Atch 3 General Decision Number.doc

DOC document 41 KB Posted

Attached to
RECOVERY - SGBP080011 - Repair H Wing Elec, Lemay Fac
Solicitation number
FA4600-09-B-0007
Issued by

About this file

Attachment 3 Wage Determination

View the file

Other files

File Type Posted
QA RECOVERY Repair H Wing Electrical RFI Final.doc DOC document
OFF-B-6072 Sheet 01 - Amendment 1 - May 09.dwf DWF file
OFF-B-6072 Sheet 04 - Amendment 1 - May 09.dwf DWF file
OFF-B-6072 Sheet 02 - Amendment 1 - May 09.dwf DWF file
FA4600-09-B-0007-0003.pdf PDF
Amendment 2.doc DOC document
Site Visit Sign in.pdf PDF
Amendment 1.doc DOC document
09000.pdf PDF
Atch 5 NCIC Data.doc DOC document
09250.pdf PDF
16124 Final Medium Voltage Cables.pdf PDF
Sheet 07-7.dwf DWF file
Section 1C H-WING.pdf PDF
16190 Final Supporting Devices.pdf PDF
Atch 4 offeror checklist.doc DOC document
08210.pdf PDF
08100.pdf PDF
16010 Final General Electrical.pdf PDF
Sheet 03-3.dwf DWF file
07900.pdf PDF
Section 1A H-WING.pdf PDF
09900.pdf PDF
Sheet 06-6.dwf DWF file
16452 Final Grounding.pdf PDF
06100.pdf PDF
16170 Final Circuit and Motor Disconnects.pdf PDF
Sheet 04-4.dwf DWF file
TOC - Repair Electrical H-Wing Stratcom.pdf PDF
08700.pdf PDF
16470 Final Panelboards.pdf PDF
06300.pdf PDF
Sheet 05-5.dwf DWF file
Cover Repair Electrical H-Wing STRATCOM.pdf PDF
16110 Final Raceways.pdf PDF
16460 Final Transformers.pdf PDF
Sheet 08-Layout.dwf DWF file
16135 Final Electrical Boxes and Fittings.pdf PDF
16482 Final Motor Control Centers.pdf PDF
Section 1B H-WING.pdf PDF
16361 Final Secondary Unit Substations.pdf PDF
02110.pdf PDF
Sheet 01-01.dwf DWF file
Solicitation.doc DOC document
16425 Final Switchboards.pdf PDF
Sheet 02-2.dwf DWF file
09650.pdf PDF
16120 Final Wires and Cables.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4600-09-B-0007

Attachment 3 06 March 2009

General Decision Number: NE080010 02/06/2009 NE10

Superseded General Decision Number: NE20070010

State: Nebraska

Construction Type: Building

County: Sarpy County in Nebraska.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 02/08/2008

1 02/22/2008

2 04/11/2008

3 06/20/2008

4 07/04/2008

5 07/18/2008

6 08/08/2008

7 09/19/2008

8 12/19/2008

9 01/02/2009

10 01/23/2009

11 02/06/2009

ASBE0039-002 05/01/2008

Rates Fringes

Insulator/asbestos worker

Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems..........$ 25.75 8.40

FOOTNOTE:

Work performed from a boatswain chair, staging, or scaffolding suspended from a permanent structure, more than thirty (30) feet above the floor or the ground: $1.00 per hour additional.

BRNE0001-001 06/01/2008

Rates Fringes

BRICKLAYER.......................$ 26.55 9.40

FOOTNOTE: Work on smoke stacks, chimneys and silos 50 ft.

and higher: $2.00 per hour additional, to be paid from the footing.

CARP0444-008 06/01/2008

Rates Fringes

CARPENTER (does not include concrete form work or overhead doors)..................$ 20.48 8.63

* CARP1463-001 06/01/2008

Rates Fringes

MILLWRIGHT.......................$ 25.34 9.63

ELEC0022-011 06/01/2008

Rates Fringes

ELECTRICIAN (includes low voltage wiring for fire alarm systems; does not include

HVAC control wiring).............$ 29.75 1%+12.01

ELEC0022-012 12/02/2008

Rates Fringes

Electricians: (Sound and voice transmission, transference systems;

television and video systems;

security stystems;

communication systems that transmit or receive information and/or control systems; energy management systems; and fire alarm systems (does not include raceway systems) (excluding cable tray for the purpose of the above listed systems;

Also, chases and/or nipples

(not to exceed 10ft.) may be installed on open wiring systems); Note: Fire alarm systems when installed in raceways in any new or remodel project when other building trades are present shall be the work of the inside electrician) (does not include HVAC control wiring))....$ 20.20 8.03

ELEV0028-001 01/01/2009

Rates Fringes

ELEVATOR MECHANIC................$ 35.23 18.285+a+b

FOOTNOTE:

a. Vacation Pay: 8% with 5 or more years of service, 6% for 6 months to 5 years service. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving

Day, Friday after Thanksgiving, and Christmas Day.

ENGI0571-004 10/01/2008

Rates Fringes

Power equipment operators:

Group 1.....................$ 17.81 7.75

Group 2.....................$ 21.11 7.75

Group 3.....................$ 23.85 7.75

Group 4.....................$ 26.08 7.75

Group 4A....................$ 27.00 7.75

Group 1: Machine oiler, Rubber tired tractor

Group 2: Trenchers, Forklifts, Hydro-Hammer, Spread oiler, Trailer or skid mounted concrete pumps

Group 3: One & two drum hoist, Tuggers, all backhoes, Dozers, and Loaders

Group 4: Cranes, Concrete pump with swing boom, Mechanic

Group 4A: CCO Crane

IRON0021-010 06/01/2008

Rates Fringes

IRONWORKER (includes metal building erection)...............$ 25.88 9.45

PLUM0016-009 05/28/2008

Rates Fringes

PLUMBER (does not include

HVAC piping).....................$ 32.42 11.69

PLUM0464-007 05/28/2008

Rates Fringes

Pipefitter/steamfitter

(includes HVAC piping)...........$ 29.58 13.10

ROOF0085-001 04/10/2007

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 20.28 4.72

SFNE0669-001 01/01/2009

Rates Fringes

SPRINKLER FITTER (FIRE)..........$ 29.56 15.30

SHEE0003-005 07/01/2008

Rates Fringes

Sheet metal worker (includes

HVAC duct work, and setting the unit; does not include

HVAC piping, HVAC wiring, or metal building erection).........$ 28.76 11.27

SUNE2000-003 09/13/2000

Rates Fringes

CEMENT MASON/CONCRETE

FINISHER (includes concrete form work and rebar).............$ 13.34 3.98

LABORER: Mason Tender...........$ 11.50 4.10

LABORER..........................$ 10.50

PAINTER (does not include wallpaper hanging)...............$ 12.50

Power Equipment Operator

Loader......................$ 12.43 .04

Sheet metal worker/electrician (HVAC wiring only).....................$ 20.21 6.09

Truck Driver, Tandem Dump........$ 8.00 .03

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .