This federal solicitation requests proposals to convert an existing building into a laundry facility and housing/furnishing management office warehouse. Key details include converting the former bowling alley building T-169 interior finishes and partitions to accommodate the new functions. Additional requirements consist of new partitions, finishes, utilities, loading docks, and replacing the existing roof with a PVC liner roof system. Offerors must provide their responses by the date specified and the agency plans to award the contract to the successful bidder thereafter. The soliciting agency is the Department of the Air Force United States Air Forces in Europe - Air Forces Africa.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION
CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
12b. CALENDAR DAYS
YES NO
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
Created On: 03 Apr 2023, 03:47 PM Azores Time
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
Section A - Solicitation/Contract Form
Convert T-169 into Laundry & FMO
Header only - Purchase Requisition Number: F2N33Q3040AW02 Date: 16 Mar 2023 Proposal Identifier: FA448623R0002 Date: 03 Apr 2023
FA448623R0002
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price
Amount
MQNA211006 - EFFICIENCY - Convert T-169 into Laundry & FMO
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Project
DFARS Clauses Incorporated by Full Text
252.229-7001 Tax Relief. Apr 2020
Basic. As prescribed in 229.402-70(a) and (a)(1), use the following clause:
TAX RELIEF-BASIC (APR 2020)
(a) Prices set forth in this contract are exclusive of all taxes and duties from which the United States Government is exempt by virtue of tax agreements between the United States Government and the Contractor's government. The following taxes or duties have been excluded from the contract price:
NAME OF TAX: ____(Offeror insert) RATE (PERCENTAGE): ____(Offeror insert)
(b) Invoices submitted in accordance with the terms and conditions of this contract shall be exclusive of all taxes or duties for which relief is available. The Contractor's invoice shall list separately the gross price, amount of tax deducted, and net price charged.
(c) When items manufactured to United States Government specifications are being acquired, the Contractor shall identify the materials or components intended to be imported in order to ensure that relief from import duties is obtained. If the Contractor intends to use imported products from inventories on hand, the price of which includes a factor for import duties, the Contractor shall ensure the United States Government's exemption from these taxes. The Contractor may obtain a refund of the import duties from its government or request the duty-free import of an amount of supplies or components corresponding to that used from inventory for this contract.
(End of clause)
Section C - Description/Specifications/Statement of Work
Requirements MQNA 21-1006 Convert T-169 into Laundry and FMO
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.246-12 Inspection of Construction. Aug 1996
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: In accordance with (IAW) the Specifications and Drawings.
DoDAAC: F2N33Q CountryCode: USA
65 CES CERF
AF BPN NO MILSBILLS PROCESSES, APO AE 09720-7710
APO, AE 09720-7710
UNITED STATES
Jose Barbosa Email: jose.barbosa.1.pt@us.af.mil Telephone: 295 57 6839
Section F - Deliveries or Performance
Overall Contract Delivery Period
From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt
From date of lead time event to completion of performance 365 Calendar Days Date of Notice to Proceed Receipt
Line Item
Delivery Schedule Quantity Address and POC
Delivery Schedule From date of lead time event to completion of performance 365 Calendar Days Date of Notice to Proceed Receipt
1 Project Place of Performance DoDAAC: F2N33Q CountryCode: USA
65 CES CERF
AF BPN NO MILSBILLS PROCESSES, APO AE
09720-7710
APO, AE 09720-7710
UNITED STATES
Jose Barbosa Email: jose.barbosa.1.pt@us.af.mil Telephone: 295 57 6839
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.204-7006 Billing Instructions. Oct 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7008 Assignment of Claims (Overseas). Jun 1997 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. Jan 2023
As prescribed in 232.7004(b), use the following clause:
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.
WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Not applicable.
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Construction Invoice.
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.
when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC F87700
Issue By DoDAAC FA4486
Admin DoDAAC FA4486
Inspect By DoDAAC F2N33Q
Service Approver (DoDAAC) FA4486
Service Acceptor (DoDAAC) FA4486
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Not applicable.
