Attachment 4 - Submittal Register 16 Mar 2023.pdf

PDF 243 KB Posted

Attached to
Convert T-169 into Laundry & FMO Federal contract opportunity
Solicitation number
FA448623R0002
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This submittal register outlines items requiring approval or submission for the conversion of building T-169 at an Air Force base in Europe into a laundry facility and housing/furnishing management office warehouse. Key items include demolition plans, structural drawings, utility plans, roof replacement, hazardous material abatement, and finishes for new partitions. The register lists over 100 submittal items across various disciplines requiring approval by material and action dates. It provides columns for scheduling review and approval by the contractor, government reviewers, and approving authority. The level of detail in the register indicates this is a design-bid-build project with many submittals required before, during, and after construction.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMIT

APPROVAL

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

1 01 14 00 SD-01 Preconstruction Submittals

2 List of Contact Personnel 1.2.1.1

3 01 30 00 SD-01 Preconstruction Submittals

4 View Location Map 1.3

5 Progress and Completion 1.4

6 Pictures

7 01 32 16.00 20 SD-01 Preconstruction Submittals

8 Baseline Construction Schedule 1.2 G

9 SD-07 Certificates

10 Monthly Updates 1.4

11 01 33 00 SD-01 Preconstruction Submittals

12 Submittal Register 1.7 G

13 Initial DD Form 1354 1.8.1 G

14 SD-11 Closeout Submittals

15 Interim Dd Form 1354 1.8.2 G

16 Final DD Form 1354 1.8.3 G

17 01 35 26 SD-01 Preconstruction Submittals

18 APP - Construction 1.7.1 G

19 Accident Prevention Plan (APP) 1.7 G

20 SD-06 Test Reports

21 Monthly Exposure Reports 1.4

22 Notifications and Reports 1.12

23 Accident Reports 1.12.2 G

24 LHE Inspection Reports 1.12.3

25 SD-07 Certificates

26 Crane Operators/Riggers 1.6.1.4

27 01 35 26 Standard Lift Plan 1.7.3.2 G

28 Critical Lift Plan 1.7.3.3 G

29 Activity Hazard Analysis (AHA) 1.8

30 Confined Space Entry Permit 1.9.1

31 Hot Work Permit 1.9.1

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O V T

O R

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

32 Certificate of Compliance 1.12.4

33 License Certificates

34 Portable Gauge Operations G

35 Planning Worksheet

36 01 45 00.10 20 SD-01 Preconstruction Submittals

37 QC Plan 1.5 G

38 01 57 19 SD-01 Preconstruction Submittals

39 Preconstruction Survey 1.6.1

40 Solid Waste Management Permit 1.10 G

41 Regulatory Notifications 1.6.2 G

42 Environmental Protection Plan 1.7 G

43 Dirt and Dust Control Plan 1.7.9.1 G

44 Employee Training Records 1.6.5 G

45 Environmental Manager 1.6.4 G

46 Qualifications

47 SD-06 Test Reports

48 Inspection Reports

49 Monthly Solid Waste Disposal 1.10.1 G

50 Report

51 SD-07 Certificates

52 Employee Training Records 1.6.5 G

53 01 57 19 Erosion and Sediment Control

54 Inspector

55 SD-11 Closeout Submittals

56 Waste Determination 3.6.1 G

57 Documentation

58 Disposal Documentation for 3.6.3.4 G

59 Hazardous and Regulated Waste

60 Assembled Employee Training 1.6.5 G

61 Records

62 Solid Waste Management Permit 1.10 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

63 Project Solid Waste Disposal 3.6.2.1 G

64 Documentation Report

65 Hazardous Waste/Debris G

66 Management

