Attachment 1 - Project Specifications 16 Mar 2023.pdf

PDF 3 MB Posted

Attached to
Convert T-169 into Laundry & FMO Federal contract opportunity
Solicitation number
FA448623R0002
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

The document summarizes project specifications for solicitation number FA448623R0002 to convert building T-169 into a laundry and furniture management office warehouse. Key details include demolishing the interior of the former bowling alley and constructing new partitions, finishes, utilities, loading docks and openings. Additional work involves replacing the existing built-up roof system with a PVC liner roof system. The project is located at Lajes Field in the Azores, Portugal and involves renovating the approximately 14,749 square foot building T-169 to accommodate laundry operations, warehouse storage, administrative offices and related functions over a 365 day performance period.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MQNA 21-1006 EFFICIENCY - Convert T-169 into Laundry & FMO

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK

01 14 00 11/11 WORK RESTRICTIONS

01 30 00 11/20 ADMINISTRATIVE REQUIREMENTS

01 32 16.00 20 08/18 SMALL PROJECT CONSTRUCTION PROGRESS

SCHEDULES

01 33 00 08/18 SUBMITTAL PROCEDURES

01 35 26 11/20 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.10 20 02/10 QUALITY CONTROL FOR MINOR CONSTRUCTION

01 57 19 11/15, CHG 5: 08/21 TEMPORARY ENVIRONMENTAL CONTROLS

01 78 00 05/19 CLOSEOUT SUBMITTALS

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 05/10 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 30 00.00 10 05/14 CAST-IN-PLACE CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DI VI SI ON 04 - MASONRY

04 20 00 11/15 UNIT MASONRY

DI VI SI ON 05 - METALS

05 52 00 02/18 METAL RAILINGS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

DI VI SI ON 08 - OPENI NGS

08 11 13 02/10 STEEL DOORS AND FRAMES

08 14 00 08/16 WOOD DOORS

08 33 23 08/20 OVERHEAD COILING DOORS

08 51 13 05/11 ALUMINUM WINDOWS

08 71 00 02/16, CHG 3: 08/20 DOOR HARDWARE

08 81 00 08/11 GLAZING

DI VI SI ON 09 - FI NI SHES

09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16 GYPSUM BOARD

09 30 10 08/17 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/17 ACOUSTICAL CEILINGS

09 65 00 08/10 RESILIENT FLOORING

09 90 00 05/11 PAINTS AND COATINGS

DI VI SI ON 10 - SPECI ALTI ES

10 44 16 11/19 FIRE EXTINGUISHERS

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/15 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND

SEISMIC CONTROL

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 23.01 02/19, CHG 1: 02/20 LONWORKS DIRECT DIGITAL CONTROL FOR

HVAC AND OTHER BUILDING CONTROL SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 08 00 08/08 APPARATUS INSPECTION AND TESTING

26 12 19.10 05/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM

26 27 14.00 20 02/11 ELECTRICITY METERING

26 51 00 05/20 INTERIOR LIGHTING

26 52 00.00 40 11/17 EMERGENCY LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 23 00.00 20 02/11 EXCAVATION AND FILL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 11 23 08/17 AGGREGATE BASE COURSE FOR FLEXIBLE

PAVING

32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

DI VI SI ON 33 - UTI LI TI ES

33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

PROJECT TABLE OF CONTENTS Page 2

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

SECTION 01 11 00

SUMMARY OF WORK

08/ 15, CHG 2: 08/ 21

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals Salvage Plan; G

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The project consists in the conversion of the former bowling alley, building T-169, into two independent areas: Laundry and Housing Management/Furnishing Management Office (FMO) Warehouse. The work includes the demolition of all interior finishes and partitions related with the bowling alley function, construction of new partitions including all finishes, new utilities, new loading docks and openings and the replacement of the existing built-up roof system with a PVC liner roof system.

1.2.2 Location

The work is located at the Lajes Field, Azores, Portugal, building T-169, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.3 PERIOD OF PERFORMANCE

The contractor shall complete the work associated with this contract within 365 calendar days of Notice to Proceed.

1.4 OCCUPANCY OF PREMISES

Building will not be occupied during performance of work under this Contract.

1.5 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that

SECTION 01 11 00 Page 1 which existed before new work started.

1.6 SUMMARY OF WORK

1.5.1 Chapter 1: Description of Work

Facility Sustainment Restoration & Modernization (FSRM) of Building T-169 at Lajes Field, Azores, Portugal. General Project Overview

The Building T-169, currently a bowling facility will be converted into a Laundry and Housing Management and Furnishing Management Office (FMO), including all necessary specialties to separate both uses and to allow each use specific operations.

1.5.1.1 Site Information

The project is located on an active US Military Installation at Lajes Field, Azores, Portugal. The building has been unoccupied for some years now. It has a rectangle shape, and its two shorter facades have access to 2 parking lots. The building medium voltage transformer, located north of the building, will be replaced within this contract, with a European voltage dual tap transformer (15000/6900V to 400V).

1.5.1.2 Project Description

Building T-169 is a single-story bowling facility 14,749 SF (1,370m2) to be converted into Laundry and Housing Management and Furnishing Management Office (FMO). The renovation includes all necessary specialties to separate both areas and build new spaces for each activity. The building has a flat built-up roof with an estimated slope of 1% that shall be renovated due to the current damages that lead to water leaks. The roof system will be exchanged for a new PVC membrane roof with a minimum slope of 2%. There is no natural light inside the existing building and for this reason openings will be made in the façade to allow the entrance of natural light required for all the administrative spaces. The current structure is assumed to be in perfect conditions, with no pathologies and capable of assuming the required interventions (Openings placement, roof replacement). All structural systems consisting of in situ concrete walls, interior metal columns and bidirectional metal trusses will be maintained.

1.5.2 Chapter 2: Functional and Technical requirements

1.5.2.1 Facility Function

The building will be converted into a Laundry and Housing Management and Furnishing Management Office (FMO).