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
52.236-1 Performance of Work by the Contractor. Apr 1984
As prescribed in 36.501(b), insert the following clause:
Performance of Work by the Contractor (Apr 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least twenty-five (25) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
(End of clause)
FAR Clauses Incorporated by Full Text
52.236-1 Performance of Work by the Contractor. Apr 1984
As prescribed in , insert the following clause: 36.501(b)
Performance of Work by the Contractor (Apr 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least percent of the total amount of twenty five (25) work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
(End of clause)
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government. Jun 2020 52.203-7 Anti-Kickback Procedures. Jun 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. May 2014 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020
52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights.
Jun 2020
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. May 2011 52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Jun 2020 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
Nov 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
Nov 2021
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.
Nov 2021
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. Oct 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.211-13 Time Extensions. Sep 2000 52.215-8 Order of Precedence-Uniform Contract Format. Oct 1997 52.222-21 Prohibition of Segregated Facilities. Apr 2015 52.222-26 Equal Opportunity. Sep 2016 52.222-27 Affirmative Action Compliance Requirements for Construction. Apr 2015 52.222-50 Combating Trafficking in Persons. Nov 2021 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. Jun 2020 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.225-14 Inconsistency between English Version and Translation of Contract. Feb 2000 52.229-6 Taxes-Foreign Fixed-Price Contracts. Feb 2013 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-17 Interest. May 2014 52.232-23 Assignment of Claims. May 2014 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services. Nov 2021 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Nov 2021 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.236-2 Differing Site Conditions. Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984 52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-8 Other Contracts. Apr 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
Apr 1984
52.236-10 Operations and Storage Areas. Apr 1984 52.236-11 Use and Possession Prior to Completion. Apr 1984 52.236-12 Cleaning Up. Apr 1984 52.236-13 Accident Prevention. Nov 1991 52.236-13 Alternate I Accident Prevention. (Alternate I) Nov 1991 52.236-14 Availability and Use of Utility Services. Apr 1984 52.236-15 Schedules for Construction Contracts. Apr 1984 52.236-17 Layout of Work. Apr 1984 52.236-21 Specifications and Drawings for Construction. Feb 1997 52.242-13 Bankruptcy. Jul 1995 52.242-14 Suspension of Work. Apr 1984 52.243-4 Changes. Jun 2007
52.244-6 Subcontracts for Commercial Products and Commercial Services. Dec 2022 52.248-3 Alternate I Value Engineering-Construction. (Alternate I) Apr 1984 52.249-2 Alternate I Termination for Convenience of the Government (Fixed-Price). (Alternate I) Sep 1996 52.249-10 Default (Fixed-Price Construction). Apr 1984
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011
252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-Related Felonies.
Jan 2023
252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. Jan 2023 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
Jan 2023
252.205-7000 Provision of Information to Cooperative Agreement Holders. Dec 1991
252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.
May 2019
252.222-7002 Compliance with Local Labor Laws (Overseas). Jun 1997 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. Jan 2023 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7002 Qualifying Country Sources as Subcontractors. Mar 2022 252.225-7005 Identification of Expenditures in the United States . Jun 2005 252.225-7041 Correspondence in English. Jun 1997 252.225-7043 Antiterrorism/Force Protection for Defense Contractors Outside the United States. Jun 2015 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023
252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns.
Jan 2023
252.232-7010 Levies on Contract Payments. Dec 2006 252.233-7001 Choice of Law (Overseas). Jun 1997 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.242-7006 Accounting System Administration. Feb 2012 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2022 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Jan 2023 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. Oct 2010
FAR Clauses Incorporated by Full Text
52.204-1 Approval of Contract. Dec 1989
As prescribed in , insert the following clause:4.103
Approval of Contract (Dec 1989)
This contract is subject to the written approval of and shall not be binding until so approved.Contracting Officer
(End of clause)
52.211-10 Commencement, Prosecution, and Completion of Work. Apr 1984
As prescribed in , insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The 11.404(b) clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.
Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within calendar days after the date the Contractor receives the notice to 10 proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than .* The time stated for completion 365 days shall include final cleanup of the premises.
(End of clause)
52.211-12 Liquidated Damages-Construction. Sep 2000
As prescribed in , insert the following clause in solicitations and contracts:11.503(b)
Liquidated Damages-Construction (Sept 2000)
If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the (a) Government in the amount of for each calendar day of delay until the work is completed or accepted.$224.26
If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These (b) liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.232-5 Payments under Fixed-Price Construction Contracts. May 2014
As prescribed in , insert the following clause:32.111(a)(5)
PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
. The Government shall pay the Contractor the contract price as provided in this contract.(a) Payment of price
. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as (b) Progress payments determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
The Contractor's request for progress payments shall include the following substantiation:(1)
An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment (i) requested.