67 Regulatory Notifications 1.6.2 G

68 Sales Documentation 3.6.2.1 G

69 01 78 00 SD-03 Product Data

70 Spare Parts Data 1.4

71 SD-08 Manufacturer’s Instructions

72 Instructions

73 SD-10 Operation and Maintenance

74 Data

75 Operation and Maintenance 3.2 G

76 Manuals

77 SD-11 Closeout Submittals

78 DD Form 1354 1.3 G

79 01 78 00 As-Built Drawings 3.1 G

80 01 78 23 SD-10 Operation and Maintenance

81 Data

82 O&M Database 1.3 G

83 Training Plan 3.1.1 G

84 Training Outline 3.1.3 G

85 Training Content 3.1.2 G

86 SD-11 Closeout Submittals

87 Training Video Recording 3.1.4 G

88 Validation of Training Completion 3.1.6 G

89 02 41 00 SD-01 Preconstruction Submittals

90 Demolition Plan 1.2.2 G

91 Deconstruction Plan G

92 Existing Conditions 1.9

93 SD-07 Certificates

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

94 Notification 1.6 G

95 SD-11 Closeout Submittals

96 Receipts 3.3.3

97 03 30 00.00 10 SD-01 Preconstruction Submittals

98 Quality Control Plan 1.6.2 G

99 Laboratory Accreditation 1.6.1

100 Sampling Plan 3.9.5.4 G

101 SD-03 Product Data

102 Recycled Content Products Part 2

103 Cementitious Materials 2.2

104 Vapor Retarder

105 03 30 00.00 10 Vapor Barrier

106 Floor Finish

107 Floor Hardener 2.8

108 Chemical Admixtures 2.4

109 SD-04 Samples

110 Surface Retarder 2.4.5

111 SD-05 Design Data

112 Mixture Proportions 2.1.1 G

113 Lightweight Aggregate Concrete 3.4

114 SD-06 Test Reports

115 Mixture Proportions 2.1.1 G

116 Testing and Inspection for CQC 3.9 G

117 Fly Ash

118 Ground Granulated Blast-Furnace

119 (GGBF) Slag

120 Aggregates 2.3

121 Air Content 3.9.5.1

122 Slump 3.9.5.2

123 Compressive Strength 3.9.5.4

124 Water 2.5

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

125 SD-07 Certificates

126 Contractor Quality Control 1.6

127 personnel

128 Ready-Mix Plant 3.2.1

129 03 30 53 SD-03 Product Data

130 Air-Entraining Admixture 2.2.3.1

131 03 30 53 Accelerating Admixture

132 Water-Reducing or Retarding 2.2.3.2

133 Admixture

134 Curing Materials 2.2.11

135 Expansion Joint Filler Strips, 2.2.6

136 Premolded

137 Joint Sealants - Field Molded 2.2.7

138 Sealants

139 Waterstops 2.4.1

140 Chemical Floor Hardener 2.4.2

141 Batching and Mixing Equipment 3.1.4.3

142 Conveying and Placing Concrete 3.2

143 Formwork 2.2.8

144 Mix Design Data 2.3 G

145 Ready-Mix Concrete 2.3

146 Curing Compound 2.4.3

147 Mechanical Reinforcing Bar 2.2.5

148 Connectors

149 SD-06 Test Reports

150 Aggregates 2.2.2

151 Concrete Mixture Proportions 2.1.3 G

152 Measurement of Floor Tolerances 3.3.3.2

153 Compressive Strength Testing 3.9.3 G

154 Slump 3.9.3 G

155 Air Content 3.9.3

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

156 Water 2.2.4

157 03 30 53 SD-07 Certificates

158 Cementitious Materials 2.2.1

159 Pozzolan

160 Aggregates 2.2.2

161 Delivery Tickets 2.3

162 SD-08 Manufacturer’s Instructions

163 Chemical Floor Hardener 2.4.2

164 Curing Compound 2.4.3

165 04 20 00 SD-02 Shop Drawings

166 Cut CMU 3.3.2.1 G

167 Detail Drawings 3.4.1.1 G

168 SD-03 Product Data

169 Cement 2.2.2.2.1 G

170 Clay Masonry Expansion-Joint 2.6.6 G

171 Materials

172 SD-05 Design Data

173 Masonry Compressive Strength 2.1.2 G

174 Bracing Calculations 3.2.5 G

175 SD-06 Test Reports

176 Single-Wythe Masonry Wall 3.6.1.1

177 Water Penetration Test

178 SD-07 Certificates

179 Concrete Masonry Units (CMU) 2.2.2.2

