Attachment 8 - Question and Answer.pdf

PDF 176 KB Posted

Attached to
Convert T-169 into Laundry & FMO Federal contract opportunity
Solicitation number
FA448623R0002
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document contains questions and answers regarding Project No. MQNA 21-1006 to convert Building T-169 at a Department of the Air Force base in Europe into a laundry and furnishing management office warehouse. The project scope involves demolishing the interior of the former bowling alley and constructing new partitions, finishes, utilities, loading docks and openings, as well as replacing the existing built-up roof with a PVC liner roof system. One question addressed the water supply needs for the extra hazard fire protection system, with the answer clarifying that the building is on a pressurized closed water loop supplied by a pumphouse capable of meeting any additional demands.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers 12-May-23

Project No. Project Title Contract

MQNA 21-1006 Convert T-169 into Laundry & FMO FA448623R0002

No REF Question Answer

39 DWG FX-101

Following the government answers to the contractors questions, question/answer #4, we find out that to fulfill the “extra hazard 0.3 gpm/2500 sq ft with 500 gpm hose allowance”, (project request, dwg FX-

101), there is not enough water to supply the system. Per NFPA and the

DOD would need a pump and water storage tank ( 158.934 gal for 120 minutes).Please see attached calculation for the storage area extra hazard

0.3/2500 with a 500 gpm hose allowance. Please clarify

Building T-169 is supplied by a pressurized closed water loop. The pressure to this loop is provided by Pumphouse T-120 that can be configured to supply the required pressure and flow if necessary (Max. flow 1500+ GPM Approx. @ 60

PSI). Contractor shall not provide water pumps or tanks in this project's scope.

Any additional water demand will be resolved outside of this project's scope.

2023-05-12T16:27:38+0000