A listing of the amount included for work performed by each subcontractor under the contract.(ii)
A listing of the total amount of each subcontract under the contract.(iii)
A listing of the amounts previously paid to each such subcontractor under the contract.(iv)
Additional supporting data in a form and detail required by the Contracting Officer.(v)
In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be (2) taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if-
Consideration is specifically authorized by this contract; and(i)
The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform (ii) this contract.
. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment (c) Contractor certification shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
____ ( )Name
____ ( )Title
____ ( )Date
. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of (d) Refund of unearned amounts such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
Notify the Contracting Officer of such performance deficiency; and(1)
Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this (2) clause) equal to interest on the unearned amount from the 8 thday after the date of receipt of the unearned amount until-
The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or(i)
The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the (ii) unearned amount.
. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be (e) Retainage made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
. All material and work covered by progress payments made shall, at the time of payment, become (f) Title, liability, and reservation of rights the sole property of the Government, but this shall not be construed as-
Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration (1) of any damaged work; or
Waiving the right of the Government to require the fulfillment of all of the terms of the contract.(2)
. In making these progress payments, the Government shall, upon request, reimburse the Contractor for (g) Reimbursement for bond premiums the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
. The Government shall pay the amount due the Contractor under this contract after-(h) Final payment
Completion and acceptance of all work;(1)
Presentation of a properly executed voucher; and(2)
Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that (3) the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 (31 U.S.C.3727 and 41 U.S.C.6305).
. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on (i) Limitation because of undefinitized work work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
. In accordance with 31 U.S.C.3903(c)(1), the amount payable under paragraph (d)(2) of this (j) Interest computation on unearned amounts clause shall be-
Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to (1) the date the Contractor receives the unearned amount; and
Deducted from the next available payment to the Contractor.(2)
(End of clause)
52.232-8 Discounts for Prompt Payment. Feb 2002
As prescribed in , insert the following clause:32.111(b)(1)
DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
Discounts for prompt payment will not be considered in the evaluation of offers. However, any offered discount will form a part of the (a) award, and will be taken if payment is made within the discount period indicated in the offer by the offeror. As an alternative to offering a discount for prompt payment in conjunction with the offer, offerors awarded contracts may include discounts for prompt payment on individual invoices.
In connection with any discount offered for prompt payment, time shall be computed from the date of the invoice. If the Contractor has not (b) placed a date on the invoice, the due date shall be calculated from the date the designated billing office receives a proper invoice, provided the agency annotates such invoice with the date of receipt at the time of receipt. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or, for an electronic funds transfer, the specified payment date. When the discount date falls on a Saturday, Sunday, or legal holiday when Federal Government offices are closed and Government business is not expected to be conducted, payment may be made on the following business day.
(End of clause)
52.232-11 Extras. Apr 1984
As prescribed in , insert the following clause, appropriately modified with respect to payment due dates in accordance with agency 32.111(c)(2) regulations, in solicitations and contracts when a fixed-price supply contract, fixed-price service contract, or transportation contract is contemplated:
EXTRAS (APR 1984)
Except as otherwise provided in this contract, no payment for extras shall be made unless such extras and the price therefor have been authorized in writing by the Contracting Officer.
(End of clause)
52.232-16 Progress Payments. Nov 2021
As prescribed in , insert the following clause:32.502-4(a)
Progress Payments (Nov 2021)
The Government will make progress payments to the Contractor when requested as work progresses, but not more frequently than monthly, in amounts of $2,500 or more approved by the Contracting Officer, under the following conditions:
Computation of amounts.(a)
(1) Unless the Contractor requests a smaller amount, the Government will compute each progress payment as 80 percent of the Contractor's total costs incurred under this contract whether or not actually paid, plus financing payments to subcontractors (see paragraph (j) of this clause), less the sum of all previous progress payments made by the Government under this contract. The Contracting Officer will consider cost of money that would be allowable under Federal Acquisition Regulation (FAR)31.205-10 as an incurred cost for progress payment purposes.