180 Admixtures for Masonry Mortar 2.4.1.3

181 Admixtures for Grout 2.4.2.2

183 04 20 00 Anchors, Ties, and Bar 2.6.2

184 Positioners

185 Joint Reinforcement 2.6.3

186 05 52 00 SD-02 Shop Drawings

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

187 Fabrication Drawings 1.2.1 G

188 Iron and Steel Hardware 3.2 G

189 Steel Shapes, Plates, Bars and 3.2

190 Strips

191 SD-03 Product Data

192 Cold-Finished Steel Bars 2.2.2 G

193 Hot-Rolled Carbon Steel Bars 2.2.1 G

194 Cold-Drawn Steel Tubing G

195 Protective Coating 2.1.3 G

196 Anchorage and Fastening 1.2.1 G

197 Systems

198 SD-07 Certificates

199 Welding Procedures 1.4.1 G

200 Welder Qualification 1.4.2 G

201 SD-08 Manufacturer’s Instructions

202 Installation Instructions 3.2

203 07 84 00 SD-02 Shop Drawings

204 Firestopping System 2.1 G

205 SD-03 Product Data

206 Firestopping Materials 2.2 G

207 SD-06 Test Reports

208 Inspection 3.3 G

209 07 84 00 SD-07 Certificates

210 Inspector Qualifications

211 Firestopping Materials 2.2

212 Installer Qualifications 1.5.1 G

213 08 33 23 SD-02 Shop Drawings

214 Overhead Coiling Doors 2.2.1 G

215 Counterbalancing Mechanism 2.2.3

216 Manual Door Operators 2.2.4

217 Electric Door Operators 2.2.5

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

218 Bottom Bars 2.2.1.2

219 Guides 2.1.1.1

220 Mounting Brackets 2.2.3.1

221 Hood 2.2.2.2

222 Installation Drawings 2.1.1.1

223 SD-03 Product Data

224 Overhead Coiling Doors 2.2.1

225 Hardware 2.2.2

226 Counterbalancing Mechanism 2.2.3

227 Manual Door Operators 2.2.4

228 Electric Door Operators 2.2.5

229 SD-05 Design Data

230 Overhead Coiling Doors 2.2.1 G

231 Hardware 2.2.2 G

232 Counterbalancing Mechanism 2.2.3

233 Manual Door Operators 2.2.4 G

234 Electric Door Operators 2.2.5 G

235 08 33 23 SD-10 Operation and Maintenance

236 Data

237 Operation and Maintenance 1.3.2 G

238 Manuals

239 SD-11 Closeout Submittals

240 Warranty 1.3.1 G

241 08 71 00 SD-02 Shop Drawings

242 Manufacturer's Detail Drawings 1.3 G

243 Verification of Existing Conditions 1.3 G

244 Hardware Schedule 1.5 G

245 Keying System 2.2.7 G

246 SD-03 Product Data

247 Hardware Items 2.2 G

248 SD-08 Manufacturer’s Instructions

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

249 Installation 3.1

250 SD-10 Operation and Maintenance

251 Data

252 Hardware Schedule 1.5 G

253 SD-11 Closeout Submittals

254 Key Bitting 1.6.1

255 09 22 00 SD-02 Shop Drawings

256 Metal Support Systems 2.1 G

257 SD-03 Product Data

258 Metal Support Systems 2.1

259 09 29 00 SD-03 Product Data

261 09 29 00 Water-Resistant Gypsum Backing 2.1.3

262 Board

263 Accessories 2.1.6

264 Gypsum Board 2.1.1

265 SD-07 Certificates

266 Asbestos Free Materials 2.1 G

267 10 44 16 SD-02 Shop Drawings

268 Fire Extinguishers 2.1.1

269 Accessories Part 2

270 Cabinets Part 2

271 Wall Brackets

272 Schedule 1.5

273 SD-03 Product Data

274 Fire Extinguishers 2.1.1

275 Accessories Part 2

276 Cabinets Part 2

277 Wall Brackets

278 Replacement Parts List 3.2.1

279 SD-04 Samples

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

280 Equipment Samples 1.3.1

281 SD-07 Certificates

282 Fire Extinguishers Certifications 2.1.1

283 Manufacturer's Warranty with 1.4

284 Inspection Tag

285 21 13 13 SD-01 Preconstruction Submittals

287 21 13 13 Qualified Fire Protection Engineer 1.2.3 G

288 (QFPE)

