Attachment 1 Specs

View the file

Other files

File Type Posted
QA RECOVERY Repair H Wing Electrical RFI Final.doc DOC document
OFF-B-6072 Sheet 01 - Amendment 1 - May 09.dwf DWF file
OFF-B-6072 Sheet 04 - Amendment 1 - May 09.dwf DWF file
OFF-B-6072 Sheet 02 - Amendment 1 - May 09.dwf DWF file
FA4600-09-B-0007-0003.pdf PDF
Amendment 2.doc DOC document
Site Visit Sign in.pdf PDF
Amendment 1.doc DOC document
09000.pdf PDF
Atch 5 NCIC Data.doc DOC document
09250.pdf PDF
16124 Final Medium Voltage Cables.pdf PDF
Sheet 07-7.dwf DWF file
Section 1C H-WING.pdf PDF
16190 Final Supporting Devices.pdf PDF
Atch 4 offeror checklist.doc DOC document
08210.pdf PDF
08100.pdf PDF
16010 Final General Electrical.pdf PDF
Sheet 03-3.dwf DWF file
07900.pdf PDF
Section 1A H-WING.pdf PDF
Sheet 06-6.dwf DWF file
16452 Final Grounding.pdf PDF
Atch 3 General Decision Number.doc DOC document
06100.pdf PDF
16170 Final Circuit and Motor Disconnects.pdf PDF
Sheet 04-4.dwf DWF file
TOC - Repair Electrical H-Wing Stratcom.pdf PDF
08700.pdf PDF
16470 Final Panelboards.pdf PDF
06300.pdf PDF
Sheet 05-5.dwf DWF file
Cover Repair Electrical H-Wing STRATCOM.pdf PDF
16110 Final Raceways.pdf PDF
16460 Final Transformers.pdf PDF
Sheet 08-Layout.dwf DWF file
16135 Final Electrical Boxes and Fittings.pdf PDF
16482 Final Motor Control Centers.pdf PDF
Section 1B H-WING.pdf PDF
16361 Final Secondary Unit Substations.pdf PDF
02110.pdf PDF
Sheet 01-01.dwf DWF file
Solicitation.doc DOC document
16425 Final Switchboards.pdf PDF
Sheet 02-2.dwf DWF file
09650.pdf PDF
16120 Final Wires and Cables.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

112-006 09900-1

SECTION 09900 1

PAINTING 2

A. GENERAL 4

SCOPE 6

The scope and extent of painting and finishing shall be as designated by Specifications, Schedules and Drawing 8 notations. 9

WORK NOT INCLUDED 11

Unless otherwise specified, shop priming of ferrous metal items is included under various sections for structural 13 steel, miscellaneous metal, metal doors and frames, prefabricated stair assemblies, prefabricated steel building 14 systems, and similar items. Same applies for shop-fabricated or factory -built mechanical and electrical 15 equipment. See list of items later in this Section. However, the presence of a shop-applied primer shall not reduce 16 the number of coats required to be applied in the field as specified under the Paint and Stain Schedule later in this 17 Section. Touch-up of primer on damaged or abraded steel items listed above shall be accomplished under the 18 sections where these items are specified. Touch-up of primer on steel doors and frames damaged or abraded 19 surfaces shall be accomplished under Section 08100. 20 Unless otherwise indicated, do not include painting when factory-finishing or installer-finishing is specified for such 22 items as (but not limited to) metal toilet enclosures, acoustic materials, and finished mechanical and electrical 23 equipment, including light fixtures, switchgear and distribution cabinets. See list of items later in this Section. 24 Unless otherwise indicated, painting is not required on surfaces such as walls or ceilings in concealed areas and 26 generally inaccessible areas, foundation spaces, furred areas, utility tunnels, pipe spaces, duct shafts, and 27 elevator shafts. See list of items later in this Section. 28 Metal surfaces of anodized aluminum, stainless steel, chromium plate, copper, bronze and similar finished 30 materials will not require finish painting, unless otherwise indicated. See list of items later in this Section. 31 Moving parts of operating units, mechanical and electrical parts, such as valve and damper operations, linkages, 33 sensing devices, motor and fan shafts will not require finish painting, unless otherwise indicated. 34 Do not paint over any code-required labels, such as Underwriters’ Laboratories and Factory Mutual, or any 36 equipment identification, performance rating, name, or nomenclature plates. 37 Omit paint/stain and/or finishing as noted for the following items: 39