The amount of financing and other payments for supplies and services purchased directly for the contract are limited to the amounts that (2) have been paid by cash, check, or other forms of payment, or that are determined due and will be paid to subcontractors-
In accordance with the terms and conditions of a subcontract or invoice; and(i)
Ordinarily within 30 days of the submission of the Contractor's payment request to the Government.(ii)
The Government will exclude accrued costs of Contractor contributions under employee pension plans until actually paid unless-(3)
The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and(i)
The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution (ii) remaining unpaid shall be excluded from the Contractor's total costs for progress payments until paid).
The Contractor shall not include the following in total costs for progress payment purposes in paragraph (a)(1) of this clause:(4)
Costs that are not reasonable, allocable to this contract, and consistent with sound and generally accepted accounting principles and (i) practices.
Costs incurred by subcontractors or suppliers.(ii)
Costs ordinarily capitalized and subject to depreciation or amortization except for the properly depreciated or amortized portion of such (iii) costs.
Payments made or amounts payable to subcontractors or suppliers, except for-(iv)
Completed work, including partial deliveries, to which the Contractor has acquired title; and(A)
Work under cost-reimbursement or time-and-material subcontracts to which the Contractor has acquired title.(B)
The amount of unliquidated progress payments may exceed neither (i) the progress payments made against incomplete work (including (5) allowable unliquidated progress payments to subcontractors) nor (ii) the value, for progress payment purposes, of the incomplete work. Incomplete work shall be considered to be the supplies and services required by this contract, for which delivery and invoicing by the Contractor and acceptance by the Government are incomplete.
The total amount of progress payments shall not exceed 80 percent of the total contract price.(6)
If a progress payment or the unliquidated progress payments exceed the amounts permitted by paragraphs (a)(4) or (a)(5) of this clause, the (7) Contractor shall repay the amount of such excess to the Government on demand.
Notwithstanding any other terms of the contract, the Contractor agrees not to request progress payments in dollar amounts of less than (8) $2,500. The Contracting Officer may make exceptions.
The costs applicable to items delivered, invoiced, and accepted shall not include costs in excess of the contract price of the items.(9)
. Except as provided in the Termination for Convenience of the Government clause, all progress payments shall be liquidated by (b) Liquidation deducting from any payment under this contract, other than advance or progress payments, the unliquidated progress payments, or 80 percent of the amount invoiced, whichever is less. The Contractor shall repay to the Government any amounts required by a retroactive price reduction, after computing liquidations and payments on past invoices at the reduced prices and adjusting the unliquidated progress payments accordingly. The Government reserves the right to unilaterally change from the ordinary liquidation rate to an alternate rate when deemed appropriate for proper contract financing.
. The Contracting Officer may reduce or suspend progress payments, increase the rate of liquidation, or take a (c) Reduction or suspension combination of these actions, after finding on substantial evidence any of the following conditions:
The Contractor failed to comply with any material requirement of this contract (which includes paragraphs (f) and (g) of this clause).(1)
Performance of this contract is endangered by the Contractor's-(2)
Failure to make progress; or(i)
Unsatisfactory financial condition.(ii)
Inventory allocated to this contract substantially exceeds reasonable requirements.(3)
The Contractor is delinquent in payment of the costs of performing this contract in the ordinary course of business.(4)
The fair value of the undelivered work is less than the amount of unliquidated progress payments for that work.(5)
The Contractor is realizing less profit than that reflected in the establishment of any alternate liquidation rate in paragraph (b) of this clause, (6) and that rate is less than the progress payment rate stated in paragraph (a)(1) of this clause.
Title.(d)
(1) Title to the property described in this paragraph (d) shall vest in the Government. Vestiture shall be immediately upon the date of this contract, for property acquired or produced before that date. Otherwise, vestiture shall occur when the property is or should have been allocable or properly chargeable to this contract.
"Property," as used in this clause, includes all of the below-described items acquired or produced by the Contractor that are or should be (2) allocable or properly chargeable to this contract under sound and generally accepted accounting principles and practices.
Parts, materials, inventories, and work in process;(i)
Special tooling and special test equipment to which the Government is to acquire title;(ii)
Nondurable ( noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges, test equipment, and other similar manufacturing (iii) i.e., aids, title to which would not be obtained as special tooling under paragraph (d)(2)(ii) of this clause; and
Drawings and technical data, to the extent the Contractor or subcontractors are required to deliver them to the Government by other (iv) clauses of this contract.