289 Sprinkler System Designer 1.4.2.1 G

290 Sprinkler System Installer 1.4.2.2 G

291 SD-02 Shop Drawings

292 Shop Drawing G

293 SD-03 Product Data

294 Pipe G

295 Fittings 2.2.1.2 G

296 Valves 2.2.4 G

297 Alarm Valves G

298 Relief Valves 2.5.5 G

299 Sprinklers 2.4 G

300 Pipe Hangers and Supports 2.2.3 G

301 Sprinkler Alarm Switch G

302 Valve Supervisory (Tamper) G

303 Switch

304 Fire Department Connection G

305 Backflow Prevention Assembly 2.3 G

306 Air Vent 2.5.6 G

307 Hose Valve 2.3.1 G

308 Nameplates 2.1.2 G

309 SD-05 Design Data

310 Hydraulic Calculations 1.2.1.2 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

311 SD-06 Test Reports

312 Test Procedures 3.6.1 G

313 21 13 13 SD-07 Certificates

314 Verification of Compliant 3.6.2.1 G

315 Installation

316 Request for Government Final 3.6.2.2 G

317 Test

318 SD-10 Operation and Maintenance

319 Data

320 Operating and Maintenance 3.8 G

321 (O&M) Instructions

322 Spare Parts 1.6 G

323 SD-11 Closeout Submittals

324 As-built drawings 3.8

325 22 00 00 SD-02 Shop Drawings

326 Plumbing System 3.8.1 G

327 SD-03 Product Data

328 Fixtures 2.4

329 Flush Valve Water Closets 2.4.2

330 WaterSense Label for Flush S

331 Valve Water Closet

332 Flush Valve Urinals 2.4.3

333 Wall Hung Lavatories 2.4.5

334 Countertop Lavatories 2.4.6

335 Kitchen Sinks 2.4.7

336 Service Sinks 2.4.8

337 Drinking-Water Coolers 2.4.9 G

338 Water Heaters 2.8 G

339 22 00 00 Pumps G

340 Backflow Prevention Assemblies 3.8.1.1 G

341 Shower Faucets 2.6.2 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

342 Welding 1.5.1

343 Vibration-Absorbing Features 3.4 G

344 Plumbing System 3.8.1

345 SD-06 Test Reports

346 Tests, Flushing and Disinfection 3.8

347 Test of Backflow Prevention 3.8.1.1 G

348 Assemblies

349 SD-07 Certificates

350 Materials and Equipment 1.3

351 Bolts 2.1.1

352 SD-10 Operation and Maintenance

353 Data

354 Plumbing System 3.8.1 G

355 22 05 48.00 20 SD-02 Shop Drawings

356 Inertia Bases 2.7

357 Machinery Bases 2.6

358 Platforms 2.6

359 Rails 2.6

360 Saddles 2.6

361 SD-03 Product Data

362 Isolators 2.3

363 Flexible Connectors 2.8

364 Flexible Duct Connectors 2.9

365 22 05 48.00 20 Pipe Guides 2.11

366 Seismic Snubbers 2.10

367 Vertical Stops 3.1.3

368 Thrust Restraints 2.12

369 Inertia Bases 2.7

370 Machinery Bases 2.6

371 Machinery Foundations and 3.1.13

372 Subbases

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

373 Platforms 2.6

374 Rails 2.6

375 Saddles 2.6

376 Machinery Manufacturer's Sound 1.4.2

377 Data

378 SD-05 Design Data

379 Inertia Bases 2.7

380 Machinery Bases 2.6

381 Platforms 2.6

382 Rails 2.6

383 Saddles 2.6

384 Machinery 1.4.3

385 Machinery over 136 Kilograms 1.4.4

386 SD-06 Test Reports

387 Seismic Snubbers 2.10

388 Equipment Vibration Tests 3.2.3.1

389 Equipment Sound Level Tests 3.2.3.2

390 Protected Spring Isolators 2.4

391 22 05 48.00 20 SD-08 Manufacturer’s Instructions

392 Vibration and Noise Isolation 3.1.1

393 Components

394 Seismic Protection Components 2.13

395 23 05 93 SD-01 Preconstruction Submittals

396 Records of Existing Conditions G

397 SD-02 Shop Drawings

398 TAB Schematic Drawings and G

399 Report Forms

400 SD-03 Product Data

401 Equipment and Performance 1.3 G

402 Data

403 TAB Related HVAC Submittals G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

404 SD-06 Test Reports

405 Completed Pre-Final DALT 3.3.5 G

406 Report

407 Certified Final DALT Report 3.3.8 G