The shipping and receiving area for FMO is planned to be allocated at the back side of the building and adjacent to the truck yard. This arrangement entails the provision of all administrative spaces and utility rooms as well as all supporting areas at the front side of the building and adjacent to the main road.

Two additional loading docks serving the laundry are provided, one for clean linen and one for dirty linen also located at the front of the building. In this way the small operational laundry trucks have better maneuverability.

The transactions of the goods will occur by several different types of

SECTION 01 11 00 Page 2 vehicle access: one for the FMO operations, and Laundry exterior operations, and two small trucks for Laundry daily operations for movement of small boxes and packages.

Internal operation of the FMO storage area is constraint by the existing structural columns. Apart from the grid spans, the internal movement of the forklifts is the main key driver for the design of the storage operation. Circulations for the movement of small electric forklift for pallets were adjusted to maximize the storage area that the building could allocate.

In addition, the administration area has been adjusted to the minimum requirements for cost efficiency as these spaces will not be used permanently.

1.5.2.2 Mission Statement

The Design Concept for the facility renovations and site improvement has been developed accomplishing the following mission:

1) Facility Right Sizing: Existing Laundry and FMO Warehouse exceed the current Lajes Field population requirements and demand relocation to reduce the dedicated space.

2) Code Compliance: The Design must meet US codes except for electrical design which will follow Host Nation(HN) electrical codes, requirements and voltages. Since mechanical equipment and any other equipment requiring power supply will need to be EU manufactured and will be provided with EU certifications such as CE and Eurovent, instead of US AHRI, etc.; UFC requirements that are incompatible with European equipment complying with HN electrical codes will not be followed for these projects.

The minimum required functional areas are:

1. Furniture warehouse storage (general, flammable & secured)

2. Loading/unloading areas

3. Industrial space for Laundry operations (including storages)

4. Dock doors for Laundry operations

5. Small workshops for reparations (one per use)

6. Shipping and receiving area

7. Administrative offices (including two private offices for the Laundry area and one private office and one open office with two workstations for the FMO area)

8. ABA Compliant toilets

9. Breakroom for Laundry Operations

10. ABA Compliant separated Shower (for FMO areas only)

11. Reception areas for customer support

12. Specific workspaces for special Laundry uses (Embroidery room, alterations room, fitting room and labeling area)

13. All the required technical rooms

The Contractor must adhere to the mission statement and implement construction efforts to fulfill these requirements.

1.5.2.3 Users

As further defined by the client 6 people will be working at the Laundry, and 3 people will be working at the FMO (foreseen to be 4 people in an immediate future)

SECTION 01 11 00 Page 3

1.5.2.4 Activities, Equipment and Vehicles

1.5.2.4.1 Activities:

The building will not be permanently occupied, and activities will be performed at a maximum during 8-hour workdays will include office work, warehouse management and loading/unloading of supplies.

The administration area will not be permanently occupied and it will have an intermittent flow of clients accessing the reception and customer service areas.

1.5.2.4.2 Equipment:

The building is designed to accommodate both a Laundry industrial workspace with 3 different areas (Wet cleaning, dry cleaning and Ironing), and a Furniture Storage Warehouse (FMO) with an open storage space consisting of 19 double pallet racking and 4 single pallet racking as well as several supporting spaces such as a workshop, a charging stations area, 3 special storages or a shipping and receiving zone.

Both uses have an administrative area for permanent workstations and client support, including ABA compliance wet rooms.

All furniture and equipment except for the sanitary fixtures, the kitchen unit, emergency eyewashes and the safety shower, to be GFGI. All plumbing fixtures to be CFCI.

For further information about the equipment and the procurement type of each element that will be used as storage refer to Equipment schedule and drawing IF101.

1.5.2.4.3 Vehicles

For the facility internal operation one type of vehicle will be used in the FMO area:

1. Electric motor narrow aisle forklift: This forklift will be used for the furniture's movement. The client confirmed that the reservation of two charging stations shall be provided for a future purchase of a new forklift of the same characteristics and dimensions.

The model and type is a Toyota 7-Series Order Picker with a 1829mm turning radius

For the facility external operations largest type of vehicles will be used:

1. TOYOTA DYNA / MITSUBISHY CANTER Length: 7.0 m, width 2.50 m

Trucks do not get inside the building.

All docks are minimum 43 inches high (High Cube Van according to Table 3-2 of UFC 4-440-01).

1.5.2.5 Sustainable Construction

Construct project in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements.

1.5.2.6 Accessibility Requirements The Design provides for:

An accessible route from the provided accessible parking into and within each one of the independent areas of the building. All the entrances to the administration area and restrooms are designed according to ABA

SECTION 01 11 00 Page 4

(Compliant turning spaces in all corridors); and every restroom and shower room being accessible with one of each plumbing fixture type.

1.5.2.7 Antiterrorism Criteria (ATFP)

The project is exempted from ATFP Requirements by the Scope of Work § Specific Design Instructions, "Anti-Terrorism/Force Protection (AT/FP) Applicability: The existing facility will have less than 11 people in it and is considered unoccupied per classification IAW UFC 4-010-01. The requirements of UFC 4-010-01 and Headquarters USEUCOM Anti-terrorism Operations Order (HQ USEUCOM AT OPORD) 20-12 will not be triggered in this project."

The area considered per occupant is greater than 40 gross m2, so that, the building is considered as low occupancy under UFC 4-010-01.

The primary location of occupancy density will be the Administrative Area.

A maximum of 6 No of personnel to occupy occasionally the break room or the office spaces of the Laundry Admin area. The calculation density of this area also does not trigger the low occupancy.

All new windows and doors do not adhere to the minimum glazing standards requested in the OPORD 18-11 and as defined in the UFC.

1.5.2.8 Cybersecurity

Acquire and execute all control systems (including systems separate from management utility monitoring and control system) in accordance with UFC 4-010-06 Cybersecurity of Facility-Related Control Systems and as required by individual Facilities Engineering Command (FEC) or Installation implementation policy.

There are no secured areas or communication facilities programmed in this project.