Although title to property is in the Government under this clause, other applicable clauses of this contract; the termination clauses, (3) e.g., shall determine the handling and disposition of the property.
The Contractor may sell any scrap resulting from production under this contract without requesting the Contracting Officer's approval, but (4) the proceeds shall be credited against the costs of performance.
To acquire for its own use or dispose of property to which title is vested in the Government under this clause, the Contractor must obtain (5) the Contracting Officer's advance approval of the action and the terms. The Contractor shall (i) exclude the allocable costs of the property from the costs of contract performance, and (ii) repay to the Government any amount of unliquidated progress payments allocable to the property. Repayment may be by cash or credit memorandum.
When the Contractor completes all of the obligations under this contract, including liquidation of all progress payments, title shall vest in (6) the Contractor for all property (or the proceeds thereof) not-
Delivered to, and accepted by, the Government under this contract; or(i)
Incorporated in supplies delivered to, and accepted by, the Government under this contract and to which title is vested in the (ii) Government under this clause.
The terms of this contract concerning liability for Government-furnished property shall not apply to property to which the Government (7) acquired title solely under this clause.
. Before delivery to and acceptance by the Government, the Contractor shall bear the risk of loss for property, the title to which (e) Risk of loss vests in the Government under this clause, except to the extent the Government expressly assumes the risk. The Contractor shall repay the Government an amount equal to the unliquidated progress payments that are based on costs allocable to property that is lost (see 45.101).
. The Contractor shall maintain an accounting system and controls adequate for the proper administration of this (f) Control of costs and property clause.
Reports, forms, and access to records.(g)
(1) The Contractor shall promptly furnish reports, certificates, financial statements, and other pertinent information (including estimates to complete) reasonably requested by the Contracting Officer for the administration of this clause. Also, the Contractor shall give the Government reasonable opportunity to examine and verify the Contractor's books, records, and accounts.
The Contractor shall furnish estimates to complete that have been developed or updated within six months of the date of the progress (2) payment request. The estimates to complete shall represent the Contractor's best estimate of total costs to complete all remaining contract work required under the contract. The estimates shall include sufficient detail to permit Government verification.
Each Contractor request for progress payment shall:(3)
Be submitted on Standard Form 1443, Contractor's Request for Progress Payment, or the electronic equivalent as required by agency (i) regulations, in accordance with the form instructions and the contract terms; and
Include any additional supporting documentation requested by the Contracting Officer.(ii)
. If this contract is terminated under the Default clause, (i) the Contractor shall, on demand, repay to the (h) Special terms regarding default Government the amount of unliquidated progress payments and (ii) title shall vest in the Contractor, on full liquidation of progress payments, for all property for which the Government elects not to require delivery under the Default clause. The Government shall be liable for no payment except as provided by the Default clause.
Reservations of rights.(i)
(1) No payment or vesting of title under this clause shall-
Excuse the Contractor from performance of obligations under this contract; or(i)
Constitute a waiver of any of the rights or remedies of the parties under the contract.(ii)
The Government's rights and remedies under this clause-(2)
Shall not be exclusive but rather shall be in addition to any other rights and remedies provided by law or this contract; and(i)
Shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any (ii) single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.
The financing payments to subcontractors mentioned in paragraphs (a)(1) and (a)(2) of this clause shall (j) Financing payments to subcontractors.
be all financing payments to subcontractors or divisions, if the following conditions are met:
The amounts included are limited to-(1)
The unliquidated remainder of financing payments made; plus(i)
Any unpaid subcontractor requests for financing payments.(ii)
The subcontract or interdivisional order is expected to involve a minimum of approximately 6 months between the beginning of work and (2) the first delivery; or, if the subcontractor is a small business concern, 4 months.