408 SD-07 Certificates

409 Independent TAB Agency and 1.5.1 G

410 Personnel Qualifications

411 DALT and TAB Submittal and G

412 Work Schedule

413 TAB Pre-Field Engineering G

414 Report

415 23 07 00 SD-02 Shop Drawings

416 MICA Plates 3.2.2.4 G

417 23 07 00 Pipe Insulation Systems 2.3

418 Pipe Insulation Systems 3.2

419 Duct Insulation Systems 3.3

420 Equipment Insulation Systems 3.4

421 Recycled content for insulation 2.3.1 S

422 materials

423 SD-03 Product Data

424 Pipe Insulation Systems 2.3 G

425 Pipe Insulation Systems 3.2 G

426 Duct Insulation Systems 3.3 G

427 Equipment Insulation Systems 3.4 G

428 SD-04 Samples

429 Thermal Insulation 2.2.1.3 G

430 Display Samples 3.1.1 G

431 SD-07 Certificates

432 Indoor air quality for adhesives 2.2.1 S

433 SD-08 Manufacturer’s Instructions

434 Pipe Insulation Systems 2.3 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

435 Pipe Insulation Systems 3.2 G

436 Duct Insulation Systems 3.3 G

437 Equipment Insulation Systems 3.4 G

438 23 09 00 SD-02 Shop Drawings

439 DDC Contractor Design Drawings G

440 Draft As-Built Drawings G

441 Final As-Built Drawings G

442 SD-03 Product Data

443 23 09 00 Programming Software G

444 Controller Application Programs G

445 Configuration Software G

446 Controller Configuration Settings G

447 Manufacturer's Product Data G

448 XIF files G

449 Draft LNS Database G

450 Final LNS Database G

451 LNS Plug-ins G

452 SD-06 Test Reports

453 Existing Conditions Report

454 Pre-Construction Quality Control G

455 (QC) Checklist

456 Post-Construction Quality Control G

457 (QC) Checklist

458 Start-Up Testing Report G

459 PVT Procedures G

460 PVT Report G

461 SD-10 Operation and Maintenance

462 Data

463 Operation and Maintenance G

464 (O&M) Instructions

465 Training Documentation G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

466 SD-11 Closeout Submittals

467 Enclosure Keys G

468 Password Summary Report G

469 23 09 00 Closeout Quality Control (QC) G

470 Checklist

471 26 08 00 SD-06 Test Reports

472 Acceptance tests and inspections 3.1 G

473 SD-07 Certificates

474 Qualifications 1.4.1 G

475 Acceptance test and inspections 1.4.3 G

476 procedure

477 26 12 19.10 SD-02 Shop Drawings

478 Pad-mounted Transformer 1.5.1 G

479 Drawings

480 SD-03 Product Data

481 Pad-mounted Transformers 2.2 G

482 SD-06 Test Reports

483 Acceptance Checks and Tests 3.6.1 G

484 SD-07 Certificates

485 Transformer Efficiencies 2.2.2.1 G

486 SD-09 Manufacturer’s Field

487 Reports

488 Transformer Test Schedule 2.7.1 G

489 Design Tests 2.7.2 G

490 Routine and Other Tests 2.7.3 G

491 SD-10 Operation and Maintenance

492 Data

493 Transformer(s) 1.6.1 G

494 26 20 00 SD-02 Shop Drawings

495 26 20 00 Panelboards 2.14 G

496 Cable Trays 2.4 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

497 Wireways 2.27 G

498 Marking Strips 3.1.9.1 G

499 SD-03 Product Data

500 Receptacles 2.13 G

501 Circuit Breakers 2.14.3 G

502 Switches 2.11 G

503 Enclosed Circuit Breakers 2.15 G

504 Motor Controllers 2.18 G

505 Manual Motor Starters 2.19 G

506 Grounding Busbar 2.22.3 G

507 Surge Protective Devices 2.28 G

508 SD-06 Test Reports

509 600-volt Wiring Test 3.5.2 G

510 Grounding System Test 3.5.3 G

511 SD-07 Certificates

512 Fuses 2.12 G

513 SD-10 Operation and Maintenance

514 Data

515 Electrical Systems 1.5.1 G

516 26 27 14.00 20 SD-02 Shop Drawings

517 Installation Drawings 1.4.1 G

518 SD-03 Product Data

519 Electricity meters 2.1.3 G

