Atch 4 offeror checklist.doc

DOC document 29 KB Posted

Attached to
RECOVERY - SGBP080011 - Repair H Wing Elec, Lemay Fac
Solicitation number
FA4600-09-B-0007
Issued by

About this file

Attachment 4 Bidders Checklist

View the file

Other files

File Type Posted
QA RECOVERY Repair H Wing Electrical RFI Final.doc DOC document
OFF-B-6072 Sheet 01 - Amendment 1 - May 09.dwf DWF file
OFF-B-6072 Sheet 04 - Amendment 1 - May 09.dwf DWF file
OFF-B-6072 Sheet 02 - Amendment 1 - May 09.dwf DWF file
FA4600-09-B-0007-0003.pdf PDF
Amendment 2.doc DOC document
Site Visit Sign in.pdf PDF
Amendment 1.doc DOC document
09000.pdf PDF
Atch 5 NCIC Data.doc DOC document
09250.pdf PDF
16124 Final Medium Voltage Cables.pdf PDF
Sheet 07-7.dwf DWF file
Section 1C H-WING.pdf PDF
16190 Final Supporting Devices.pdf PDF
08210.pdf PDF
08100.pdf PDF
16010 Final General Electrical.pdf PDF
Sheet 03-3.dwf DWF file
07900.pdf PDF
Section 1A H-WING.pdf PDF
09900.pdf PDF
Sheet 06-6.dwf DWF file
16452 Final Grounding.pdf PDF
Atch 3 General Decision Number.doc DOC document
06100.pdf PDF
16170 Final Circuit and Motor Disconnects.pdf PDF
Sheet 04-4.dwf DWF file
TOC - Repair Electrical H-Wing Stratcom.pdf PDF
08700.pdf PDF
16470 Final Panelboards.pdf PDF
06300.pdf PDF
Sheet 05-5.dwf DWF file
Cover Repair Electrical H-Wing STRATCOM.pdf PDF
16110 Final Raceways.pdf PDF
16460 Final Transformers.pdf PDF
Sheet 08-Layout.dwf DWF file
16135 Final Electrical Boxes and Fittings.pdf PDF
16482 Final Motor Control Centers.pdf PDF
Section 1B H-WING.pdf PDF
16361 Final Secondary Unit Substations.pdf PDF
02110.pdf PDF
Sheet 01-01.dwf DWF file
Solicitation.doc DOC document
16425 Final Switchboards.pdf PDF
Sheet 02-2.dwf DWF file
09650.pdf PDF
16120 Final Wires and Cables.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4600-09-B-0007

Attachment 4

06 March 2009

OFFERORS’ CHECKLIST

The following is a list of actions that should be used to preclude irregularities. Offerors are encouraged to use this checklist when preparing their solicitation package.

_________ Have blocks 14, 15, 16, 17, 19, 21a, 21b, 21c of the SF 1442 been completed?

_________ Has the bid schedule been completed? Did you include a paper copy and an electronic copy with your offer?

_________ Are decimal points in the proper place?

_________ Have you checked the unit prices, extended prices and total price?

_________ Have all amendments (if any have been issued) to the IFB been acknowledged by completing blocks 8 & 15 of the SF 30 (amendment) and returning it with your offer?

_________Have you completed online representations and certifications via ORCA at www.bpn.gov?

_________ Are you registered with the Central Contractor Register (CCR) located at www.bpn.gov? Is your registration current? To include the applicable NAICS 238220 _________ Did you provide the information required under Solicitation Section L, entitled “Preporation of Bids-Construction”?

THIS LIST MAY NOT BE ALL-INCLUSIVE. IT IS THE OFFERORS’ RESPONSIBILITY THAT THEY COMPLETE AND PROVIDE ALL REQUIRED INFORMATION/DOCUMENTATION WITH THEIR OFFER. FAILURE TO PROVIDE ALL REQUIRED INFORMATION MAY RESULT IN THE OFFER BEING CONSIDERED NON-RESPONSIVE, RECEIVING A NEUTRAL RATING, OR EXCLUSION FROM THE COMPETITIVE RANGE.

File details come from the government source that posted it. Updated .