• Security cameras 40

• Fire sprinkler heads 41

• Acoustic materials 42

• Finished mechanical and electrical equipment 43

• Electrical switchgear and distribution panels 44

• Light fixtures 45

QUALITY ASSURANCE 48

ACCEPTABLE MANUFACTURERS are as follows (or approved equal): 50

Benjamin Moore and Company 51 Diamond Vogel 52 ICI Dulux Paints 53 Kwal Paint 54 Pittsburgh Paints, PPG Industries, Inc. 55 Pratt and Lambert 56 Sherwin-Williams Company 57 Tnemec Co., Inc. 58

112-006 09900-2

REVIEW OF PAINTING SCOPE BEFORE BIDDING 1

The Painting Contractor shall be responsible for performing all work and providing all materials required to achieve 3 the design intent shown on these Drawings. The Owner will not be responsible for any additional expense to the 4 Contractor if the conditions causing those expenses could have been discovered in an on-site inspection prior to 5 bid submittal. 6

SUBMITTALS 8

Submit samples of each type of finish and color in accordance with Section 1B, Shop Drawings/Submittals. Paint 10 samples shall be submitted on 8 1/2-inch x 11-inch Mead Mark I cover paper, coated on one side, with paint 11 sprayed or applied with a foam rubber roller. Samples shall be submitted within 15 days after the Contract date. 12 Back of paint samples shall show the paint manufacturer and the trade name of the proposed paint. 13

EXTRA STOCK 15

The Contractor shall furnish the Government with one gallon of each color or type of finish, sealed and unused, 17 together with the mixing formula written on the cans. The Contractor shall also furnish two copies of this 18 information to the Government in addition to the instructions attached to paint containers. 19

DELIVERY, STORAGE AND PROTECTION 21

All paints, varnishes, stains, paste fillers, and similar materials shall be delivered in the original containers with 23 seals unbroken and labels intact. 24 All materials used on the project shall be stored in a single place designated by the Government Construction 26 Representative. Such storage place shall be kept neat and clean, and all damage thereto or to its surroundings 27 shall be made good. Any oil, rags, waste, etc. shall be removed from the building every night, and every 28 precaution taken to avoid the danger of fire. 29

JOB CONDITIONS 31

Surface temperature shall be maintained at the minimum temperature required by the paint manufacturer during 33 application and drying of paints. Exterior surfaces shall not be painted or finished during weather period that are 34 forbidden by the manufacturer’s written instructions. See manufacturer’s written instructions for more specific 35 information. 36 Adjacent work, building finishes and surfaces, together with cabinets and similar items, shall be totally protected 38 with masking tape, drop cloths or other suitable coverings. Cabinets, shelving, furnishings and equipment, or 39 similar items shall not be utilized for any construction-related purpose or utilized as work surface, scaffolding, 40 plank supports or in any way walked upon. 41

B. PRODUCTS 43

MATERIALS 45

The Contractor shall have the option of using materials and finishes manufactured by any one of the 47 manufacturers previously listed (or approved equal). Materials used throughout shall be the products of one 48 manufacturer only, and shall be first line and top grade materials produced by the manufacturer selected. The 49 mentioning of a specific brand name is done to establish a minimum acceptable standard or quality desired. 50

C. EXECUTION 52

PREPARATION 54

All surfaces to be finished shall be power-washed and/or scraped and wiped cleaned free of loose dirt and dust 56 before painting. After the first coat, putty nail holes, cracks, etc. with putty of a color to match that of finish. Bring 57 putty flush to the adjoining surface. 58

112-006 09900-3

Metal surfaces which are not galvanized or shop-coated shall be washed with mineral spirits to remove dirt and 1 grease. Remove rust or scale by wire brushing or sandpapering clean. 2 Roof deck, beams, joists, ductwork, conduit, etc. scheduled to receive paint shall be clean and dry, and shall have 4 all loose rust, paint and other foreign material removed before painting. 5 Clean and treat galvanized metal chemically with a compound designed for this purpose, such as "Lithoform", 7 "Stibley", or "Solfo Metallic Coat", in accordance with the paint manufacturer's instructions. 8 Sand hard glossy-previously painted surface finishes to insure adhesion. Spot prime with primer specified for new 10 surfaces where existing paint or primer has been partially removed by blistering, peeling, rupture, or cracking. 11 Completely remove existing finish if 25 percent or more of the existing finish has failed or can be easily scraped off 12 the surface. 13