520 Current transformer 2.1.2 G

521 26 27 14.00 20 communications 2.2 G

522 Configuration Software 3.1.2 G

523 SD-06 Test Reports

524 Acceptance checks and tests 3.2.1 G

525 System functional verification 3.2.2 G

526 Building meter installation sheet, 3.2.1 G

527 per building

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

528 Completed meter installation 3.2.1 G

529 schedule

530 Completed meter data schedule 3.2.1 G

531 Meter configuration template 2.1.1 G

532 Meter configuration report 3.2.1 G

533 SD-10 Operation and Maintenance

534 Data

535 Electricity Meters and 1.5.1 G

536 Accessories

537 SD-11 Closeout Submittals

538 System functional verification 3.2.2 G

539 26 51 00 SD-02 Shop Drawings

540 Luminaire Drawings 1.5.1 G

541 Occupancy/Vacancy Sensor 1.5.7 G

542 Coverage Layout

543 Lighting Control System One-Line 1.7.2 G

544 Diagram

545 SD-03 Product Data

546 Luminaires 2.2 G

547 26 51 00 Light Sources 2.3 G

548 LED Drivers 2.4 G

549 Luminaire Warranty 1.6.1 G

550 Lighting Controls Warranty 1.6.2 G

551 Local Area Controller 2.5.1.1.1 G

552 Lighting Relay Panel G

553 Lighting Control Panel G

554 Switches 2.5.2.1 G

555 Occupancy/Vacancy Sensors 2.5.2.3 G

556 Photosensors 2.5.2.4 G

557 Power Packs 2.5.2.3.4 G

558 Exit Signs 2.6.1 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

559 Emergency Drivers 2.6.2 G

560 SD-06 Test Reports

561 IES LM-79 Test Report 1.5.2 G

562 IES LM-80 Test Report 1.5.3 G

563 IES TM-21 Test Report 1.5.4 G

564 IES TM-30 Test Report 1.5.5 G

565 Occupancy/Vacancy Sensor 3.2.1.1 G

566 Verification Test

567 Photosensor Verification Test 3.2.1.1 G

568 SD-07 Certificates

569 LED Driver and Dimming Switch 1.5.6 G

570 Compatibility Certificate

571 SD-10 Operation and Maintenance

572 Data

573 26 51 00 Lighting System 1.7.1 G

574 Lighting Control System 1.7.2 G

575 Maintenance Staff Training Plan 3.3.1.1 G

576 26 52 00.00 40 SD-02 Shop Drawings

577 Central Emergency Lighting G

578 Systems

579 SD-03 Product Data

580 Material, Equipment, and Fixture 1.2.1 G

581 Lists

582 Sample Warranty 1.2.1 G

583 Emergency Lighting Egress Units 2.2.1 G

584 Emergency Fluorescent Lighting G

585 Central Emergency Lighting G

586 Systems

587 Accessories G

588 SD-06 Test Reports

589 System Operational Tests 3.2 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

590 SD-07 Certificates

591 Certificates of Conformance 1.2.1

592 SD-11 Closeout Submittals

593 Warranty 3.3

594 27 10 00 SD-02 Shop Drawings

595 Telecommunications drawings 1.6.1.1 G

596 Telecommunications Space 1.6.1.2 G

597 Drawings

598 SD-03 Product Data

599 27 10 00 Telecommunications cabling 2.3 G

600 Patch panels 2.4.5 G

601 Telecommunications 2.5 G

602 outlet/connector assemblies

603 Equipment support frame 2.4.2 G

604 Connector blocks 2.4.3 G

605 SD-06 Test Reports

606 Telecommunications cabling 3.5.1 G

607 testing

608 SD-07 Certificates

609 Telecommunications Contractor 1.6.2.1 G

610 Key Personnel 1.6.2.2 G

611 Manufacturer Qualifications 1.6.2.3 G

612 Test plan 1.6.3 G

613 SD-09 Manufacturer’s Field

614 Reports

615 Factory reel tests 2.10.1 G

616 SD-10 Operation and Maintenance

617 Data

618 Telecommunications cabling and 1.10.1 G

619 pathway system

620 SD-11 Closeout Submittals

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

621 Record Documentation 1.10.2 G

622 28 31 76 SD-01 Preconstruction Submittals

623 Qualified Fire Protection Engineer 1.3.2 G

624 (QFPE)