If the financing payments are in the form of progress payments, the terms of the subcontract or interdivisional order concerning progress (3) payments-
Are substantially similar to the terms of this clause for any subcontractor that is a large business concern, or this clause with its Alternate (i) I for any subcontractor that is a small business concern;
Are at least as favorable to the Government as the terms of this clause;(ii)
Are not more favorable to the subcontractor or division than the terms of this clause are to the Contractor;(iii)
Are in conformance with the requirements of FAR 32.504(e); and(iv)
Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the Government's (v) right to require delivery of the property to the Government if-
The Contractor defaults; or(A)
The subcontractor becomes bankrupt or insolvent.(B)
If the financing payments are in the form of performance-based payments, the terms of the subcontract or interdivisional order concerning (4) payments-
Are substantially similar to the Performance-Based Payments clause at FAR 52.232-32 and meet the criteria for, and definition of, (i) performance-based payments in FAR part 32;
Are in conformance with the requirements of FAR 32.504(f); and(ii)
Subordinate all subcontractor rights concerning property to which the Government has title under the subcon-(iii) tract to the Government's right to require delivery of the property to the Government if-
The Contractor defaults; or(A)
The subcontractor becomes bankrupt or insolvent.(B)
If the financing payments are in the form of commercial product or commercial service financing payments, the terms of the subcontract or (5) interdivisional order concerning payments-
Are constructed in accordance with FAR 32.206(c) and included in a subcontract for a commercial product or commercial service (i) purchase that meets the definition and standards for acquisition of commercial products and commercial services in FAR parts 2 and 12;
Are in conformance with the requirements of FAR 32.504(g); and(ii)
Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the Government's (iii) right to require delivery of the property to the Government if-
The Contractor defaults; or(A)
The subcontractor becomes bankrupt or insolvent.(B)
If financing is in the form of progress payments, the progress payment rate in the subcontract is the customary rate used by the contracting (6) agency, depending on whether the subcontractor is or is not a small business concern.
Concerning any proceeds received by the Government for property to which title has vested in the Government under the subcontract terms, (7) the parties agree that the proceeds shall be applied to reducing any unliquidated financing payments by the Government to the Contractor under this contract.
If no unliquidated financing payments to the Contractor remain, but there are unliquidated financing payments that the Contractor has made (8) to any subcontractor, the Contractor shall be subrogated to all the rights the Government obtained through the terms required by this clause to be in any subcontract, as if all such rights had been assigned and transferred to the Contractor.
To facilitate small business participation in subcontracting under this contract, the Contractor shall provide financing payments to small (9) business concerns, in conformity with the standards for customary contract financing payments stated in FAR 32.113. The Contractor shall not consider the need for such financing payments as a handicap or adverse factor in the award of subcontracts.
. Notwithstanding any other progress payment provisions in this contract, progress payments may (k) Limitations on undefinitized contract actions not exceed 80 percent of costs incurred on work accomplished under undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes. This limitation shall apply to the costs incurred, as computed in accordance with paragraph (a) of this clause, and shall remain in effect until the contract action is definitized. Costs incurred which are subject to this limitation shall be segregated on Contractor progress payment requests and invoices from those costs eligible for higher progress payment rates. For purposes of progress payment liquidation, as described in paragraph (b) of this clause, progress payments for undefinitized contract actions shall be liquidated at 80 percent of the amount invoiced for work performed under the undefinitized contract action as long as the contract action remains undefinitized. The amount of unliquidated progress payments for undefinitized contract actions shall not exceed 80 percent of the maximum liability of the Government under the undefinitized contract action or such lower limit specified elsewhere in the contract. Separate limits may be specified for separate actions.
. The designated payment office will make progress payments on the day after the designated billing office receives a proper (l) Due date 30th progress payment request. In the event that the Government requires an audit or other review of a specific progress payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.
Progress payments are considered contract financing and are not subject to the interest penalty provisions of the Prompt Payment Act.
. The Contractor shall account for and submit progress payment requests under (m) Progress payments under indefinite-delivery contracts individual orders as if the order constituted a separate contract, unless otherwise specified in this contract.
(End of clause)
52.232-27 Prompt Payment for Construction Contracts. Jan 2017
As prescribed in , insert the following clause:32.908(b)
PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
Notwithstanding any other payment terms in this contract, the Government will make invoice payments under the terms and conditions specified in this clause. The Government considers payment as being made on the day a check is dated or the date of an electronic funds transfer. Definitions of pertinent terms are set forth in sections 2.101, 32.001, and 32.902 of the Federal Acquisition Regulation. All days referred to in this clause are calendar days, unless otherwise specified. (However, see paragraph (a)(3) concerning payments due on Saturdays, Sundays, and legal holidays.)
Invoice payments- (a) . For purposes of this clause, there are several types of invoice payments that may occur (1) Types of invoice payments under this…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .