08700.pdf
PDF 59 KB Posted
- Solicitation number
- FA4600-09-B-0007
About this file
Attachment 1 Specs
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
112-006 08700-1
SECTION 08700 1
HARDWARE AND SPECIALTIES 2
A. GENERAL 4
RELATED WORK SPECIFIED ELSEWHERE 6
Metal Doors and Frames Section 08100 8 Wood Doors Section 08210 9
GENERAL REQUIREMENTS 11
Supply all items of finish hardware and related services necessary for the proper functioning of all doors, and for 13 such other requirements as are designated under this Section. 14
QUALITY ASSURANCE 16
The firm supplying hardware for this project shall employ a member of the American Society of Architectural 18 Hardware Consultants, or a person of equivalent capability, he shall be available during construction for 19 consultation and technical assistance. 20 The hardware supplier shall coordinate all hardware items to be installed in or on metal doors and frames with the 22 supplier of those items to assure proper fit, reinforcing and operation. 23 Provide hardware for fire-rated openings in compliance with NFPA Standard No. 80 and local building code 25 requirements. Provide only hardware which has been tested and listed by UL or FM for types and sizes of doors 26 required and complies with requirements of door and door frame labels. 27
SUBMITTALS 29
Submit Hardware Schedule in accordance with Section 1B, Shop Drawings/Submittals. The Hardware Schedule 31 shall list the type, manufacturer's name and number, finish and location. All abbreviations and symbols used on 32 the Schedule shall be explained. No hardware shall be ordered, or delivered to the job, until approval of the 33 schedule has been received from the Government Construction Representative. Approval of the schedule does 34 not relieve the hardware supplier of fulfilling all terms of the Specifications. 35 Supply three (3) copies of installation instructions, maintenance instructions for each operating item, maintenance 37 instructions for finishes, and parts manuals for all locksets, closers, exit devices and other operating devices to the 38 Contractor for inclusion in the overall project Maintenance Manual. 39 Supply three (3) complete sets of all installation and adjustment tools for transmittal to the Government 41 Construction Representative for each different style, type and series of lockset, latch, lock, exit device, closer or 42 other adjustable hardware item provided and installed at this project. 43 Verify keyway requirements and establish core mark, control, grand master, master, submaster divisions and 45 individual passage keying requirements with the Government Construction Representative. Verification shall 46 include keying for miscellaneous locks on other items listed at the beginning of this Section. Submit separate 47 detailed schedule indicating clearly how the final instructions to the Government Construction Representative on 48 keying of locks have been fulfilled. 49
SUBMITTAL SEQUENCE 51
Submit schedule at earliest possible date particularly where acceptance of hardware schedule must precede 53 fabrication of other work (e.g., metal doors and frames), which are critical in the project construction schedule. 54 Include with schedule the product data, samples, shop drawings of other work affected by builders of hardware, 55 and other information essential to the coordinated review of hardware schedule. 56
112-006 08700-2
PRODUCT HANDLING 1
Package hardware in individual containers on a set-by-set basis with set numbers that correspond to the approved 3 hardware schedule. Each set shall contain each item of hardware required for that set including necessary screws, 4 keys and installation instructions, and installation templates for spotting mortising tools. Two or more identical sets 5 may be packaged in the same container. Mark each container clearly with hardware set numbers. All keys shall 6 be tagged according to their corresponding locks and delivered to the Government Construction Representative as 7 described hereinafter. All construction keys shall be delivered to the Contractor. 8
B. PRODUCTS 10
HARDWARE 12
Finish hardware shall be as hereinafter specified and scheduled. Provide additional items of hardware, which are 14 necessary to make a complete workmanlike installation even though such items are not specified. Such 15 miscellaneous items shall be equal in quality to items which are specified. 16 Brands and models designated in this Section are intended to define the exact standards of quality, function and 18 design required. Substitution will not be permitted unless given written approval by the Government Construction 19 Representative. 20