625 28 31 76 Fire alarm system designer 1.9.2.1 G

626 Supervisor 1.9.2.2 G

627 Technician 1.9.2.3 G

628 Installer 1.9.2.4 G

629 Test Technician 1.9.2.5 G

630 Fire Alarm System Site-Specific 1.7 G

631 Software Acknowledgement

632 SD-02 Shop Drawings

633 Nameplates 1.9.1.3 G

634 Instructions 2.2.4 G

635 Wiring Diagrams 1.9.1.4 G

636 System Layout 1.9.1.5 G

637 Notification Appliances 1.9.1.6 G

638 Initiating devices 1.9.1.7 G

639 Amplifiers 1.9.1.8 G

640 Battery Power 1.9.1.9 G

641 Voltage Drop Calculations 1.9.1.10 G

642 SD-03 Product Data

643 Fire Alarm and Mass Notification 2.3 G

644 Control Unit (FMCU)

645 Local Operating Console (LOC) 1.4.4 G

646 Amplifiers 1.9.1.8 G

647 Tone Generators 2.5 G

648 Digitalized voice generators 2.5 G

649 LCD Annunciator 2.6.1 G

650 Manual Stations 2.7 G

651 28 31 76 Smoke Detectors 2.8 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

652 Duct Smoke Detectors 2.8.2 G

653 Heat Detectors G

654 Addressable Interface Devices 2.9 G

655 Addressable Control Modules 2.10 G

656 Isolation Modules 2.11 G

657 Notification Appliances 1.9.1.6 G

658 Textual Display Sign Control 2.12.3 G

659 Panel

660 Textual Display Signs 2.12.3 G

661 Batteries 2.14.1 G

662 Battery Chargers 2.14.2 G

663 Supplemental Notification 2.14.1.1 G

664 Appliance Circuit Panels

665 Auxiliary Power Supply Panels 2.14.1.1 G

666 Surge Protective Devices 2.15 G

667 Alarm Wiring 2.15 G

668 Back Boxes and Conduit 3.3.4 G

669 Terminal Cabinets 3.3.2 G

670 Digital Alarm Communicator G

671 Transmitter (DACT)

672 Automatic Fire Alarm 2.18 G

673 Transmitters

674 Radio Transmitter and Interface 2.18.1 G

675 Panels

676 Mass Notification Transceiver 2.17.1 G

677 28 31 76 Electromagnetic Door Holders G

678 Environmental Enclosures or 2.19 G

679 Guards

680 Document Storage Cabinet 3.12.3 G

681 SD-06 Test Reports

682 Test Procedures 3.8.1 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

683 SD-07 Certificates

684 Verification of Compliant 3.8.2.1 G

685 Installation

686 Request for Government Final 3.8.2.2 G

687 Test

688 SD-10 Operation and Maintenance

689 Data

690 Operation and Maintenance 3.10 G

691 (O&M) Instructions

692 Instruction of Government 3.11 G

693 Employees

694 SD-11 Closeout Submittals

695 As-Built Drawings 1.9.1.13

696 Spare Parts 1.11.1

697 31 23 00.00 20 SD-06 Test Reports

698 Fill and backfill 3.12.2.1

699 Select material 3.12.2.2

700 Porous fill 3.12.2.3

701 Density tests 3.12.2.4

702 Moisture Content Tests 3.12.2.5

703 33 71 02 SD-02 Shop Drawings

704 Precast Underground Structures 1.5.1 G

705 SD-03 Product Data

706 Medium Voltage Cable 2.5 G

707 Medium Voltage Cable Joints 2.7 G

708 Medium Voltage Cable 2.6 G

709 Terminations

710 Precast Concrete Structures G

711 Sealing Material

712 Pulling-In Irons 3.5.3

713 Manhole Frames and Covers 2.13.1 G

NEEDED BY

MATERIAL

NEEDED BY

A C T I O N

C O D E

DATE OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

CONTRACT NO.

CONTRACTOR

A C T I V I T Y

N o

T R A N S M I T T T A L

N o

S P E C S E C T

DESCRIPTION ITEM SUBMITTED

P A R A G R A P H

C L A R I F I C A T I O N

G O

A E

R E V W R

CONTRACTOR: SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APPR

AUTH

REMARKS

TITLE AND LOCATION

EFFICIENCY - Convert T-169 into Laundry & FMO

I T E M

SUBMITTAL REGISTER

714 Handhole Frames and Covers 2.13.2 G

715 Composite/Fiberglass Handholes 2.13.4 G

716 Cable Supports 2.14 G

717 SD-06 Test Reports

718 Medium Voltage Cable 2.17.2 G

719 Qualification and Production Tests

720 Field Acceptance Checks and 3.18.1 G

721 Tests

722 Arc-proofing Test 2.17.1 G

723 Cable Installation Plan and 3.3 G

724 Procedure

725 SD-07 Certificates

726 Cable splicer/terminator G

727 Cable Installer Qualifications 1.5.2 G