1.5.2.9 Materials and Equipment

1) Materials and products used, must be durable, heavy duty industry standard. The equipment must be the manufacturer's standard quality and must be compatible with all other equipment and materials within the system or assembly. Equipment and materials must include all connections and accessories necessary to ensure operability and correct installation according to manufacturer's requirements.

2) Each major piece of equipment must have the manufacturer's name, address, contact information, type or style, model or serial number, and catalog number, date of manufacture on a plate secured to the piece of equipment. The definition of a "major piece of equipment" must be at the discretion of the COR. At minimum, two (each) of all Operation and Maintenance manuals must be provided for each piece of equipment. These must be clearly labeled, bound and delivered at one time within 30 days of contract completion. Provide two (2) each of any unique tools required to operate or maintain each piece of equipment.

3) All equipment delivered and placed in storage must be stored with protection from the weather and temperature variation, dirt and dust, and other contaminants. The government must not be responsible for damaged or missing equipment.

4) The availability of supply, maintenance and replacement parts; and skilled service contractor support must be available in the region with

SECTION 01 11 00 Page 5 documented methods of resourcing. Do not utilize systems requiring complicated and expensive replacement efforts. Avoid using proprietary parts, software, or fee/license-based equipment (installations).

1.5.2.10 Interior Circulations

The interior circulations of the storage, industrial and administration areas have been studied for the required operations, personnel safety, and life safety compliance.

1.5.2.11 Acoustical Design

The requirements of all relevant building components are met based on its use. For all materials used in the calculation, physically equivalent or better products must be used.

1.5.2.12 Roof drainage

Existing drainage system is maintained, through the exterior façade columns acting as scupper spout. Roof water will be redirected through the 1% slopes to hidden gutters located on the long facade's perimeter and from them to the exterior through these scupper spouts.

1.5.2.13 Signage

The FMO Storage shall be provided with horizontal and vertical signage.

Pedestrian walkways and passages, as well as vehicular traffic directions shall be yellow painted on the floor. Doors shall be provided with signs.

Fire-safety markings shall be also provided.

Impact protection against accidental forklift collision shall be provided in the FMO Storage. The main column's structure shall be protected by means of column protections and column guards mounted to the floor.

Steel protection and bollards shall be provided at each end of the warehouse racking systems, doorways, large equipment, and doors shall be protected with impact-protective steel poles.

1.5.2.14 Life Safety and Fire Protection

1.5.2.14.1 Applicable codes and standards

UFC 1-200-01, DoD BUILDING CODE, 2022 UFC 4-010-01, DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, 12 December 2018, WITH CHANGE 2, 30 July 2022 UFC 4-021-01, DESIGN AND O&M: MASS NOTIFICATION SYSTEM, 9 April 2008, WITH CHANGE 1, 1 January 2010

UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES 8 AUGUST 2016,

with CHANGE 6, 6 MAY 2021

UFC 3-601-02, FIRE PROTECTION SYSTEMS INSPECTION, TESTING AND MAINTENANCE

ENGINEERING FOR FACILITIES

INTERNATIONAL BUILDING CODE (IBC) 2021

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 1, FIRE CODE, 2021 NFPA 10,

STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2022

NFPA 13, STANDARD FOR THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEMS, 2022

NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE SERVICE MAINS AND THEIR

APPURTENANCES, 2022

NFPA 70, NATIONAL ELECTRICAL CODE, 2020

NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2022

NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2022 NFPA

SECTION 01 11 00 Page 6

101, LIFE SAFETY CODE, 2021

NFPA 400, HAZARDOUS MATERIALS CODE, 2022

1.5.2.14.2 Life Safety Design Criteria

1.5.2.14.2.1 Existing facility (UFC 3-600-01 Section 34)

Per UFC 3-600-01 Section 34-1.2.8, where the floor plan reconfigurations exceed 50% of the floor area, the entire floor must be brought up to requirements for new construction in UFC and NFPA.

1.5.2.14.2.2 Occupancy classification

Occupancy classification is determined by the occupancy type and the hazard classification of the building's contents. This section summarizes the occupancy classification for various areas within the T-169 building in accordance with UFC 3-600-01, NFPA 101 and IBC.

Where multiple occupancies exist within a building, one of the below approaches shall be adopted for compliance. This will be detailed based on the architectural layouts.

Mixed non-separated occupancy is where the occupancies are intermingled.

Each portion of the building is classified according to its use, however, means of egress, type of construction, protection and other safeguards are to comply with the most restrictive fire and life safety requirements of the occupancies involved.

Separated occupancy is where the occupancies are separated by fire resistance-rated assemblies and where each separated occupancy meets its egress requirements independently of other occupancies.

Accessory or incidental occupancy is a type of occupancy which is different from the main occupancy of the building or floor. Such areas are accessory to the predominant occupancy and areas affected by additional reference has been analyzed.

For this design a mixed non-separated occupancy has been chosen based on the following classification:

Area Classification as per IBC Classification as per NFPA

Warehouse area Group S-1 Storage (Ch.42)

Laundries area Group F-1 Industrial occupancy (Ch.40)

Office area Group B Business (Ch.38)

1.5.2.14.3 Building construction

The requirements for fire resistance rating to a building's structure are determined by Type of Construction. The Type of Construction shall be based on occupancy type, maximum floor area and maximum height of the building.

Based on the existing structure of the building, steel beams and columns without protection for the primary frame and concrete façade solution Type II B structural type construction has been considered according to IBC table 601. The currently fire rating requirements for this structure are summarized on the next table:

SECTION 01 11 00 Page 7

Element Type IIB (IBC)

STRUCTURAL FRAME 0

BEARING WALLS (EXTERIOR) 0

BEARING WALLS (INTERIOR) 0

INTERIOR NONBEARING WALLS & PARTITIONS 0

ROOF CONSTRUCTION 0

FLOOR CONSTRUCTION 0

1.5.2.14.4 Area and building height classification

Based on the occupancy class and table 504.3 /504.4 IBC, for a sprinklered building and an II B construction type the maximum number of stories, height and maximum requirements for T- 169 building are detailed as follows:

Occupancy classification

Height Ft (m) Area Ft2(m2) No. Stories

Industrial (Group F-1)

75(22.50) 92,000(8,547) 3

Storage (Group S-1) 75(22.50) 70,000(5,760) 4

Business (Group B) 75(22.50) 62,000(6,503) 4

Total for building T-169 area is 14,550 SF (1,350 m2), distributed in a single-story building.