ITEM SPECIFIED ACCEPTABLE 22
Hinges Stanley Hager, McKinney 23 Locks Corbin-Russwin No Substitutions 24 Closers Norton LCN 4040 EDA, Stanley D-4550EDA 25 Overhead Stops Rixson ABH 26 Flat Goods &Stops Rockwood Trimco 27 Push Plates #70A 3” x 16” US32D 28 Pull Plates #125 x 70A 3” x 16” US32D 29
Kick Plates 8" x 2" L.D.W. x .050 US32D 30 Armor Plates 30” x 2” L.D.W. x .050 US32D 31 Wall Stops #403 US26D 32
Door Bolts Rockwood Ives 33 Weatherproofing* Pemko Reese 34 *Provide S88D perimeter gasket at fire-rated doors. Provide appropriate meeting stile strips at pairs. 36
KEYING 38
All locks shall be keyed in the factory registered system previously established for this building; supply 4 keys for 40 each master and sub-master division, and 2 passage keys per lock. 41 Cores and keys for all locks shall be furnished and installed under this Combined Contract. 42 Keying arrangements and requirements for all new locks shall be coordinated directly between the hardware 44 supplier and the Government Construction Representative. 45 Hardware shall have the following U.S. Standard finishes: 47
1. US26D or US32D for all items unless otherwise specified. 48
2. AL finish for exposed surfaces of door closers unless otherwise noted. 49
3. Similar finishes for all other items unless otherwise noted. 50 Closers on all doors shall be mounted with sex bolts and finishing washers. Grommet nuts will not be acceptable. 52 Provide mounting plates where required. Closers shall be of the parallel arm configuration where possible. Closer 53 arms shall be heavy-duty type for all closers. 54 Fabricate door plates from 0.50-inch thick metal, drilled and countersunk for field mounting, furnished with 56 matching finish oval head screws suitable for door material construction. 57 All metal frames shall receive Glynn Johnson GJ64 silencers as required. Provide three silencers on strike jambs 59
112-006 08700-3 of frames of single swing doors and two silencers on heads of frames of double-swing doors. 1 Dead stop angles for closers and overhead stops shall be accurately determined to prevent doors from contacting 3 adjoining walls or other doors while still affecting the hold-open point at the greatest possible angle. 4 Supply correct wall stop anchors to coordinate with the wall construction. Wall stops installed on stud walls must 6 be screwed into wood blocking installed within the wall under Section 06100. 7
C. EXECUTION 9
HARDWARE LOCATIONS 11
Hardware locations (height above finish floor) shall be as follows: 13
Exit Devices 40” to centerline of bar 14 Interior & Exterior Levers & Pulls 40” to centerline 15 Push/Pull Plates 32” to bottom of plates 16 Flush Cup Pulls 36” to centerline 17
INSTALLATION OF HARDWARE 19
GENERAL 21
Install each hardware item in compliance with the manufacturer's written instructions. Wherever cutting and fitting 23 is required to install hardware onto or into surfaces, which are later to be painted or finished in another way, 24 coordinate removal, storage and reinstallation or application of surface protections with finishing work specified in 25 the Division 9 sections. Do not install surface-mounted items until finishes have been completed on the substrate. 26 Set units level, plumb and true to line and location. Adjust and reinforce the attachment substrate as necessary for 28 proper installation and operation. 29 Drill, tap and countersink units for surface-applied hardware and other items which are not factory-prepared for 31 anchorage fasteners. Space fasteners and anchors in accordance with industry standards and manufacturer's 32 recommendations. 33
INSTALLATION OF WEATHERSTRIPPING AND SEALS 35
Provide metal fasteners of type which will not work loose as a result of normal door use, and which are compatible 37 with metal of the stripping, the frame or the door. Provide only smooth exposed fastener heads, which do not 38 constitute a snagging hazard to clothing of building occupants. 39 Set units plumb and level, accurately centered at optimum location for maintaining a permanent seal. 40 Adjust doors, frames and hardware, as necessary, to achieve proper operation of seals and stripping. 42
ADJUST AND CLEAN 44
Adjust and check each operating item of hardware and each door, to ensure proper operation or function of every 46 unit. Replace any unit which cannot be adjusted to operate freely and smoothly as intended for the application 47 made. 48
HARDWARE SCHEDULE 50
HARDWARE SET NO. 1 52
3 Pairs Hinges FBB179 4 ½” x 4 ½” NRP US26D 53 1 Each Storeroom Lockset CL3357 NZD 626 54 1 Each Overhead Stop #10 US32D 55 2 Each Flush Bolts #555 AL 56
File details come from the government source that posted it. Updated .