This document is a Performance Work Statement (PWS) for Substation Maintenance services at Vandenberg Space Force Base (VSFB). The PWS details the requirements for monthly inspections and maintenance of substation equipment including transformers, breakers, switches, and associated infrastructure. The contract is being procured as a 100% Small Business Set-Aside under NAICS code 237130 with a $45 million size standard. A pre-proposal conference and site visit will be held on October 15, 2024, and proposals are due by October 31, 2024. The contract will be a Firm Fixed Price type. Key tasks include inspecting and maintaining the condition of substation equipment, monitoring oil levels and pressures, and addressing any discrepancies noted during the inspections.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 3 Response on Substation.pdf | ||
| RFI 2 Response on Substation.pdf | ||
| RFI Response on Substation Mnx 20241028.pdf | ||
| FA461024Q00280001 Substation Amend 1 20241029.pdf | ||
| PWS Atch 1-9 Substation Single Line Diagrams.pdf | ||
| PWS Atch 11 Environmental Compliance.pdf | ||
| Site Visit Minutes 20241018.pdf | ||
| Atch 4 Technical Experience Questionnaire 20240904.docx | DOCX document | |
| Atch 1 PWS Substation Maintenance 20240910.docx | DOCX document | |
| Atch 2 SCA WD 2015-5647 Rev 22 22 July 2024.pdf | ||
| FA461024Q0028 Substation Maint RFQ 20240930.pdf | ||
| Atch 5- Mission Essential Contractor Services Plan Template.docx | DOCX document | |
| Atch 3 Over and Above Request.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Inspected ID: 4565
Exterior Inspection Status Discrepancies if any
Perimeter OK
Fence OK
Fence grounds OK
Gates OK
Gate grounds OK
Building exterior OK
Front door OK
Back door Ok
Exterior building lights note 3
Switchyard lights note 3
Photocells OK
AC power wiring OK
Strobes OK
Weeds OK
Switching structures OK
Insulators OK
70 kV switches OK
Switch platform grounds OK
Transformers B1 B2 B3
Main tank PSI N/A N/A N/A
N2 regulated PSI 4 4 1.5
N2 reserve tank PSI 500 900 1800
Main tank oil temperature 40 40 40
Winding temperature 40 40 40
Main tank oil level OK OK OK
Bushing oil level NA OK OK
Fan condition OK OK OK
Fan operation OK note 1 OK
Heat exchangers OK OK OK
Foundation OK OK OK
Oil leak evidence OK OK OK
Control wiring OK OK OK
Bonding grounds OK OK OK
Main tap setting 3 3 3
Bushing connections OK OK OK
Main tank Condition OK OK OK
Oil filtration unit oos oos oos
Substation B
10/17/2024
Substation B
Load Tap Changers B1 B2 B3
LTC tank oil level OK OK OK
LTC tap as found 6L 6L 5L
Lowest tap since last reading 14L 13L 13L
Highest tap since last reading 2L 2L 2L
Tap operations counter 52903 78209 61718
LTC cabinet lights NA NA N/A
LTC tank condition OK OK OK
Oil leak evidence OK OK OK
70 kV Breakers B70-1 B70-2 B70-3 B70-4 B70-5 B70-6 B70-7
Operations Counter 193 230 202 213 223 218 189
Pressure 80 66 64 68 68 66 66
Mechanism type S S S S S S S
Heaters OK OK OK OK OK OK OK
Control cabinet OK OK OK OK OK OK OK
Interior light OK OK OK OK OK OK OK
Pole condition OK OK OK OK OK OK OK
System leaks OK OK OK OK OK OK OK
Wiring and connections OK OK OK OK OK OK OK
70 kV PTs Bay B1 Bay B2 Bay B3
Phase A oil level OK OK OK
Phase B oil level OK OK OK
Phase C oil level OK OK OK
Oil leak evidence? OK OK OK
Fuses OK OK OK
Problems Noted at Substation B:
Note 1
Note 2
Note 3
Note 4
Note 5
Note 6
Note 7
Note 8
Note 9
Note 10
1 fan out
Multiple yard lights out
Multiple exterior yard lights out