1.5.2.14.5 Compartmentation

According to UFC 3-600-01, IBC and NFPA 101 compartmentation requirements are defined according to the following requirements:

- Non separated occupancies shall comply with the most restrictive provisions of each use (508.3.1 IBC)

- No separation is required between non separated occupancies (580.3.3

IBC)

- MEP rooms and flammable storage areas has been considered as a special hazard area. Those areas are protected by an automatic extinguishing and smoke partitions (NFPA 101 section 8.7.1.2)

1.5.2.14.6 Openings, penetrations and joints

Every opening in a fire barrier shall be protected to limit the spread of fire and restrict the movement of smoke from one side of the fire barrier to the other. All services penetrating fire barriers shall be fire stopped using listed and approved fire stop systems applicable for the type of service penetration and the fire rating of the penetrating wall. The rating of installed firestop systems shall be equivalent to the rating of the barrier in which the firestopping is installed.

SECTION 01 11 00 Page 8

Openings in fire resistance-rated assemblies will be in accordance with NFPA 101 table 8.3.3.2.2.

1.5.2.14.7 Interior finishes

Interior finishes shall be in accordance UFC 3-600-01 §8-1, NFPA 101 section 10.2

All areas class A, class B, or class C interior finish materials are permitted.

For corridors and exit enclosures: class A or class B interior finish materials are permitted.

Class I/II floor finishes will be required based on NFPA 101 Section 10.2.7

1.5.2.14.8 Means Of Egress

Means of egress shall be in accordance with NFPA 101 (UFC 3-600-01 Section 10-1). Building strategy design is based on a mixed non-separated occupancies, there for the entire building must comply with the most restrictive requirement associated at each use.

1.5.2.14.8.1 Occupant load

Occupant load factor has been defined based on the following:

- Table 10-1 UFC 3-600-01

- Table 7.3.1.2 NFPA 101

Based on Occupant load factor detailed above, for the T-169 building the following requirements are calculated:

Use Area Ft2(m2) Ratio Ft2 (m2)/ person

Occupant load

Industrial 2,800 (260) 100 (9.3) 28

Business 3,000 (280) 150 (14) 20

Telecommunication room

215 (20) 300 (27.7) 1

Technical rooms (Mechanical, electrical, sprinklers and compressed air)

1,250 (115) 500(46.5) 3

Storage area 6,950 (646) 500(46.5) 14

1.5.2.14.8.2 Number and capacity of means of egress

Number of exits are resolved according to chapter 38 .2.4, 40.2.4 and

42.2.4 of NFPA 101 for each type of use.

- Single exit is proposed for travel distance less than maximum common path of traveling as detailed in chapters 40.2.4.1.2 of NFPA 101.

- Multiple exits are proposed where previous condition is not achieved.

SECTION 01 11 00 Page 9

1.5.2.14.8.3 Arrangement of means of egress

The exits shall be arranged such that the dead-end corridor, common path and travel distance requirements are satisfied as is detailed below:

- A dead end exists in a corridor where the corridor continues past an exit and creates a pocket into which an occupant might travel. The occupant then recognizes there is no exit at that end of the pocket and is forced into retracing the original path to reach the exit.

- A common path of travel exists where a space is arranged so that occupants within that space are able to travel in only one direction to reach any of the exits or to reach the point at which the occupants have the choice of two paths of travel to remote exits.

- A travel distance is the length of travel from the furthest point to the nearest exit

The next table summarize egress requirements for each use:

Use Dead- end ft (m) Common path ft (m) Travel distance ft (m)

Industrial 50 (15) 100 (30) 400 (122)

Storage 100 (30) 100 (30) 400 (122)

Business 50 (15) 100 (30) 300 (91)

1.5.2.14.8.4 Door widths and swing

Means of egress components will be sized based on table 7.3.3.1 of NFPA

101. Based on the reference, factor for egress elements design is detailed below:

- 0.2 in/person (5 mm/person) for dimensioning level components.

- Minimum width for egress components shall comply with Section 7.3.4 of NFPA 101 therefore minimum width for doors is 32 in (810 mm) Doors will swing in the direction of egress when serving an occupant load of 50 or greater. (NFPA 101: 7.2.1.4.2)

Minimum 1/3 of the maximum overall diagonal dimension of the area dimension has been consider where multiple exit are provided (storage area).

1.5.2.14.8.5 Illumination (normal lighting) and emergency lighting and exit signages

Illumination shall be in accordance with chapter 7.8 of NFPA 101.

Illumination shall be provided throughout the exit access (corridors, passageways leading to an exit), exits and exit discharge.

Lighting and electric provisions shall be of approved types and in conformity with the specifications of UFC requirements.

Floors and walking surface shall be in accordance with Section 7.8.1.3.

the following requirements shall be at least comply based on point (2) of

7.8.1.3 NFPA 101:

- The minimum illumination for floors and other walking surfaces, other than new stairs during conditions of stair use, shall be to values of at

SECTION 01 11 00 Page 10 least 1 ft-candle (10.8 lux), measured at the floor.

- Required illumination shall be arranged so that the failure of any single lighting unit does not result in an illumination level of less than

0.2 ft-candle (2.2 lux) in any designated area

Emergency lighting shall meet the following requirements:

- (7.9.2.1.1 NFPA 101) Initial illumination that is not less than an average of 1 ft-candle (10.8 lux) and, at any point, not less than 0.1 ft-candle (1.1 lux), measured along the path of egress at floor level.

