Additional RFI Responses.pdf

PDF 100 KB Posted

Attached to
Child Development Center Renovation Solicitation
Solicitation number
FA452824R0001
Issued by

About this file

This document contains additional questions and responses regarding the asbestos and lead paint report for the Child Development Center Renovation Solicitation (Solicitation Number FA452824R0001). The key details are:

The document provides clarification on the size and quantities of specific items referenced in the asbestos and lead paint abatement report, including exterior window caulking, hard pipe fittings, and transite exterior overhead panels. It also notes that any additional asbestos-containing materials found during renovation must be properly sampled, tested, and abated by a licensed contractor. The document further specifies the expected quantity of vermiculite insulation in the CMU walls and that it must be properly addressed. Additionally, it provides information on the size of the required lighting inverter. Lastly, it addresses questions about utilizing key employee's past performance on previous contracts.

View the file

Other files

File Type Posted
Section M - Evaluation Factors_Amendment 11.pdf PDF
Solicitation Amendment FA452824R00010011 SF 30.pdf PDF
Bid Schedule_Amendment 11.pdf PDF
Section L _ Instructions to Offerors_Amendment 11.pdf PDF
Solicitation Amendment - FA452824R00010011.pdf PDF
Past Performance Questionnaire_Amendment 11.pdf PDF
10 Bid Schedule_amendment 5.pdf PDF
Solicitation Amendment FA452824R00010009 SF 30.pdf PDF
RFI Questions and Responses 2.pdf PDF
09 Specs_amendment 4.pdf PDF
Solicitation Amendment FA452824R00010008 SF 30.pdf PDF
Solicitation Amendment FA452824R00010007 SF 30.pdf PDF
RFI Questions and Responses.pdf PDF
Solicitation Amendment FA452824R00010006 SF 30.pdf PDF
08 Drawings Specs amendment 3.pdf PDF
Solicitation Amendment FA452824R00010005 SF 30.pdf PDF
Solicitation Amendment FA452824R00010004 SF 30.pdf PDF
Solicitation FA452824R00010003 SF30 Amendment 3.pdf PDF
Solicitation Amendment FA452824R00010002 SF 30.pdf PDF
Solicitation - FA452824R00010001 Amendment.pdf PDF
Final Section L Amend.pdf PDF
Final Section L Amend 1.pdf PDF
Final Section M.pdf PDF
07 Bid Schedule.pdf PDF
05 AF Form 66 Schedule of Materials Submittals.pdf PDF
03 Drawings.pdf PDF
01 CDC B164 Specifications.pdf PDF
Solicitation - FA452824R0001.pdf PDF
Past Performance Information Form.pdf PDF
06 Wage Determination ND.txt TXT text file
Final Section L.pdf PDF
04 As-Built Drawings.pdf PDF
02 Specifications amendment.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addi onal Ques ons Regarding the Asbestos and Lead Paint Report:

1) What is the size of the windows referred as Exterior Window Caulking ‐16 windows referenced or the

LF of caulking needing removed?

Exis ng windows are 4’ x 3’4”.

2) What are the sizes of the 5 fi ngs reference in the Hard Pipe Fi ng Insula on in the abatement report?

Four of the hard fi ngs are 2.5” in diameter and one hard fi ng is 3.5” in diameter. If addi onal suspicious pipe insula on is found during renova on, it must be sampled and tested for asbestos prior to disturbing or impac ng. Asbestos material found will have to be removed by a current state of North

Dakota asbestos contractor according to specifica ons. Addi onal quan es beyond those iden fied in the report will be addressed via modifica on.

3) In reference to the Transit Exterior Overhand Panels on the south, east and west sides of building what is the size of each panel, its references 1,800 total in the Abetment report?

Transite exterior overhead panels vary in size with the largest observed panels measuring 4’ X 12’.

4) I have another ques on for you. Its referenced‐on page 7 of 9 under 5.0 Recommenda ons.

It talks about the CMU black walls from the original building containing vermiculite insula on. Can you determine what is the wall size, Height/Length and how many walls? Ot total SF needing removed?

Contractor shall assume that the CMU wall, in original por on of building (Southeast half), contains ACM vermiculite insula on. Precau ons should be taken when cu ng out sec ons of exterior wall for new openings. Expected quan ty is 85 SF based on new exterior cut openings. Provide price in item 0005 of the amended bid schedule. If vermiculite insula on is found during renova on, it must be sampled and tested for asbestos prior to disturbing or impac ng. Asbestos material found will have to be removed by a current state of North Dakota asbestos contractor according to specifica ons. Addi onal quan es beyond those iden fied in the report will be addressed via modifica on.

5) Could the government please provide clarifica on on the size of the ligh ng inverter required that is shown on plan sheet EL101. Don’t see a specifica on for the ligh ng inverter.

1500 VA for the ligh ng inverter. The lights operate at 120 volts.

6) Past Performance: Are we able to u lize key employees for past performance? i.e. if a major stakeholder (Vice President and/or consultant) of a previous contractor was part of the firm’s construc on team can we u lize their previous experience for past performance?

Past Performance will be evaluated in accordance with Section L, Volume II – Past Performance Proposal.

File details come from the government source that posted it. Updated .