is there any previous test data available? If so, please provide.

Q9: Previous test data will be provided to the successful offeror at the time of award.

We will not release that information to the bidders. However, we can inform the bidders that the equipment is well-maintained and has exceptionally favorable test data for nearly all of the inventory on this contract.

Q10: Is there a coordination study available? If so, please provide results.

Q10: We will not release our coordination study to the bidders because it is not relevant to this contract.

Q11: Are there any one-line drawings available? If so, please provide.

A11: The single-line diagrams were inadvertently omitted from the PWS attachments. They are all shown in a single PDF, one substation per page, now attached.

Q12: Is there a projected outage schedule per substation? If so, is it possible to get a copy?

A12: There is no projected outage schedule for each substation. The contractor will have to participate in the 30 CES weekly scheduling meeting to secure dates for the maintenance planned each month. Typically, 30 CES can support any requested maintenance dates gives adequate advance notice, normally 2 to 3 months ahead of the maintenance visit.

Q13: At the site visit, there was mention of certain MOP’s (method of procedure) set in place that the contractor will need to follow. Please provide the MOP’s.

A13: MOPs have already been developed for each substation shutdown and have been exercised many times by the 30 CES electricians and engineers. The contractor does not participate in these MOPs, except to apply locks and tags to the equipment that is necessary to develop the safe clearance zone. We will not provide the MOPs to the bidders; however, we can tell you that the safe clearance is generally established one 70 kV node away from the work zone, and those nodes are visible on the substation single-line diagrams provided.

JESSICA N. ROWE, GS-9

Contract Specialist

2024-10-28T10:50:47-0700
ROWE.JESSICA.N.1055384920