- (7.9.2.1.2 NFPA 101) Illumination levels shall be permitted to decline to not less than an average of 0.6 ft-candle (6.5 lux) and, at any point, not less than 0.06 ft-candle (0.65 lux) at the end of 11?2 hours

Based on Section 7.9.2.1 of NFPA 101 Emergency illumination shall be provided for a minimum of 90 minutes in the event of failure of normal lighting.

1.5.2.14.8.6 Exit signages

Marking of exit access routes are required where the method of reaching an exit is not readily apparent, and such that no point in an exit access corridor or exit passageway is more than 30 m or the listed viewing distance for the sign.

1.5.2.14.9 Fire Brigade Access

Fire brigade access will be in accordance with UFC 3-600-01 clause 9.1

Access is required within 33 ft (10 m) of at least one exterior door that can be opened from the outside and that provides access to the interior of the building. Fire department access roads will be provided such that any portion of an exterior wall is located not more than 450 feet from the fire department access roads as measured by an approved route around the exterior of the building.

The sprinkler system fire department connection must be within 150 ft (45m) of a fire department access road.

The dimensions of fire lanes and turnarounds and the marking of such provisions will comply with NFPA 1 and any requirements of the local fire department.

1.5.2.14.10 Fire Suppression System 1.5.2.16.10.1 Design criteria Sprinkler system and fire extinguishers shall be considered for the protection of all space within the scope of the project.

Light hazard has been considered for the offices area, toilets, and vestibules according to applicable codes and standards.

Ordinary hazard has been considered for the laundries, mechanical rooms, electrical rooms, small storage rooms, machine rooms, according to applicable codes and standards.

Extra hazard has been considered for the warehouse, according to applicable codes and standards.

Special hazard has been considered for the storage of flammable liquids, according to applicable codes and standards.

SECTION 01 11 00 Page 11

1.5.2.14.11 Demolitions

All existing fire detection and alarm within the building must be dismantled, including but not limited to, smoke detectors, manual pull stations, fire alarms, strobes, speakers, wiring, conduits, cable trays, etc.

All existing firefighting systems within the building must be dismantled, including but not limited to, sprinkler heads, piping downstream the existing check valve, piping support, portable fire extinguishers, etc.

1.5.2.15 Telecommunications and Security Systems

1.5.2.15.1 Codes and Standards

Telecommunications systems design for Building T-169 shall comply with applicable US regulations, such as Unified Facilities Criteria (UFC) and

NFPA.

List of Electrical codes and standards (use the current, latest edition):

- UFC 3-580-01 2016 c1 Telecommunications Interior Infrastructure Planning and Design

1.5.2.15.2 Design Criteria

1.5.2.15.2.1 Telecommunications

The telecommunication service will be provided to the building from the existing telecom network incoming currently located closed to the main entrance to the building in the Southeast façade. A Normal Internet Protocol Router Network (NIPR) network will be considered, providing unclassified pathways within the building. Secret Internet Protocol Router Network (SIPR) is not required for the building as confirmed by USAFE and the users.

The building shall be provided with an independent Telecommunications Room, with enough space for 1 cabinet 1000x1000 mm and the footprint for a potential future additional unit.

The existing service entrance fiber cable shall be replaced from building T-100 (Comm Room) to the new rack in the telecommunications room.

Equipment racks/cabinets shall be floor mounted with a minimum of 90 cm clear space in the front and back of the rack. There shall be one rack and a spare in the room.

The design assumes an average electrical consumption of 2,5 kW per rack.

As mentioned in mechanical section, the Telecommunications Room will be provided with a cooling system by 2 split units (one as backup) with wall mounted indoor units. UPS is not required.

1.5.2.15.2.2 Security

The design only considers the main infrastructure pathway for the CCTV cameras, as routed in the drawings. These pathways start in the processing control unit (PCU) within the Telecom Room and connects the different security cameras. The installation of the cameras, recording system and

SECTION 01 11 00 Page 12 cables are not included in the scope of this project.

1.5.2.16 Electrical

1.5.2.16.1 Codes and Standards

Electrical systems design for Building T-169 shall comply with Portuguese and applicable US regulations, such as R.T.I.E.B.T, Unified Facilities Criteria (UFC) and NFPA, and comply with included matrix, in terms of requirements. However, the electrical network within for the building will be designed considering Portuguese voltages and frequencies (400 (PH-PH) /

230 (PH-N); 50 HZ).

Therefore, equipment, devices, and receptacles to be used will be as per Portuguese standards and rules of thumbs.

List of Electrical codes and standards (use the current, latest edition):

- Regras Técnicas das Instalações Eléctricas de Baixa Tensão (RTIEBT)

- EN 12464-1 Light and lighting. Lighting of workplaces. Indoor workplaces

- EN 12464-1 Light and lighting. Lighting of workplaces. Outdoor workplaces

- INTERNATIONAL BUILDING CODE (IBC) (2018 EDITION)

- NATIONAL ELECTRIC CODE (NEC)

- UFC 3-501-01 Electrical engineering

- UFC 3-520-01 Interior electrical systems

- UFC 3-530-01 Interior and exterior lighting systems and controls

- UFC 3-540-01 Engine-driven generator systems for prime and standby power applications

- UFC 3-575-01 Lightning and static electricity protection system

A compliance matrix comparing US and Portuguese requirements can be found as an attachment to this document.

1.5.2.16.2 Existing Conditions and Demolitions

The building is currently provided with an existing pad mounted transformer 500 kVA next to building T-169, which supply power to the existing Main Distribution Panel (MDP). The transformer is providing power according to US voltages, so, as stated previously, a new dual tap transformer shall be installed for power supply to the building with Portuguese voltages (Primary: 15kV or 6.9kV; Secondary: 230/400V).

Therefore, the complete low voltage system within the facility shall be dismantled and disposal from the feeder to the building, including, but not limited to, MDP and secondary distribution panels, lighting fixtures, switches, receptacles, wiring, cable trays, conduits, etc., except the earthing and bonding system.

It is assumed that the existing building is provided with an earthing and bonding system in perfect working conditions, so these systems will be kept and extended if required to protect the new equipment

1.5.2.16.3 Power Distribution System

1.5.2.18.3.1 Design Criteria

- Project design criteria shall be based on fully compliance with US, UFC, and Portuguese standards according to electrical compliance matrix.

