QA 12MAY2023.pdf

PDF 176 KB Posted

Attached to
Convert T-169 into Laundry & FMO Federal contract opportunity
Solicitation number
FA448623R0002
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document contains questions and answers related to Federal Contract Opportunity FA448623R0002 for the conversion of Building T-169 at an Air Force base in Europe. The project scope involves demolishing the interior of the former bowling alley and constructing new partitions to create separate laundry and warehouse spaces. Utilities and loading areas will be updated and the roof replaced. One question asked about water supply for fire suppression, but the response clarified that the building is on a pressurized loop supplied by a pumphouse capable of meeting flow requirements. No additional water infrastructure will be provided under this contract.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers 12-May-23

Project No. Project Title Contract

MQNA 21-1006 Convert T-169 into Laundry & FMO FA448623R0002

No REF Question Answer

39 DWG FX-101

Following the government answers to the contractors questions, question/answer #4, we find out that to fulfill the “extra hazard 0.3 gpm/2500 sq ft with 500 gpm hose allowance”, (project request, dwg FX-

101), there is not enough water to supply the system. Per NFPA and the

DOD would need a pump and water storage tank ( 158.934 gal for 120 minutes).Please see attached calculation for the storage area extra hazard

0.3/2500 with a 500 gpm hose allowance. Please clarify

Building T-169 is supplied by a pressurized closed water loop. The pressure to this loop is provided by Pumphouse T-120 that can be configured to supply the required pressure and flow if necessary (Max. flow 1500+ GPM Approx. @ 60

PSI). Contractor shall not provide water pumps or tanks in this project's scope.

Any additional water demand will be resolved outside of this project's scope.

2023-05-12T16:27:38+0000
PIRES.BRUNO.M.1530237920