BACKPRIMING 15

All concealed surfaces of exterior wood members used in this project (including at all field cuts) shall be primed 17 before any assembly work is undertaken, including assembly work done in the fabrication mill. There are no 18 exceptions. 19

APPLICATION 21

Application of the first coat shall constitute acceptance of surfaces as fit and proper to receive finish. 23 Apply all materials under adequate illumination, spread evenly and flow on smoothly without runs or sags. All 25 coats must be thoroughly dry before applying succeeding coats. 26 Spray application of paints will be permitted provided the application is by airless-type spray equipment, and 28 provided the application by spray is followed by a roller on wall surfaces. Roller shall thoroughly work paint into 29 pores for complete surface coverage. Conventional paint spray equipment will be permitted on metal fabrications. 30 Sprayed surfaces shall be smooth, free of imperfections, and paint runs, and shall be completely covered by each 31 coat. 32 Undercoats of paint shall be of the approximate color as the final coat. 34 For factory-primed and mill-primed surfaces, use the materials specified in every case for such surfaces and use in 35 accordance with the manufacturer's directions for the first or priming coat. 36 Between varnish coats, sand varnish finish applied to wood with fine sandpaper; clean and tack to produce an 38 even, smooth finish. 39 Wood doors shall be finished on both sides, on all four edges and at cutouts immediately upon arrival at the 41 jobsite. After doors have been fitted, all four edges shall be thoroughly sealed with stain and varnish for 42 transparent finished doors. Edge finishes shall be the same as for the faces. 43

ADJUSTING AND CLEANING 45

Clean adjacent and other surfaces which are smeared or splattered as a result of painting and finishing work. 47

PAINT AND STAIN SCHEDULE 49

See list of approved manufacturers of paint and stain products earlier in this section. The paint and stain materials 51 listed below are given as a means of establishing the standard for the required paint and stain materials. 52

INTERIOR WORK 58

112-006 09900-4

FERROUS METAL AND ALUMINUM ITEMS (I.E., INTERIOR METAL DOORS, METAL DOOR AND WINDOW 1

FRAMES, SHOP-PRIMED STEEL, ETC., EXCEPT AS NOTED BELOW) 2

1 coat S-W Kem Bond HS Universal Metal Primer, B50 Series (4 mils wet, 1.2 mils dry) 3 2 coats S-W All Surface Enamel Alkyd Eg-Shel, A11 Series (4 mils wet, 1.6 mils dry per coat) 4

EXISTING GWB 6

2 coats S-W ProMar 200 Latex Eg-Shel Enamel, B20W200 (4 mils wet, 1.6 mils dry per coat) 7

NEW GWB 9

1 coat S-W PrepRite 200 Latex Wall Primer, B28W200 (4 mils wet, 1.2 mils dry) 10 2 coats S-W ProMar 200 Latex Eg-Shel Enamel, B20W200 (4 mils wet, 1.6 mils dry per coat) 11

HARDWOOD FOR TRANSPARENT STAINED FINISH 13

1 coat Penetrating Stain 14 2 coats S-W Wood Classics Waterborne Polyurethane Varnish, Satin finish 15

MISCELLANEOUS ITEMS 17

Registers, grilles, heating and water pipes, electrical conduits, outlet boxes, and panelboard fronts exposed in 19 finished rooms shall be painted as specified for Metal Work or as specified or required for the surfaces to be 20 painted. Color shall match color of adjacent wall or ceiling surfaces. 21

PAINT AND STAIN COLOR SELECTIONS 23

See Section 09000, Color Schedule. 25

PAINT AND STAIN LOCATION SCHEDULE 27

See Section 09000, Color Schedule. 29

INTERIOR COLOR PLACEMENT 31

GWB walls See Finishes Plans and 33

Details (P-1 unless noted 34 otherwise) 35

Hollow metal frames P-2 37