- Portuguese voltages and frequency are required.

SECTION 01 11 00 Page 13

- No US receptacles as per US voltages and frequencies will be provided, so in case any specific equipment or workstation needs it, it will be provided by portable transformers.

- Uninterruptible power supply (UPS) and/or generator are not required for this building.

Electrical service shall be provided to the building from the new transformer, as explained above. The feeder will be based on 230/400 V, 5 wires, 50 Hz and shall be connected to the new MDP within the electrical room at the Southeast corner of the building.

Power supply line from the new main distribution panel "MDB-01", located in electrical room, feeds the distribution panelboards "MCP-01", "FMO-01", "BCP-01", "OFP-01", "LP-01", "TRP-01" and IT loads.

1.5.2.18.3.2 Load Analysis

A load estimation has been performed based on UFC 3-501-01 Section 3-2.3.1., and the information provided by the End Users in relation to the equipment to be supplied. Maximum demand load at MDP will be 440,28 kVA, and a global demand factor of 0.8 shall be applied to this load according to UFC 3-501-01 Appendix E. Table 1 resulting in a total demand load of 352,22 kVA.

1.5.2.16.4 Lighting

The scope of works for the projects includes replacing all the lighting system. It will affect to the following:

- Remove existing lighting fixture within the project area.

- Installation of new lighting fixtures within the project area. All new luminaries will be LED type.

According to Portuguese criteria (EN 12464-1 & EN 12464-2), the lighting system must comply with the minimum values listed next below:

Room/Area type Average luminance (lux)

Uniformity (Avg/Min) UGR

Traffic zones inside buildings

100 0.4 28

Canteens and break areas

200 0.4 28

Bathrooms, lockers and toilet areas

200 0.4 25

Switchboard rooms 500 0.6 19

Laundries and dry cleaning

300 0.6 25

Offices Filing, copying, etc. 300 Writing, typing, reading, data processing 500

Filing, copying, etc. 0.4 Writing, typing, reading, data processing 0.6

Filing, copying, etc. 19 Writing, typing, reading, data processing 19

Reception desk 300 Reception desk 0.6 Reception desk 22

SECTION 01 11 00 Page 14

Room/Area type Average luminance (lux)

Uniformity (Avg/Min) UGR

Logistics and warehouse

Unloading/loading areas 200 Grouping/packing area 300

Unloading/loading areas 0.4 Grouping/packing area 0.5

Unloading/loading areas 25 Grouping/packing area 22

Rack storage - floor

Rack storage - floor 0.5

Rack storage - floor

Rack storage - rack face 75

Rack storage - rack face 0.4

Rack storage - rack face NA

Central logistics corridor 300

Central logistics corridor 0.6

Central logistics corridor 22

According to US criteria (UFC 3-520-01, UFC 3-530-01 & NFPA 70), the lighting system will comply with the minimum values listed next below:

Room/Area type Average luminance (lux)

Uniformity (Avg/Min) UGR

Technical Room 200 3:1 -

Server Room 500 3:1 -

Office Room 500 2:1 -

Battery Rooms 300 3:1 -

Rest Rooms/Toilets 200 2:1 -

Storage Rooms 100 3:1 -

Warehouses 300 3:1 -

Corridors 100 2:1 -

Shipping/receiving area/turn-in area

300 3:1 -

Stairways 100 2:1 -

Loading dock, corridor with fork lifts, traffic

150 2:1 -

Generally, Portuguese criteria shall be applied, but for areas not defined in EN 12464-1, the US criteria shall be used. However, for uniformity, values considered in UFC will be used (more stringent) in some cases.

1.5.2.16.5 Grounding System

The electrical systems shall be grounded in accordance with safety codes, DOD/ UFC, and NFPA 70.

Feeders and branch circuits shall carry a separate equipment ground conductor, and the new grounding system shall be connected to the existing grounding system.

1.5.2.16.6 Lightning Protection System

SECTION 01 11 00 Page 15

A lightning risk assessment has been developed, evaluating the compliance in accordance with NFPA 780 and IEC62305. The result of the assessment indicates the building does not require a lightning protection system. A surge protection system shall be provided for the different main and secondary panels, considering the required type for each.

1.5.2.17 Plumbing

1.5.2.17.1 Codes and Standards

Plumbing systems for Building T-169 shall comply with applicable US regulations, such as Unified Facilities Criteria (UFC) and ASHRAE.

List of Mechanical codes and standards (use the current, latest edition):

- INTERNATIONAL BUILDING CODE (IBC) (2018 EDITION)

- INTERNATIONAL MECHANICAL CODE (IMC) (2018 EDITION)

- INTERNATIONAL PLUMBING CODE (IPC) (2018 EDITION)

- UFC 3-401-01 MECHANICAL ENGINEERING

- UFC 3-420-01 PLUMBING SYSTEMS

1.5.2.17.2 Existing Plumbing System Conditions and Demolition

Domestic water and fire protection water is currently provided by the main to the building which enter at the Southeast corner of the building. The pressure and water flow to existing building is sufficient to supply the facility, so it is not expected to locate any pump or associated tanks.

A water softening system is required due to water hardness (170 mg/L).

According to UFC 3-420-01, paragraph 614.1, water hardness for laundries should not exceed 2.5 grains per gallon or 43 ppm (mg/L).

The connection to the existing water distribution network shall be made in the Sprinklers Room. A water flow meter and a backflow preventer shall be provided.

The wastewater system shall tie into a wastewater main on the Southeast side of Building T-169.

Existing plumbing and sanitary networks within the building shall be fully dismantled and disposed of, including but not limited to, plumbing fixtures, piping, insulation, supports, valves, and any other ancillary elements.

1.5.2.17.3 Plumbing Scope

The Scope of Work is to provide the plumbing for building T-169 building, consisting of 1,328.55 gross square meters (14,300.39 gross square feet) to supply the following functions:

- Warehouse spaces

- Charging stations

- Warehouse administrative spaces

- Laundry spaces

- Laundry administrative spaces

- Technical rooms

Plumbing fixtures: FMO building shall be provided with a female toilet

SECTION 01 11 00 Page 16

(with 1 lavatory and 1 WC), a male toilet (with 1 lavatory, 1 WC and 1 urinal), a janitor's room with 1 mop sink and a shower room. Laundry building will be provided with a female toilet (with 1 lavatory and 1 WC), a male toilet (with 1 lavatory, 1 WC and 1 urinal), and a janitor's room with 1 mop sink. An emergency shower shall be provided in the charging stations area.

PLUMBING FIXTURES SCHEDULE

MARK FIXTURE COLD WATER

(mm)

HOT WATER

(mm)

WASTE (mm) VENT (mm) FLOW RATE (l/s)

WC-1 Water closet floor mounted, floor discharge, vitreous china, dual flush manual flushometer

ABA

compliant, 655mmx355mm

20 - 100 50 3

U-1 Urinal 20 - 50 40 2.5

SH-1 Shower 15 15 50 40 2.5

LV-1 Single Sink 15 15 40 32 1.9

S-1 Stainless Steel floor mounted mop sink with stainless steel grate in janitor's room, 600mmx600mm

15 15 40 32 3

EWC-1 Full Stainless Steel water cooler

15 - 40 32 -

EW-1 Eyewash 20 20 50 40 0.03

EWS-1 Emergency Shower

20 20 100 50 1.27

SECTION 01 11 00 Page 17

PLUMBING FIXTURES SCHEDULE

FD-1 Floor drain 125mm round bronze top, cast iron body, 100mm drain connection, integral trap guard device

- - 100 40 -

Hot Water Supply Temperature: Facility domestic hot water tanks temperature shall not be maintained at less than 60 ° C (140 ° F) to prevent the growth of Legionella bacteria. The hot water delivery temperature at the hot water mixing valve for sinks shall not be less than 50 °C (122 °F). Hot water distribution supply temperature will always be between 50 - 60 °C. For the emergency showers, as per ANZI Z358 regulations, tepid water in the range of 16 - 38 °C (60 - 100 F) shall be provided.

1.5.2.17.4 Special Systems

- Compressed Air: laundry systems require a compressed air system.

Contractor shall install two air compressors, to be provided by the government, in the Compressor Room. Contractor shall provide and install a compressed air pipe network to supply laundry systems according to project drawings.

- Steam: laundry systems require a steam system. Contractor shall install two electrical steam boilers, to be provided by the government.

Contractor shall provide and install a steam pipe network to supply laundry systems according to project drawings.

1.5.2.17.5 Energy and Water Reduction Compliance

- Meet ASHRAE 189.1 Building Water Use Reduction: low flow and flush fixtures shall be incorporated in the addition to reduce the demand from the public water supply. Plumbing fixtures will be in accordance with NSF International (NSF) 372/11 certification and meet sustainability requirements for water savings. All plumbing fixtures shall be CE labeled.

- Submetering: a water meter will be provided for the plumbing system.

No submetering will be required for each area of the building.

1.5.2.18 Mechanical

1.5.2.18.1 Codes and Standards

Mechanical systems design for Building T-169 comply with applicable US regulations, such as Unified Facilities Criteria (UFC) and ASHRAE.

List of Mechanical codes and standards (use the current, latest edition):

SECTION 01 11 00 Page 18

- INTERNATIONAL BUILDING CODE (IBC) (2018 EDITION)- INTERNATIONAL

MECHANICAL CODE (IMC) (2018 EDITION)

- UFC 3-401-01 Mechanical Engineering

- UFC 3-410-01 HVAC SYSTEMS

- UFC 3-410-02 DDC FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS

- UFC 3-310-06 INDUSTRIAL VENTILATION

- UFC 3-420-01 PLUMBING SYSTEMS

- ASHRAE FUNDAMENTALS

- ASHRAE HVAC SYSTEMS AND EQUIPMENT

- ASHRAE HVAC APPLICATIONS

- ASHRAE Standard 15 - Safety Standard for Refrigeration System

- ASHRAE Standard 55 - Thermal Environmental Conditions for Human

- Occupancy

- ASHRAE Standard 62.1 - Ventilation for Acceptable Indoor Air Quality

- ASHRAE Standard 90.1 - Energy Standard for Buildings Except Low-Rise

- Residential Buildings

1.5.2.18.2 Existing Conditions and Demolitions

The building is currently provided with a HVAC system by a chiller, AHU and an air distribution system. The complete system shall be dismantled and disposed of, including but not limited to, the chiller, the AHU, ductworks, piping, supports, diffusers, grilles, exhaust fans, split units and any other ancillary element.

1.5.2.18.3 Mechanical Scope

The Scope of Work is to provide the mechanical infrastructure for building T-169, consisting of 1,328.55 gross square meters (14,300.39 gross square feet) to provide the following functions:

- Warehouse spaces

- Charging stations

- Warehouse administrative spaces

- Laundry spaces

- Laundry administrative spaces

- Technical rooms

1.5.2.20.3.1 Design Conditions

OUTDOOR CONDITIONS:

(1) The mechanical system design of the building is based on the most stringent weather data.

(2) As per UFC 3-410-01, the outdoor design temperature for comfort cooling shall be 1% dry bulb and the corresponding wet bulb temperature for the locale and the 1% dehumidification dewpoint temperature and the corresponding dry bulb temperature.

(3) For specialized technical rooms, such as Telecom Room, the outdoor design temperature for cooling shall be the 0.4 percent dry bulb temperature and the corresponding MCWB temperature and the 1.0 percent humidity ratio and corresponding MCDB.

(4) Outdoor design temperature for comfort heating shall be the 99% dry bulb temperature.

(5) In addition, for sizing condensers, add 3ºC to the outdoor dry bulb temperature.

(6) According to that, outdoor design conditions for the project, taken from ASHRAE Fundamentals Handbook 2017 (LAJES AP, PORTUGAL), are the following:

(a) Comfort Cooling DB/MCWB (1%): 26.2ºC/21.8ºC

SECTION 01 11 00 Page 19

(b) Comfort Cooling Dehumidification DP/HR/MCDB (1%):

21.8ºC/16.6/24.2ºC

(c) Specialized Technical Rooms Cooling DB/MCWB (0.4%):

27.2ºC/22.3ºC

(d) Specialized Technical Rooms Cooling Dehumidification DP/HR/MCDB (0.4%): 22.2ºC/16.9/24.5ºC

(e) Heating DB (99%): 9.9ºC.

INDOOR CONDITIONS:

(1) Administrative areas:

(a) Indoor conditions is based on UFC 3-410-01.

(i) Cooling: 78.0° F (25.6 °C) dry-bulb / 57.9° F (14.4 °C) dewpoint / 50-percent relative humidity).

(ii) Heating: 68°F (20°C) dry bulb. During unoccupied hours, temperatures must be set no higher than 55°F (12.8°C). Provide humidification where the indoor relative humidity for comfort heating is expected to fall below 30 percent at design conditions.

(2) Warehouse areas:

(a) Indoor conditions is based on UFC 4-440-01.

(i) Cooling: not required.

(ii) Heating: 55°F (12.8°C) dry bulb.

(b) To avoid humidity problems that could cause damage to the furniture stored, the relative humidity shall be less than 50%.

(3) Laundry areas:

(a) Indoor conditions is based on UFC 3-410-01.

(i) Cooling: it's necessary to keep the temperature in the work areas from exceeding 84.2°F (29°C). Heating: not required.

(4) Charging stations:

(a) Indoor conditions is based on ASHRAE-D-86863.

(i) Cooling: the temperature shall be maintained between 66.2°F (19°C) and 75.2°F (24°C) with a humidity between 35% and 65%, but no special control is required.

Summary:

Area Criteria Cooling Heating Relative Humidity

Warehouse UFC 4-440-01, N/A DB: 12.8C N/A

ASHRAE

62.1-2019

Laundry UFC 3-410-01, DB: 29C N/A N/A

ASHRAE

62.1-2019

Charging stations

UFC UFC 4-440-01, Recommended:

DB:

19-24C

N/A Recommended:

35%-65%

3-410-04N

Receiving shipping

& UFC

4-440-01, DB:

25.6C / 78F

DB: 20C / 68F 30%-50%

ASHRAE

62.1-2019

Dewpoint max:

14.4C / 57.9F

SECTION 01 11 00 Page 20

Area Criteria Cooling Heating Relative Humidity

Flammable storage

UFC 4-440-01 DB: <38C N/A N/A

Workshop UFC 3-410-01 DB:

25.6C / 78F

DB: 20C / 68F 30%-50%

Dewpoint max:

14.4C / 57.9F

Personnel manager office

UFC 3-410-01 DB:

25.6C / 78F

DB: 20C / 68F 30%-50%

Dewpoint max:

14.4C / 57.9F

Standard office

UFC 3-410-01 DB:

25.6C / 78F

DB: 20C / 68F 30%-50%

Dewpoint max:

14.4C / 57.9F

Reception, customer service

UFC 3-410-01 DB:

25.6C / 78F

DB: 20C / 68F 30%-50%

Dewpoint max:

14.4C / 57.9F

Breakroom UFC 3-410-01 DB:

25.6C / 78F

DB: 20C / 68F 30%-50%

Dewpoint max:

14.4C / 57.9F

Embroidery room

UFC 3-410-01 DB:

25.6C / 78F

DB: 20C / 68F 30%-50%

Dewpoint max:

14.4C / 57.9F

Reception UFC 3-410-01

DB:

25.6C / 78F

DB: 20C

/ 68F

30%-50%

Dewpoint max:

14.4C / 57.9F

Alterations room

UFC

3-410-01

DB:

25.6C / 78F

DB: 20C

/ 68F

30%-50%

Dewpoint max:

14.4C / 57.9F

Fitting room

UFC

3-410-01

DB:

25.6C / 78F

DB: 20C

/ 68F

30%-50%

SECTION 01 11 00 Page 21

Area Criteria Cooling Heating Relative Humidity

Dewpoint max:

14.4C / 57.9F

Repair maintenance shop

UFC

3-410-01

DB:

25.6C / 78F

DB: 20C

/ 68F

30%-50%

Dewpoint max:

14.4C / 57.9F

Mechanical rooms

UFC

3-410-01

N/A N/A N/A

Telecom room

UFC

3-410-01

DB:

5-35C / 41-95F

DB:

5-35C / 41-95F

N/A

Dewpoint max:

28C /

Dewpoint max:

28C /

Electrical room

UFC

3-410-01

N/A N/A N/A

- Filtration: Air filter efficiencies is based on ASHRAE Test Standard

52.2. Air handling units shall have filters with a Minimum Efficiency Rating Value of 13.

- Ventilation:

(1) According to ASHRAE 62.1, section 6.4, it is required to provide mechanical ventilation system for the facility. It is not possible to comply with the conditions to have only natural ventilation.

(2) Ventilation rates as per ASHRAE 62.1:

(a) Office spaces: 2,5 l/s*person + 0,3 l/s*sqm

(b) Storage spaces: 5 l/s*person + 0,3 l/s*sqm

(c) Laundry: 2,5 l/s*person + 0,6 l/s*sqm

- Toilet exhaust air: exhaust air rates as per ASHRAE 62.1: Toilets:

25 l/s per unit

Each room is provided with return grilles, sized to balance the incoming air decreased from the exhaust air flow rates provided from toilets, to create a balance of air flows in every space. A ceiling mounted fan shall be provided for toilets and janitor's room allowing an air exchange of 8 volumes per hour, as required by UNI 10339 (HN code).

- Technical rooms exhaust air: exhaust air rates as per ASHRAE 62.1:

Technical rooms: 10 ACH (air changes per hour)

Each Technical room, such as electrical room, sprinklers room, telecom room and…